Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Environmental Protection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Corrective Action Investigation Plan for Corrective Action Unit 414: Clean Slate III Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 1

Corrective Action Unit (CAU) 414 is located on the Tonopah Test Range, which is approximately 130 miles northwest of Las Vegas, Nevada, and approximately 40 miles southeast of Tonopah, Nevada. The CAU 414 site consists of the release of radionuclides to the surface and shallow subsurface from the conduct of the Clean Slate III (CSIII) storage–transportation test conducted on June 9, 1963. CAU 414 includes one corrective action site (CAS), TA-23-03CS (Pu Contaminated Soil). The known releases at CAU 414 are the result of the atmospheric dispersal of contamination from the 1963 CSIII test. The CSIII test was a nonnuclear detonation of a nuclear device located inside a reinforced concrete bunker covered with 8 feet of soil. This test dispersed radionuclides, primarily uranium and plutonium, on the ground surface. The presence and nature of contamination at CAU 414 will be evaluated based on information collected from a corrective action investigation (CAI). The investigation is based on the data quality objectives (DQOs) developed on June 7, 2016, by representatives of the Nevada Division of Environmental Protection; the U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective action alternatives for CAU 414.

54 ENVIRONMENTAL SCIENCES↗

Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs), data-sharing, real-time characterization reporting, surface and groundwater modeling and other interface planning activities were utilized to help facilitate and complete characterization and remediation activities. As a result of these strategies, the surgical extraction of one contiguous area of soil approximately 354 cubic meters is planned for FY12. The strategies discussed resulted in a major reduction of footprint remediation (i.e., 2.8% of the original estimate) which was originally estimated at over 26,759 cubic meters. The original estimate was developed using historical data collected at various times over the period of 20 years. By leveraging a hybrid sampling approach that involved both statistically-based and biased sampling locations, the area of contamination was significantly reduced resulting in both a compliant remedial design that is cost effective while mitigating a principle threat sources to surface and groundwater at the Y-12 plant. One remedial action boundary of 354 cubic meters was verified in the northern section of the Western OSY area known as the old drum de-header station for VOCs. The original estimate for disposal was in excess of 26,759 cubic meters. This area is scheduled for waste characterization and profile development in the first half of fiscal year 2012. The anticipated disposal facility is an on-site Oak Ridge CERCLA disposal landfill known as the Environmental Management Waste Management Facility (EMWMF). By utilizing the careful strategic planning, field-based screening and close cooperation of regulatory stakeholders as detailed in this paper, the total area of soil requiring remedial action within the Y-12 OSY footprint was 354 cubic meters or 2.8% of the original planned estimate. A potential waste reduction of 97.2% was realized over the original planned estimate for OSY Soils. Significant cost savings were achieved by - Minimizing the footprint of the remedial action; - Confirmatory analysis of soils instead of use of historical sampling results for waste profile development; - Targeting traditional laboratory analysis for soils that failed field screen protocols for radionuclides, heavy metals and VOCs; - Providing accurate and precise definition of RABs; and - Reduction of target contaminants for focused laboratory analysis instead of broad-range contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing Radium Distributions, Source Attribution and Impacts from Marcellus Produced Water

This presentation characterizes spatial trends in radium (Ra) concentrations, sources, and potential impacts generated from Marcellus Shale produced waters. Here, we combine previously published produced water data with additional Ra activity measurements extracted from residual waste reports submitted to the Pennsylvania Department of Environmental Protection from 2012-2023. This is the largest, spatially referenced compilation of Ra activity measurements from produced water sourced from the Marcellus Shale to date. The median Marcellus Shale produced water Ra activity presented here is 6,906 pCi/L (interquartile range = 12,515 pCi/L). Radium activities in the positively skewed dataset can exceed 30,000 pCi/L in some parts of the state. The regional trends in Ra concentrations and isotopic ratios will be characterized and potential environmental and health implications discussed.

