Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operator learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Technology test bed review

The topics are presented in viewgraph form and include the following: (1) Space Shuttle Main Engine (SSME) technology test bed (TTB) history; (2) TTB objectives; (3) TTB major accomplishments; (4) TTB contributions to SSME; (5) major impacts of 3001 testing; (6) some challenges to computational fluid dynamics (CFD); (7) the high pressure fuel turbopump (HPFTP); and (8) 3001 lessons learned in design and operations.

Mcconnaughey, H. V.↗

The Software Engineering Laboratory: An operational software experience factory

For 15 years, the Software Engineering Laboratory (SEL) has been carrying out studies and experiments for the purpose of understanding, assessing, and improving software and software processes within a production software development environment at NASA/GSFC. The SEL comprises three major organizations: (1) NASA/GSFC, Flight Dynamics Division; (2) University of Maryland, Department of Computer Science; and (3) Computer Sciences Corporation, Flight Dynamics Technology Group. These organizations have jointly carried out several hundred software studies, producing hundreds of reports, papers, and documents, all of which describe some aspect of the software engineering technology that was analyzed in the flight dynamics environment at NASA. The studies range from small, controlled experiments (such as analyzing the effectiveness of code reading versus that of functional testing) to large, multiple project studies (such as assessing the impacts of Ada on a production environment). The organization's driving goal is to improve the software process continually, so that sustained improvement may be observed in the resulting products. This paper discusses the SEL as a functioning example of an operational software experience factory and summarizes the characteristics of and major lessons learned from 15 years of SEL operations.

Basili, Victor R.↗

Group Task Force on Satellite Rescue and Repair

The Group Task Force was chartered by the Administrator of NASA to recommend 'a policy outlining the criteria, the design standards, and the pricing model to guide NASA in assessing the responsibilities for government and nongovernment Satellite Rescue and Repair Missions.' Criteria for accepting such missions, risks, and benefits to all sectors of our economy involved in satellite services, adequacy of planning and training, and the impact on NASA's primary mission were reviewed. The Group began by asking a more fundamental question; is satellite rescue and repair a logical element of NASA's mission? Factors considered were: (1) the probability of rescue or repair opportunities arising; (2) the economic justification for such attempts; (3) the benefits to NASA, both from such ad hoc learning experiences in space operations and the impact on the public perception of NASA; (4) the effect of such unanticipated missions on NASA's scheduled activities; (5) any potential effect on NASA's technical capability to work in space; and (6) any potential effect on U.S. economic competitiveness.

Source record↗

Hubble Space Telescope high speed photometer orbital verification

The purpose of this report is to provide a summary of the results of the HSP (High Speed Photometer) Orbital Verification (OV) tests and to report conclusions and lessons learned from the initial operations of the HSP. The HSP OV plan covered the activities through fine (phase 3) alignment. This report covers all activities (OV, SV, and SAO) from launch to the completion of phase 3 alignment. Those activities in this period that are not OV tests are described to the extent that they relate to OV activities.

Richards, Evan E.↗

PI in the sky: The astronaut science advisor on SLS-2

The Astronaut Science Advisor (ASA, also known as Principal-Investigator-in-a-Box) is an advanced engineering effort to apply expert systems technology to experiment monitoring and control. Its goal is to increase the scientific value of information returned from experiments on manned space missions. The first in-space test of the system will be in conjunction with Professor Larry Young's (MIT) vestibulo-ocular 'Rotating Dome' experiment on the Spacelab Life Sciences 2 mission (STS-58) in the Fall of 1993. In a cost-saving effort, off-the-shelf equipment was employed wherever possible. Several modifications were necessary in order to make the system flight-worthy. The software consists of three interlocking modules. A real-time data acquisition system digitizes and stores all experiment data and then characterizes the signals in symbolic form; a rule-based expert system uses the symbolic signal characteristics to make decisions concerning the experiment; and a highly graphic user interface requiring a minimum of user intervention presents information to the astronaut operator. Much has been learned about the design of software and user interfaces for interactive computing in space. In addition, we gained a great deal of knowledge about building relatively inexpensive hardware and software for use in space. New technologies are being assessed to make the system a much more powerful ally in future scientific research in space and on the ground.

