Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Unique safety features and licensing requirements of the NuScale small modular reactor

Small modular reactors (SMR) offer a novel approach to the construction and operation of nuclear power plants. The NuScale VOYGR™ plant uses a simplified SMR design that is based on proven light-water reactor technology with substantial improvements in nuclear safety. It consists of a 250 MWt reactor core housed with other primary system components in an integral reactor pressure vessel surrounded by a steel containment vessel, all of which is immersed in a large pool of water that also serves as the ultimate heat sink. At the core of the NuScale safety case are three primary safety systems: the decay heat removal system, the emergency core cooling system, and the containment. The ability of the NuScale Power Module (NPM) passive safety systems to remove core decay heat for an unlimited duration is demonstrated through analysis of a beyond-design-basis extended loss of AC power with no replenishment of water to the ultimate heat sink or operator actions. The NuScale methodology to evaluate an indefinite loss of AC power uses the proprietary NRELAP5 systems analysis computer code. Analysis results show that the reactor coolant system liquid level above the core is maintained and that containment pressure remains below the vessel design pressure. Once full passive air cooling is established, containment pressure and temperature will decrease over time with decreasing core decay heat. NuScale received standard design approval in September 2020 and design certification in January 2023 for its 50 MWe NPM configured as a 12 module plant. NuScale is currently seeking standard design approval to increase its core power to 250 MWt, nominally 77 MWe per module, in a 6-module plant (VOYGR™-6) configuration. The high-level safety of NuScale’s SMR technology is foundational to a new standard of nuclear power plant resilience.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Phase Doppler Interferometry for Efficient Cloud Drop Size Distribution, Number Density, and LWC Measurements

Threats to aviation safety as a result of super-cooled large drops (SLD) has been addressed by the FAA rules change (14 CFR Part 25) with the additional icing certification requirement. SLD clouds often consist of bi-modal drop size spectra leading to significant problems in simulating and characterizing these conditions in situ and in icing wind tunnels. Legacy instrumentation for measuring drop size distributions and liquid water content are challenged under these conditions. The large size range measurement problem is addressed with the development of the Phase Doppler Interferometer, Flight Probe Dual-Range (PDI FPDR). The method is described in this report along with the measurement capabilities including the dynamic measurement range and overall working size range. The PDI instrument bases drop size measurements on the light wavelength as the measurement length scale. The light wavelength is a much more robust scale, especially as compared to the light scattering intensity. Additionally, methods for accurately characterizing the sample volume in situ based on measured drop velocity and transit time are reviewed, given the importance of this parameter for merging results and measuring LWC. Droplet coincidence in the sample volume can be problematic so this condition is treated with an innovative signal parsing approach. Measurement examples acquired in the NASA IRT are provided. Measurements of LWC showed good agreement with the Artium Particle Imaging (PI) instrument but diverged from the tunnel calibration results for larger MVD values.

42 ENGINEERING↗

Introduction to Flight Test Engineering [Introduction Aux Techniques Des Essais En Vol]

