The three-dimensional structure of NeoB: An aminotransferase involved in the biosynthesis of neomycin: Structure of NeoB
Abstract not provided
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided
Since 1980, the Agency is responsible by law for the safe management of all radioactive waste produced in Belgium, including decommissioning wastes. By the law of 11 January 1991 and the implementing Royal Decree of 16/10/1991, ONDRAF/NIRAS has been entrusted with a mission concerning the decommissioning of nuclear facilities. This mission involves the collection and assessment of data concerning decommissioning forecasts for nuclear facilities, the approval of facilities' decommissioning programmes, the establishment - in consultation with operators - of financing conditions for decommissioning, as well as the implementation of these programmes on request by the operator, or in the case of its failure to do so. This is the case for the company Best Medical Belgium SA located at Fleurus (MDS Nordion SA, till April 2011), which produced radioisotopes for medical applications and went bankrupt in 2012. These installations have been entrusted to ONDRAF/NIRAS. A plan of action was developed for taking over the operations in the framework of remediation and decommissioning. Steps have been taken to integrate his new role as a nuclear operator. The installations of Best Medical Belgium SA are now referred to as the 'O/N - Site Fleurus.' Nuclear facility operators, or any person requesting to operate a nuclear facility, are obliged to provide ONDRAF/NIRAS, under their responsibility and in due time, with all the necessary information concerning these facilities' decommissioning forecasts, the nature, quantities and dates of transfer of the resulting waste, and the financing conditions for these facilities' decommissioning. In order to make the necessary funds available for decommissioning a nuclear facility when it will be shut down, operators are obliged to establish provisions during the facility's active life. These provisions are calculated in such a way that the total amount established at the time of the final shutdown covers all costs resulting from the facility's final phase, namely the preparation of decommissioning, decontamination, more or less long-term maintenance, dismantling, treatment, conditioning and disposal of waste produced during this phase. In order to face to multiple and repeated evaluation processes, the Agency, already in the early 90's, started with the implementation of its own integrated data processing system, recording the physical and radiological inventories of nuclear facilities, and allowing the evaluation of the quantities of decommissioning materials and wastes as well as of the decommissioning costs of these facilities. The cost evaluations cover all decommissioning activities from final shutdown of the facility until final release from nuclear control, as well as conventional demolition and site restoration if required. Beside the information related to the inventories, the database involves so called auxiliary tables integrating unit prices of the various decontamination and dismantling techniques, unit rates for radioactive waste processing, interim storage and final disposal. (authors)
Closely Space Parallel Runway (CSPR) configurations are capacity limited for departures due to the requirement to apply wake vortex separation standards from traffic departing on the adjacent parallel runway. To mitigate the effects of this constraint, a concept focusing on wind dependent departure operations has been developed, known as the Wake Turbulence Mitigation for Departures (WTMD). This concept takes advantage of the fact that crosswinds of sufficient velocity blow wakes generated by aircraft departing from the downwind runway away from the upwind runway. Consequently, under certain conditions, wake separations on the upwind runway would not be required based on wakes generated by aircraft on the downwind runway, as is currently the case. It follows that information requirements, and sources for this information, would need to be determined for airport traffic control tower (ATCT) supervisory personnel who would be charged with decisions regarding use of the procedure. To determine the information requirements, data were collected from ATCT supervisors and controller-in-charge qualified individuals at Lambert-St. Louis International Airport (STL) and George Bush Houston Intercontinental Airport (IAH). STL and IAH were chosen as data collection sites based on the implementation of a WTMD prototype system, operating in shadow mode, at these locations. The 17 total subjects (STL: 5, IAH: 12) represented a broad-base of air traffic experience. Results indicated that the following information was required to support the conduct of WTMD operations: current and forecast weather information, current and forecast traffic demand and traffic flow restrictions, and WTMD System status information and alerting. Subjects further indicated that the requisite information is currently available in the tower cab with the exception of the WTMD status and alerting. Subjects were given a demonstration of a display supporting the prototype systems and unanimously stated that the WTMD status information they felt important was represented. Overwhelmingly, subjects felt that approving, monitoring and terminating the WTMD procedure could be integrated into their supervisory workload.