Hazelton, Lyman R.↗

An integrated strategy for the planetary sciences: 1995 - 2010

In 1992, the National Research Council's Space Studies Board charged its Committee on Planetary and Lunar Exploration (COMPLEX) to: (1) summarize current understanding of the planets and the solar system; (2) pose the most significant scientific questions that remain; and (3) establish the priorities for scientific exploration of the planets for the period from 1995 to 2010. The broad scientific goals of solar system exploration include: (1) understanding how physical and chemical processes determine the major characteristics of the planets, and thereby help us to understand the operation of Earth; (2) learning about how planetary systems originate and evolve; (3) determining how life developed in the solar system, particularly on Earth, and in what ways life modifies planetary environments; and (4) discovering how relatively simple, basic laws of physics and chemistry can lead to the diverse phenomena observed in complex systems. COMPLEX maintains that the most useful new programs to emphasize in the period from 1995 to 2010 are detailed investigations of comets, Mars, and Jupiter and an intensive search for, and characterization of, extrasolar planets.

Source record↗

(Re)inventing Government-Industry R and D Collaboration

This paper describes the lessons learned in developing and operating a large-scale strategic alliance whose organization and coordination is U.S. Government-led using new means for R&D collaboration. Consortia in the United States counter a century of 1884 Sherman Anti-Trust Law-based governmental and legal policy and a longstanding business tradition of unfettered competition. Success in public-private collaboration in America requires compelling vision and motivation by both partners to reinvent our ways of doing business. The foundations for reinventing government and alliance building were laid in 1994 with Vice President Al Gore's mandates for Federal Lab Reviews and other examinations of the roles and missions for the nation's more than 700 government labs. In addition, the 1984 National Cooperative Research Act (NCRA) set in motion the abilities for U.S. companies to collaborate in pre-competitive technology development. The budget realities of the 1990's for NASA and other government agencies demand that government discover the means to accomplish its mission by leveraging resources through streamlining as well as alliances. Federal R&D investments can be significantly leveraged for greater national benefit through strategic alliances with industry and university partners. This paper presents early results from one of NASA's first large-scale public/private joint R&D ventures.

Holmes, Bruce J.↗

MISR: protection from ourselves

Outlines lessons learned by the Instrument Operations Team of NASA/JPL Terra's Multi-angle Imaging SpectroRadiometer mission. It narrates a story of MISR: Protection from Ourselves! and describes, in detail, how the MISR instrument survived operator errors.

MISR operations↗

Operational Concept for the NASA Constellation Program's Ares I Crew Launch Vehicle

Ares I design brings together innovation and new technologies with established infrastructure and proven heritage hardware to achieve safe, reliable, and affordable human access to space. NASA has 50 years of experience from Apollo and Space Shuttle. The Marshall Space Flight Center's Mission Operations Laboratory is leading an operability benchmarking effort to compile operations and supportability lessons learned from large launch vehicle systems, both domestically and internationally. Ares V will be maturing as the Shuttle is retired and the Ares I design enters the production phase. More details on the Ares I and Ares V will be presented at SpaceOps 2010 in Huntsville, Alabama, U.S.A., April 2010.

Best, Joel↗

SSV Launch Monitoring Strategies: HGDS Design Implementation Through System Maturity

With over 500,000 gallons of liquid hydrogen and liquid oxygen, it is of vital importance to monitor the space shuttle vehicle (SSV) from external tank (ET) load through launch. The Hazardous Gas Detection System (HGDS) was installed as the primary system responsible for monitoring fuel leaks within the orbiter and ET. The HGDS was designed to obtain the lowest possible detection limits with the best resolution while monitoring the SSV for any hydrogen, helium, oxygen, or argon as the main requirement. The HGDS is a redundant mass spectrometer used for real-time monitoring during Power Reactant Storage and Distribution (PRSD) load and ET load through launch or scrub. This system also performs SSV processing leak checks of the Tail Service Mast (TSM) umbilical quick disconnects (QD's), Ground Umbilical Carrier Plate (GUCP) QD's and supports auxiliary power unit (APU) system tests. From design to initial implementation and operations, the HGDS has evolved into a mature and reliable launch support system. This paper will discuss the operational challenges and lessons learned from facing design deficiencies, validation and maintenance efforts, life cycle issues, and evolving requirements

Shoemaker, Marc D.↗

The Use of Radar to Improve Rainfall Estimation over the Tennessee and San Joaquin River Valleys

This slide presentation provides an overview of the collaborative radar rainfall project between the Tennessee Valley Authority (TVA), the Von Braun Center for Science & Innovation (VCSI), NASA MSFC and UAHuntsville. Two systems were used in this project, Advanced Radar for Meteorological & Operational Research (ARMOR) Rainfall Estimation Processing System (AREPS), a demonstration project of real-time radar rainfall using a research radar and NEXRAD Rainfall Estimation Processing System (NREPS). The objectives, methodology, some results and validation, operational experience and lessons learned are reviewed. The presentation. Another project that is using radar to improve rainfall estimations is in California, specifically the San Joaquin River Valley. This is part of a overall project to develop a integrated tool to assist water management within the San Joaquin River Valley. This involves integrating several components: (1) Radar precipitation estimates, (2) Distributed hydro model, (3) Snowfall measurements and Surface temperature / moisture measurements. NREPS was selected to provide precipitation component.