Flight test is at the core of what organizations must do in order to validate the operation and systems on an aircraft. While the AGARDograph series 300 and 160 series deal with aspects of this testing, this volume pulls it all together as an introduction to the process required to do effective flight test engineering. This volume was originally published in 1995. Its utility has been proven in that many flight test organizations and universities have requested copies for their engineers and students. It was felt that re-issuing it in a new format designed for electronic publication would be valuable to the community. This second printing changes none of the text, but rather reformats it. All the original references to AGARD (instead of RTO) are left in place so that none of the flavor of the original publication is lost. This is the Introductory Volume to the Flight Test Techniques Series. It is a general introduction to the various activities and aspects of Flight Test Engineering that must be considered when planning, conducting, and reporting a flight test program. Its main intent is to provide a broad overview to the novice engineer or to other people who have a need to interface with specialists within the flight test community. The first two Sections provide some insight into the question of why flight test and give a short history of flight test engineering. Sections 3 through 10 deal with the preparation for flight testing. They provide guidance on the preliminary factors that must be considered; the composition of the test team; the logistic support requirements; the instrumentation and data processing requirements; the flight test plan; the associated preliminary ground tests; and last, but by no means least, discuss safety aspects. Sections 11 through 27 describe the various types of flight tests that are usually conducted during the development and certification of a new or modified aircraft type. Each Section offers a brief introduction to the topic under consideration, and the nature and the objectives of the tests to be conducted. It lists the test instrumentation (and, where appropriate, other test equipment and facilities) required, describes the test maneuvers to be executed, and indicates the way in which the test data is selected, analyzed, and presented. The various activities that should take place between test flights are presented next. Items that are covered are: who to debrief; what type of reports to send where: types of data analysis required for next flight; review of test data to make a comparison to predicted data and some courses of action if there is not good agreement; and comments on selecting the next test flight. The activities that must take place upon completion of the test program are presented. The types of reports and briefings that should take place and a discussion of some of the uses of the flight test data are covered. A brief forecast is presented of where present trends may be leading.

Test facilities↗

Technical Facilities Management, Loan Pool, and Calibration

My work at JPL for the SURF program began on June 11, 2012 with the Technical Facilities Management group (TFM). As well as TFM, I worked with Loan Pool and Metrology to help them out with various tasks. Unlike a lot of other interns, I did not have a specific project rather many different tasks to be completed over the course of the 10 weeks.The first task to be completed was to sort through old certification reports in 6 different boxes to locate reports that needed to be archived into a digital database. There were no reports within these boxes that needed to be archived but rather were to be shredded. The reports went back to the early 1980's and up to the early 2000's. I was looking for reports dated from 2002 to 2012

Technical Facilities Management group (TFM)↗

Commercial Crew Program

Presentation for workshop titled Additive Manufacturing Qualification and Certification for Space and Missile Applications.

Commerical Crew↗

Cryo-vacuum testing of the JWST Integrated Science Instrument Module (SPIE)

In late 2015/early 2016, a major cryo-vacuum test was carried out for the Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST). This test comprised the final cryo-certification and calibration test of the ISIM, after its ambient environmental test program (vibration, acoustics, EMI/EMC), and before its delivery for integration with the rest of the JWST observatory. Over the 108-day period of the round-the-clock test program, the full complement of ISIM flight instruments, structure, harness radiator, and electronics were put through a comprehensive program of thermal, optical, electrical, and operational tests. The test verified the health and excellent performance of the instruments and ISIM systems, proving the ISIM element's readiness for integration with the telescope. We report here on the context, goals, setup, execution, and key results for this critical JWST milestone.

James Webb Space Telescope (JWST)↗

Verification and Validation of Safety-Critical Aircraft Systems Operating under Off-Nominal, Contingency, and Emergency Conditions

Verification and validation (V&V) of safety-critical technologies developed for loss of control (LOC) prevention and recovery and other aviation safety concerns pose significant challenges. Aircraft LOC can result from a wide spectrum of hazards, often occurring in combination, which cannot be fully replicated during evaluation. Technologies developed for LOC prevention and recovery must therefore be effective under a wide variety of hazardous and uncertain conditions, and the verification and validation of these technologies must provide some measure of assurance that the new vehicle safety technologies do no harm (i.e., that they themselves do not introduce new safety risks). V&V technologies must also enable the identification of system limitations and constraints, as well as enable the identification of safe and unsafe operating conditions (and their boundaries). Additionally, the V&V of complex, increasingly autonomous systems is a fundamental concern. Scalable, reproducible and cost-effective techniques for the assurance of safety critical systems during their design and operation is a key barrier to fielding new systems or updating current systems. Moreover, these techniques need to provide artifacts that enable a comprehensive evidence-based approach to certification. This briefing summarizes research performed under NASA’s Aviation Safety Program and follow-on research for the V&V of safety-critical aircraft system technologies developed for LOC prevention and recovery and increasingly autonomous systems, and for a broad assurance capability in both current and emerging aviation applications. Note that, in this briefing, the term “validation” refers to a confirmation that the system implementation (e.g., algorithms etc.) is performing the intended function(s), as well as an affirmation of effectiveness in these functions. “Verification” refers to a confirmation that the system implementation in the software and hardware meets its (hopefully validated) specifications (e.g., correctly executes algorithms as designed).

