Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PWR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Study of treatment as an alternative WM pathway: examples of I-graphite and metallic components such as steam generators - 15212

EDF is working continuously to optimize and secure its waste management pathways, leading in some case to develop appropriate treatment solutions that could be implemented parallel to reference solutions, complementary or as alternative solutions to already existing paths. This approach is illustrated by the examples of steam generators replaced during the operation of French PWR power plants, and of irradiated graphite (stacks and sleeves), coming from the decommissioning of UNGG reactors, which have been shut down. Concerning graphite wastes, the near surface disposal facility intended for this waste does not exist yet, and is currently giving rise to the research of a suitable site, and an evaluation of its performances. While accompanying ANDRA (French national agency for nuclear waste management), in charge of the development of the facility, and while waiting for more data to be available, EDF is continuing the consolidation of graphite wastes radiological inventory, and is working on the development of an alternative management solution, based on a thermal treatment process. Depending on the nature of the treatment, and on the choice of operating parameters, this treatment may contribute to reduce graphite wastes volume and/or promote its acceptance in a disposal facility. Reducing the radiological inventory by decontamination is one of the means to achieve these objectives. Concerning replaced steam generators, nearly 200 of them will have been removed by 2030, and stored on site waiting for their treatment, which represents about 65 000 tons of metal. Initially intended to be cut and packed on NPPs' sites during their dismantling, EDF is studying the economic value of having the steam generators treated in a centralized facility, which allows reducing the volume of final wastes by optimizing cutting operations, while considering recycling after melting. However, this studied pathway implies a number of difficulties to be overcome. In particular, the shipment of such large components to a centralized facility may be complex. Moreover, French regulatory framework does not allow recycling outside nuclear industry, therefore limiting recycling opportunities to storage containers for radioactive wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vacuum drying of spent fuel storage canisters/casks - 'just how much water could be left in there, anyway?' - 15233

The process of moving spent fuel assemblies from wet storage in the spent fuel pool to dry storage in an inert gas environment within a canister or cask typically involves two main stages. In the first stage, the bulk of the water is removed by a draining or siphoning operation, conducted with pressure inside the canister maintained at 1.3 to 2 atm. This process removes most of the water in the cask cavity, but residual water can be left behind, in three main regions. The largest region, typically, is the bottom of the cavity below the end of the siphon tube. A second general class of locations, also located at the bottom of the cask cavity, consists of the 'dashpots' at the ends of the various non-fuel tubular structures within the fuel assemblies. For PWR assemblies, these are the control rod guide sleeve tubes and instrumentation thimbles. For BWR assemblies, these are the water rods of various designs and control blade ends in some configurations. A third class of locations consists of porous material within the cavity that can absorb water, such as thin ceramic neutron poison plates, and ostensibly intact fuel rods that nevertheless might have pinholes or fine cracks in the cladding that could allow pool water to creep inside the fuel rod. To remove residual water from these locations, the second stage of drying operations utilizes vacuum drying, by reducing the pressure sufficiently to convert the water to vapor that can then be pumped out of the canister cavity. In this operation, the cask cavity pressure is slowly reduced from the nominal condition of (1.3-2.0 atm (1000-1520 torr), to a final target pressure below 3 torr (0.004 atm). This is typically accomplished in three to five stages, with prescribed 'hold' points defined in procedures or in the Technical Specifications, to preclude sudden pressure spikes due to flashing of water to steam, or development of large local temperature gradients in the fuel rods or other cask internal components. This paper discusses the various locations in the system where residual water may 'hang up' in the cask, and presents a discussion of the physical basis for the effectiveness of vacuum drying for removing it. Results and conclusions based on realistic qualitative and quantitative evaluations of the transient heat transfer behavior of the system are presented, based on detailed modeling of a range of spent fuel canister designs and decay heat loads, most notably the 24P Dry Shielded Canisters (DSCs) stored at the Rancho Seco Independent Spent Fuel Storage Installation (ISFSI), the NAC-MPC modules at Maine Yankee, the 24P DSCs stored at Calvert Cliffs, and the Holtec HI-STORM modules at Hope Creek. The evaluations presented here show that ice formation within a spent fuel canister is highly unlikely, due to the availability of a large thermal source term in the form of the decay heat load of the spent fuel. The formation of ice is an operational concern, since it mainly affects operation of equipment external to the canister (i.e., the hoses, valves, and fittings of the vacuum drying equipment.) Evaluations are presented for quantifying the amount of residual water that could remain in the cask cavity, even after successful drying operations, since vacuum drying is a limit process, and by definition, cannot remove all of the water from the cavity, no matter how long the operation goes on, even if all of it is in vapor form. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Cires facility in Morvilliers: from a VLL waste disposal facility to the development of industrial activities - 15252

