Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Magnetospheric Atmospheric X-ray Imaging Experiment (MAXIE)

This report summarizes the activities sponsored by the Office of Naval Research for the Magnetospheric Atmospheric X-ray Imaging Experiment (MAXIE). The MAXIE instrument was developed as a joint activity of Lockheed, The Aerospace Corporation, and the University of Bergen, Norway. Lockheed was responsible for the overall management of the program, interfacing with the appropriate government agencies, the overall electrical and mechanical design, flight software, environmental testing, spacecraft integration activities, on orbit checkout, and data processing activities. The Magnetospheric Atmospheric X-ray Imaging Experiment (MAXIE), the ONR 401 experiment, is the first in a new class of satellite-borne remote sensing instruments. The primary innovation is the ability to obtain rapid, sequential, images with high sensitivity of the earth's X ray aurora from a low altitude polar orbiting satellite. These images can be used to identify dynamic temporal variations in the three-dimensional (energy and position) distribution of electron precipitation into the atmosphere. MAXIE was launched on the TIROS NOAA-13 satellite on 9 August 1993. The experiment performed well during its turn-on sequence; however, the spacecraft bus failed on 21 August 1993. New spacebased technologies successfully used in MAXIE were mixed-mode ASIC microcircuits, a zero torque scanning system with associated viscoelastic damping, a paraffin stow release mechanism, a parallel integrating PHA processor, a low noise Si(Li) sensor telescope, and an advanced thermal cooling system. MAXIE's on orbit operation, control of penetrating particle backgrounds, and scientific data indicated good overall performance.

Imhof, W. L.↗

STS-81 Flight Day 3

On this third day of the STS-81 mission, the flight crew, Cmdr. Michael A. Baker, Pilot Brent W. Jett, Mission Specialists, John M. Grunsfeld, Marsha S. Ivins, Peter J.K. Wisoff, and Jerry M. Linenger, spend most of their workday completing preparations for the rendezvous and linkup of the Space Shuttle with the Mir Space Station. Pilot Brent Jett finishes the checkout of navigation tools that will be used during the rendezvous. Later he joins John Grunsfeld and they install a camera in the Orbiter Docking System to provide television views of the docking target on the Mir. Commander Mike Baker will use this later as he flies Atlantis to its docking with Mir.

Source record↗

STS-81 Flight Day 10

On this tenth day of the STS-81 mission, the flight crew, Cmdr. Michael A. Baker, Pilot Brent W. Jett, Mission Specialists, John M. Grunsfeld, Marsha S. Ivins, Peter J.K. Wisoff, and John Blaha, prepare for the return back to earth. The shuttle's key flight control systems are checked for entry and landing phase of the mission. Commander Mike Baker and Pilot Brent Jett activate one of Atlantis' three hydraulic power units to test the shuttle's aerosurfaces. Baker and Jett fire Atlantis' steering jets in a routine prelanding checkout. The astronauts also test a medical restraint system in the Spacehab module, placing two crewmembers in the device. Crewmembers then begin to stow items away in the crew cabin, initiate the scheduled deactivation of Spacehab systems and associated hardware.

Source record↗

Scientific and Technical Support for the Galileo Net Flux Radiometer Experiment

This report describes work in support of the Galileo Net Flux Radiometer (NFR), an instrument mounted on the Galileo probe, a spacecraft designed for entry into and direct measurements of Jupiter's atmosphere. Tasks originally proposed for the post launch period are briefly as follows: attend and support PSG (Project Science Group) and other project science meetings; support in-flight checkouts; maintain and keep safe the spare instrument and GSE (Ground Support Equipment); organize and maintain documentation; finish NFR calibration measurements, documentation, and analysis; characterize and diagnose instrument anomalies; develop descent data analysis tools; and science data analysis and publication. Because we had the capability to satisfy a project support need we also subsequently proposed and were funded to make ground- based observations of Jupiter during the period surrounding the Galileo arrival at Jupiter, using the Swedish Solar Telescope at La Palma, Canary Islands. The following section (11) provides background information on the NFR instrument.

