Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Recovery Act”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Energy Efficiency Services Sector: Workforce Size and Expectations for Growth

The energy efficiency services sector (EESS) is poised to become an increasingly important part of the U.S. economy. Climate change and energy supply concerns, volatile and increasing energy prices, and a desire for greater energy independence have led many state and national leaders to support an increasingly prominent role for energy efficiency in U.S. energy policy. The national economic recession has also helped to boost the visibility of energy efficiency, as part of a strategy to support economic recovery. We expect investment in energy efficiency to increase dramatically both in the near-term and through 2020 and beyond. This increase will come both from public support, such as the American Recovery and Reinvestment Act (ARRA) and significant increases in utility ratepayer funds directed toward efficiency, and also from increased private spending due to codes and standards, increasing energy prices, and voluntary standards for industry. Given the growing attention on energy efficiency, there is a concern among policy makers, program administrators, and others that there is an insufficiently trained workforce in place to meet the energy efficiency goals being put in place by local, state, and federal policy. To understand the likelihood of a potential workforce gap and appropriate response strategies, one needs to understand the size, composition, and potential for growth of the EESS. We use a bottom-up approach based upon almost 300 interviews with program administrators, education and training providers, and a variety of EESS employers and trade associations; communications with over 50 sector experts; as well as an extensive literature review. We attempt to provide insight into key aspects of the EESS by describing the current job composition, the current workforce size, our projections for sector growth through 2020, and key issues that may limit this growth.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Review of Evaluation, Measurement and Verification Approaches Used to Estimate the Load Impacts and Effectiveness of Energy Efficiency Programs

Public and private funding for end-use energy efficiency actions is expected to increase significantly in the United States over the next decade. For example, Barbose et al (2009) estimate that spending on ratepayer-funded energy efficiency programs in the U.S. could increase from $3.1 billion in 2008 to $7.5 and 12.4 billion by 2020 under their medium and high scenarios. This increase in spending could yield annual electric energy savings ranging from 0.58% - 0.93% of total U.S. retail sales in 2020, up from 0.34% of retail sales in 2008. Interest in and support for energy efficiency has broadened among national and state policymakers. Prominent examples include {approx}$18 billion in new funding for energy efficiency programs (e.g., State Energy Program, Weatherization, and Energy Efficiency and Conservation Block Grants) in the 2009 American Recovery and Reinvestment Act (ARRA). Increased funding for energy efficiency should result in more benefits as well as more scrutiny of these results. As energy efficiency becomes a more prominent component of the U.S. national energy strategy and policies, assessing the effectiveness and energy saving impacts of energy efficiency programs is likely to become increasingly important for policymakers and private and public funders of efficiency actions. Thus, it is critical that evaluation, measurement, and verification (EM&V) is carried out effectively and efficiently, which implies that: (1) Effective program evaluation, measurement, and verification (EM&V) methodologies and tools are available to key stakeholders (e.g., regulatory agencies, program administrators, consumers, and evaluation consultants); and (2) Capacity (people and infrastructure resources) is available to conduct EM&V activities and report results in ways that support program improvement and provide data that reliably compares achieved results against goals and similar programs in other jurisdictions (benchmarking). The National Action Plan for Energy Efficiency (2007) presented commonly used definitions for EM&V in the context of energy efficiency programs: (1) Evaluation (E) - The performance of studies and activities aimed at determining the effects and effectiveness of EE programs; (2) Measurement and Verification (M&V) - Data collection, monitoring, and analysis associated with the calculation of gross energy and demand savings from individual measures, sites or projects. M&V can be a subset of program evaluation; and (3) Evaluation, Measurement, and Verification (EM&V) - This term is frequently seen in evaluation literature. EM&V is a catchall acronym for determining both the effectiveness of program designs and estimates of load impacts at the portfolio, program and project level. This report is a scoping study that assesses current practices and methods in the evaluation, measurement and verification (EM&V) of ratepayer-funded energy efficiency programs, with a focus on methods and practices currently used for determining whether projected (ex-ante) energy and demand savings have been achieved (ex-post). M&V practices for privately-funded energy efficiency projects (e.g., ESCO projects) or programs where the primary focus is greenhouse gas reductions were not part of the scope of this study. We identify and discuss key purposes and uses of current evaluations of end-use energy efficiency programs, methods used to evaluate these programs, processes used to determine those methods; and key issues that need to be addressed now and in the future, based on discussions with regulatory agencies, policymakers, program administrators, and evaluation practitioners in 14 states and national experts in the evaluation field. We also explore how EM&V may evolve in a future in which efficiency funding increases significantly, innovative mechanisms for rewarding program performance are adopted, the role of efficiency in greenhouse gas mitigation is more closely linked, and programs are increasingly funded from multiple sources often with multiple program administrators and intended to meet multiple purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Survey of the U.S. ESCO Industry: Market Growth and Development from 2008 to 2011