The disposal facility of CIRES for very low level wastes was designed to provide safe and cost effective services to waste generators, in particular for decommissioning works. The facility could significantly increase waste annual deliveries to meet waste generators' needs and accommodate large disused components as PWR steam generators after decontamination. However an anticipated saturation of its capacity is foreseen as needs for disposal has doubled since its start-up. The geometry of the cells was optimized and the technical capacity of the repository is presently by 40% above its licensed capacity. Saturation has been delayed; however a new facility will be necessary by 2030 and other waste management options are to be considered as recycling of metallic wastes or crushed concrete rubble. CIRES facility also became Andra's industrial platform for the management of institutional wastes. A grouping and a storage facility have been built and a new processing facility should start up in 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of HL deposits for the D and D of UP1 reprocessing plant - retrieval and treatment scenarios - 15295

Built in 1958 on the Marcoule CEA site, the UP1 facility, was the 1. French industrial (500 t U / year) reprocessing plant based on the PUREX process. The plant, which has stopped operation in 1997, constitutes with its auxiliary workshop (vitrification workshop, glass canister storage), one of the largest and most challenging decommissioning project in France. In about 40 years of operation, various type of fuels elements such as metallic uranium, U-Al fuel rods, Phenix breeder elements or PWR fuel have been reprocessed, thereby requiring several plant and process adaptations. Resulting from these complex process chemistry and operation history, significant fouling of the chemical plant circuits and components has occurred. The fission product (FP) concentration process is particularly concerned. Preliminary investigation performed in 2010 in the evaporator's feeding tanks revealed the presence of significant amounts of sludge and dose rates as high as 250 Gy/h. Therefore a thorough investigation campaign, including visual inspection, volume quantification, deposits sampling, and radiological characterization of the components of this workshop has been initiated in 2013. Chemical analysis performed so far show that the solids are mainly composed of zirconium phosphates, 'MoZr' compounds and nitrate salt precipitates. But the presence of insoluble fines arising from the dissolution workshop and organic residues resulting from the TBP decomposition has also been evidenced in some of the tanks. The numerous constraints associated with the management of such highly active sludge, with Cs-137 specific activity ranging from 1 to 10 GBq/g, and a complex physico-chemical composition, lead CEA to investigate the implementation of an in situ conditioning treatment able to produce a waste package complying with existing evacuation routes and/or on-site storage facilities. The full paper presents an overview of the UP1 D and D project and then focuses on the possible dismantling scenarios for the FP concentration workshop, including the evaluation of different strategies for the highly active deposits management. The investigations and deposits characterization program will be developed so as the sampling methodologies that has been specifically tuned. In the light of the best actual knowledge of the deposits properties, the recovery and conditioning treatment scenarios will be exposed, considering, as a case study, the development of a specific vitrification tool to be implemented In Situ and specifically designed to match the requirements and constraints of the D and D project: adequately dimensioned, compact, flexible with respect to the feed composition, for a limited duration of use and designed to be dismantled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proven Uranium Recovery Solutions for the Nuclear Fuel Manufacturing Market - 16060