Validation↗

Database Design Strategies for Coordinated Simulation and Testing in Additive Manufacturing

The qualification and certification (Q&C) process presents a significant challenge for widespread adoption of additive manufacturing (AM) materials and processes for aerospace applications. A relational database framework will be presented as a tool for data curation of coordinated experimental and computational materials modeling research activities. A comparison of relational and hierarchical data structures in this domain will be emphasized through the evolution of a database design strategy. This framework’s mission is to support the advancement of computational materials-informed Q&C by providing the necessary data infrastructure to trace reliability and reproducibility measures through unified AM materials simulation and experimental testing. FAIR (findable, accessible, interoperable, and reusable) data will be highlighted as a necessary precursor for automation of specific actions, which ultimately reduces the time and expense burden for Q&C. The discussion will be mostly limited to back-end design elements, though a few front-end user experience examples will also be shared.

Qualification↗

Scoping, Tailoring, and Abstraction Refinement in the Hazard Assessment Process

Hazard assessment is an engineering activity that produces insight into which states of thing being engineered might be hazardous. In aviation contexts, it is often performed for certification credit at both the aircraft and system levels during the early design phase of the system’s lifecycle. However, novel aircraft paradigms such as urban air mobility (UAM) operations might either violate assumptions on which traditional aviation hazard assessment is based or simply possess attributes that would make other approaches more effective. In this paper, we define the key concepts underpinning hazard assessment and identify the limitations and assumptions inherent in hazard analysis. We analyze popular techniques to show how they embody these key concepts. We identify ways in which hazard assessment may be scoped and tailored to an application. And, using worked examples, we discuss how, where, and why such tailoring might be needed, especially in novel contexts.

Aviation Safety↗

HIRF Tolerance and Avoidance for Advanced Air Mobility Vehicles

Advanced Air Mobility (AAM), including Urban Air Mobility (UAM), and Unmanned Aerial Systems (UAS) vehicles may fly in similar airspace to Transport Category Rotorcraft, thereby requiring meeting the same stringent High-Intensity Radiated Fields (HIRF) certification requirements. In a previous effort, a proposed map-based approach protects a vehicle by keeping it away from high power sources at safe distances based on its tolerance level. By designing to a lower tolerance level, significant cost savings can be achieved at the cost of slightly more complex flight planning. However, too low a threshold can result in large avoidance areas, potentially reducing the vehicle operating space. This current effort suggests a minimum threshold for vehicles operating in an urban area. It is derived from analyzing regulatory transmitter data for New York City as a representative metropolitan. As a result, a vehicle can tolerate common lower-power transmitters by default and only needs to avoid far less common high-power sources. It is also found the existing HIRF requirements may be insufficient against many powerful transmitters such as weather radars and satellite uplink transmitters, and that the map-based approach can address this concern.

HIRF↗

Assessing High-Intensity Radiated Fields (HIRF) from High-Power Antennas for Air Vehicle Safety

Advanced Air Mobility (AAM), including Urban Air Mobility (UAM), vehicles may be required to meet stringent High-Intensity Radiated Fields (HIRF) certification requirements. HIRF can cause interference and even damage to vehicle systems. A recently proposed map-based avoidance approach can help reduce HIRF protection costs compared to the standard approach. However, it necessitates knowing the locations, frequencies, and transmit powers of high-power antennas within the operating area. This study aims to provide the necessary transmitter data by utilizing regulatory license databases. Using New York City as a representative urban area, fixed transmitter data are presented for AM, FM, TV, satellite uplink, land-mobile radio, microwave link, weather radars, and others. The maximum effective isotropic radiated powers of the antenna are reported. The associated electric field envelopes at 100 feet (30.48 m) distance are compared against the current rotorcraft HIRF standard. The results show that the current standards for protecting vehicles are inadequate. Maps of regions with high HIRF are illustrated. Data for several other cities are also being considered.