In this study, LBNL analyzes the current size of the Energy Service Company (ESCO) industry, industry growth projections to 2011, and market trends in order to provide policymakers with a more indepth understanding of energy efficiency activity among private sector firms. We draw heavily on information from interviews with ESCOs conducted from October 2009 to February 2010 and from our review of publicly available financial information regarding individual ESCOs. A significant ramp-up in energy efficiency activities is occurring at the local, state, and federal level. These activities include the establishment in {approx}18 states of statewide energy savings goals to be obtained from adoption of an Energy Efficiency Resource Standard (EERS), legislative or state regulatory directives to obtain all cost-effective demand-side resources (Barbose et al 2009), and a significant increase in federal funding for energy efficiency programs as part of the American Recovery and Reinvestment Act (ARRA). As part of this increased focus on energy efficiency, policymakers are evaluating the role of private sector companies, including ESCOs, in delivering cost-effective energy savings to end-users. The U.S. ESCO industry has long been recognized for its role in successfully delivering comprehensive energy projects in the public sector. This study analyzes the current size of the ESCO industry, industry growth projections, and market trends in order to provide policymakers with a more in-depth understanding of energy efficiency activity among private sector firms. This study may also be of interest to policymakers abroad who are exploring options to encourage development of a private-sector energy services industry in their own countries. This study draws heavily on information from interviews with ESCOs conducted from October 2009 to February 2010 and is part of a series of ESCO industry reports prepared by Lawrence Berkeley National Laboratory (LBNL) in collaboration with the National Association of Energy Services Companies (NAESCO). The analysis builds on previous ESCO industry reports (see Goldman et al. 2005 and Hopper et al. 2007) and provides updated estimates of ESCO industry revenues and ESCO views on perceived trends in costs and savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) that the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1-September 30, 2010, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This fourth quarter comprises a total of 2208 possible hours for the fixed and mobile sites. The average of the fixed sites exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has historically had a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning in the second quarter of FY2010, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original instrumentation and new instrumentation made available through the American Recovery and Reinvestment Act of 2009 (ARRA). The Central Facility and 4 extended facilities will remain, but there will be up to 12 new surface characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The transition to the smaller footprint is ongoing through this quarter. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place by the end of calendar year 2011. AMF1 continues its 20-month deployment in Graciosa Island, the Azores, Portugal, that began on May 1, 2009. The AMF will also have additional observational capabilities by the end of 2011. The second ARM Mobile Facility (AMF2) was deployed this quarter to Steamboat Springs, Colorado, in support of the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX). The first field deployment of the second ARM Mobile Facility will be used to validate ARM-developed algorithms that convert the remote sensing measurements to cloud properties for liquid and mixed phase clouds. Although AMF2 is being set up this quarter, the official start date of the field campaign is not until November 1, 2010. This quarterly report provides the cumulative numbers of scientific user accounts by site for the period October 1, 2009-September 30, 2010.

54 ENVIRONMENTAL SCIENCES↗

Energy Security, Innovation & Sustainability Initiative

More than a dozen energy experts convened in Houston, Texas, on February 13, 2009, for the first in a series of four regionally-based energy summits being held by the Council on Competitiveness. The Southern Energy Summit was hosted by Marathon Oil Corporation, and participants explored the public policy, business and technological challenges to increasing the diversity and sustainability of U.S. energy supplies. There was strong consensus that no single form of energy can satisfy the projected doubling, if not tripling, of demand by the year 2050 while also meeting pressing environmental challenges, including climate change. Innovative technology such as carbon capture and storage, new mitigation techniques and alternative forms of energy must all be brought to bear. However, unlike breakthroughs in information technology, advancing broad-based energy innovation requires an enormous scale that must be factored into any equation that represents an energy solution. Further, the time frame for developing alternative forms of energy is much longer than many believe and is not understood by the general public, whose support for sustainability is critical. Some panelists estimated that it will take more than 50 years to achieve the vision of an energy system that is locally tailored and has tremendous diversity in generation. A long-term commitment to energy sustainability may also require some game-changing strategies that calm volatile energy markets and avoid political cycles. Taking a page from U.S. economic history, one panelist suggested the creation of an independent Federal Energy Reserve Board not unlike the Federal Reserve. The board would be independent and influence national decisions on energy supply, technology, infrastructure and the nation's carbon footprint to better calm the volatile energy market. Public-private efforts are critical. Energy sustainability will require partnerships with the federal government, such as the U.S. Department of Energy's National Laboratories, that can provide real-world improvements in both the short- and long-term. Indeed, the roles of government and the private sector in energy sustainability were brought into sharper focus by the pending American Recovery and Reinvestment Act of 2009, also known as the economic stimulus bill. There was cautious optimism that the bill was moving the nation in the right direction by way of focusing on greater energy efficiency, alternative forms of energy and improved infrastructure. Nevertheless, there was concern over Congress picking energy winners and losers. Instead, Congress should challenge industry to produce solutions that will create a clear path forward to energy sustainability that the American people can support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State Energy Efficient Appliance Rebate Program (SEEARP) Reports