During the Nuclear Fuel Manufacturing process a number of by-products and residues are generated from various sources. In recent years, Westinghouse has characterised and processed around 50,000 drums of residue comprising of numerous different types generated over 60 years from the manufacture of numerous types of fuel for greater than 50 reactors. These include, AGR, Magnox (uranium metal fuel), PWR, fast reactors and various test reactors. Different organisations have different definitions and names for each of these categories but essentially they fall into one of the following categories: Clean Scrap (U{sub 3}O{sub 8}, UO{sub 2}, UO{sub 3}, UF{sub 4}, powders, pellets), Dirty Scrap (U{sub 3}O{sub 8}, UO{sub 2}, UO{sub 3}, UF{sub 4}, powders, pellets), Gd Contaminated Scrap (U{sub 3}O{sub 8}, UO{sub 2}, powders, pellets), Ash, Sludge, Combustible / soft residues (e.g. ventilation filters, gloves, plastic bags), Contaminated metals (including contaminated scrap zirconium tubes), Materials arising from decommissioning. Routes have been developed across the industry for a number of the categories listed above, however in numerous examples, routes have not been established and materials have been stored creating a significant legacy. Westinghouse understands the issues regarding legacy uranic material and the financial and regulatory impact of storage. Interim storage of materials may seem like a low cost option in the short term; however ongoing costs for facilities, manpower and equipment, without a permanent and final solution can result in significant lifetime material management costs. Recovery of uranium and sending materials for safe disposal of enriched uranium residues is not easy because of the criticality risk both during processing and at a disposal site. Therefore quantities of materials than can be sent via permitted disposal routes are very limited The development of regulations often means that finding solutions is becoming more difficult. It is believed that timely resolution is ultimately the most cost effective solution. In addition, the intrinsic value of recycling this material is also high and in some cases can mitigate the cost of processing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience on Safety Review of Liquid and Gaseous Effluent Monitoring System for Nuclear Power Plants in Korea - 16237

The liquid and gaseous effluent monitoring systems are important components in order to evaluate and minimize the radiation environmental impacts from Nuclear Power Plants (NPPs). Therefore, licensee should install liquid and gaseous effluent monitoring systems and these systems should be reviewed by regulatory body. In Korea, the criteria of liquid and gaseous effluent monitoring systems for NPPs are stipulated in Nuclear Safety Act (NSA) and subordinate statute, and it is stated in 'Regulation on Technical Standards for Nuclear Reactor Facilities, etc.' that 'Instrumentation shall be provided to monitor related variables, including the following, and systems over their anticipated ranges of normal operations, anticipated operational occurrences, and accident conditions'. RG-1.97(Rev. 3, 1983) of US Nuclear Regulatory Commission (NRC) was used as criterion for accident monitoring instrumentations for NPPs in Korea. Licensee, however, started to apply RG-1.97(Rev. 4, 2006) as new criterion for accident monitoring instrumentation of the Construction Permit (CP) of new NPPs (Shin-kori Unit 5 and 6). Licensee submitted the report for type selection criteria and this report shows selection criteria of from 'Type A variables' to 'Type E variables'. Licensee of Korea has plans to submit the validation report regarding the criteria for accident monitoring instrumentation during Operation License (OL) and regulatory body of Korea also will conduct safety review of these reports. A graded approach to establishing a sampling program is required in ANSI/HPS N13.1-1999. Because deaerator release pipe of Shin-kori unit 5, 6 was integrated into condenser vacuum system release pipe, regulatory body reviewed application of a graded approach on this integration. Output of PWR GALE shows that iodine released from turbine building is 0.12% of total iodine release amount and this value is potential impact categories (PICs) 3 in ANSI/HPS N13.1-1999. So, periodic sampler installed in condenser vacuum system release pipe in Shin-kori unit 5, 6 is suitable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation Cask for Bare High Burnup Used Nuclear Fuel - 16362