Mackey, Justin↗

Concentration of Ra-226 in Malaysian Drinking and Bottled Mineral Water

The concentration of the radionuclide {sup 226}Ra was determined in the drinking water which was taken from various sources. It was found that the concentration varies from non-detectable (ND) to highest value of 0.30 Bq per liter. The concentration was found to be high in mineral water as compare with surface water such as domestic pipe water. Some of these values have exceeded the EPA (Environmental Protection Agency) of America regulations. The activity concentrations obtained are compared with data from other countries. The estimated annual effective doses from drinking the water are determined. The values obtained range from 0.02 mSv to about 0.06 mSv per year.

54 ENVIRONMENTAL SCIENCES↗

Contaminant Attenuation and Transport Characterization of 200-DV-1 Operable Unit Sediment Samples from Boreholes C9497, C9498, C9603, C9488, and C9513

Contaminants disposed of at the land surface must migrate through the vadose zone before entering groundwater. Processes that occur in the vadose zone can attenuate contaminant concentrations during transport through the vadose zone. Thus, quantifying contaminant attenuation and contaminant transport processes in the vadose zone, in support of the conceptual site model (CSM) and fate and transport assessments, is important for assessing the need for, and type of, remediation in the vadose zone and groundwater. The framework to characterize attenuation and transport processes provided in U.S. Environmental Protection Agency (EPA) guidance documents was used to guide the laboratory effort reported herein.

54 ENVIRONMENTAL SCIENCES↗

National Emission Standards for Hazardous Air Pollutants - Radionuclide Emissions Calendar Year 2009

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office operates the Nevada Test Site (NTS) and North Las Vegas Facility (NLVF). From 1951 through 1992, the NTS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NTS activities has been monitored since the initiation of atmospheric testing. Limitation to underground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NTS. After nuclear testing ended in 1992, NTS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by wind) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of tritium were also emitted to air at the NLVF, an NTS support complex in North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) limits the release of radioactivity from a U.S. Department of Energy facility to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation not related to NTS activities. Unrelated doses could come from naturally occurring radioactive elements or from sources such as medically or commercially used radionuclides. The NTS demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. Six locations on the NTS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration of each detected radionuclide at each of these locations is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2. At any one location, if multiple radionuclides are detected, then compliance with NESHAP is demonstrated when the sum of the fractions (determined by dividing each radionuclide’s concentration by its CL and then adding the fractions together) is less than 1.0. In 2009, the potential dose from radiological emissions to air, resulting from both current and past NTS activities, at onsite compliance monitoring stations was a maximum of 1.69 mrem/yr, well below the 10 mrem/yr dose limit. Air sampling data collected at all six critical receptor stations had average concentrations of radioactivity that were a fraction of the CL values listed in Table 2 in Appendix E of 40 CFR 61. Concentrations ranged from less than 1 percent to a maximum of 17 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers from potential release points on the NTS, concentrations at this location would be only a small fraction of that measured on the NTS. The potential dose to the public from NLVF emissions was also very low at 0.000044 mrem/yr, 230,000 times lower than the 10 mrem/yr limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Emission Standards for Hazardous Air Pollutants - Radionuclide Emissions Calendar Year 2009

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office operates the Nevada Test Site (NTS) and North Las Vegas Facility (NLVF). From 1951 through 1992, the NTS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NTS activities has been monitored since the initiation of atmospheric testing. Limitation to underground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NTS. After nuclear testing ended in 1992, NTS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by wind) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of tritium were also emitted to air at the NLVF, an NTS support complex in North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) limits the release of radioactivity from a U.S. Department of Energy facility to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation not related to NTS activities. Unrelated doses could come from naturally occurring radioactive elements or from sources such as medically or commercially used radionuclides. The NTS demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. Six locations on the NTS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration of each detected radionuclide at each of these locations is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2. At any one location, if multiple radionuclides are detected, then compliance with NESHAP is demonstrated when the sum of the fractions (determined by dividing each radionuclide’s concentration by its CL and then adding the fractions together) is less than 1.0. In 2009, the potential dose from radiological emissions to air, resulting from both current and past NTS activities, at onsite compliance monitoring stations was a maximum of 1.69 mrem/yr, well below the 10 mrem/yr dose limit. Air sampling data collected at all six critical receptor stations had average concentrations of radioactivity that were a fraction of the CL values listed in Table 2 in Appendix E of 40 CFR 61. Concentrations ranged from less than 1 percent to a maximum of 17 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers from potential release points on the NTS, concentrations at this location would be only a small fraction of that measured on the NTS. The potential dose to the public from NLVF emissions was also very low at 0.000044 mrem/yr, 230,000 times lower than the 10 mrem/yr limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Facility Deactivation and Decommissioning at the Savannah River Site