A field demonstration of enhanced attenuation (EA) was initiated in 2014 to expedite the remediation of industrial solvents in the groundwater impacted by the former landfill Operable Unit 1 (OU-1) at the US Department of Energy (DOE) Mound, Ohio, Site. EA uses active engineering solutions to alter the target site so that the contaminant plume will passively stabilize and shrink. For OU-1, the EA was implemented by targeted injection of an electron donor (vegetable oil) to create 'structured geochemical zones'. Volatile organic compounds (VOCs) in the altered subsurface system encounter alternating anaerobic and aerobic environments along the plume flow path. The effect of these structured geochemical zones is effective and rapid degradation of parent compounds such as trichloroethene (TCE) and tetrachloroethene (PCE), and daughter compounds such as cis-1,2-dichloroethene and vinyl chloride. EA at Mound OU-1 provides a transition to natural attenuation and is an alternative to the baseline pump-and-treat (P and T) system. Industrial solvents (primarily TCE) and other VOCs that originated from the former solid-waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound site. A groundwater P and T system was initiated in 1996 to control the plume, and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,100 cubic meters (99,500 cubic yards) of material were removed from the OU-1 landfill area. Operation of the groundwater P and T system continued throughout this period. The principles and technical basis of the ongoing EA field demonstration were developed by the Interstate Technology and Regulatory Council. The goal of the EA implementation is to provide a bridge between active groundwater treatments and monitored natural attenuation. EA relies on understanding and manipulating the contaminant mass balance. Technologies are applied to sustainably reduce the contaminant loading from the source and/or increase the rate of natural attenuation processes within the plume. In 2014, a core team that included DOE, the US Environmental Protection Agency (EPA), the Ohio EPA, and technical support organizations evaluated remedial options for OU-1. During the 2014 evaluation, the team projected a cleanup time frame for the baseline P and T system of 26 additional years and a cleanup time frame for the EA remedy of 13 years. On the basis of that evaluation, EPA approved the implementation of the EA remedy that required the shutdown of the P and T system. The combination of technologies implemented for OU-1 EA included (a) neat vegetable oil in the vadose zone in the former landfill and (b) emulsified vegetable oil within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation anaerobic treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient aerobic plume (via co-metabolism). The results from the first year of the field demonstration indicate that the dissolved TCE and PCE plumes have decreased in size and mass. Statistical tests indicate that the VOC concentrations in the majority of the source-area wells are decreasing. The VOC concentrations throughout the plume are projected to be below the target maximum contaminant level of 2 to 5 μg/L within 5 to 10 years-sooner than the design projection of 13 years. The biogeochemistry and microbial community within the structured geochemical zones are consistent with the design and appear to be stable. At Mound OU-1, EA has accelerated progress toward the remedial action objectives and reduced costs. Ongoing monitoring will determine whether the EA remedy has transitioned the site into monitored natural attenuation status and whether the EA will continue to be effective, timely, and sustainable. (authors)
Because of significantly reduced wastewater discharges to the Central Facilities Area Sewage Treatment Plant, wastewater has not been land applied since 2011. The future need to land apply wastewater was evaluated. Based on the current wastewater flows into the Central Facilities Area Sewage Treatment Plant, expected future missions at Central Facilities Area, and the discovery in 2014 that Lagoon 3 was leaking at an unacceptable rate, it was determined that the Central Facilities Area Sewage Treatment Plant is significantly oversized and that Lagoons 1 and 2 could be converted to total evaporation lagoons. Therefore, the decision was made to remove the existing sludge in Lagoon 3 and transfer it to Lagoon 2 for additional treatment, decommission Lagoon 3 and the land application area, and terminate the wastewater reuse permit. A closure plan was submitted and approved by the Idaho Department of Environmental Quality in 2016. This report describes the closure activities that were performed. Closure activities included: • Characterizing the soil/liner in Lagoon 3 to determine whether further characterization and/or remediation will be required under the Comprehensive Environmental Response, Compensation, and Liability Act. • Based on the results from the soil/liner sampling, determining whether additional sampling will be required for the land application area. • Removing the sludge in Lagoon 3 and placing it in Lagoon 2. • Puncturing the Lagoon 3 soil/liner to prevent ponding of storm water and becoming a source for vectors. • Installing a permanent cap on the inlet piping to Lagoon 3. Samples were collected on November 10, 2016, and were submitted for analysis to an off-site laboratory. Data validation and evaluation were performed by Portage, INC. Sample results confirmed that there is no hazard to human health and the environment and that Lagoon 3 and the land application area could be closed. In August 2017, sludge was removed from Lagoon 3 and placed in Lagoon 2, the soil/liner was punctured in 4 places, and caps were installed on the primary and bypass inlet lines.