A conceptual design for a reusable transportation cask (the 6625B-HB) capable of transporting boiling water reactor (BWR) and pressurized water reactor (PWR) used nuclear fuel (UNF) assemblies, including high burnup UNF, was produced for the Department of Energy (DOE) by AREVA. This cask could be configured to ship these assemblies either as bare fuel or fuel loaded into single-assembly damaged fuel cans (DFCs). The 6625B-HB cask has been designed with reasonable assurance it can be certified by the Nuclear Regulatory Commission (NRC) under 10 CFR Part 71 based on AREVA TN's experience with the MP197HB (a transportation cask designed to ship high burnup UNF in a dry storage canister), fabricated within existing facilities, used by most utilities, and transported by rail. The level of detail developed for the 6625B-HB is intended to support analyses and planning activities that DOE is performing in laying the groundwork for an integrated waste management system, which includes preparing for future large-scale transport of UNF to consolidated interim storage or disposal facilities. The details of the conceptual design include cask characteristics (e.g., capacity, dimensions, and masses), characteristics of the UNF that could be shipped in this cask system concept, estimates of costs to fabricate this cask system, an assessment of operational activity durations and associated cumulative doses for loading and unloading this cask system, and identification of potential limitations or anticipated licensing considerations of relevance for this cask system. This design concept for a reusable transportation cask would enhance the high-burnup fuel assembly carrying capacity as compared to other NRC-certified transportation casks and, unlike welded canister systems, could be used for shipment of bare UNF assemblies taken directly from reactor spent fuel pools (SFPs). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AVANTech's Innovative LLW Concentrate Treatment System Reducing Environmental Releases - 16416

Russian Water-Water Energetic Reactors (VVER) and some Pressurized Water Reactors (PWR) utilize evaporator or reverse osmosis units to generate concentrate that must be disposed as LLRW. The new AVANTech Concentrate Treatment System (CTS{sup TM}) was developed to decontaminate the concentrate to the point where the dry solids after evaporation are free releasable to the environment and the radioactive waste generated represents less than 3% of the original concentrate volume, thus decreasing disposal costs substantially. These concentrate solids can be recycled to non-nuclear applications or disposed as industrial waste. Bench-scale testing has been completed with actual concentrate waste from two VVER plants with final results less than the IAEA General Safety Requirements (GSR) Part 3 discharge requirements. The VVER plants utilize chelants to conduct periodic decontamination of the piping systems that must be destroyed before utilizing precipitants and ion exchange to remove most of the isotopes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NUHOMS{sup R} EOS (Extended Optimized Storage): Robust, Advanced, and Dual Purpose Dry Storage System - 16472

