Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Production Support Flight Control Computers: Research Capability for F/A-18 Aircraft at Dryden Flight Research Center

NASA Dryden Flight Research Center (DFRC) is working with the United States Navy to complete ground testing and initiate flight testing of a modified set of F/A-18 flight control computers. The Production Support Flight Control Computers (PSFCC) can give any fleet F/A-18 airplane an in-flight, pilot-selectable research control law capability. NASA DFRC can efficiently flight test the PSFCC for the following four reasons: (1) Six F/A-18 chase aircraft are available which could be used with the PSFCC; (2) An F/A-18 processor-in-the-loop simulation exists for validation testing; (3) The expertise has been developed in programming the research processor in the PSFCC; and (4) A well-defined process has been established for clearing flight control research projects for flight. This report presents a functional description of the PSFCC. Descriptions of the NASA DFRC facilities, PSFCC verification and validation process, and planned PSFCC projects are also provided.

Carter, John F.↗

TPSAS-NF1676L-35202-DND

On March 20th, 2019, the National Aeronautics and Space Administration (NASA) and the Sistema de la Integración Centroamericana (SICA, Central American Integration System) issued a joint statement sharing their mutual desire to make Earth observations and remote sensing data and products more readily available to SICA member countries to inform their decision making. Regional capacity building in the use of Earth observations was one of the many opportunities for collaboration highlighted in this joint statement. As an initial capacity building effort, NASA deployed a series of feasibility projects through the DEVELOP Program to engage emerging and transitioning professionals with SICA member state partner agencies. The initial projects in summer 2019 addressed landslides in the Dominican Republic, near-coastal flooding in Guatemala and El Salvador, and environmental challenges to the Mesoamerican Reef off the coast of Belize. Additional projects were planned for fall 2019 with the objective of impacting environmental challenges for the remaining SICA member states. This presentation will summarize the results of projects conducted to date, address the lessons learned in the process of rapid engagement with regional entities, and consider how the partnership may evolve over time.

Kenton Ross↗

Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Gen-4 and Gen-5 Radio Plans

NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current plans for the prototype radio development.

communication↗

REopt: A Platform for Energy System Integration and Optimization: Preprint

REopt is NREL's energy planning platform offering concurrent, multi-technology integration and optimization capabilities to help clients meet their cost savings and energy performance goals. The REopt platform provides techno-economic decision-support analysis throughout the energy planning process, from agency-level screening and macro planning to project development to energy asset operation. REopt employs an integrated approach to optimizing a site?s energy costs by considering electricity and thermal consumption, resource availability, complex tariff structures including time-of-use, demand and sell-back rates, incentives, net-metering, and interconnection limits. Formulated as a mixed integer linear program, REopt recommends an optimally-sized mix of conventional and renewable energy, and energy storage technologies; estimates the net present value associated with implementing those technologies; and provides the cost-optimal dispatch strategy for operating them at maximum economic efficiency. The REopt platform can be customized to address a variety of energy optimization scenarios including policy, microgrid, and operational energy applications. This paper presents the REopt techno-economic model along with two examples of recently completed analysis projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic approach to long range planning of manpower

Publication presents a total long range planning model for project oriented organizations. The total model consists of planning systems which originate - /1/ at the project level and consolidate into an overall plan, and /2/ from a budetary ceiling and allocate to the individual projects. Analysis of /1/ and /2/ is provided for management decision making.

Lejk, R. A.↗

Establishing a Technical Assistance Network to Build Capacity in Southwest Alaska (Southwest Alaska Energy Network - Final Report)