The Liquid Waste facilities at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) are operated by Liquid Waste Operations contractor Savannah River Remediation LLC (SRR). A separate Performance Assessment (PA) is prepared to support disposal operations at the Saltstone Disposal Facility and closure evaluations for the two liquid waste tank farm facilities at SRS, F-Tank Farm and H-Tank Farm. A PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified in operations and closure regulatory guidance. The Saltstone Disposal Facility is subject to a State of South Carolina industrial solid waste landfill permit and the tank farms are subject to a state industrial waste water permit. The three Liquid Waste facilities are also subject to a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Due to the regulatory structure, a PA is a key technical document reviewed by the DOE, the State of South Carolina and the EPA. As the waste material disposed of in the Saltstone Disposal Facility and the residual material in the closed tank farms is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005, the U.S. Nuclear Regulatory Commission (NRC) is also a reviewing agency for the PAs. Pursuant to the Act, the NRC also has a continuing role to monitor disposal actions to assess compliance with stated performance objectives. The Liquid Waste PA program at SRS represents a continual process over the life of the disposal and closure operations. When the need for a PA or PA revision is identified, the first step is to develop a conceptual model to best represent the facility conditions. The conceptual model will include physical dimensions of the closed system, both the engineered and natural system, and modeling input parameters associated with the modeled features, both initial values (at the time of facility closure) and degradation rates/values. During the development of the PA, evaluations are conducted to reflect not only the results associated with the best available information at the time but also to evaluate potential uncertainties and sensitivities associated with the modeled system. While the PA will reflect the modeled system results from the best available information, it will also identify areas for future work to reduce overall PA uncertainties moving forward. DOE requires a PA Maintenance Program such that work continues to reduce model uncertainties, thus bolstering confidence in PA results that support regulatory decisions. This maintenance work may include new Research and Development activities or modeling as informed by previous PA results and other new information that becomes available. As new information becomes available, it is evaluated against previous PAs and appropriate actions are taken to ensure continued confidence in the regulatory decisions. Therefore, the PA program is a continual process that is not just the development of a PA but seeks to incorporate new information to reduce overall model uncertainty and provide continuing confidence in regulatory decisions. (author)
The dynamic and reversible acetylation of proteins, catalysed by histone acetyltransferases (HATs) and histone deacetylases (HDACs), is a major epigenetic regulatory mechanism of gene transcription1 and is associated with multiple diseases. Histone deacetylase inhibitors are currently approved to treat certain cancers, but progress on the development of drug-like histone actyltransferase inhibitors has lagged behind2. The histone acetyltransferase paralogues p300 and CREB-binding protein (CBP) are key transcriptional co-activators that are essential for a multitude of cellular processes, and have also been implicated in human pathological conditions (including cancer3). Current inhibitors of the p300 and CBP histone acetyltransferase domains, including natural products4, bi-substrate analogues5 and the widely used small molecule C6466,7, lack potency or selectivity. Here, we describe A-485, a potent, selective and drug-like catalytic inhibitor of p300 and CBP. We present a high resolution (1.95 Å) co-crystal structure of a small molecule bound to the catalytic active site of p300 and demonstrate that A-485 competes with acetyl coenzyme A (acetyl-CoA). A-485 selectively inhibited proliferation in lineage-specific tumour types, including several haematological malignancies and androgen receptor-positive prostate cancer. A-485 inhibited the androgen receptor transcriptional program in both androgen-sensitive and castration-resistant prostate cancer and inhibited tumour growth in a castration-resistant xenograft model. These results demonstrate the feasibility of using small molecule inhibitors to selectively target the catalytic activity of histone acetyltransferases, which may provide effective treatments for transcriptional activator-driven malignancies and diseases.