AREVA TN has completed the design, analysis, and US NRC license submittal for the NUHOMS{sup R} Extended Optimized Storage (EOS) system. NUHOMS{sup R} EOS offers a large capacity and high heat load dry storage and transportation solution for UNF. EOS is not a new system, but an evolution of the already-proven safe and low-risk horizontal NUHOMS{sup R} storage system, which is one of the most widely used UNF dry storage systems in the United States. The EOS system features a 37PTH dry shielded canister (DSC) for 37 PWR UNF assemblies and an 89BTH DSC for the 89 BWR UNF assemblies. The EOS DSCs will be stored inside a horizontal storage module (HSM) that is a robust, fortress-like concrete storage overpack. Designed with the lessons learned from the Fukushima event in Japan in mind, EOS has robust margins for beyond design basis (BDB) events and offers the lowest risk and highest safety margin of any dry storage system design for recovery from BDB events. EOS also offers innovative aging management features with an aging management program (AMP) to assure safe and low dose long-term storage at the utility sites. EOS incorporates ports for AMP inspections and offers the option of using duplex stainless steel (DSS) for the DSC shell in order to negate corrosion issues. EOS is stored horizontally and above ground, making it easy and quick to access for visual inspection, monitoring, and mitigating actions during AMP. NUHOMS{sup R} EOS is optimized for high capacity, high burnup, high enrichments, and very low cooling times for UNF assemblies. It enables the highest heat load per canister (50 kW) and low dose rates. Even with high heat loads, EOS has significant margins to design basis limits. As the future of used fuel disposition will require the need to move fuel off-site to interim or consolidated storage, EOS is the ideal solution as it enables on-site loading and unloading operations that mitigate risk when transferring fuel on-site or transporting fuel off-site. The EOS design can be safely located in a traditional outdoor setting with fortress-like concrete reinforced modules that offer superior resistance to attack or can be safely operated inside of a building enclosure for those utilities desiring a more discreet siting for its used fuel storage systems. EOS has an innovative basket design that is made of high strength low alloy (HSLA) material and is easy to fabricate due to its non-welded design. Its innovative inlet and outlet air vent design, which incorporates dose reduction hardware, allows for optimal ambient airflow for highly efficient heat transfer with minimal radiation dose. The NUHOMS{sup R} EOS storage modules are interlocked in a side-by-side configuration offering superior and robust seismic performance. The license application for NUHOMS{sup R} EOS is currently under US NRC review and this system will be available for deployment in 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Packaging for Transport of the ILW-LL of EDF First Generation Power Plant Dismantling - 16517

EDF has a first generation decommissioning plan involving different types of reactors: Heavy Water Reactor, Natural Uranium and Gas Cooled Reactor, Fast Neutron Reactor and Chooz-A the first Pressurized Water Reactor (PWR) of the French decommissioning plan. The dismantling of these first generation reactors produces various types of radioactive waste, the most radioactive of them being the intermediate-level long-lived waste (ILW LL). After cutting and/or extraction from the reactors, these ILW LLs have to be transported to the EDF Conditioning and Storage Facility for Activated Waste ICEDA where they will be temporarily stored until a final depository solution is built. To transport these irradiated and contaminated metallic wastes, EDF decided to give ROBATEL Industries the responsibility of designing a new B- type package and obtaining the associated approval from the French Nuclear Safety Authority (ASN). A lot of issues had to be overcome to comply with the nuclear transport regulations and answer the ASN and its technical support IRSN's questions. Among them, was the difficulty to have a single type of package to transport unblocked waste coming from reactors of different technologies, sites in different stages of decommissioning and using different methods of waste production, conditioning and control. In the end, EDF had to apply for a specific approval for each dismantling site. These difficulties, some other technical issues encountered, and the decision to get first an approval for the transport of Chooz A's ILW LLs, are described here. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extended Storage of High Burn-up Fuel Cask R and D Project - 16591

Under contract by EPRI and DOE, AREVA Federal Services LLC (AFS) is leading a team consisting of AREVA Inc. and Dominion Virginia Power (Dominion) to develop and conduct a full-scale confirmatory Research project with HBU fuel. A test plan was developed using an existing AREVA Transnuclear (TN) TN-32 bolted storage cask with a modified, specially instrumented lid to be engineered and then loaded with multiple cladding types of HBU pressurized water reactor (PWR) UNF from Dominion's North Anna Power Station (this modified cask is identified as TN-32B). Seven specially designed thermocouple lances, each containing nine detectors, will be inserted into the designated fuel assembly guide tubes through the modified cask lid. The loaded cask with the monitoring system will be placed into dry storage on the existing North Anna Independent Spent Fuel Storage Installation (ISFSI) pad for a period of extended monitoring. In addition, design modifications to the lid have been incorporated to permit periodic gas sampling of the cask internals during the storage period on the ISFSI pad. The fuel selected for this research project ranges in average assembly burnup between 50 GWD/MTU to 67 GWD/MTU. The instrumentation used to collect the thermal data is very similar to in-core thermocouple detectors used at nuclear power plants and is considered very reliable for this application. Prior to cask loading at North Anna, a series of 'fit up' tests will be performed at the fabricator to ensure proper alignment, fit and function of the modified cask and related instrumentation and equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Criticality effect of long-term changes in material compositions and geometry in disposal canisters

