Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Launch operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

NASA Small Spacecraft Systems Virtual Institute – Building A SmallSat Community

Small spacecraft (smallsats) continue to find meaningful applications in the exploration of space and the Earth. Many agencies, companies, and universities are successfully exploiting these lower cost platforms, with their associated higher flight frequencies to rapidly develop and test novel technologies, conduct robotic exploration missions, and perform a wide range of science investigations. In addition to their lower costs to develop, integrate, launch, and operate, smallsats foster alternate approaches that can be used to conduct space research. This allows non-traditional individuals, groups, and organizations to contribute to space exploration and science applying novel management approaches spanning mission design, testing, and operations. Many of these approaches are based on collaborations and networks and have origins in related industries. Over time, a smallsat community has evolved to embody a new way of doing space. NASA, through various methods supports the development and growth of these communities, both within the agency and externally. This paper describes the processes, tools, and resources that NASA has developed and deployed to enable, inform, streamline, and sustain the smallsat community for the benefit of the space agency.

Bruce D. Yost↗

Overview of Past Space Nuclear Reactor Functional Safety Principles in the Context of Recent Policy Changes

Space nuclear reactor technology development and associated approaches to safety have been ongoing for over 60 years. This paper selects functional safety principles associated with space reactors at several points in time since the early 1980s and provides an overview of their general content, similarities, and differences, as well as how they have evolved. It also reflects, where applicable, on how recent Federal policies in the area of space nuclear systems may affect how these safety principles apply to future activities.

Crew Safety↗

Regulatory Approach for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is being developed to support crewed or cargo transfer missions to Mars. Obtaining regulatory approval for NTP engine testing proves a challenge for not only the technology maturation required but also the fabrication, launch and operational nuclear regulatory environments. Existing regulations currently apply to either (1) high power, long duration commercial power plants, or (2) low power, short duration research reactors. NTP systems find themselves in a separate and unique area due to their higher power but short operating duration. This is supplemented by use of the reactor coolant as propellant. When planning the regulatory approach for NTP systems, operations in space and testing on Earth must be considered – each have their own challenges. This paper identifies a preliminary pathway for regulatory approval to operate a NTP demonstration engine as well as supporting test data that is recommended to be generated during the development program to support major regulatory milestones and deliverables.

Regulatory↗

Space Nuclear Propulsion (SNP) Material Property Handbook

The National Aeronautics and Space Administration’s (NASA’s) Space Nuclear Propulsion (SNP) project aims to demonstrate the feasibility of nuclear thermal propulsion (NTP) as a thrust mechanism for spacecraft. An initial Demonstration Rocket for Agile Cislunar Operations (DRACO) launch will serve as a test of the technology in Earth’s orbit. Future work may involve the development of an NTP engine and spacecraft design with the capability to transport astronauts from Earth to Mars and back safely, though NTP has other potential uses too.

Nuclear Thermal Propulsion↗

A Green Propulsion Dual Mode (GPDM) In-Space Technology Demonstration on a 6U CubeSat

Over the past decade there has been an increase in the launch and operations of small spacecraft. Small spacecraft (defined as having a total vehicle mass of < 180 kg) provide an opportunity for low-cost, high impact technology demonstrations on a small scale. They also create opportunities for government, industry, and academic to engage, transfer knowledge, and extend partnerships with non-traditional partners. NASA’s Marshall Space Flight Center (MSFC) is leading a collaborative effort to demonstrate a dual-mode (chemical and electrospray) propulsion system using a common propellant system as a payload on a 6U CubeSat. The novel feature in the propulsion system is the interfacing of propulsion technologies requiring dramatically different operating conditions and support hardware. GPDM will use a low toxicity or “green” propellant known as Advanced Spacecraft Energetic Non-Toxic (ASCENT) to demonstrate using a chemical thruster for translation burns and electrospray propulsion for both attitude control and translational burns on the spacecraft. Specific mission activities could include demonstration of collision avoidance during frequent altitude adjustment maneuvers to validate thruster performance and managing extended duration thruster burns of at least 24 hours with limited vehicle contact times. This paper will summarize the ground testing, spacecraft development, mission objectives, and mission planning activities to achieve some of GPDM’s technical objectives.