HIRF↗

Assessing High-Intensity Radiated Fields (HIRF) from High-Power Antennas for Air Vehicle Safety

Advanced Air Mobility (AAM), including Urban Air Mobility (UAM), vehicles may be required to meet stringent High-Intensity Radiated Fields (HIRF) certification requirements. HIRF can cause interference and even damage to vehicle systems. A recently proposed map-based avoidance approach can help reduce HIRF protection costs compared to the standard approach. However, it necessitates knowing the locations, frequencies, and transmit powers of high-power antennas within the operating area. This study aims to provide the necessary transmitter data by utilizing regulatory license databases. Using New York City as a representative urban area, fixed transmitter data are presented for AM, FM, TV, satellite uplink, land-mobile radio, microwave link, weather radars, and others. The maximum effective isotropic radiated powers of the antenna are reported. The associated electric field envelopes at 100 feet (30.48 m) distance are compared against the current rotorcraft HIRF standard. The results show that the current standards for protecting vehicles are inadequate. Maps of regions with high HIRF are illustrated. Data for several other cities are also being considered.

HIRF↗

A Frank Discussion on Lessons Learned From Adopting and Applying NASA-STD-6030 for Spaceflight Systems

With the advancement and adoption of Additive Manufacturing (AM) for spaceflight systems, numerous lessons have been learned during the qualification and certification of AM components. The lessons learned covered in this presentation will provide an overview of the challenges faced by NASA centers and commercial partners working to design AM hardware that complies with NASA-STD-6030 Additive Manufacturing Requirements (AMR). Topics of interest include tailoring of requirements for specific projects, documentation requirements, and addressing conservative approaches towards mechanical property development and analysis. In addition to that, this presentation aims to impress that these lessons learned will influence the future revisions of the NASA technical standard to facilitate and advance AM technology adoption on NASA projects.

Additive Manufacturing↗

Status and Trends in the Voluntary Market (2019 Data)

Green power refers to renewable electricity voluntarily purchased by retail electricity customers. Renewable energy sources for green power include solar, wind, biomass, geothermal, and small-scale hydropower. This report summarizes data on the various ways in which voluntary purchasers - including residential, commercial, and institutional customers - purchase green power. We summarize key historic trends in U.S. voluntary green power markets and the current status of green power sales through seven products: utility green pricing programs, utility renewable contracts, competitive suppliers, unbundled renewable energy certificates, community choice aggregations, power purchase agreements, and community solar.

42 ENGINEERING↗

2021 Prototype Installation and Testing Awardee: XFlow Energy Company

XFlow Energy Company (XFlow Energy) aims to reduce the cost of wind energy by designing vertical-axis wind turbines (VAWTs), which have a cheaper blade manufacturing process and a mechanically simpler design than traditional wind turbines, among other cost-saving advantages. However, a lack of modeling or simulation tools that can predict the coupling between aerodynamic and structural forces poses a significant challenge to developers of VAWTs. Known as aeroelastic models, these are not just important design tools - they're critical for certifying VAWTs of 25 kilowatts (kW), which is the size of XFlow Energy's prototype wind turbine. Without certification, XFlow Energy will not be able to deliver an independently validated product to its customers, and those customers will not be eligible for state and federal incentives. An accurate aeroelastic model could provide less-conservative structural optimization tactics than are currently used, resulting in a wind turbine with lower capital costs.

CIP↗

Meeting Building Energy Performance Standards at The Westory

The Westory office building used Washington, DC's Building Energy Performance Standard as an impetus for energy efficiency improvements and certification with the assistance of Cushman & Wakefield's Energy & Sustainability Services.

Energy Performance Standards, Energy Audit, ENERGY↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