In February 2002, the U.S. Department of Energy initiated actions to expedite Cleanup, focus on significant and early risk reduction, and reduce costs at the Savannah River Site (SRS). In response SRS started on a project focused on completing the decommissioning of inactive facilities in T, D, and M Areas, areas that are on the perimeter of the Site, by the end of 2006. In June 2003, the Department of Energy Savannah River Operations Office (DOE-SR), the South Carolina Department of Health and Environmental Control (SCDHEC), and the Environmental Protection Agency, Region 4 (EPA-4) endorsed a Memorandum of Agreement (MOA) concerning cleanup at the Savannah River Site (SRS). The vision of the Agreement is that SRS will reduce its operations footprint to establish a buffer zone at the perimeter of the Site, while the central core area of the Site will be reserved for continuing or future long-term operations. DOE-SR, EPA-4, and SCDHEC agreed that establishing this buffer zone and appropriately sequencing environmental restoration and decommissioning activities can lead to greater efficiency and accelerate completion of entire site areas. This vision is embodied in the concept of Area Completion - which integrated operations, deactivation and decommissioning (D and D), and soils and groundwater cleanup into a time-phased approach to completing all the work necessary to address the Cold War legacy. D and D addresses the 'footprint' of the building or structure, while the soils and groundwater project addresses any environmental remediation that may be required in the underlying and surrounding soils and groundwater. Since then, {approx}250 facilities have been decommissioned at the SRS, ranging from guard stations to nuclear fuel production facilities. The efforts made up front to develop the MOA and maintain open and active involvement with the EPA and SCDHEC was instrumental to the success of the SRS D and D Project. Accelerated D and D requires innovative regulatory approaches so that time and resources are spent commensurate with the hazards of the facilities being decommissioned. The graded approach developed at SRS accomplished a balance between building hazards and the amount of regulatory and public involvement.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Overview of the Risk Assessment Information System

This technical memorandum (TM) presents an overview of the Risk Assessment Information System (RAIS), a collection of web-based tools designed to assist with the environmental risk assessment process. The objective of the RAIS is to be a single resource for the risk assessment process, providing guidance when planning and performing the steps: data assessment, exposure assessment, toxicity assessment, and risk characterization. The RAIS evolved as a result of the initial remediation efforts at various United States (U.S.) Department of Energy (DOE) facilities. The goal was to increase the efficiency and transparency of the human health and ecological assessments being performed by DOE’s Office of Environmental Management, Oak Ridge Operations (ORO) office by providing a repository for toxicity information, physicochemical data, risk assessment procedures, standardized risk calculation methods, and web-based tools. Since the initial launch in 1996, the RAIS has expanded its user base outside of the federal government and now has users from over 100 countries, universities, states, and local governments. What sets the RAIS apart from other risk assessment sites are the publicly available, searchable toxicity and physicochemical databases and the wide range of chemical and radionuclide risk calculation tools. The purpose of this TM is to present the RAIS tools in order of the website menus and explain how they fit in the risk assessment process. In addition, this TM describes differences between the chemical and radionuclide tools of the RAIS. Screening level equations, chronic daily intake equations, and default exposure factors used in the chemical and radionuclide calculators are included in the appendices of this TM. This TM is not intended to be a detailed guide to risk assessment or the RAIS tools. The tools on the RAIS can be used to comply with procedures from multiple agencies, including but not limited to DOE, U.S. Environmental Protection Agency (EPA), U.S. Department of Defense (DoD), and many state governments. Further information on the RAIS tools can be found in the user guides and tutorials available on the webpage.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Radiological Risk Assessment of Capstone Depleted Uranium Aerosols