Sromovsky, Lawrence A.↗

Scientific and Technical Support for the Galileo Net Flux Radiometer Experiment

This report describes work in support of the Galileo Net Flux Radiometer (NFR), an instrument mounted on the Galileo probe, a spacecraft designed for entry into and direct measurements of Jupiter's atmosphere. Tasks originally proposed for the post launch period covered by NCC 2-854 are briefly as follows: attend and support PSG (Project Science Group) and other project science meetings; support in-flight checkouts; maintain and keep safe the spare instrument and GSE (Ground Support Equipment); organize and maintain documentation; finish NFR calibration measurements, documentation, and analysis; characterize and diagnose instrument anomalies; develop descent data analysis tools; and science data analysis and publication. Because we had the capability to satisfy a project support need we also subsequently proposed and were funded to make ground-based observations of Jupiter during the period surrounding the Galileo arrival at Jupiter, using the Swedish Solar Telescope at La Palma, Canary Islands. The following section provides background information on the NFR instrument. Section 3 contains the final report of work done.

Sromovsky, Lawrence A.↗

STS-82 Flight Day 05 Highlights

The fifth day of the STS-82 mission begins with the crew, Commander Kenneth D. Bowersox, Pilot Scott J. Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Gregory J. Harbaugh, Steven L. Smith, Joseph R. Tanner, and Steven A. Hawley completing the checkout of spacesuits well ahead of schedule, allowing them to start the second spacewalk of the flight. Harbaugh and Tanner went right to work, replacing a degraded Fine Guidance Sensor and a failed Engineering and Science Tape Recorder with new spares. The astronauts also installed a new unit known as the Optical Control Electronics Enhancement Kit, which will further increase the capability of the new Fine Guidance Sensor. During the spacewalk, the astronauts and flight controllers took note of cracking and wear incurred by thermal insulation which protects several areas of the telescope.

Source record↗

STS-82 Flight Day 02 Highlights

On the second day of the STS-82 mission, the crew Commander Kenneth D. Bowersox, Pilot Scott J. Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Gregory J. Harbaugh, Steven L. Smith, Joseph R. Tanner, and Steven A. Hawley survey the payload bay with the Shuttle's 50-foot remote manipulator system (RMS). Hawley puts the arm through its paces to verify it's ability to capture the Hubble Space Telescope (HST). To prepare for the up coming spacewalks, the astronauts assemble on the middeck to checkout tools they will use while servicing the telescope.

Source record↗

Training Manual for Elements of Interface Definition and Control

The primary thrust of this manual is to ensure that the format and information needed to control interfaces between equipment are clear and understandable. The emphasis is on controlling the engineering design of the interface and not on the functional performance requirements of the system or the internal workings of the interfacing equipment. Interface control should take place, with rare exception, at the interfacing elements and no further. There are two essential sections of the manual. Chapter 2, Principles of Interface Control, discusses how interfaces are defined. It describes different types of interfaces to be considered and recommends a format for the documentation necessary for adequate interface control. Chapter 3, The Process: Through the Design Phases, provides tailored guidance for interface definition and control. This manual can be used to improve planned or existing interface control processes during system design and development. It can also be used to refresh and update the corporate knowledge base. The information presented herein will reduce the amount of paper and data required in interface definition and control processes by as much as 50 percent and will shorten the time required to prepare an interface control document. It also highlights the essential technical parameters that ensure that flight subsystems will indeed fit together and function as intended after assembly and checkout.

Lalli, Vincent R.↗

Research and Technology 1996: Innovation in Time and Space

As the NASA Center responsible for assembly, checkout, servicing, launch, recovery, and operational support of Space Transportation System elements and payloads, the John F. Kennedy Space Center is placing increasing emphasis on its advanced technology development program. This program encompasses the efforts of the Engineering Development Directorate laboratories, most of the KSC operations contractors, academia, and selected commercial industries - all working in a team effort within their own areas of expertise. This edition of the Kennedy Space Center Research and Technology 1996 Annual Report covers efforts of all these contributors to the KSC advanced technology development program, as well as our technology transfer activities.