The Southwest Alaska Municipal Conference (SWAMC) is a non-profit regional membership economic development organization that represents the Aleutian/Pribilof Islands, Bristol Bay, and Kodiak regions of southwest Alaska. SWAMC applied for the DOE-OIE Establishment of an Inter-Tribal Technical Assistance Energy Providers Network grant FOA to work with our partners to provide energy planning and project development technical assistance. The project team was made up of SWAMC, three regional organizations, a management consulting firm, and a panel of technical consultants. SWAMC sub-contracted with the three Alaska Native regional non-profit organizations – Aleutian Pribilof Islands Association (APIA), Bristol Bay Native Association (BBNA), and Kodiak Area Native Association (KANA) – to fund full or partial Regional Energy Coordinator (REC) positions. The project period ran from September 2016 to March 2020. The project goal was to help southwest Alaska regional tribal partners and communities to develop efficient and financially sustainable structures for identifying and developing energy projects that enhance community resiliency and energy sustainability. This project established energy coordinators and management structures in the Aleutian, Bristol Bay, and Kodiak regions to expand technical assistance capacity of regional residents; demonstrate this capacity by advancing energy efficiency, heat, and power supply projects; and secure long-term funding commitments to establish a sustained technical assistance structure. The project team expanded technical assistance capacity of energy coordinators and regional stakeholders in several ways: by providing funding for the SWAMC project manager to attend three Office of Indian Energy trainings; for energy coordinators to attend numerous energy conferences; for utility clerks from several villages to receive one-on-one reporting training on Alaska’s Power Cost Equalization electric subsidy program; and for the Kodiak REC to complete the Arctic Remote Energy Networks Academy and NREL’s Executive Energy Leadership Academy. The energy coordinators demonstrated and shared their increased capacity by hosting several public events: SWAMC hosted two full-day energy workshops in February 2017 and 2018; the Kodiak REC hosted seven Energy Committee meetings for Kodiak stakeholders and gave several presentations at other events; and SWAMC and BBNA organized a Bristol Bay Regional Energy Visioning Session in May 2019. The project team created platforms to both share and request information to involve energy stakeholders in this project, including an energy website, a Facebook group, a periodic newsletter, surveys, mass emails, and paper mailers. An increase in regional capacity was demonstrated through several grant awards, including a $1.2 million USDA grant for Akhiok for an electric distribution infrastructure replacement; an AHFC Kickstarter grant for Aleknagik to audit 2 Tribal and 3 City buildings; and installation of an Air Source Heat Pump demonstration project in Atka. Two communities and one region – Ouzinkie (May 2017), Ugashik (July 2017), and the Bristol Bay region (May 2019) – utilized DOE’s technical assistance services to hold Strategic Energy Planning sessions with NREL and DOE facilitation assistance. And in early 2018, SWAMC established a parallel program, funded through a USDA Energy Audit and Renewable Energy Development grant to provide subsidized energy audits for small businesses in the region. SWAMC and partners have now completed energy audits of over 60 businesses (buildings and fishing vessels) and are currently operating a third round of the USDA program. Fifteen of those business owners have now received additional grant funding to cover 25% of the cost of the energy efficiency upgrades identified in the audit. This technical assistance structure will be sustained beyond DOE grant funding in several forms. As a sign of increased grant writing and project management capacity, the Kodiak Regional Energy Coordinator applied for and received a USDA Community Facilities Technical Assistance and Training grant to continue work begun under this program. Energy coordination tasks have been folded into existing economic development positions at SWAMC and at BBNA, ensuring long-term outreach and support in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lessons Learned from the Development of the DGR Konrad - 19619

The Federal Republic Germany builds the deep geological repository Konrad. The repository is suitable for low- and intermediate-level radioactive waste (LAW and MAW) and it is the first German repository site, which is not located in a salt geological formation. Konrad is a former iron ore mine in Salzgitter (in southeast Lower Saxony) with an active production time between 1961 and 1976. In 2007, the BGE started with the conversion of the mine infrastructure above and underground to build the repository while using the shafts and some roadways of the former mine. The experiences gained from ten years project progress with its complexities and difficulties can be used for similar repository projects in the future. The Konrad repository is designed for 303,000 m{sup 3} of LAW and MAW, which will be emplaced in chambers. The emplacement chambers are located outside of the existing mine, so an impairment by the old mine workings can be excluded. So far, the first area with emplacement chambers has been excavated. In order to be able to start repository operations in 2027, a wide range of work in building construction, civil engineering, shaft sinking and infrastructure development above and below ground has been necessary and will be completed in the next years. The main activities are focused on the Konrad 1 and 2 sites and the part of the infrastructure located in the future control area, which is used for repository operations. There are still many challenges to overcome in the Konrad repository project, although many processes have been put on the right track in recent years. Looking back on past activities and in the cautious preview, this paper gives some indications from which lessons can be drawn and should be applied to similar projects in the future. - Prefer small dimensions for the infrastructure, such as insets and roadway cross-section, and the appropriate machinery and handling equipment; - Detailed process planning for construction in existing infrastructure in the run-up to implementation; - Intensive communication with contracted partners on the preparation of planning documents for nuclear examination procedures and ensuring an excellent contract management; - Early start of the implementation planning for projects under nuclear law, taking into account the relevant boundary conditions; - Ensuring the support of the project by the local community and other stakeholders. Overall, the use of parts of the existing above and underground infrastructure for the construction of a new repository is more difficult than for a complete new construction. But using the shafts of an existing mine delivers the advantage of very good knowledge about the underground environment. In addition, the areas necessary for the construction and operation of the buildings and facilities are already available and secured and do not compete with other projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