Nehemiah Joel Williams↗

GRAS NRT Precise Orbit Determination: Operational Experience

EUMETSAT launched the meteorological satellite MetOp-A in October 2006; it is the first of the three satellites that constitute the EUMETSAT Polar System (EPS) space segment. This satellite carries a challenging and innovative instrument, the GNSS Receiver for Atmospheric Sounding (GRAS). The goal of the GRAS instrument is to support the production of atmospheric profiles of temperature and humidity with high accuracy, in an operational context, based on the bending of the GPS signals traversing the atmosphere during the so-called occultation periods. One of the key aspects associated to the data processing of the GRAS instrument is the necessity to describe the satellite motion and GPS receiver clock behaviour with high accuracy and within very strict timeliness limitations. In addition to these severe requirements, the GRAS Product Processing Facility (PPF) must be integrated in the EPS core ground segment, which introduces additional complexity from the data integration and operational procedure points of view. This paper sets out the rationale for algorithm selection and the conclusions from operational experience. It describes in detail the rationale and conclusions derived from the selection and implementation of the algorithms leading to the final orbit determination requirements (0.1 mm/s in velocity and 1 ns in receiver clock error at 1 Hz). Then it describes the operational approach and extracts the ideas and conclusions derived from the operational experience.

MartinezFadrique, Francisco M.↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Plans for West Coast STS launch capability

The layout and scope of operations of the Vandenberg AFB West Coast Launch Site for the Space Shuttle are examined. The launch site intended for the first West Coast launch in December 1983 is being constructed by the United States Air Force. Topic discussed include site/selection/management/concepts, Shuttle hardware flow and related facilities, launch pad operations, orbiter erection at SLC-6 VAFB, solid rocket booster operations, and payload ground processing. In conclusion it is noted that NASA and DOD personnel are working together to ensure that the launch site is completed on schedule at minimum cost.

Murphy, W. P.↗

Feasibility Study of SDAS Instrumentation's Ability to Identify Mobile Launcher (ML)/Crawler-Transporter (CT) Modes During Rollout Operations

The Space Launch System (SLS) and its Mobile Launcher (ML) will be transported to the launch pad via the Crawler-Transporter (CT) system. Rollout (i.e., transportation) loads produce structural loads on the integrated SLS/Orion Multi-Purpose Crew Vehicle (MPCV) launch vehicle which are of a concern with respect to fatigue. As part of the risk reduction process and in addition to the modal building block test approach that has been adopted by the SLS Program, acceleration data will be obtained during rollout for use in modal parameter estimation. There are several occurrences where the ML/CT will be transported either into the Vertical Assembly Building (VAB) or to the launch pad and back without the SLS stack as part of the Kennedy Space Center (KSC) Exploration Ground Systems (EGS) Integrated Test and Checkout (ITCO). NASA KSC EGS has instrumentation installed on both the ML and CT to record data during rollout, at the launch pad, and during liftoff. The EGS instrumentation on the ML, which includes accelerometers, is referred to as the Sensor Data Acquisition System (SDAS). The EGS instrumentation on the CT, which also includes accelerometers, is referred to as the CT Data Acquisition System (CTDAS). The forces and accelerations applied to the ML and CT during a rollout event will be higher than any of the planned building block modal tests. This can be very beneficial in helping identify nonlinear behavior in the structure. Developing modal parameters from the same test hardware in multiple boundary conditions and under multiple levels of excitation is a key step in developing a well correlated FEM. The purpose of this study was three fold. First, determine the target modes of the ML/CT in its rollout configuration. Second, determine if the test degrees of freedom (DOF) corresponding to the layout of the SDAS/CTDAS accelerometers (i.e. position and orientation) is sufficient to identify the target modes. Third, determine if the Generic Rollout Forcing Functions (GRFF's) is sufficient for identifying the ML/CT target modes accounting for variations in CT speed, modal damping, and sensor/ambient background noise levels. The finding from the first part of this study identified 28 target modes of the ML/CT rollout configuration based upon Modal Effective Mass Fractions (MEFF) and engineering judgement. The finding from the second part of this study showed that the SDAS/CTDAS accelerometers (i.e. position and orientation) are able to identify a sufficient number of the target modes to support model correlation of the ML/CT FEM. The finding from the third part of this study confirms the GRFFs sufficiently excite the ML/CT such that varying quantities of the defined target modes should be able to be extracted when utilizing an Experimental Modal Analysis (EMA) Multi-Input Multi-Output (MIMO) analysis approach. An EMA analysis approach was used because Operational Modal Analysis (OMA) tools were not available and the GRFFs were sufficiently uncorrelated. Two key findings from this third part of the study are that the CT speed does not show a significant impact on the ability to extract the modal parameters and that keeping the ambient background noise observed at each accelerometer location at or below 30 µgrms is essential to the success of this approach.

