Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Overview of NASA's Detailed Investigation into the MEDLI2 Flight Data

- MEDLI2 “Deep Dive” - Why a focused investigation? - Deeper understanding of the MEDLI2 dataset, including TPS in-depth temperatures, backshell pressure, and radiative heat flux - Validate new tools for future Mars missions including Mars Sample Return and Humans-to-Mars - MEDLI2 is considerably more complex than MEDLI - Fully leverage the significant investment in the MEDLI2 instrumentation suite - Core research areas: - PICA-NuSil (PICA-N) testing, model development, and validation - Detailed aeroheating investigations - Sensor fusion of collocated measurements - High-fidelity analyses and uncertainty quantification - Trajectory and aerodynamics investigations

Tom West↗

Modular Assembled Radiators for Nuclear Electric Propulsion (NEP) VehicLes (MARVL) Project Thermal Technology Development

Nuclear Electric Propulsion (NEP) has been considered for crew and cargo class missions to Mars for more than six decades. The Primary Heat Rejection Subsystem (PHRS) of an NEP vehicle expels the megawatts of waste heat generated by the Power Conversion Subsystem (PCS). In previous studies, integrating the majority of the NEP vehicle within a single launch fairing required the use of complex deployable elements and resulted in reduced PCS efficiency. To achieve the necessary radiating area, past design studies have utilized massive multi-wing folding radiators resulting in conceptual PHRS designs that have been widely acknowledged as non-optimal. The Modular Assembled Radiators for NEP VehicLes (MARVL) project is incorporating in-Space Assembly (iSA) into the design process to realize lightweight, modular, and more capable PHRS radiators. Since the project’s Authority to Proceed (ATP) date of October 2024, the project team has been developing a modular design for the PHRS radiators that will be suitable for both the Mars mission environments and iSA commissioning operations. This document captures the current progress of the incremental technology development for the thermal components of the MARVL System of Interest (SOI).

Modular Radiator↗

The Mars Observer mission

Attention is given to the establishment of the Planetary Observer program and the initiation of the Mars Observer project (scheduled for 1990), its scientific objectives, and plans for operations. The Mars Observer mission will provide a spacecraft platform about Mars from which the entire Martian surface and atmosphere may be mapped for at least one Martian year. This first Planetary Observer mission will reveal how a series of low-cost missions can be planned and implemented to fit within constrained NASA budget for planetary operation.

Purdy, W. I., Jr.↗

Nuclear Thermal Propulsion (NTP): A Proven, Growth Technology for Fast Transit Human Missions to Mars

The "fast conjunction" long surface stay mission option was selected for NASA's recent Mars Design Reference Architecture (DRA) 5.0 study because it provided adequate time at Mars (approx. 540 days) for the crew to explore the planet's geological diversity while also reducing the "1-way" transit times to and from Mars to approx. 6 months. Short transit times are desirable in order to reduce the debilitating physiological effects on the human body that can result from prolonged exposure to the zero-gravity (0-gE) and radiation environments of space. Recent measurements from the RAD detector attached to the Curiosity rover indicate that astronauts would receive a radiation dose of approx. 0.66 Sv (approx. 66 rem)-the limiting value established by NASA-during their 1-year journey in deep space. Proven nuclear thermal rocket (NTR) technology, with its high thrust and high specific impulse (Isp approx. 900 s), can cut 1-way transit times by as much as 50 percent by increasing the propellant capacity of the Mars transfer vehicle (MTV). No large technology scale-ups in engine size are required for these short transit missions either since the smallest engine tested during the Rover program-the 25 klbf "Pewee" engine is sufficient when used in a clustered arrangement of three to four engines. The "Copernicus" crewed MTV developed for DRA 5.0 is a 0-gE design consisting of three basic components: (1) the NTP stage (NTPS); (2) the crewed payload element; and (3) an integrated "saddle truss" and LH2 propellant drop tank assembly that connects the two elements. With a propellant capacity of approx. 190 t, Copernicus can support 1-way transit times ranging from approx. 150 to 220 days over the 15-year synodic cycle. The paper examines the impact on vehicle design of decreasing transit times for the 2033 mission opportunity. With a fourth "upgraded" SLS/HLV launch, an "in-line" LH2 tank element can be added to Copernicus allowing 1-way transit times of 130 days. To achieve 100 to 120 day transit times, Copernicus' saddle truss/drop tank assembly is replaced by a "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. The HLV launch count increases (from approx. 5 to 7) and a fourth engine is needed to reduce total mission burn time and gravity losses. Using a "split mission" approach, the NTPS, in-line tank and the saddle truss/LH2 drop tank elements can be configured as a pre-deployed Earth Return Vehicle/propellant tanker supporting 90-day crewed mission transits. The split mission approach also eliminates the need for on-orbit assembly. Mission scenario descriptions, key features and operational characteristics for five different vehicle configurations are presented.