The Ames Fitness Program services 5,000 civil servants and contractors working at Ames Research Center. A 3,000 square foot fitness center, equipped with cardiovascular machines, weight training machines, and free weight equipment is on site. Thirty exercise classes are held each week at the Center. A weight loss program is offered, including individual exercise prescriptions, fitness testing, and organized monthly runs. The Fitness Center is staffed by one full-time program coordinator and 15 hours per week of part-time help. Membership is available to all employees at Ames at no charge, and there are no fees for participation in any of the program activities. Prior to using the Center, employees must obtain a physical examination and complete a membership package. Funding for the Ames Fitness Program was in jeopardy in December 1992; however, the employees circulated a petition in support of the program and collected more than 1500 signatures in only three days. Funding has been approved through October 1993.
The ISAIA project was originally proposed in 1999 as a successor to the informal AstroBrowse project. AstroBrowse, which provided a data location service for astronomical archives and catalogs, was a first step toward data system integration and interoperability. The goals of ISAIA were ambitious: '...To develop an interdisciplinary data location and integration service for space science. Building upon existing data services and communications protocols, this service will allow users to transparently query hundreds or thousands of WWW-based resources (catalogs, data, computational resources, bibliographic references, etc.) from a single interface. The service will collect responses from various resources and integrate them in a seamless fashion for display and manipulation by the user.' Funding was approved only for a one-year pilot study, a decision that in retrospect was wise given the rapid changes in information technology in the past few years and the emergence of the Virtual Observatory initiatives in the US and worldwide. Indeed, the ISAIA pilot study was influential in shaping the science goals, system design, metadata standards, and technology choices for the virtual observatory. The ISAIA pilot project also helped to cement working relationships among the NASA data centers, US ground-based observatories, and international data centers. The ISAIA project was formed as a collaborative effort between thirteen institutions that provided data to astronomers, space physicists, and planetary scientists. Among the fruits we ultimately hoped would come from this project would be a central site on the Web that any space scientist could use to efficiently locate existing data relevant to a particular scientific question. Furthermore, we hoped that the needed technology would be general enough to allow smaller, more-focused community within space science could use the same technologies and standards to provide more specialized services. A major challenge to searching for data across a broad community is that information that describe some data products are either not relevant to other data or not applicable in the same way. Some previous metadata standard development efforts (e.g., in the earth science and library communities) have produced standards that are very large and difficult to support. To address this problem, we studied how a standard may be divided into separable pieces. Data providers that wish to participate in interoperable searches can support only those parts of the standard that are relevant to them. We prototyped a top-level metadata standard that was small and applicable to all space science data.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.
Purpose: Image-guidance has been widely used in radiation oncology for accurate radiotherapy. The goal of this study is to quantify the benefit of image-guidance in image-guided radiotherapy (IGRT) of cancers. Methods: In this study, a new index termed image-guidance benefit (IGB), was proposed to quantify the benefit of image-guidance in cancer radiotherapy. It is calculated as a ratio of the square sum of dose differences between planning dose matrix and actual delivery dose matrix post image-guidance to the square sum of dose summation between the two matrixes, summing over all dose scoring voxels. Ranging from 0 to 1, larger IGB values indicate larger benefit out of image-guidance. With IRB approval, the DICOM RT files and 3D couch shifts applied during IGRT of 2219 patients were collected, based on which patient-specific IGB values were calculated with an in-house MATLAB code. Results: In this study, the mean IGB value was found to be 0.0398 (0.000583–0.999) with a positive correlation between IGB value and 3D couch shift vector at 0.0435 per cm (P<0.0001). With 2 mm shift as a threshold above which an image-guidance is deemed clinically necessary, the corresponding mean IGB value was 0.00457, much less than 0.0398 (P<0.001). However, the IGB values of 56 cases based on couch shifts were less than those based on 2 mm shift. Conclusion: The IGB values were patient-specific and site-dependent. Using 2 mm shifts as criterion for applying image-guidance, the applied image-guidance procedures were found clinically necessary and highly beneficial in 97.5% of cancer patients. However, image-guidance procedures were found over-used in about 2.5% of cancer patients in our current practices of IGRT, which should be avoided as they added no benefit in improving delivery accuracy while increasing cancer risk.