Assessment of the health risk from exposure to aerosols of depleted uranium (DU) is an important outcome of the Capstone aerosol studies that established exposure ranges to personnel in armored combat vehicles perforated by DU munitions. Although the radiation exposure from DU is low, there is concern that DU deposited in the body may increase cancer rates. Radiation doses to various organs of the body resulting from the inhalation of DU aerosols measured in the Capstone studies were calculated using International Commission on Radiological Protection (ICRP) models. Organs and tissues with the highest calculated committed equivalent 50-yr doses were lung and extrathoracic tissues (nose and nasal passages, pharynx, larynx, mouth and thoracic lymph nodes). Doses to the bone surface and kidney were about 5 to 10% of the doses to the extrathoracic tissues. The methodologies of the ICRP International Steering Committee on Radiation Standards (ISCORS) were used for determining the whole body cancer risk. Organ-specific risks were estimated using ICRP and U.S. Environmental Protection Agency (EPA) methodologies. Risks for crewmembers and first responders were determined for selected scenarios based on the time interval of exposure and for vehicle and armor type. The lung was the organ with the highest cancer mortality risk, accounting for about 97% of the risks summed from all organs. The highest mean lifetime risk for lung cancer for the scenario with the longest exposure time interval (2 h) was 0.42%. This risk is low compared with the natural or background risk of 7.35%. These risks can be significantly reduced by using an existing ventilation system (if operable) and by reducing personnel time in the vehicle immediately after perforation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Storm Water Pollution Prevention Plan TA-60 Material Recycling Facility

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan TA-60 Roads and Grounds Facility and Associated Sigma Mesa Staging Area

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan TA-60 Asphalt Batch Plant

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Nevada Test Site National Emission Standards for Hazardous Air Pollutants Calendar Year 2008

The Nevada Test Site (NTS) is operated by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office. From 1951 through 1992, the NTS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NTS activities has been monitored since the initiation of atmospheric testing. Limitation to under-ground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NTS. After nuclear testing ended in 1992, NTS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by winds) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of tritium were also emitted to air at the North Las Vegas Facility (NLVF), an NTS support complex in the city of North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) (CFR, 2008a) limits the release of radioactivity from a U.S. Department of Energy facility (e.g., the NTS) to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation not related to NTS activities. Unrelated doses could come from naturally occurring radioactive elements or from other man-made sources such as medical treatments. The NTS demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. Six locations on the NTS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration of each detected radionuclide at each of these locations is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2 (CFR, 2008a). At any one location, if multiple radionuclides are detected then compliance with NESHAP is demonstrated when the sum of the fractions (determined by dividing each radionuclide's concentration by its CL and then adding the fractions together) is less than 1.0. In 2008, the potential dose from radiological emissions to air, from both current and past NTS activities, at onsite compliance monitoring stations was a maximum of 1.9 mrem/yr; well below the 10 mrem/yr dose limit. Air sampling data collected at all six pseudo-critical receptor stations had average concentrations of radioactivity that were a fraction of the CL values listed in Table 2 in Appendix E of 40 CFR 61 (CFR, 2008a). Concentrations ranged from less than 1 percent to a maximum of 19 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers (12 miles) from the NTS boundary, concentrations at this location would be only a small fraction of that measured on the NTS. Potential dose to the public from NLVF was also very low at 0.00006 mrem/yr; more than 160,000 times lower than the 10 mrem/yr limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

No-Impact Threshold Values for NRAP's Reduced Order Models

The purpose of this study was to develop methodologies for establishing baseline datasets and statistical protocols for determining statistically significant changes between background concentrations and predicted concentrations that would be used to represent a contamination plume in the Gen II models being developed by NRAP’s Groundwater Protection team. The initial effort examined selected portions of two aquifer systems; the urban shallow-unconfined aquifer system of the Edwards-Trinity Aquifer System (being used to develop the ROM for carbon-rock aquifers, and the a portion of the High Plains Aquifer (an unconsolidated and semi-consolidated sand and gravel aquifer, being used to development the ROM for sandstone aquifers). Threshold values were determined for Cd, Pb, As, pH, and TDS that could be used to identify contamination due to predicted impacts from carbon sequestration storage reservoirs, based on recommendations found in the EPA’s ''Unified Guidance for Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities'' (US Environmental Protection Agency 2009). Results from this effort can be used to inform a ''no change'' scenario with respect to groundwater impacts, rather than the use of an MCL that could be significantly higher than existing concentrations in the aquifer.