Petersen, Walter A.↗

Legacy of Environmental Research During the Space Shuttle Program

The Space Shuttle Program provided many opportunities to study the role of spaceflight on human life for over the last 30 years and represents the longest and largest U.S. human spaceflight program. Risks to crewmembers were included in the research areas of nutrition, microbiology, toxicology, radiation, and sleep quality. To better understand the Shuttle environment, Crew Health Care System was developed. As part of this system, the Environmental Health Subsystem was developed to monitor the atmosphere for gaseous contaminants and microbial contamination levels and to monitor water quality and radiation. This program expended a great deal of effort in studying and mitigating risks related to contaminations due to food, water, air, surfaces, crewmembers, and payloads including those with animals. As the Shuttle had limited stowage space and food selection, the development of nutritional requirements for crewmembers was imperative. As the Shuttle was a reusable vehicle, microbial contamination was of great concern. The development of monitoring instruments that could withstand the space environment took several years and many variations to come up with a suitable instrument. Research with space radiation provided an improved understanding of the various sources of ionizing radiation and the development of monitoring instrumentation for space weather and the human exposure within the orbiter's cabin. Space toxicology matured to include the management of offgassing products that could pollute the crewmembers air quality. The Shuttle Program implemented a 5-level toxicity rating system and developed new monitoring instrumentation to detect toxic compounds. The environment of space caused circadian desynchrony, sleep deficiency, and fatigue leading to much research and major emphasis on countermeasures. Outcomes of the research in these areas were countermeasures, operational protocols, and hardware. Learning Objectives: This symposium will provide an overview of the major environmental lessons learned and the development of countermeasures, monitoring hardware, and procedures.

Lane, Helen W.↗

STEREO Superior Solar Conjunction Mission Phase

With its long duration and high gain antenna (HGA) feed thermal constraint; the NASA Solar-TErestrial RElations Observatory (STEREO) solar conjunction mission phase is quite unique to deep space operations. Originally designed for a two year heliocentric orbit mission to primarily study coronal mass ejection propagation, after 8 years of continuous science data collection, the twin STEREO observatories entered the solar conjunction mission phase, for which they were not designed. Nine months before entering conjunction, an unforeseen thermal constraint threatened to stop daily communications and science data collection for 15months. With a 3.5 month long communication blackout from the superior solar conjunction, without ground commands, each observatory will reset every 3 days, resulting in 35 system resets at an Earth range of 2 AU. As the observatories will be conjoined for the first time in 8 years, a unique opportunity for calibrating the same instruments on identical spacecraft will occur. As each observatory has lost redundancy, and with only a limited fidelity hardware simulator, how can the new observatory configuration be adequately and safely tested on each spacecraft? Without ground commands, how would a 3-axis stabilized spacecraft safely manage the ever accumulating system momentum without using propellant for thrusters? Could science data still be collected for the duration of the solar conjunction mission phase? Would the observatories survive? In its second extended mission, operational resources were limited at best. This paper discusses the solutions to the STEREO superior solar conjunction operational challenges, science data impact, testing, mission operations, results, and lessons learned while implementing.

STEREO↗

Research and Development of The Immersive Simulations and Engineering Environment

March of 2018 marked the conclusion of the primary updates to the immersive Simulations and Engineering Environment (iSEE) at Kennedy Space Center (KSC). Many of the problems that had arisen during the previous semester have been addressed and rectified. These included the malfunction to one of the lab's primary routers, the inefficiency of the capture environment, and various interface issues in the analysis software, Jack. This semester was primarily research and development oriented with some focus on implementation of the new hardware and software that was received last semester. The new computers and cameras that arrived sometime during the winter were installed, and the lab received its second operation opportunity. The second operation was a major milestone for the lab, both in terms of what the abilities were and what can be learned from its use. The operation performed was a virtual simulation of a critical task that would occur, if it should be needed, in the Multi Payload Processing Facility. It was done to gather human factors data on its safety and process controls. The technicians were able to come to a number of conclusions about how to perform their task as a result of utilizing iSEE. Another key breakthrough this semester was the introduction to Jack Script, a scripting language built into our analysis software that further extend Jack capabilities. In addition to the aforementioned, many preparations were made for family day, an exposition for KSC families to come out and tour the spaceport. Due to family day being moved to the spring, the video made last fall had to be updated with recent environment changes in preparation for the Family Day demonstrations.

