Development of Performance Validation Tool for the NPCS for APR1400
Availability of nuclear power plant is highly dependent on the quality of major control systems including NSSS Control Systems. It has been experienced that a small flaw hidden among the control functions resulted in large operational transient or even reactor trip. The proactive quality control of these systems is not easy because of the dynamical characteristics of control algorithms. In a stand-alone or open loop state, it is not possible to perform integral system tests because they need control loads to form an appropriate closed control loop. In the construction plant, Power Ascension Test (PAT) is the first chance to witness the overall performance of the control systems. Because the PAT is the last activity of plant construction schedule, the cost of corrective actions is very high if any functional defect is found in this stage. To minimize risk caused by late detection of control system defects, we developed a validation tool as a proactive test device for the NSSS Process Control System (NPCS) for the SKN Unit 3 which is the first APR1400 plant in Korea. In this paper, the features of the dynamic performance test tool, test methodology, and the test results are described.