The State Energy Efficient Appliance Rebate Program (SEEARP) reports database includes rebate reports (xls) and summary factsheets (pdf) from states and territories that participated in SEEARP. With funding provided by the American Recovery and Reinvestment Act of 2009 (ARRA), the U.S. Department of Energy (DOE) developed SEEARP to spur economic activity and invest in long-term energy savings by helping consumers replace older, inefficient appliances with new, efficient models. SEEARP provided almost $300 million to the 56 U.S. states and territories to support state-level consumer rebate programs for efficient appliances from December 1, 2009 to February 17, 2012. The successes and challenges of SEEARP provide valuable lessons for designing and running a consumer-focused appliance rebate program. In addition to the SEEARP reports database, the two reports included provide a results and program design lessons.

appliances↗

A Review of the Evaluation of Building Energy Code Compliance in the United States

Building energy codes are essential tools for achieving energy efficiency in buildings. However, the full energy savings potential of these codes can only be realized if buildings are constructed in compliance with them. Therefore, evaluating building energy code compliance is crucial in bridging the gap between the energy efficiency requirements set by energy codes and the actualized energy savings achieved. An energy code compliance evaluation serves as a mechanism to assess construction practices, evaluate the effectiveness of code enforcement, identify gaps in compliance, and guide strategies for improvement through training and education. Conducting code compliance evaluation activities involves field studies that require careful design and significant resources. Historically, more emphasis has been placed on developing and adopting building energy codes, while efforts to evaluate compliance have been relatively limited and lacking consistent approaches. The passage of the 2009 American Recovery and Reinvestment Act (ARRA), which mandated that states create plans for achieving 90% compliance within eight years, stimulated the need for an energy code compliance evaluation. As a result, federal, state, and local governments, and utilities have invested in the development of methodologies and tools for code compliance evaluation studies. This paper reviews the code compliance evaluation studies conducted in the United States over the past three decades. It describes and compares the methodologies and metrics used to assess building energy code compliance, summarizes the general elements and steps involved in the evaluation process, and discusses common issues in these studies. Over time, code compliance evaluation methodologies have evolved from isolated development within individual states, regions, and utilities, to widely accepted protocols applicable across different states and local jurisdictions. There has been a transition in compliance metrics, shifting from historical compliance rates to energy-consumption-oriented approaches.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NASA UAS Update

Last year may prove to be a pivotal year for the National Aeronautics and Space Administration (NASA) in the Unmanned Aircraft Systems (UAS) arena, especially in relation to routine UAS access to airspace as NASA accepted an invitation to join the UAS Executive Committee (UAS ExCom). The UAS ExCom is a multi-agency, Federal executive-level committee comprised of the Federal Aviation Administration (FAA), Department of Defense (DoD), Department of Homeland Security (DHS), and NASA with the goals to: 1) Coordinate and align efforts between key Federal Government agencies to achieve routine safe federal public UAS operations in the National Airspace System (NAS); 2) Coordinate and prioritize technical, procedural, regulatory, and policy solutions needed to deliver incremental capabilities; 3) Develop a plan to accommodate the larger stakeholder community at the appropriate time; and 4) Resolve conflicts between Federal Government agencies (FAA, DoD, DHS, and NASA), related to the above goals. The committee was formed in recognition of the need of UAS operated by these agencies to access to the National Airspace System (NAS) to support operational, training, development and research requirements. In order to meet that need, technical, procedural, regulatory, and policy solutions are required to deliver incremental capabilities leading to routine access. The formation of the UAS ExCom is significant in that it represents a tangible commitment by FAA senior leadership to address the UAS access challenge. While the focus of the ExCom is government owned and operated UAS, civil UAS operations are bound to benefit by the progress made in achieving routine access for government UAS. As the UAS ExCom was forming, NASA's Aeronautics Research Mission Directorate began to show renewed interest in UAS, particularly in relation to the future state of the air transportation system under the Next Generation Air Transportation System (NextGen). NASA made funding from the American Recovery and Revitalization Act available in order to continue addressing the issue of routine civil UAS access.