Purpose: Our goal is to implement lean methodology to make our current process of CT simulation to treatment more efficient. Methods: In this study, we implemented lean methodology and tools and employed flowchart in excel for process-mapping. We formed a group of physicians, physicists, dosimetrists, therapists and a clinical physics assistant and huddled bi-weekly to map current value streams. We performed GEMBA walks and observed current processes from scheduling patient CT Simulations to treatment plan approval. From this, the entire workflow was categorized into processes, sub-processes, and tasks. For each process we gathered data on touch time, first time quality, undesirable effects (UDEs), and wait-times from relevant members of each task. UDEs were binned per frequency of their occurrence. We huddled to map future state and to find solutions to high frequency UDEs. We implemented visual controls, hard stops, and documented issues found during chart checks prior to treatment plan approval. Results: We have identified approximately 64 UDEs in our current workflow that could cause delays, re-work, compromise the quality and safety of patient treatments, or cause wait times between 1 – 6 days. While some UDEs are unavoidable, such as re-planning due to patient weight loss, eliminating avoidable UDEs is our goal. In 2015, we found 399 issues with patient treatment plans, of which 261, 95 and 43 were low, medium and high severity, respectively. We also mapped patient-specific QA processes for IMRT/Rapid Arc and SRS/SBRT, involving 10 and 18 steps, respectively. From these, 13 UDEs were found and 5 were addressed that solved 20% of issues. Conclusion: We have successfully implemented lean methodology and tools. We are further mapping treatment site specific workflows to identify bottlenecks, potential breakdowns and personnel allocation and employ tools like failure mode effects analysis to mitigate risk factors to make this process efficient.
The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low activity wastewater streams from the Effluent Treatment Project (ETP), H-Canyon, and the high level waste (HLW) storage tanks, are stored as a mixture in Tank 50H until it can be pumped to the Saltstone Facility for treatment and disposal. Specific waste acceptance criteria (WAC) must be met for the transfer of low-level aqueous waste from Tank 50H to the Saltstone Facility. Low level waste which meets the WAC can be transferred, stored and treated in the Saltstone Production Facility (SPF) for subsequent disposal as saltstone in the Saltstone Disposal Facility (SDF). Waste Solidification Engineering (WSE) has requested through a Technical Task Request (TTR) that the Savannah River National Laboratory (SRNL) measure the concentrations of chemical and radionuclide contaminants listed in the currently approved Saltstone Waste Acceptance Criteria (WAC). A Task Technical and Quality Assurance Plan and Analytical Study Plan has been written for this request. WAC determinations are needed on a quarterly basis for chemical contaminants and every first and third quarter for radioactive contaminants. This memorandum presents the results for the chemical and radionuclide contaminants in the third quarter, from the samples taken from Tank 50 in September, 2007.
The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it can be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The Documentation Package for the RFID Temperature Monitoring System; Software Test Plan and Results for ARG-US OnSite; Configuration Management Plan (CMP) for the ARG-US System; Requirements Management Plan for the ARG-US System; and Design Management Plan for ARG-US.
This report is a follow on from HF Designworks’ 2018 report on state of the present and state of the art sensor technologies as they related to Ground Based Detect and Avoid (GBDAA) systems for Unmanned Aircraft Systems (UAS). In this update, HF Designworks again looks to UAS test sites, manufacturers, vendors, and users to identify the latest sensor technologies covering not just GBDAA, but additional UAS sensor types; including airborne. For this latest report, the following sensor types were reviewed, as well as a few that don’t quite fit within the following categories: Electro-Optical / Infrared (EO/IR), LiDAR, RADAR, Radiofrequency (RF) scanner, Acoustic, and Other. From our interviews and research with various organizations and individuals, we found both interesting new technologies as well as improvements to many technologies first reviewed in 2018. Compared with our 2018 findings, many of the new technologies have helped produce sensors that are smaller, lighter, require less power, and have better range and resolution than those discussed in 2018. However, challenges still exist. There is no single currently available and FAA approved sensor suite that can adequately provide complete detect and avoid capabilities to meet the needs of UAS beyond visual line of sight (BVLOS) in the civilian airspace.