Borowski, Stanley K.↗

Crew activities, science, and hazards of manned missions to Mars

The crew scientific and nonscientific activities that will occur at each stage of a mission to Mars are examined. Crew activities during the interplanetary flight phase will include simulations, maintenance and monitoring, communications, upgrading procedures and operations, solar activity monitoring, cross-training and sharpening of skills, physical conditioning, and free-time activities. Scientific activities will address human physiology, human psychology, sociology, astronomy, space environment effects, manufacturing, and space agriculture. Crew activities on the Martian surface will include exploration, construction, manufacturing, food production, maintenance and training, and free time. Studies of Martian geology and atmosphere, of the life forms that may exist there, and of the Martian moons will occur on the planet's surface. Crew activities and scientific studies that will occur in Mars orbit, and the hazards relevant to each stage of the mission, are also addressed.

Clark, Benton C.↗

Operational Considerations for Fission Reactors Utilized on Nuclear Thermal Propulsion Missions to Mars

This report is aimed at identifying the implications associated with the operation of space nuclear power reactors that would be utilized for Nuclear Thermal Propulsion (NTP) missions to Mars. The objective of this study is to evaluate the operational features of reactors that could provide propulsion and possibly electrical power for future crewed and cargo missions to Mars. This report follows upon an initial report looking at the generic considerations for operating fission reactors in space applications and is intended as a deeper dive into the operational features related to specific Mars NTP applications.

Nuclear Thermal Propulsion↗

A pioneer-class Mars aeronomy mission

Preliminary studies of a Pioneer-class Mars-orbiter aeronomy mission are reviewed. The aeronomy objectives and payload are discussed, along with the mission requirements, spacecraft design requirements, possible spacecraft designs, and total mission costs. It is shown that existing earth-orbiting communication satellites can be easily modified for the aeronomy mission and that the total mission cost should be between $150 million and $185 million in 1982 dollars.

Jackson, R. W.↗

A Pioneer-class Mars climatology mission

Preliminary studies of a Pioneer-class Mars-orbiter climatology mission are reviewed. The mission requirements and objectives are discussed, as are the program requirements, a mission profile, possible spacecraft designs, payload options, and mission costs. It is shown that existing earth-orbiting communication satellites can be adapted for the climatology mission and that the overall baseline cost should be between $133 million and &168 million in 1982 dollars.

Nishioka, K.↗

A Lean, Fast Mars Round-trip Mission Architecture: Using Current Technologies for a Human Mission in the 2030s

We present a lean fast-transfer architecture concept for a first human mission to Mars that utilizes current technologies and two pivotal parameters: an end-to-end Mars mission duration of approximately one year, and a deep space habitat of approximately 50 metric tons. These parameters were formulated by a 2012 deep space habitat study conducted at the NASA Johnson Space Center (JSC) that focused on a subset of recognized high- engineering-risk factors that may otherwise limit space travel to destinations such as Mars or near-Earth asteroid (NEA)s. With these constraints, we model and promote Mars mission opportunities in the 2030s enabled by a combination of on-orbit staging, mission element pre-positioning, and unique round-trip trajectories identified by state-of-the-art astrodynamics algorithms.

Bailey, Lora↗

Calculation of Operations Efficiency Factors for Mars Surface Missions

The duration of a mission--and subsequently, the minimum spacecraft lifetime--is a key component in designing the capabilities of a spacecraft during mission formulation. However, determining the duration is not simply a function of how long it will take the spacecraft to execute the activities needed to achieve mission objectives. Instead, the effects of the interaction between the spacecraft and ground operators must also be taken into account. This paper describes a method, using "operations efficiency factors", to account for these effects for Mars surface missions. Typically, this level of analysis has not been performed until much later in the mission development cycle, and has not been able to influence mission or spacecraft design. Further, the notion of moving to sustainable operations during Prime Mission--and the effect that change would have on operations productivity and mission objective choices--has not been encountered until the most recent rover missions (MSL, the (now-cancelled) joint NASA-ESA 2018 Mars rover, and the proposed rover for Mars 2020). Since MSL had a single control center and sun-synchronous relay assets (like MER), estimates of productivity derived from MER prime and extended missions were used. However, Mars 2018's anticipated complexity (there would have been control centers in California and Italy, and a non-sun-synchronous relay asset) required the development of an explicit model of operations efficiency that could handle these complexities. In the case of the proposed Mars 2018 mission, the model was employed to assess the mission return of competing operations concepts, and as an input to component lifetime requirements. In this paper we provide examples of how to calculate the operations efficiency factor for a given operational configuration, and how to apply the factors to surface mission scenarios. This model can be applied to future missions to enable early effective trades between operations design, science mission planning, and spacecraft design.