Winkel, James P.↗

Re-Engineering the Mission Operations System (MOS) for the Prime and Extended Mission

One of the most challenging tasks in a space science mission is designing the Mission Operations System (MOS). Whereas the focus of the project is getting the spacecraft built and tested for launch, the mission operations engineers must build a system to carry out the science objectives. The completed MOS design is then formally assessed in the many reviews. Once a mission has completed the reviews, the Mission Operation System (MOS) design has been validated to the Functional Requirements and is ready for operations. The design was built based on heritage processes, new technology, and lessons learned from past experience. Furthermore, our operational concepts must be properly mapped to the mission design and science objectives. However, during the course of implementing the science objective in the operations phase after launch, the MOS experiences an evolutional change to adapt for actual performance characteristics. This drives the re-engineering of the MOS, because the MOS includes the flight and ground segments. Using the Spitzer mission as an example we demonstrate how the MOS design evolved for both the prime and extended mission to enhance the overall efficiency for science return. In our re-engineering process, we ensured that no requirements were violated or mission objectives compromised. In most cases, optimized performance across the MOS, including gains in science return as well as savings in the budget profile was achieved. Finally, we suggest a need to better categorize the Operations Phase (Phase E) in the NASA Life-Cycle Phases of Formulation and Implementation

Extended Mission↗

Estimation of dynamic stability parameters from drop model flight tests

A recent NASA application of a remotely-piloted drop model to studies of the high angle-of-attack and spinning characteristics of a fighter configuration has provided an opportunity to evaluate and develop parameter estimation methods for the complex aerodynamic environment associated with high angles of attack. The paper discusses the overall drop model operation including descriptions of the model, instrumentation, launch and recovery operations, piloting concept, and parameter identification methods used. Static and dynamic stability derivatives were obtained for an angle-of-attack range from -20 deg to 53 deg. The results of the study indicated that the variations of the estimates with angle of attack were consistent for most of the static derivatives, and the effects of configuration modifications to the model (such as nose strakes) were apparent in the static derivative estimates. The dynamic derivatives exhibited greater uncertainty levels than the static derivatives, possibly due to nonlinear aerodynamics, model response characteristics, or additional derivatives.