Bauer, Jeffrey Ervin↗

System-Level Experimental Validations for Supersonic Commercial Transport Aircraft Entering Service in the 2018-2020 Time Period

This report describes the work conducted by The Boeing Company under American Recovery and Reinvestment Act (ARRA) and NASA funding to experimentally validate the conceptual design of a supersonic airliner feasible for entry into service in the 2018 to 2020 timeframe (NASA N+2 generation). The report discusses the design, analysis and development of a low-boom concept that meets aggressive sonic boom and performance goals for a cruise Mach number of 1.8. The design is achieved through integrated multidisciplinary optimization tools. The report also describes the detailed design and fabrication of both sonic boom and performance wind tunnel models of the low-boom concept. Additionally, a description of the detailed validation wind tunnel testing that was performed with the wind tunnel models is provided along with validation comparisons with pretest Computational Fluid Dynamics (CFD). Finally, the report describes the evaluation of existing NASA sonic boom pressure rail measurement instrumentation and a detailed description of new sonic boom measurement instrumentation that was constructed for the validation wind tunnel testing.

Magee, Todd E.↗

TPSAS-NF1676L-16299-DND

As part of the American Recovery and Reinvestment Act (ARRA) of 2009, the DOE ARM program deployed a new ground-­‐based Arctic High Spectral Resolution Lidar (AHSRL) at the North Slope of Alaska (NSA) site. This lidar, which is based on the AHSRL that was part of the NOAA’s SEARCH (Study of Environmental Arctic Change) contribution to the Canadian Network for the Detection of Atmospheric Change (CANDAC) facility at Eureka, Nunavut Territory, is an autonomous lidar that provides calibrated profiles of particulate (i.e. aerosol and cloud) backscatter cross section, optical thickness and circular depolarization at 532 nm. The AHSRL provides measurements of both intensive and extensive particulate properties. The intensive parameters depend only on the nature of the particles (size, composition, shape), not on the quantity or concentration. Here we show examples of the AHSRL data during both clear and cloudy conditions to show how these measurements can be used to depict aerosols and clouds over the NSA.

Marian Clayton↗

Investment Dimension: Enhanced Data Equals Better Climate Models

Through the American Recovery and Reinvestment Act of 2009, the U.S. Department of Energy provided the Atmospheric Radiation Measurement (ARM) Climate Research Facility with $60 million for new and upgraded instrumentation, equipment, and infrastructure to improve atmospheric data sets. These enhancements will take place among the permanent ARM research sites in Oklahoma and Alaska in the United States, and near the equator in the tropical Western Pacific. They will also advance the capabilities of ARM’s mobile and aerial research platforms. This article focuses on key enhancements - particularly new scanning radars, enhanced lidar technologies, aerosol observation systems, and in situ aircraft probes - that will provide unprecedented data sets for the modeling community.

54 ENVIRONMENTAL SCIENCES↗

ORNL MAXLAB Flexible Research Platforms

Oak Ridge National Laboratory (ORNL) was competitively awarded the “Maximum Energy Efficiency Building Research Laboratory” (MAXLAB) project under the American Recovery and Reinvestment Act (ARRA). As part of that project, the design and construction of two flexible research platforms (FRP) was included to provide new building test apparatus at ORNL. The two FRPs are designed to be capable of being outfitted as test buildings that are representative of typical construction methods, materials, and geometry used in the light commercial market. These test buildings will be heavily instrumented and will provide ORNL’s industry partners a means of assessing new HVAC, control, and envelope solutions under realistic conditions, in a low financial risk environment. The long-term data collected at the facility can be used to validate analytic models which can then be used by developers to refine their potential products and reduce delivery time to market. This paper outlines the FRP concept, long term research plan and the challenges in the design and construction of the base research apparatus and test buildings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ORNL Soils Remediation and Slabs Removal The Bridge from D&D to Redevelopment