Source record↗

Pre-Flight Dark Forward Electrical Testing of the Mir Cooperative Solar Array

The Mir Cooperative Solar Array (MCSA) was developed jointly by the United States (US) and Russia to provide approximately 6 kW of photovoltaic power to the Russian space station Mir. After final assembly in Russia, the MCSA was shipped to the NASA Kennedy Space Center (KSC) in the summer of 1995 and launched to Mir in November 1995. Program managers were concerned of the potential for MCSA damage during the transatlantic shipment and the associated handling operations. To address this concern, NASA Lewis Research Center (LERC) developed an innovative dark-forward electrical test program to assess the gross electrical condition of each generator following shipment from Russia. The use of dark test techniques, which allow the array to remain in the stowed configuration, greatly simplifies the checkout of large area solar arrays. MCSA dark electrical testing was successfully performed at KSC in July 1995 following transatlantic shipment. Data from this testing enabled engineers to quantify the effects of potential MCSA physical damage that would degrade on-orbit electrical performance. In this paper, an overview of the principles and heritage of photovoltaic array dark testing is given. The specific MCSA dark test program is also described including the hardware, software, testing procedures and test results. The current-voltage (4) response of both solar cell circuitry and by-pass diode circuitry was obtained. To guide the development of dark test hardware, software and procedures, a dedicated FORTRAN computer code was developed to predict the dark 4 responses of generators with a variety of feasible damage modes. By comparing the actual test data with the predictions, the physical condition of the generator could be inferred. Based on this data analysis, no electrical short-circuits or open-circuits were detected. This suggested the MCSA did not sustain physical damage that affected electrical performance during handling and shipment from Russia to the US. Good agreement between the test data and computational predictions indicated MCSA electrical performance was amenable to accurate analysis and was well understood.

Kerslake, Thomas W.↗

STS-83 Mission Highlights Resources Tape

The STS-83 mission flight crew, Cmdr. James D. Halsell Jr., Pilot Susan L. Still, Payload Cmdr. Janice E. Voss, Mission Specialists Michael L. Gernhardt and Donald A. Thomas, and Payload Specialist Gregory T. Linteris and Roger K. Crouch present an overview of their mission. The primary payload is the Microgravity Science Laboratory (MSL), which is a collection of microgravity experiments housed inside a European Spacelab Long Module (LM). MSL features 19 materials science investigations in 4 major facilities. These facilities are the Large Isothermal Furnace, the EXpedite the PRocessing of Experiments to the Space Station (EXPRESS) Rack, the Electromagnetic Containerless Processing Facility (TEMPUS), and the Coarsening in Solid-Liquid Mixtures (CSLM) Facility, the Droplet Combustion Experiment (DCE); and the Combustion Module-1 Facility. Additional technology experiments will be performed in the Middeck Glovebox (MGBX) developed by the Marshall Space Flight Center (MSFC) and the High-Packed Digital Television (HI-PAC DTV) system will be used to provide multi-channel real-time analog science video. Pre-flight, launch, and orbital footage is followed a discussion of the spaceborne experiments aboard the MSL. The end footage shows the shuttle's prelanding checkout, reentry, and landing.

Source record↗

Research and Technology at the John F. Kennedy Space Center 1993

As the NASA Center responsible for assembly, checkout, servicing, launch, recovery, and operational support of Space Transportation System elements and payloads, the John F. Kennedy Space Center is placing increasing emphasis on its advanced technology development program. This program encompasses the efforts of the Engineering Development Directorate laboratories, most of the KSC operations contractors, academia, and selected commercial industries - all working in a team effort within their own areas of expertise. This edition of the Kennedy Space Center Research and Technology 1993 Annual Report covers efforts of all these contributors to the KSC advanced technology development program, as well as our technology transfer activities. Major areas of research include material science, advanced software, industrial engineering, nondestructive evaluation, life sciences, atmospheric sciences, environmental technology, robotics, and electronics and instrumentation.

Source record↗

STS-85 Day 02 Highlights

On this second day of the STS-85 mission, the flight crew, Cmdr. Curtis L. Brown, Jr., Pilot Kent V. Rominger, Payload Cmdr. N. Jan Davis (Ph.D.), Mission Specialists Robert L. Curbeam, Jr. and Stephen K. Robinson (Ph.D.), and Payload Specialist Bjarni V. Tryggvason activated instruments of the Technology Applications and Science (TAS), including the Shuttle Laser Altimeter, the Infrared Spectral Imaging Radiometer (ISIR), the Cryogenic On-Orbit Long Life Active Refrigerator (COOLAR), Two Phase Flow (TPF), Critical Viscosity of Xenon (CVX) and were initializing the Solar Constant Experiment (SOLCON) and preparing for its first observation. Work with the Japanese-built Manipulator Flight Demonstration (MFD) experiment l begins when Davis begins checkout of its Small Fine Arm, destined for use outside the International Space Station's Japanese Experiment Module. Brown is seen being interviewed by WBTV-TV, Charlotte, N.C., and WTVD-TV, Raleigh-Durham, N.C.