Chambers, J. R.↗

Space Operations for a New Era of Exploration Launch Vehicles

NASA's Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human space exploration. Since 2005, Ares has made substantial progress on designing, developing, and testing the Ares I crew launch vehicle and has continued its in-depth studies of the Ares V cargo launch vehicles. The combined Ares I/Ares V architecture has been designed to reduce the complexity and labor intensity of ground operations for America's next journeys beyond low-Earth orbit (LEO). A deliberate effort is being made to ensure a high level of system operability to significantly increase safety and system availability as well as reduce recurring costs for this new launch vehicle. The Ares Projects goal is to instill operability as part of the vehicles requirements development, design, and operations. This simplicity will come from using simpler, proven engine designs, as in the case of the J-2X upper stage engine and RS-68 engine; improving existing hardware, as in the case of the Shuttle-heritage 5-segment solid rocket motor; and using common propulsion and instrument unit elements between Ares I and Ares V. Furthermore, lessons learned while developing Ares I will be applied directly to Ares V operations. In 2009, the Ares Projects plan to conduct the first flight test of Ares I, designated Ares I-X. Ares I-X preparations have already prompted changes to the vehicle stacking and launch infrastructure at Kennedy Space Center (KSC), including removing Shuttle-specific fixtures from the Vehicle Assembly Building (VAB) to accommodate Ares I-style stacking operations, new firing room computers and infrastructure in the VAB Launch Control Center, and new lightning protection system towers at Launch Complex 39B to accommodate the greater height of Ares I-X. In addition to lessons learned from the stacking of Ares I-X, the flight test itself promises to yield important data and operations lessons for assembling, launching, and flying Ares I.

Cook, Stephen A.↗

The DAWN Project's Transition to Mission Operations: on Its Way to Rendezvous with (4) Vesta and (1) Ceres

Dawn launched on 27 September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The operations team conducted an extensive set of assessments of the engineering subsystems and science instruments during the first 80 days of the mission. A major objective of this period was to thrust for one week with the ion propulsion system to verify flight and ground systems readiness for typical interplanetary operations. Upon successful conclusion of the checkout phase, the interplanetary cruise phase began, most of which will be devoted to thrusting. The flexibility afforded by the use of ion propulsion enabled the project to accommodate a launch postponement of more than 3 months caused by a combination of launch vehicle and tracking system readiness, unfavorable weather, and then conflicts with other launches. Even with the shift in the launch date, all of the science objectives are retained with the same schedule and greater technical margins. This paper describes the conclusion of the development phase of the project, launch operations, and the progress of mission operations.

launch operations↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

The engineering development of the new Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these spacecraft systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large and complex system engineering challenge, which is being addressed in part by focusing on the specific subsystems involved in the handling of off-nominal mission and fault tolerance with response management. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML) and Systems Modeling Language (SysML), the Mission and Fault Management (M&FM) algorithms for the vehicle are crafted and vetted in specialized Integrated Development Teams (IDTs) composed of multiple development disciplines such as Systems Engineering (SE), Flight Software (FSW), Safety and Mission Assurance (S&MA) and the major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GNC), Thrust Vector Control (TVC), and liquid engines. These model based algorithms and their development lifecycle from inception through Flight Software certification are an important focus of this development effort to further insure reliable detection and response to off-nominal vehicle states during all phases of vehicle operation from pre-launch through end of flight. NASA formed a dedicated M&FM team for addressing fault management early in the development lifecycle for the SLS initiative. As part of the development of the M&FM capabilities, this team has developed a dedicated testbed that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. Additionally, the team has developed processes for implementing and validating these algorithms for concept validation and risk reduction for the SLS program. The flexibility of the Vehicle Management End-to-end Testbed (VMET) enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the developed algorithms utilizing actual subsystem models such as MPS. The intent of VMET is to validate the M&FM algorithms and substantiate them with performance baselines for each of the target vehicle subsystems in an independent platform exterior to the flight software development infrastructure and its related testing entities. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test cases into flight software compounded with potential human errors throughout the development lifecycle. Risk reduction is addressed by the M&FM analysis group working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and associated detection and responses that can be tested in VMET to ensure that failures can be detected, and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM such as telemetry packing and processing. The baseline plan for use of VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes.