The landscape of the Oak Ridge National Laboratory (ORNL) has dramatically changed over the past 2 years with demolition of aging facilities in the Central Campus. Removal of these infrastructure legacies was possible due to an influx of DOE-Environmental Management funding through the American Recovery and Reinvestment Act of 2009 (ARRA). Facility D&D traditionally removes everything down to the building slab, and the Soils and Sediments Program is responsible for slabs, below-grade footers, abandoned waste utilities, and soils contaminated above certain risk levels that must be removed before the site can be considered for redevelopment. , DOE-EM has used a combination of base and ARRA funding to facilitate the clean-up process in ORNL s 2000 Area. Demolition of 13 buildings in the area was funded by the ARRA. Characterization of the remaining slabs, underground pipelines and soils was funded by DOE-EM base funding. Additional ARRA funding was provided for the removal of the slabs, pipelines and contaminated soils. Removal work is in progress and consists of removing and disposing of approximately 10,000 cubic yards (CY) of concrete, 2,500 CY of debris, and 500 CY of contaminated soil. The completion of this work will allow the site to be available for redevelopment and site reuse efforts at ORNL.

Conger, M Malinda↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flathead Electric Cooperative Facility Geothermal Heat Pump System Upgrade.

High initial cost and lack of public awareness of ground source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects have been competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This paper highlights findings of a case study of one of the ARRA-funded GSHP demonstration projects, which is a heating only central GSHP system using shallow aquifer as heat source and installed at a warehouse and truck bay at Kalispell, MT. This case study is based on the analysis of measured performance data, utility bills, and calculations of energy consumptions of conventional central heating systems for providing the same heat outputs as the central GSHP system did. The evaluated performance metrics include energy efficiency of the heat pump equipment and the overall GSHP system, pumping performance, energy savings, carbon emission reductions, and cost-effectiveness of GSHP system compared with conventional heating systems. This case study also identified areas for reducing uncertainties in performance evaluation, improving operational efficiency, and reducing installed cost of similar GSHP systems in the future. Publication of ASHRAE at the annual conference in Seattle June 2014.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sustaining the National Geothermal Data System: Considerations for a System Wide Approach and Node Maintenance, Geothermal Resources Council 37th Annual Meeting, Las Vegas, Nevada, September 29-October 2, 2013

Since the 2009 American Recovery and Reinvestment Act the U.S. Department of Energy’s Geothermal Technologies Office has funded $33.7 million for multiple data digitization and aggregation projects focused on making vast amounts of geothermal relevant data available to industry for advancing geothermal exploration. These projects are collectively part of the National Geothermal Data System (NGDS), a distributed, networked system for maintaining, sharing, and accessing data in an effort to lower the levelized cost of electricity (LCOE). Determining “who owns” and “who maintains” the NGDS and its data nodes (repositories in the distributed system) is yet to be determined. However, the invest- ment in building and populating the NGDS has been substantial, both in terms of dollars and time; it is critical that this investment be protected by ensuring sustainability of the data, the software and systems, and the accessibility of the data. Only then, will the benefits be fully realized. To keep this operational system sustainable will require four core elements: continued serving of data and applications; maintenance of system operations; a governance structure; and an effective business model. Each of these presents a number of challenges. Data being added to the NGDS are not strictly geothermal but data considered relevant to geothermal exploration and develop- ment, including vast amounts of oil and gas and groundwater wells, among other data. These are relevant to a broader base of users. By diversifying the client base to other users and other fields, the cost of maintaining core infrastructure can be spread across an array of stakeholders and clients. It is presumed that NGDS will continue to provide free and open access to its data resources. The next-phase NGDS operation should be structured to eventually pursue revenue streams to help off-set sustainability expenses as necessary and appropriate, potentially including income from: grants and contracts (agencies, foundations, pri- vate sector), membership, fees for services (consulting, training, customization, ‘app’ development), repository services (data, services, apps, models, documents, multimedia), advertisements, fees for premier services or applications, subscriptions to value added services, licenses, contributions and donations, endow- ments, and sponsorships.

15 GEOTHERMAL ENERGY↗

National Wind Technology Center Dynamic 5-Megawatt Dynamometer

The National Wind Technology Center (NWTC) offers wind industry engineers a unique opportunity to conduct a wide range of tests. Its custom-designed dynamometers can test wind turbine systems from 1 kilowatt (kW) to 5 megawatts (MW). The NWTC's new dynamometer facility simulates operating field conditions to assess the reliability and performance of wind turbine prototypes and commercial machines, thereby reducing deployment time, failures, and maintenance or replacement costs. Funded by the U.S. Department of Energy with American Recovery and Reinvestment Act (ARRA) funds, the 5-MW dynamometer will provide the ability to test wind turbine drivetrains and connect those drivetrains directly to the electricity grid or through a controllable grid interface (CGI). The CGI tests the low-voltage ride-through capability of a drivetrain as well as its response to faults and other abnormal grid conditions.

17 WIND ENERGY↗