Motion Capture↗

Initial Calibration Activities and Performance Assessments of NOAA-20 VIIRS

The second VIIRS instrument was launched on-board the NOAA-20 (formerly JPSS-1) satellite onNovember 18, 2017. It was designed and built with the same performance requirements as the first VIIRSon-board the S-NPP launched on October 28, 2011. Currently, the NOAA-20 is orbiting the Earth in thesame plane as the S-NPP but separated in time and space by 50 minutes. The VIIRS observations are made in22 spectral bands, including a day-night band (DNB) that cover wavelengths from visible to long-waveinfrared. The sensor's on-orbit calibration is provided by a set of on-board calibrators (OBCs), which includea solar diffuser (SD), a solar diffuser stability monitor (SDSM), and a blackbody (BB). After turn-on, theVIIRS instrument conducted a series of post-launch testing (PLT) and intensive calibration and validation(ICV) activities, including those performed via spacecraft maneuvers, designed to verify and establishinstrument on-orbit calibration performance baseline. This paper provides an overview of NOAA-20 VIIRSICV activities and an assessment of its initial on-orbit performance with a focus on several key calibrationparameters, such as the detector response (or gain), dynamic range, and signal-to-noise ratio (SNR). Variousissues identified and lessons learned from initial instrument operation and calibration are also discussed insupport of long-term monitoring (LTM) of NOAA-20 VIIRS calibration and data quality.

Calibration↗

OSIRIS-REx Orbit Determination Performance During the Navigation Campaign

The OSIRIS-REx mission Navigation Campaign consists of three sub-phases: Approach,Preliminary Survey, and Orbital A. Approach was designed for initial characterization ofBennu while matching Bennu's heliocentric velocity. Preliminary Survey provided the firstspacecraft-based estimate of Bennu's mass. This phase consisted of five target flybys witha close approach distance of about 7 km. Orbital A was a two-month phase devoted to theNavigation Team learning the close proximity operations dynamics and environment aroundBennu and transitioning from center-finding optical navigation to landmark feature-basednavigation. This paper provides a detailed summary of the orbit determination performancethroughout the Navigation Campaign.

Leonard, Jason M.↗

Update on Feasibility of UV LEDs in a Spacecraft Wastewater Application

As the National Aeronautics and Space Administration (NASA) expands its scope and begins to venture into long-duration, manned space flights, the function and maintenance of spacecraft water systems becomes increasingly critical and difficult. New mission requirements limit opportunities for resupply and demand extended periods of uncrewed operations. Based on lessons learned from the International Space Station (ISS), one particular challenge of future spacecraft water systems will be maintaining adequate microbial control, especially in water subsystems and component-level elements, where effective long-duration biocontrol strategies do not currently exist. To ensure the reliability and redundancy in these systems, innovative technologies will be needed to ensure mission success. After proving feasibility of commercial-off-the-shelf (COTS) devices in flow-through applications in 2018, work focused on utilizing ultraviolet (UV) light emitting diodes (LEDs) in a wastewater tank application. This paper gives an update on the tank testing that has been performed to date. Using this technology may reduce the need for consumable resupply, such as filters or biocides, and minimize crew time to make the repairs on exhausted and/or compromised systems. The ultimate rationale behind developing a UV disinfection system is to increase the stability of water systems as requirements for sterility and microbial control become more stringent for deep space missions. The resulting data from this study will be used to narrow down possible technology demonstrations for selected ISS locations to assess the use of UV technology on future exploration-class spacecraft systems.

Susan N. Gilbert↗

On-Orbit Results and Lessons Learned from the ASTERIA Space Telescope Mission

The Arcsecond Space Telescope Enabling Research in Astrophysics (ASTERIA) was deployed from the International Space Station (ISS) on 20 November 2017, beginning a technology demonstration and opportunistic science mission to advance the state of the art in nanosatellite performance for astrophysical observations. The goal of ASTERIA is to achieve arcsecond-level line-of-sight pointing error and highly stable focal plane temperature control. These capabilities enable precision photometry—i.e. the careful measurement of stellar brightness over time—which in turn allows investigation of astrophysical phenomena such as transiting exoplanets. By the end of the 90-day prime mission, ASTERIA had achieved line-of-sight pointing stability of approximately 0.5 arcseconds root mean square (RMS) over 20-minute observations, pointing repeatability of 1 milliarcsecond RMS from one observation to the next, and focal plane temperature stability better than ±0.01 K over 20-minute observations. This paper presents an overview of the ASTERIA flight and ground system, summarizes the pre-delivery test campaign, and discusses the on-orbit performance obtained by the pointing and thermal control subsystems. We also describe the process for planning opportunistic science observations and present lessons learned from development and operations. Having successfully operated for over 200 days as of this writing, ASTERIA is currently in an extended mission to observe nearby bright stars for transiting exoplanets.

Seager, Sara↗