Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Maintenance of Time and Frequency in the DSN Using the Global Positioning System

The Deep Space Network must maintain time and frequency within specified limits in order to accurately track the spacecraft engaged in deep space exploration. The DSN has three tracking complexes, located approximately equidistantly around the Earth. Various methods are used to coordinate the clocks among the three complexes. These methods include Loran-C, TV Line 10, very long baseline interferometry (VLBI), and the Global Positioning System (GPS). The GPS is becoming increasingly important because of the accuracy, precision, and rapid availability of the data; GPS receivers have been installed at each of the DSN complexes and are used to obtain daily time offsets between the master clock at each site and UTC(USNO/NBS). Calculations are made to obtain frequency offsets and Allan variances. These data are analyzed and used to monitor the performance of the hydrogen masers that provide the reference frequencies for the DSN frequency and timing system (DFT). A brief history of the GPS timing receivers in the DSN, a description of the data and information flow, data on the performance of the DSN master clocks and GPS measurement system, and a description of hydrogen maser frequency steering using these data are presented.

Clements, P. A.↗

Crew activities, science, and hazards of manned missions to Mars

The crew scientific and nonscientific activities that will occur at each stage of a mission to Mars are examined. Crew activities during the interplanetary flight phase will include simulations, maintenance and monitoring, communications, upgrading procedures and operations, solar activity monitoring, cross-training and sharpening of skills, physical conditioning, and free-time activities. Scientific activities will address human physiology, human psychology, sociology, astronomy, space environment effects, manufacturing, and space agriculture. Crew activities on the Martian surface will include exploration, construction, manufacturing, food production, maintenance and training, and free time. Studies of Martian geology and atmosphere, of the life forms that may exist there, and of the Martian moons will occur on the planet's surface. Crew activities and scientific studies that will occur in Mars orbit, and the hazards relevant to each stage of the mission, are also addressed.

Clark, Benton C.↗

The effect of low light intensity on the maintenance of circadian synchrony in human subjects

The light-intensity threshold for humans is not known. In past space flights owing to power restrictions, light intensities have been minimal and reported to be as low as 15 ft. c. This study was conducted to determine whether the light (L)/dark (D) environment of 16L : 8D at the relatively low light intensity of 15 ft. c. was adequate for the maintenance of circadian synchrony in human subjects. Six healthy male subjects aged 20-23 years were exposed for 21 days to a 16L : 8D photoperiod. During the first 7 days the light intensity was 100 ft. c.; it was reduced to 15 ft. c. during the next 7 days and increased again to 100 ft. c. during the last 7 days of the study. Rectal temperature (RT) and heart rate (HR) were recorded continuously throughout the 21 days of the study. In the 100 ft. c. 16L : 8D the RT and HR rhythms remained stable and circadian throughout. When the light intensity was decreased to 15 ft. c. the periodicity of the HR rhythm was significantly decreased and this rhythm showed marked instability. In contrast the period of the RT rhythm did not change but a consistent phase delay occurred due to a delay in the lights-on associated rise in RT. These divergent effects on these two rhythms in internal desynchronization and performance decrement during the 15 ft. c. exposure. The data emphasize the need for establishing accurately the minimal lighting requirements for the maintenance of circadian rhythms of humans in confined environments.