Trevino, Luis↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASAs Space Launch System

The engineering development of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS) requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The nominal and off-nominal characteristics of SLS's elements and subsystems must be understood and matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large and complex systems engineering challenge, which is being addressed in part by focusing on the specific subsystems involved in the handling of off-nominal mission and fault tolerance with response management. Using traditional model-based system and software engineering design principles from the Unified Modeling Language (UML) and Systems Modeling Language (SysML), the Mission and Fault Management (M&FM) algorithms for the vehicle are crafted and vetted in Integrated Development Teams (IDTs) composed of multiple development disciplines such as Systems Engineering (SE), Flight Software (FSW), Safety and Mission Assurance (S&MA) and the major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GNC), Thrust Vector Control (TVC), and liquid engines. These model-based algorithms and their development lifecycle from inception through FSW certification are an important focus of SLS's development effort to further ensure reliable detection and response to off-nominal vehicle states during all phases of vehicle operation from pre-launch through end of flight. To test and validate these M&FM algorithms a dedicated test-bed was developed for full Vehicle Management End-to-End Testing (VMET). For addressing fault management (FM) early in the development lifecycle for the SLS program, NASA formed the M&FM team as part of the Integrated Systems Health Management and Automation Branch under the Spacecraft Vehicle Systems Department at the Marshall Space Flight Center (MSFC). To support the development of the FM algorithms, the VMET developed by the M&FM team provides the ability to integrate the algorithms, perform test cases, and integrate vendor-supplied physics-based launch vehicle (LV) subsystem models. Additionally, the team has developed processes for implementing and validating the M&FM algorithms for concept validation and risk reduction. The flexibility of the VMET capabilities enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the developed algorithms utilizing actual subsystem models such as MPS, GNC, and others. One of the principal functions of VMET is to validate the M&FM algorithms and substantiate them with performance baselines for each of the target vehicle subsystems in an independent platform exterior to the flight software test and validation processes. In any software development process there is inherent risk in the interpretation and implementation of concepts from requirements and test cases into flight software compounded with potential human errors throughout the development and regression testing lifecycle. Risk reduction is addressed by the M&FM group but in particular by the Analysis Team working with other organizations such as S&MA, Structures and Environments, GNC, Orion, Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission (LOM) and Loss of Crew (LOC) probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and associated detection and responses to be tested in VMET to ensure reliable failure detection, and confirm responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - the ARINC 6535-partitioned Operating System, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM such as telemetry packing and processing. The baseline plan for use of VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by FSW. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure their effectiveness and performance in the exterior FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Modular space station phase B extension: Shuttle interface requirements

The interface requirements cover both the ground and orbital phases of operation from the launch of the first MSS module until the initial modular station has been manned and in routine operation. As a point of reference, the two-stage, fully reusable space shuttle was selected. The space shuttle is briefly described from the standpoint of its features most important to the interface requirements with the MSS. The environment induced upon the MSS elements when transported to and from orbit by the shuttle orbiter also is included. The mission operation includes the space shuttle launch facilities, the ground flow of the MSS modules, and the orbital operations of rendezvous, MSS buildup, resupply of the manned station, and orbiter descent and landing. The shuttle's once-around abort case is described as it affects the MSS interface requirements. The interfaces between the orbiter and the MSS resulting from the ground and orbital operations, are also described.

Source record↗

LANDSAT-2 launch and flight activation. Launch through orbit 50 and orbit adjust operation

The results of the analysis conducted on the telemetry data from the prelaunch, launch, and flight activation phases of LANDSAT-2 spacecraft are presented according to subsystems and interrelationships that exist between subsystems. Subsystem characteristics are included along with the flight evaluation results. Flight data are compared to baseline data established at the 20 C plateau during thermal vacuum testing of the spacecraft. Evaluation guidelines are derived from the specifications developed from the LANDSAT program objectives: (1) acquisition of multispectral images of the surface of the earth; and (2) use of the LANDSAT-2 receiving, frequency translating, and transmitting equipment as a relay system to gather data from fixed earth-based sensor platforms which are operated by individual investigators. Data are presented on the first 50 orbits of the spacecraft.

Source record↗