Source record↗

RXTE Observations of Cas A

The exciting detection by the COMPTEL instrument of the 1157 keV Ti-44 line from the supernova remnant Cas A sets important new constraints on supernova dynamics and nucleosynthesis. The Ti-44 decay also produces x-ray lines at 68 and 78 keV, whose flux should be essentially the same as that of the gamma ray line. The revised COMPTEL flux of 4 x l0(exp -5) cm(exp -2)s(exp -1) is very near the sensitivity limit for line detection by the HEXTE instrument on RXTE. We report on the results from two RXTE observations - 20 ks during In Orbit Checkout in January 1996 and 200 ks in April 1996. We also find a strong continuum emission suggesting cosmic ray electron acceleration in the remnant.

Rothschild, R. E.↗

STS-89 Post Flight Presentation

The flight crew of the STS-89 Space Shuttle Orbiter Endeavour, Cmdr. Terrence W. Wilcutt, Pilot Frank Edwards, and Mission Specialists Michael P. Anderson, James F. Reilly, Bonnie J. Dunbar, Salizhan Shakirovich Sharipov, David A. Wolf, and Andrew S.W. Thomas present an overview of their mission. It's whose primary objective was the rendezvous and space docking with the Mir Space Station. Video film footage includes prelaunch and launch activities; shuttle launch; in-orbit docking between Mir and Endeavour; general crew activities; transfer of supplies, equipment, and microgravity experiments to Mir; undocking maneuvers and Mir fly around; pre-return checkout of flight systems; and reentry and landing of the orbiter.

Source record↗

The Control System for the X-33 Linear Aerospike Engine

The linear aerospike engine is being developed for single-stage -to-orbit (SSTO) applications. The primary advantages of a linear aerospike engine over a conventional bell nozzle engine include altitude compensation, which provides enhanced performance, and lower vehicle weight resulting from the integration of the engine into the vehicle structure. A feature of this integration is the ability to provide thrust vector control (TVC) by differential throttling of the engine combustion elements, rather than the more conventional approach of gimballing the entire engine. An analysis of the X-33 flight trajectories has shown that it is necessary to provide +/- 15% roll, pitch and yaw TVC authority with an optional capability of +/- 30% pitch at select times during the mission. The TVC performance requirements for X-33 engine became a major driver in the design of the engine control system. The thrust level of the X-33 engine as well as the amount of TVC are managed by a control system which consists of electronic, instrumentation, propellant valves, electro-mechanical actuators, spark igniters, and harnesses. The engine control system is responsible for the thrust control, mixture ratio control, thrust vector control, engine health monitoring, and communication to the vehicle during all operational modes of the engine (checkout, pre-start, start, main-stage, shutdown and post shutdown). The methodology for thrust vector control, the health monitoring approach which includes failure detection, isolation, and response, and the basic control system design are the topic of this paper. As an additional point of interest a brief description of the X-33 engine system will be included in this paper.

Jackson, Jerry E.↗

The on-orbit optical performance of STIS

The Space Telescope Imaging Spectrograph (STIS) is a versatile, general purpose instrument installed aboard the Hubble Space Telescope in February, 1997. During the following Servicing Mission Orbital Verification (SMOV) period, STIS has been made operational and aligned, and initial checkout and calibration completed. The overall optical performance goals have largely been achieved and a summary of these results is presented.

Bowers, Charles W.↗

Initial flight results of the TRMM Kalman filter

The Tropical Rainfall Measuring Mission (TRMM) spacecraft is a nadir pointing spacecraft that nominally controls attitude based on the Earth Sensor Assembly (ESA) output. After a potential single point failure in the ESA was identified, the contingency attitude determination method chosen to backup the ESA-based system was a sixth-order extended Kalman filter that uses magnetometer and digital sun sensor measurements. A brief description of the TRMM Kalman filter will be given, including some implementation issues and algorithm heritage. Operational aspects of the Kalman filter and some failure detection and correction will be described. The Kalman filter was tested in a sun pointing attitude and in a nadir pointing attitude during the in-orbit checkout period, and results from those tests will be presented. This paper will describe some lessons learned from the experience of the TRMM team.

Andrews, Stephen F.↗