Circadian Rhythm/physiology/radiation effects↗

Smallsat 2024 - Starling Cubesat Swarm Technology Demonstration Flight Results

The Starling swarm of four 6U CubeSats launched in July 2023 to test four key technologies to enable future swarm missions: 1) Mobile Ad-Hoc Networking (MANET) over a crosslink radio network 2) Autonomous onboard decision-making for operations 3) Optical-based absolute and relative navigation 4) Autonomous maneuver planning and execution The Starling team implemented the Better Approach to Mobile Ad-hoc Networking (B.A.T.M.A.N.) protocol to automatically manage the crosslink network of four satellites. The B.A.T.M.A.N. protocol uses a decentralized approach to managing a multi-hop mesh network of devices, in this case, a satellite swarm. The four satellites were able to successfully establish a network at multiple data rates and demonstrate file transfer and command issuance between spacecraft over the network. Starling incorporated Distributed Spacecraft Autonomy's (DSA) software to demonstrate onboard decision-making. The DSA software takes L1/L2 band GPS measurements and uses them to estimate the relative Total Electron Count (TEC) in the ionosphere. The onboard software then determines if there are any features of interest and provides that information to the other satellites over the crosslink network. The swarm of satellites then reaches a consensus on the optimal TEC observation strategy and adjusts its measurement collection tactics autonomously. The Starling Formation-Flying Optical Experiment (StarFOX), produced by Stanford's Space Rendezvous Laboratory, uses the onboard star trackers to collect images of the other swarm spacecraft and produce angles-only navigation estimates. This system is envisioned to be valuable in applications in which Global Navigation Satellite Systems (GNSS) are not available, such as in cis-lunar or deep space. StarFOX successfully applied its algorithms to multiple simultaneous spacecraft targets using the star tracker imagery. Finally, Starling used Emergent Space's Cluster Flight Application (CFA) software suite for the Reconfiguration and Orbit Maintenance Experiments Onboard (ROMEO) demonstration of autonomously planning and executing propulsive maneuvers. Large swarms will need to be able to maintain formation requirements with minimal operator involvement, especially as the size of the swarm scales up. Results from the ROMEO experiment are presented. Starling is funded by the Small Spacecraft Technology (SST) program out of NASA's Space Technology Mission Directorate (STMD).

distributed systems↗

The solid polymer electrolyte fuel cell for the Space Shuttle Orbiter.

Recent developments in the General Electric solid polymer electrolyte fuel cell have demonstrated the capability of 2000 hours of maintenance-free life and the potential for 5000 to 10,000 hours of useful life with invariant performance. Hardware developments for a 5 kW fuel cell module directed toward NASA's Space Shuttle Orbiter application have demonstrated the capability of operation on propulsion-grade reactants, operation with simple stop/start procedures, and with a specific weight of 25 lb/kW for a complete module.

Chapman, L. E.↗

Intelligent diagnostics systems

Intelligent systems have been applied to today's problems and could also be applied to space operations integrity. One of these systems is the XMAN tool designed for 'troubleshooting' jet engines. XMAN is the eXpert MAiNtenance tool developed to be an expert information analysis tool which stores trending and diagnostic data on Air Force engines. XMAN operates with a 'network topology' which follows a flow chart containing engine management information reports required by the governments technical order procedures. With XMAN technology, the user is able to identify engine problems by presenting the assertions of the fault isolation logic and attempting to satisfy individual assertions by referring to the databases created by an engine monitoring system. The troubleshooting process requires interaction between the technician and the computer to acquire new evidence form auxiliary maintenance tests corroboration of analytical results to accurately diagnose equipment malfunctions. This same technology will be required for systems which are functioning in space either with an onboard crew, or with an unmanned system. The technology and lessons learned developing this technology while suggesting definite applications for its use with developing space systems are addressed.

Mcquiston, Barbara M.↗

Manned maneuvering unit - A space platform support system

The assembly and evaluation of large space platforms in low earth orbit will become practical in the Shuttle era. Extravehicular crewmembers, equipped with manned maneuvering units (MMUs), will play a vital role in the construction and checkout of these platforms. The MMU is a propulsive backpack with mobility extending the crew's visual, mental, and manipulative capabilities beyond the cabin to on-the-spot assembly and maintenance operations. Previous MMU experience is reviewed, Shuttle MMU design features related to space platform support are described, and the use of the MMU for specific construction and assembly tasks is illustrated.

Whitsett, C. E., Jr.↗

Solar dynamic power system development for Space Station Freedom

The development of a solar dynamic electric power generation system as part of the Space Station Freedom Program is documented. The solar dynamic power system includes a solar concentrator, which collects sunlight; a receiver, which accepts and stores the concentrated solar energy and transfers this energy to a gas; a Brayton turbine, alternator, and compressor unit, which generates electric power; and a radiator, which rejects waste heat. Solar dynamic systems have greater efficiency and lower maintenance costs than photovoltaic systems and are being considered for future growth of Space Station Freedom. Solar dynamic development managed by the NASA Lewis Research Center from 1986 to Feb. 1991 is covered. It summarizes technology and hardware development, describes 'lessons learned', and, through an extensive bibliography, serves as a source list of documents that provide details of the design and analytic results achieved. It was prepared by the staff of the Solar Dynamic Power System Branch at the NASA Lewis Research Center in Cleveland, Ohio. The report includes results from the prime contractor as well as from in-house efforts, university grants, and other contracts. Also included are the writers' opinions on the best way to proceed technically and programmatically with solar dynamic efforts in the future, on the basis of their experiences in this program.