For the Swedish final repository the basic requirement concerning margin to criticality is that k{sub eff} should be less than 0.95. This criterion is always fulfilled if the disposal canister is dry. If it is assumed that a canister is filled with water it is shown that the criticality criterion is fulfilled using burnup-credit for PWR fuel and credit for burnable poison for BWR fuel. If water is assumed to leak in, long term chemical processes will change the material compositions and geometries in the canister during the one million year analysis period. The main process expected to affect significantly the chemical composition of the materials in the canister is the corrosion of cast iron and carbon steel of the insert, the corrosion of the stainless steel, Inconel or Zircaloy in the fuel element structural material, the corrosion of Zircaloy cladding and finally the corrosion of spent fuel itself. During metal corrosion, various anoxic corrosion products are formed, usually with lower density than the metal itself, causing thus a volume increase in the canister, accompanied by geometrical changes. In this paper the reactivity effects of these changes are analysed and results presented. It is shown that the largest reactivity increase is due to the decrease of the water gap between the fuel and the fuel channel, due to the formation of Magnetite. Other process that possibly will increase the reactivity is if Siderite is produced besides from Magnetite, the production of Hydrogen, corrosion of the fuel and radial movements of fuel rods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Irradiated Control Rods: Cost of an Industrial Approach - 18009

This paper concerns the sorting of irradiated control rods that can be done to limit the volume of Intermediate Level Long-lived Waste. More specifically it assesses the cost of an industrial approach. For this we used numerical simulations, penalizing hypotheses and measurements. The cost is given in term of the increased volume of the control rods placed into deep geological storage. To calculate the radioactive inventories, we have developed a calculation scheme which includes a mapping of the neutron flux, a calculation of the isotopic compositions evolution, and a validation of the results. For the state of the art simulations, all operational fuel loading patterns were considered and coupled with all effective power distributions. The analysis of the calculated results shows that the simulations produce a slight overestimation of the measurements. For envelope simulations, penalizing fuel loading patterns and nominal power distribution conditions were used. Most of the radionuclides needed to declare the radiological inventories are difficult to measure. Therefore, for each radionuclide a scaling factor referred to a key radionuclide, can be calculated. Then during the dismantling operations these calculated scaling factors are multiplied by the measured key radionuclide to determine the radiological inventory. The industrial approach consists of combining envelope simulations with scaling factors. Applied to PWR control rods, the industrial approach overestimates the radiological inventories by a factor of 2. As such, the calculated position of the Intermediate Level Long Lived part limit moves +6 cm. Compared to the 1 meter of the control rod pins classified as Intermediate Level Long Lived, the industrial approach would increase by 6 % the volume of the control rods placed into the deep geological storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How to Replace Co-60 Tracer when Faced with Unknown Variability of Initial Cobalt Content - 18059