Laubach, Sharon↗

Martian settlement

The rationale for a manned Mars mission and the establishment of a base is divided into three areas: science, resource utilization, and strategic issues. The effects of a Mars mission on the objectives of near-term NASA programs, and the applications of these programs to a Mars mission are examined. The use of extraterrestrial resources to supply space settlements and thereby reduce transportation costs is studied; the development of systems for extraterrestrial materials processing will need to be researched. The possibility of a joint U.S./Soviet Mars mission is discussed by the symposium participants.

Roberts, Barney B.↗

Mars Global Reference Atmospheric Model (Mars-GRAM) and Database for Mission Design

Mars Global Reference Atmospheric Model (Mars-GRAM 2001) is an engineering-level Mars atmosphere model widely used for many Mars mission applications. From 0-80 km, it is based on NASA Ames Mars General Circulation Model, while above 80 km it is based on Mars Thermospheric General Circulation Model. Mars-GRAM 2001 and MGCM use surface topography from Mars Global Surveyor Mars Orbiting Laser Altimeter. Validation studies are described comparing Mars-GRAM with Mars Global Surveyor Radio Science and Thermal Emission Spectrometer data. RS data from 2480 profiles were used, covering latitudes 75 deg S to 72 deg N, surface to approximately 40 km, for seasons ranging from areocentric longitude of Sun (Ls) = 70-160 deg and 265-310 deg. RS data spanned a range of local times, mostly 0-9 hours and 18-24 hours. For interests in aerocapture and precision landing, comparisons concentrated on atmospheric density. At a fixed height of 20 km, RS density varied by about a factor of 2.5 over ranges of latitudes and Ls values observed. Evaluated at matching positions and times, these figures show average RSMars-GRAM density ratios were generally 1+/-)0.05, except at heights above approximately 25 km and latitudes above approximately 50 deg N. Average standard deviation of RSMars-GRAM density ratio was 6%. TES data were used covering surface to approximately 40 km, over more than a full Mars year (February, 1999 - June, 2001, just before start of a Mars global dust storm). Depending on season, TES data covered latitudes 85 deg S to 85 deg N. Most TES data were concentrated near local times 2 hours and 14 hours. Observed average TES/Mars-GRAM density ratios were generally 1+/-0.05, except at high altitudes (15-30 km, depending on season) and high latitudes (greater than 45 deg N), or at most altitudes in the southern hemisphere at Ls approximately 90 and 180 deg. Compared to TES averages for a given latitude and season, TES data had average density standard deviation about the mean of approximately 2.5% for all data, or approximately 1-4%, depending on time of day and dust optical depth. Average standard deviation of TES/Mars-GRAM density ratio was 8.9% for local time 2 hours and 7.1% for local time 14 hours. Thus standard deviation of observed TES/Mars-GRAM density ratio, evaluated at matching positions and times, is about three times the standard deviation of TES data about the TES mean value at a given position and season.

Justus, C. G.↗

Habitability during long-duration space missions - Key issues associated with a mission to Mars

Isolation and confinement conditions similar to those of a long-duration mission to Mars are examined, focusing on 14 behavioral issues with design implications. Consideration is given to sleep, clothing, exercise, medical support, personal hygiene, food preparation, group interaction, habitat aesthetics, outside communications, recreational opportunities, privacy, waste disposal, onboard training, and the microgravity environment. The results are used to develop operational requirements and habitability design guidelines for interplanetary spacecraft.

Stuster, Jack↗

The PH-D proposal - A manned mission to Phobos and Deimos

The rationale for a manned mission to the satellites of Mars is discussed. The view has been expressed that NASA must define a major program to follow the Shuttle and to utilize it. However, such a program could not be initiated and proceed without public support, and to obtain this support, public interest would have to be excited. It is shown that, of a number of possible targets for manned exploration in the solar system, Mars appears to be the only possible candidate. Attention is given to a comparison of three Mars missions, a Mars 1984 mission, a manned landing on Mars surface, a manned landing on Phobos and Deimos (Ph-D project), putting men in Mars orbit, the capabilities of the Ph-D mission, a description of the spacecraft, a Ph-D project operations plan, and aspects of timing, technology, and costs.

Singer, S. F.↗

NASA Mars 2020 Landed Mission Development

In January of 2014, NASA received fifty-eight proposals from U.S. and international teams for science and exploration technology investigations, for consideration for inclusion as part of NASA's next mobile landed mission to Mars. The results of the competitive procurement were released in late July of 2014: Seven payloads were selected for the investigations that would contribute to meeting the overall objectives of the mission. The extraordinary scientific and technology development interest in the Mars 2020 mission is a direct result of NASA's sustained and coordinated plan for the exploration of Mars, and ultimately, its search for life elsewhere in the universe. The Mars 2020 Mission will preserve the heritage and directly build upon NASA's Mars Science Laboratory Mission and Curiosity Rover to implement its mission. In this paper, early development history leading to its development announcement, as well as key development status and design features for its implementation, is summarized.

MSR↗