Source record↗

Components Refurbishment and Chemical Analysis Facility Hot Spot 1 Year 2 Annual Performance Monitoring Report

The Performance Monitoring Report presents the Year 2 operations, maintenance, and monitoring (OM&M) activities for the hydraulic containment system (HCS) Interim Measures (IM) at the Components Refurbishment and Chemical Analysis (CRCA) Facility located at John F. Kennedy Space Center (KSC), Florida. Year 2 operations extended from September 2020 to August 2021 and included: operation, maintenance and monitoring of the HCS; performance monitoring through collection of groundwater samples; and sub-slab gas and ambient air sampling. The existing hydrogeologic model was also updated. The system is performing as designed, and groundwater data demonstrate contaminant reduction.

CRCA↗

Extending ISS Life Beyond 2030

This paper presents an overview of the International Space Station life extension project, focusing on the analytical approach used to assess its primary structure. Also addressed are life extension approaches for other affected sub-systems, including secondary structure, materials, Environmental Control and Life Support Systems (ECLSS), Electrical Power Systems (EPS), and Logistics and Maintenance (L&M). The United States On-orbit Segment (USOS) of the International Space Station (ISS) was initially designed for a 15-year on-orbit life, but with the realization of its continued importance, efforts were made to extend its operations through 2030. The paper discusses the various analyses conducted, including future operations planning, load simulation, material degradation studies, thermal analyses, and fracture analyses. The results demonstrate the feasibility and achievability of extending the ISS's life, ensuring its on-going role as a hub for scientific research, international cooperation, and educational endeavors. With the life extension process in place, continuous operations beyond 2030 are possible to maintain an uninterrupted human presence in Low Earth Orbit, facilitating the testing of new technologies, and allow for a seamless transition to new commercially owned and operated destinations.

design life↗

The case for Mars III: Strategies for exploration - General interest and overview

Papers on the possibilities for manned Mars missions are presented, covering topics such as space policy, space education and Mars exploration, economic issues, international cooperation, life support, biomedical factors, human factors, the Mars Rover Sample Return Mission, and possible unmanned precursor missions to Mars. Other topics include the scientific objectives for human exploration of Mars, mission strategies, possible transportation systems for manned Mars flight, advanced propulsion techniques, and the utilization of Mars resources. Additional subjects include the construction and maintenance of a Martian base, possible systems for mobility on the Martian surface, space power systems, and the use of the Space Station for a Mars mission.

Stoker, Carol R.↗

From Lunar Regolith to Fabricated Parts: Technology Developments and the Utilization of Moon Dirt

The U.S. Space Exploration Policy has as a cornerstone the establishment of an outpost on the moon. This lunar outpost wil1 eventually provide the necessary planning, technology development, testbed, and training for manned missions in the future beyond the Moon. As part of the overall activity, the National Aeronautics and Space Administration (NASA) is investigating how the in situ resources can be utilized to improve mission success by reducing up-mass, improving safety, reducing risk, and bringing down costs for the overall mission. Marshall Space Flight Center (MSFC), along with other NASA centers, is supporting this endeavor by exploring how lunar regolith can be mined for uses such as construction, life support, propulsion, power, and fabrication. An infrastructure capable of fabrication and nondestructive evaluation will be needed to support habitat structure development and maintenance, tools and mechanical parts fabrication, as well as repair and replacement of space-mission hardware such as life-support items, vehicle components, and crew systems, This infrastructure will utilize the technologies being developed under the In Situ Fabrication and Repair (ISFR) element, which is working in conjunction with the technologies being developed under the In Situ Resources Utilization (ISRU) element, to live off the land. The ISFR Element supports the Space Exploration Initiative by reducing downtime due to failed components; decreasing risk to crew by recovering quickly from degraded operation of equipment; improving system functionality with advanced geometry capabilities; and enhancing mission safety by reducing assembly part counts of original designs where possible. This paper addresses the need and plan for understanding the properties of the lunar regolith to determine the applicability of using this material in a fabrication process. This effort includes the development of high fidelity simulants that will be used in fabrication processes on the ground to drive down risk and increase the Technology Readiness Level (TRL) prior to implementing this capability on the moon. Also discussed in this paper is the on-going research using Electron Beam Melting (EBM) technology as a possible solution to manufacturing parts and spares on the Moon's surface.