Roadmap to an Engineering-Scale Nuclear Fuel Performance & Safety Code

Developing new fuels and qualifying them for large-scale deployment in power reactors is a lengthy and expensive process, typically spanning a period of two decades from concept to licensing. Nuclear fuel designers serve an indispensable role in the process, at the initial exploratory phase as well as in analysis of the testing results. In recent years fuel performance capabilities based on first principles have been playing more of a role in what has traditionally been an empirically dominated process. Nonetheless, nuclear fuel behavior is based on the interaction of multiple complex phenomena, and recent evolutionary approaches are being applied more on a phenomenon-by-phenomenon basis, targeting localized problems, as opposed to a systematic approach based on a fundamental understanding of all interacting parameters. Advanced nuclear fuels are generally more complex, and less understood, than the traditional fuels used in existing reactors (ceramic UO{sub 2} with burnable poisons and other minor additives). The added challenges are primarily caused by a less complete empirical database and, in the case of recycled fuel, the inherent variability in fuel compositions. It is clear that using the traditional approach to develop and qualify fuels over the entire range of variables pertinent to the U.S. Department of Energy (DOE) Office of Nuclear Energy on a timely basis with available funds would be very challenging, if not impossible. As a result the DOE Office of Nuclear Energy has launched the Nuclear Energy Advanced Modeling and Simulation (NEAMS) approach to revolutionize fuel development. This new approach is predicated upon transferring the recent advances in computational sciences and computer technologies into the fuel development program. The effort will couple computational science with recent advances in the fundamental understanding of physical phenomena through ab initio modeling and targeted phenomenological testing to leapfrog many fuel-development activities. Realizing the full benefits of this approach will likely take some time. However, it is important that the developmental activities for modeling and simulation be tightly coupled with the experimental activities to maximize feedback effects and accelerate both the experimental and analytical elements of the program toward a common objective. The close integration of modeling and simulation and experimental activities is key to developing a useful fuel performance simulation capability, providing a validated design and analysis tool, and understanding the uncertainties within the models and design process. The efforts of this project are integrally connected to the Transmutation Fuels Campaign (TFC), which maintains as a primary objective to formulate, fabricate, and qualify a transuranic-based fuel with added minor actinides for use in future fast reactors. Additional details of the TFC scope can be found in the Transmutation Fuels Campaign Execution Plan. This project is an integral component of the TFC modeling and simulation effort, and this multiyear plan borrowed liberally from the Transmutation Fuels Campaign Modeling and Simulation Roadmap. This document provides the multiyear staged development plan to develop a continuum-level Integrated Performance and Safety Code (IPSC) to predict the behavior of the fuel and cladding during normal reactor operations and anticipated transients up to the point of clad breach.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data-Driven Understanding of Low-to-Moderate Income Customers’ Adoption and Financial Qualification in Community Solar (Final Technical Report)