54 ENVIRONMENTAL SCIENCES↗

NASA's Marshall Space Flight Center Saves Water With High-Efficiency Toilet and Urinal Program

The National Aeronautics and Space Administration’s (NASA) Marshall Space Flight Center (MSFC) has a longstanding, successful sustainability program that focuses on energy and water efficiency as well as environmental protection. Because MSFC was built in the 1960s, most of the buildings house outdated, inefficient restroom fixtures. The facility engineering team at MSFC developed an innovative efficiency model for replacing these older toilets and urinals.

Best Management Practice Case Study #6↗

Risk-based area of review estimation in overpressured reservoirs to support injection well storage facility permit requirements for CO 2 storage projects

This paper by the Energy & Environmental Research Center presents a workflow and modeling approach for delineating a risk-based area of review (AOR) to support a U.S. Environmental Protection Agency (EPA) Class VI permit for a carbon dioxide (CO 2 ) storage project. The approach combines semianalytical solutions for estimating formation fluid leakage through a hypothetical leaky wellbore with the results of numerical reservoir simulations to define the AOR. The modeling utilizes 1) semianalytical solutions from the peer-reviewed literature for formation fluid leakage through abandoned wellbores by Raven (1990) and Avci (1994), 2) a FORTRAN model compiled and described in Cihan et al. (2011, 2012) called ASLMA (Analytical Solution for Leakage in Multilayered Aquifers), and 3) a computational framework for estimating a risk-based AOR first proposed by Oldenburg et al. (2014, 2016). Therefore, the approach builds upon well-established research and underlying hydrogeological principles that have been upheld for nearly three decades. Moreover, the ASLMA model has been broadly applied to an array of storage projects. The work presented herein extends these earlier works using a custom wrapper written in the software environment, R (R Core Team, 2020), which was developed to perform multiple runs of the ASLMA model using given ranges for one or more input parameters. In addition, the current work simulates the pressure buildup within the storage reservoir in response to CO 2 injection using a compositional simulator to better accommodate the temporospatial evolution of pressure buildup within the storage reservoir that is more accurately modeled using a heterogeneous geologic model and a compositional simulator that accounts for the multiphase interactions. The workflow is demonstrated using a case study for a 180,000-metric-ton-per-year storage project located in the PCOR (Plains CO 2 Reduction) Partnership region. For the storage project evaluated here, under the scenario where the leaky wellbore is open to a saline aquifer (thief zone) between the overlying seal (cap rock) and the underground sources of drinking water (USDW), the risk-based AOR essentially collapses to the areal extent of the CO 2 plume in the storage reservoir because the pressure buildup in the storage reservoir beyond the CO 2 plume is insufficient to drive formation fluids up a hypothetical leaky wellbore into the USDW. However, even under the conservative assumption that the leaky wellbore is not open to a thief zone, beyond the areal extent of the CO 2 plume, the incremental leakage is less than 400 m 3 over 20 years, which represents ~0.0001% or less of the total volume of water contained within the USDW rock volume. As discussed in the text, the threshold criterion for defining the risk-based AOR is site-specific and should be informed by the results of the sensitivity analysis and available site characterization data. The approach outlined in this paper is designed to be protective of USDWs and, therefore, comply with the Safe Drinking Water Act requirements and provisions for the U.S. EPA Class VI Underground Injection Control (UIC) Program (Class VI Rule) and North Dakota Administrative Code Chapter 43-05-01.

54 ENVIRONMENTAL SCIENCES↗