McLemore, C. A.↗

Socially Driven HVAC Optimization Federal Building and US Courthouse Phoenix, Arizona

Under many circumstances in facilities management, keeping occupants comfortable and saving energy are diametrically opposed. To stay cool in summer and warm in winter requires energy to maintain indoor temperatures. If energy is saved by allowing indoor temperatures to get warmer in the summer or colder in winter, occupants’ comfort levels decrease. There is great potential to reduce costs and maintain occupant comfort if a system existed that could break this diametric opposition. The comfort of building occupants in today’s facilities is controlled by maintaining a given space temperature through the use of a thermostat. These devices operate in a very simple manner in which they are set to maintain a certain constant space temperature range. If the occupant is too hot or cold, he or she writes a work order for facility maintenance staff to adjust the thermostat to a new constant temperature range. This feedback cycle is repeated as needed to avoid generating complaints of too hot/cold from the occupants. This system has two areas in which it can be improved. First, there is the labor cost associated with a facilities maintenance person having to respond to each request when an occupant is uncomfortable. Person-hours are spent receiving the work order and adjusting space thermostats to a level that, hopefully, will allow the occupant to be comfortable. Second, the space temperature is maintained within a constant range, with no effort being made to finetune the space temperature to a setting that conserves energy while maintaining occupant comfort. Occupant comfort is based upon many more factors than just the space temperature. When other factors are taken into account, there is potential to save energy while maintaining that comfort level.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of an interchangeable end effector mechanism for the Ranger telerobotic vehicle

The Ranger program at the Space Systems Laboratory (SSL) at the University of Maryland is a demonstration of an extremely low cost, space flight experiment. The Ranger vehicle is designed to perform teleoperated spacecraft maintenance. Completing the various tasks included in spacecraft maintenance requires several specific tools. This paper describes the Ranger interchangeable end effector mechanism (IEEM). Its design allows Ranger to change end effectors to utilize the appropriate tool for the various tasks. The Ranger vehicle is designed with four manipulators. A seven degree-of-freedom (DOF) grappling manipulator securely attaches the vehicle to the work site. A 6 DOF camera positioning manipulator allows the operator to position a stereo pair of video cameras for visual feedback. The two remaining manipulators are the 7 DOF dexterous arms. They are the primary means by which Ranger accomplishes its required tasks. At the end of each of these dexterous manipulators is an IEEM. This paper begins with a brief overview of the Space Systems Laboratory and the Ranger program. The constraints leading to the requirements for an IEEM are described. The following section then describes the design strategies and the down selection process resulting in two candidate designs, taper and pneumatic connector type. Next, the leading candidate design is described in detail, followed by a preliminary discussion of failure modes and planned testing. The paper concludes with a brief review and a section discussing future work.

Cohen, Robert↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

LST refurbishment and support

The Large Space Telescope (LST) is a Space Shuttle payload with relatively high reliability, but it will require maintenance support in order to meet the operational life requirement of 15 years. It was determined that it would be efficient and economical to support LST by having four limited inflight maintenance (IFM) missions and three ground refurbishments. The IFM missions would include replacement of the four items with a limited operating life. The LST program would provide for a ground refurbishment every four years at a central payload depot. It was recommended that the depot should be located at MSFC and be manned by a permanent party which would be augmented on a temporary basis during LST refurbishments by engineering personnel from the LST contractors. Required spare parts would be acquired incrementally for the depot based on maximum refurbishment of repairable items.

Henschke, J.↗

A new method for hardware/software integration of strategic systems - Case study of the Space Shuttle

An advanced system integrated self-test has been developed to provide dynamic checkout of all critical subsystems and hardware/software interfaces of the Space Shuttle during pre-launch ground testing. The system modifies hardware sensor data to represent a real flight scenario. This modified data then drives the flight software. The system was sucessfully utilized for three phases of Space Shuttle testing, and will be expanded for use as a maintenance tool.

Haque, S. I.↗