When Solstice began working in the community solar industry, it quickly became clear that there was a wide disparity along race and class lines in terms of what kind of household traditional solar offerings benefited. Solstice is an organization that aligns itself to the principles of a Just Transition, or the concept that a transition to a green economy should benefit and prioritize historically marginalized groups of people. Given that low-income communities are disproportionately burdened by our current polluting fossil fuel economy, Solstice set out to investigate the root causes of the exclusion of low to moderate income (LMI) households in the community solar market. As we worked more and more with financiers, developers, and LMI households, we recognized that significant barriers to entry in a developer-owned project were credit threshold requirements. A FICO score of 750 and higher discriminates against LMI households that are not financially stable enough to take on multiple lines of credit (or who may not have been deemed credit worthy enough to access a line of credit) yet who may have been reliable utility customers. As Solstice began looking further into preliminary data and speaking to community-based organizations (CBOs) that serve LMI households, we found our hypothesis to be worth investigating; there was indeed a subset of LMI households with poor FICO scores (or no FICO score at all) that had perfect bill payment history. Though initially Solstice was intent on gathering a body of data to prove or disprove this hypothesis, we were also concerned that all this proof of a financially stable and reliable customer was not being incorporated into FICO, and wondered if such a score would be possible. After preliminary research into the existence of alternative scores, Solstice realized that many mission-driven lending institutions rely on alternative metrics that are formulated for their specific industry. However, we also realized that community solar did not have an alternative credit underwriting mechanism, though there was great need from solar financiers for one. We anticipated that the creation of an EnergyScore would contribute to financiers’ need to qualify more people, as these entities are desperately looking for ways to lower the cost of customer acquisition. FICO turns away nearly 50% of potential customers (according to our own acquisition experience), and much of the community solar industry is realizing that FICO is not the perfect qualifying mechanism. Additionally, with a grounding in energy justice, just transitions, and climate justice, Solstice recognizes the need for a solution that addresses a more urgent need for LMI households to access renewable energy savings and relieve energy burdens. With funding from the Department of Energy, we gathered the data necessary to build the EnergyScore, reached out to mission-driven developers willing to test the metric, and secured several demonstration projects to pilot the EnergyScore. After acquiring customers for these demo projects using the EnergyScore, we will be continuously collecting customer payment behavior data. Though it goes beyond the scope of this project, we plan to disseminate this de-identified data with the wider community solar industry, which includes not only financiers and developers, but other mission-driven nonprofits, solar cooperatives, community-based organizations, environmental justice activists, and academics. While we intend to disprove the notion that LMI households cannot be included in projects without acutely increasing the risk to project finances, we also hope the data can be used to negotiate better pricing of systems and terms of ownership for community groups seeking to build inclusive projects.

14 SOLAR ENERGY↗

Opening

Overview of the operation and upgrade plans for the machine. Upgrade studies and taskforces. The Chamonix 2010 discussions led to five new task forces: planning for a long shut down in 2012 for splice consolidation; long term consolidation planning for the injector complex; SPS upgrade task force (accelerated program for SPS upgrade); PSB upgrade and its implications for the PS (e.g. radiation etc.); LHC High Luminosity project (investigate planning for ONE upgrade by 2018-2020); Launch of a dedicated study for doubling the beam energy in the LHC->HE-LHC.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Efficient Hybrid Attack Graph Generation for Cyber-Physical System Resilience Experimentation (Final Project Report)

HAGEN project has developed theory, algorithms, and capabilities to assist cyber physical system modelers and operators to perform system and device-level vulnerability assessment, risk assessment, impact assessment, and mitigation planning. The project generates hybrid attack graphs for Cyber-Physical System (CPS) resilience experimentation at desired scale and speed. The project will produce composite attack datasets, algorithms, and demonstrable prototypical tools, and a library of high-impact attack sequences for a given CPS of interest. This report provided overall summary of research and development performed between FY22-24.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Technology Evaluation for Environmental Risk Mitigation Compendium

The Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center and its predecessor organization the Acquisition Pollution Prevention Program (AP2) supported the National Aeronautics and Space Administration (NASA) in identifying technology solutions to risks and costs to NASA programs driven by environmental regulations and requirements. TEERM researched the commercial and government marketplace to locate viable and available technologies that met NASAs needs. TEERM focused on addressing environmentally-driven risks of direct concern to NASA programs and facilities, including hazardous materials in NASA operations and materials that became obsolescent because of environmental regulations. TEERM projects aimed to reduce cost; ensure the health and safety of people, assets, and the environment; promote efficiency; and minimize duplication. Major TEERM and AP2 projects focused on waste minimization and hazardous waste treatment, recycling, corrosion prevention and control, solvent and ozone depleting substances substitution, and aqueous based cleaners. In 2017, NASA made the decision to terminate the TEERM Principal Center. This Compendium Report documents TEERM and AP2 project successes. The Compendium Report traces the evolution of TEERM based on evolving risks and requirements for NASA and its relationship to the Space Shuttle Program, the United States Department of Defense, the European Space Agency, and other public and private stakeholders. This Compendium Report also documents project details from Project Summaries and Joint Test Plans and describes project stakeholders and collaborative effort results.