Electricite de France (EDF), radioactive waste producer, is responsible for managing waste from dismantling of its permanently shut-down nuclear power plants. The process has been opened for more than 10 years for some plants of the first generation and is under preparation for the first pressurized water reactor (PWR) plants to be dismantled. Nowadays it is generally admitted that waste disposal is the main constraint of dismantling. In France, waste producer is required by safety rules to obtain an agreement from French governmental agency (ANDRA) before any waste production and for each type of waste under project. Such an agreement which is a technical file, is the proof that the container, the way of waste conditioning, waste composition itself and especially the activity of each radionuclide (RN), comply with all the requirements of the disposal safety studies. We should also notice in French regulation that the declaration process of activities i.e. the way the radiological content of each container is computed and declared is a prerequisite to its disposal shipment. Taking into account that EDF has already prepared numerous files describing the means to fill the container itself, the main problem to cope with now is the declaration of each RN which is present in each container ready to be shipped to the disposal. The paper points out the general case of Difficult- To-Measure (DTM) radionuclide management and specially the high difference between waste from plants in operation and waste from dismantling plants. Starting from a '3D' neutron flux cartography computation at 100% power, a specific global strategy of DTM activation RN evaluation for each type of waste has been developed. As the only tracer is Co- 60, which is almost always the case in EDF dismantling, the way to compute the global scaling factors of mix of different waste initial composition is easy when the cobalt initial composition (before irradiation by neutrons) is known. But, in some cases, cobalt is not included in the steel composition required for conception purposes but only considered as an impurity which maximum quantity is known. The result is that, even for a given family of waste corresponding to the same object for dismantling, the tracer value variability is not any more correlated with the irradiation level of the activated waste, which is completely spoiling any of its tracer property. The more the cobalt level variability is high, the more the necessary conservative choice of minimum cobalt level to compute the activation scaling factor will lead to an important overestimation of DTM RN using these scaling factor with respect to Co-60. The paper describes a method using residual thermal power measurement and removing computed Co-60 residual thermal power with the help of gamma measurement to give a new tracer without any chaotic behavior. The possible application is studied on interim storage of irradiated graphite sleeves mixed with stainless steel wires. This method avoids overestimation of graphite inventories coming from activation by neutron flux and using scaling factors with respect to any failing gamma tracer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification and Analysis of Spent Fuel Safety Information Database in Korea - 18252

The Public Engagement Commission on SNF management (PECOS) published the recommendation report on the spent fuel management of Korea in June, 2015. Based on this report, the national basic policy for high level radioactive waste management of Korea was established and promulgated, taking into consideration the national/international trends on policy and technology development. According to the national plan, the siting for deep geological disposal facility of high level radioactive waste will be proceeded by 2028. Once the site is selected at somewhere, centralized spent fuel storage facility will be constructed by 2035 at the same site while research program is ongoing to determine the compatibility of the site for disposal facility. According to the enforcement decree of the nuclear safety act, the definition of 'interim storage' is that a safe storage of spent fuel which is received from NPP operator for a specified period, until it is processed or permanently disposed of. It means that spent fuels should be taken over with integrated information of spent fuel from NPP operator to the KORAD (Korea Radioactive waste agency). The aim of this study is to confirm and analyze present and future spent fuel data in order to provide the basic information to the safety research on the transport and storage of spent fuel in Korea. AMORES (Automatic Multi-batch ORIGEN Runner for Evaluation of Spent fuel) was used for the aim of this study. All 16,160 bundles of PWR spent fuel database as of the end of 2015 and the expected spent fuel which will be generated from 2016 to 2053 are evaluated and verified based on national basic plan. Through scenario analysis, it was estimated that approximately 15,000 MTU of spent fuel will be transported to intermediate storage facilities by 2052. Therefore, 44%, 6%, and 33% of spent fuel will be left in Kori, Hanbit and Hanul sites, respectively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Two-phase pressure drop due to a spacer grid in a heated rod bundle

The present study investigates the effect of a spacer grid on two-phase pressure drop in a heated rod bundle with similar configuration to that used in a pressurized water reactor (PWR). Data from the Rod Bundle Heat Transfer (RBHT) facility at Penn State was used to compare with the existing models available in the literature. Steady state two-phase flow tests were performed in the rod bundle with liquid inlet conditions varying over the Reynolds number (Re) range of 140 < Re < 2200. At the spacer grid of interest, the mass quality (x) varies from 0.02 < x < 0.9. The pressure drop due to the spacer grid was found to vary significantly with the superficial vapor velocity. In addition to model comparison, an alternative approach involving the use of an effective two-phase grid loss coefficient is proposed to account for the two-phase pressure drop due to the spacer grid. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment of boric acid accumulation in a reactor core blocked by debris