material obsolescent↗

Future Circular Collider Feasibility Study Report

Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. It outlines a technically feasible and economically viable civil engineering configuration that serves as the baseline for detailed subsurface investigations, construction design, cost estimation, and project implementation planning. Additionally, the report highlights ongoing subsurface investigations in key areas to support the development of an improved 3D subsurface model of the region. The report describes the development of the project scenario based on the ‘avoid-reduce-compensate’ iterative optimisation approach. The reference scenario balances optimal physics performance with territorial compatibility, implementation risks, and costs. Environmental field investigations covering almost 600 hectares of terrain—including numerous urban, economic, social, and technical aspects—confirmed the project’s technical feasibility and contributed to the preparation of essential input documents for the formal project authorisation phase. The summary also highlights the initiation of public dialogue as part of the authorisation process. The results of a comprehensive socio-economic impact assessment, which included significant environmental effects, are presented. Even under the most conservative and stringent conditions, a positive benefit-cost ratio for the FCC-ee is obtained. Finally, the report provides a summary of the studies conducted to document the current state of the environment.

Benedikt, M. [European Organization for Nuclear Re↗

Laboratory Experiments and Instrument Intercomparison Studies of Carbonaceous Aerosol Particles

Aerosols containing black carbon (and some specific types of organic particulate matter) directly absorb incoming light, heating the atmosphere. In addition, all aerosol particles backscatter solar light, leading to a net-cooling effect. Indirect effects involve hydrophilic aerosols, which serve as cloud condensation nuclei (CCN) that affect cloud cover and cloud stability, impacting both atmospheric radiation balance and precipitation patterns. At night, all clouds produce local warming, but overall clouds exert a net-cooling effect on the Earth. The effect of aerosol radiative forcing on climate may be as large as that of the greenhouse gases, but predominantly opposite in sign and much more uncertain. The uncertainties in the representation of aerosol interactions in climate models makes it problematic to use model projections to guide energy policy. The objective of our program is to reduce the uncertainties in the aerosol radiative forcing in the two areas highlighted in the ASR Science and Program Plan. That is, (1) addressing the direct effect by correlating particle chemistry and morphology with particle optical properties (i.e. absorption, scattering, extinction), and (2) addressing the indirect effect by correlating particle hygroscopicity and CCN activity with particle size, chemistry, and morphology. In this connection we are systematically studying particle formation, oxidation, and the effects of particle coating. The work is specifically focused on carbonaceous particles where the uncertainties in the climate relevant properties are the highest. The ongoing work consists of laboratory experiments and related instrument inter-comparison studies both coordinated with field and modeling studies, with the aim of providing reliable data to represent aerosol processes in climate models. The work is performed in the aerosol laboratory at Boston College. At the center of our laboratory setup are two main sources for the production of aerosol particles: (a) two well-characterized source of soot particles and (b) a flow reactor for controlled OH and/or O3 oxidation of relevant gas phase species to produce well-characterized SOA particles. After formation, the aerosol particles are subjected to physical and chemical processes that simulate aerosol growth and aging. A suite of instruments in our laboratory is used to characterize the physical and chemical properties of aerosol particles before and after processing. The Time of Flight Aerosol Mass Spectrometer (ToF-AMS) together with a Scanning Mobility Particle Sizer (SMPS) measures particle mass, volume, density, composition (including black carbon content), dynamic shape factor, and fractal dimension. The–ToF-AMS was developed at ARI with Boston College participation. About 120 AMS instruments are now in service (including 5 built for DOE laboratories) performing field and laboratory studies world-wide. Other major instruments include a thermal denuder, two Differential Mobility Analyzers (DMA), a Cloud Condensation Nuclei Counter (CCN), a Thermal desorption Aerosol GC/MS (TAG) and the new Soot Particle Aerosol Mass Spectrometer (SP-AMS). Optical instrumentation required for the studies have been brought to our laboratory as part of ongoing and planned collaborative projects with colleagues from DOE, NOAA and university laboratories. Optical instruments that will be utilized include a Photoacoustic Spectrometer (PAS), a Cavity Ring Down Aerosol Extinction Spectrometer (CRD-AES), a Photo Thermal Interferometer (PTI), a new 7-wavelength Aethalometer and a Cavity Attenuated Phase Shift Extinction Monitor (CAPS). These instruments are providing aerosol absorption, extinction and scattering coefficients at a range of atmospherically relevant wavelengths. During the past two years our work has continued along the lines of our original proposal. We report on 12 completed and/or continuing projects conducted during the period 08/14 to 0814/2015. These projects are described in 17 manuscripts published in refereed journals.

54 ENVIRONMENTAL SCIENCES↗

Feasibility of Estimating Relative Nutrient Contributions of Agriculture using MODIS Time Series

Around the Gulf of Mexico, high-input crops in several regions make a significant contribution to nutrient loading of small to medium estuaries and to the near-shore Gulf. Some crops cultivated near the coast include sorghum in Texas, rice in Texas and Louisiana, sugarcane in Florida and Louisiana, citrus orchards in Florida, pecan orchards in Mississippi and Alabama, and heavy sod and ornamental production around Mobile and Tampa Bay. In addition to crops, management of timberlands in proximity to the coasts also plays a role in nutrient loading. In the summer of 2008, a feasibility project is planned to explore the use of NASA data to enhance the spatial and temporal resolution of near-coast nutrient source information available to the coastal community. The purpose of this project is to demonstrate the viability of nutrient source information products applicable to small to medium watersheds surrounding the Gulf of Mexico. Conceptually, these products are intended to complement estuarine nutrient monitoring.

Ross, Kenton W.↗

Exploration Life Support Technology Development for Lunar Missions

Exploration Life Support (ELS) is one of NASA's Exploration Technology Development Projects. ELS plans, coordinates and implements the development of new life support technologies for human exploration missions as outlined in NASA's Vision for Space Exploration. ELS technology development currently supports three major projects of the Constellation Program - the Orion Crew Exploration Vehicle (CEV), the Altair Lunar Lander and Lunar Surface Systems. ELS content includes Air Revitalization Systems (ARS), Water Recovery Systems (WRS), Waste Management Systems (WMS), Habitation Engineering, Systems Integration, Modeling and Analysis (SIMA), and Validation and Testing. The primary goal of the ELS project is to provide different technology options to Constellation which fill gaps or provide substantial improvements over the state-of-the-art in life support systems. Since the Constellation missions are so challenging, mass, power, and volume must be reduced from Space Shuttle and Space Station technologies. Systems engineering analysis also optimizes the overall architecture by considering all interfaces with the life support system and potential for reduction or reuse of resources. For long duration missions, technologies which aid in closure of air and water loops with increased reliability are essential as well as techniques to minimize or deal with waste. The ELS project utilizes in-house efforts at five NASA centers, aerospace industry contracts, Small Business Innovative Research contracts and other means to develop advanced life support technologies. Testing, analysis and reduced gravity flight experiments are also conducted at the NASA field centers. This paper gives a current status of technologies under development by ELS and relates them to the Constellation customers who will eventually use them.

Ewert, Michael K.↗

Feasibility of Estimating Relative Nutrient Contributions of Agriculture and Forests Using MODIS Time Series

Around the Gulf of Mexico, high-input crops in several regions make a significant contribution to nutrient loading of small to medium estuaries and to the near-shore Gulf. Some crops cultivated near the coast include sorghum in Texas, rice in Texas and Louisiana, sugarcane in Florida and Louisiana, citrus orchards in Florida, pecan orchards in Mississippi and Alabama, and heavy sod and ornamental production around Mobile and Tampa Bay. In addition to crops, management of timberlands in proximity to the coasts also plays a role in nutrient loading. In the summer of 2008, a feasibility project is planned to explore the use of NASA data to enhance the spatial and temporal resolution of near-coast nutrient source information available to the coastal community. The purpose of this project is to demonstrate the viability of nutrient source information products applicable to small to medium watersheds surrounding the Gulf of Mexico. Conceptually, these products are intended to complement estuarine nutrient monitoring.

Ross, Kenton W.↗