To examine the potential for boron precipitation in the core during sump recirculation when latent debris has formed a blockage at the core inlet, TRACE simulations of long term cooling following a loss-of-coolant accident (LOCA) in a Westinghouse four loop pressurized water reactor (PWR) were performed. The TRAC/RELAP Advanced Computational Engine (TRACE) was modified to account for the higher fluid densities and viscosities that occur when the coolant contains boric acid. Previous versions of TRACE calculated the transport of boron in the RCS, but assumed coolant properties to be the same as pure water. This was appropriate for very low concentrations of boric acid, but not when the concentrations approach those where precipitation is possible. These modifications allow TRACE to simulate natural circulation caused by a concentration difference in addition to the buoyancy induced by temperature differences. The results of the TRACE calculations suggest that there is margin to boric acid precipitation during long term cooling following a large break LOCA even if debris significantly affects flow at the core inlet. Significant blockages at either the lower core plate or bottom fuel nozzles did not result in boric acid concentrations likely to cause precipitation in the core. The calculations do show that precipitation can occur in the upper head where coolant can become trapped and in the steam generators where entrained fluid can evaporate and deposit the boron carried by the droplets. Of particular importance, is that the boric acid concentration and coolant temperature in the lower plenum and regions near debris blockage remained well below precipitation levels supporting a conclusion that precipitation is not likely to make the blockage more severe. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Used Fuel Dry Storage Systems and Components for Shutdown Plants to Expedite Defueling of Spent Fuel Pool - 18378

For plants that have announced plans to shut down, their main priority is to off-load the Used Nuclear Fuel from the spent fuel pool to dry storage at an ISFSI so that they can proceed to 'Safe store' or other storage options, and start their decommissioning process as soon as possible. One of the major expenses for a decommissioned plant is the cost of maintenance of the spent fuel pool. Therefore, the ability of the dry storage system to store short cooled fuel is an important aspect of dry storage system for shutdown plants. When a shutdown plant evaluates the dry storage options, total cost of the transferring the fuel from the pool to ISFSI site needs to be evaluated. One of the major costs to the utility for dry storage is the cost of ISFSI pad (basemat) along with the cost of dry storage system hardware. Smaller ISFSI footprint saves utility for the cost of ISFSI site excavation, cost of engineered backfill and cost of ISFSI pad. In order to minimize the cost of dry storage systems, besides the size of the ISFSI pad as described above, other important considerations is to use high capacity systems. The highest capacity systems available in the dry storage market today are with 37 PWR or 89 BWR used fuel assemblies per canister. These dry storage systems are expected to be at the plant sites for extended duration due to the unavailability of Interim Storage Facilities or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the dry storage systems canisters and storage overpack so that they can safely protect the fuel and integrity of used nuclear fuel is maintained during storage period is of utmost importance. Robust Aging Management Program is an important aspect for dry storage systems not only at the shutdown plants but also at the operating plants. This paper will provide the update of a reduced footprint version of TN Americas NUHOMS{sup R} System with MATRIX HSM and NUHOMS{sup R} EOS Canisters that addresses the need for maximizing safety, ISFSI capacity while optimizing cost. It will provide an update on the current capabilities, design features and current status of the licensing and deployment of NUHOMS{sup R} EOS System. It will provide the current status of the MATRIX HSM along with the significant enhancement included for a robust Canister Evolved Safety Program for Aging Management. It will also describe the construction sequence; loading operations, and inspections during extended storage as a part of aging management program. The compact version of TN Americas NUHOMS{sup R} System with MATRIX HSM offers a 'Universal' Storage Overpack which is designed to accept all different designs dry storage canisters available in the industry. As UNF storage continues to drives the industry towards innovations that address the need for optimized dry storage systems, compact ISFSIs and prudent aging management programs, this new evolution of the TN Americas NUHOMS{sup R} system with MATRIX HSM and EOS Canisters offers a significant leap forward in addressing all of these challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