Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BEAM LINES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

H(+) - O(+) two-stream interaction on auroral field lines

Upflowing beams of hydrogen, oxygen, and minor ion species, and downward accelerated electrons have been observed above several thousand kilometers altitude on evening auroral field lines. The mechanism for electron and ion acceleration is generally accepted to be the presence of a quasi-static electric field with a component parallel to the earth's magnetic field. The thermal energy of the observed beams is much larger than ionospheric ion temperatures indicating that the beams have been heated as they are accelerated upward. This heating is probably due to a two-stream interaction between beams of different mass ions. The beams gain equal energy in the potential drop and so have different average velocities. Their relative streaming initiates an ion-ion two-stream interaction which then mediates a transfer of energy and momentum between the beams and causes thermalization of each beam. The qualitative evidence that supports this scenario is reviewed. Properties of the two-stream instability are presented in order to demonstrate that a calculation of the evolution of ion beams requires a model that includes field-aligned spatial structure.

Bergmann, Rachelle↗

A state of the art Lambertson septum magnet of the RHIC beam injection system

The beam injection system of the Relativistic Heavy Ion Collider (RHIC) is the last section of the beam transfer line which transports the beam from the Alternating Gradient Synchrotron (AGS) to RHIC and comes under the acronym AtR (AGS to RHIC). The Lambertson septum magnet is one of the magnetic elements of the RHIC injection system. This paper presents results from the 2D and 3D electromagnetic design of the RHIC Lambertson septum magnet which has unique design features to minimize the magnetic field at the circulated beam region including the fringe field regions at the entrance and exit of the magnet.

43 PARTICLE ACCELERATORS↗

BEST medical radioisotope production cyclotrons

Best Cyclotron Systems Inc (BCSI) is currently developing 14 MeV, 25 MeV, 35MeV and 70MeV cyclotrons for radioisotope production and research applications as well as the entire spectrum of targets and nuclear synthesis modules for the production of Positron Emission Tomography (PET), Single Photon Emission Computed Tomography (SPECT) and radiation therapy isotopes. The company is a subsidiary of Best Medical International, renowned in the field of medical instrumentation and radiation therapy. All cyclotrons have external negative hydrogen ion sources, four radial sectors with two dees in opposite valleys, cryogenic vacuum system and simultaneous beam extraction on opposite lines. The beam intensity ranges from 400 {mu}A to 1000 {mu}A, depending on the cyclotron energy and application.

07 ISOTOPE AND RADIATION SOURCES↗

Theoretical and numerical analyses of a slit-masked chicane for modulated bunch generation

Density modulations on electron beams can improve machine performance of beam-driven accelerators and FELs with resonance beam-wave coupling. The beam modulation is studied with a masked chicane by the analytic model and simulations with the beam parameters of the Fermilab Accelerator Science and Technology (FAST) facility. With the chicane design parameters (bending angle of 18o, bending radius of 0.95 m and R 56 ~ –0.19 m) and a nominal beam of 3 ps bunch length, the analytic model showed that a slit-mask with slit period 900 μ m and aperture width 300 μ m induces a modulation of bunch-to-bunch spacing ~ 100 μ m to the bunch with 2.4% correlated energy spread. With the designed slit mask and a 3 ps bunch, particle-in-cell (PIC) simulations, including nonlinear energy distributions, space charge force, and coherent synchrotron radiation (CSR) effect, also result in beam modulation with bunch-to-bunch distance around 100 μ m and a corresponding modulation frequency of 3 THz. The beam modulation has been extensively examined with three different beam conditions, 2.25 ps (0.25 nC), 3.25 ps (1 nC), and 4.75 ps (3.2 nC), by tracking code Elegant. The simulation analysis indicates that the sliced beam by the slit-mask with 3 ~ 6% correlated energy spread has modulation lengths about 187 μ m (0.25 nC), 270 μ m (1 nC) and 325 μ m (3.2 nC). As a result, the theoretical and numerical data proved the capability of the designed masked chicane in producing modulated bunch train with micro-bunch length around 100 fs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Pion contamination in the MICE muon beam

Here, the international Muon Ionization Cooling Experiment (MICE) will perform a systematic investigation of ionization cooling with muon beams of momentum between 140 and 240\,MeV/c at the Rutherford Appleton Laboratory ISIS facility. The measurement of ionization cooling in MICE relies on the selection of a pure sample of muons that traverse the experiment. To make this selection, the MICE Muon Beam is designed to deliver a beam of muons with less than $\sim$1% contamination. To make the final muon selection, MICE employs a particle-identification (PID) system upstream and downstream of the cooling cell. The PID system includes time-of-flight hodoscopes, threshold-Cherenkov counters and calorimetry. The upper limit for the pion contamination measured in this paper is $f_\pi < 1.4\%$ at 90% C.L., including systematic uncertainties. Therefore, the MICE Muon Beam is able to meet the stringent pion-contamination requirements of the study of ionization cooling.

43 PARTICLE ACCELERATORS↗

IOTA (Integrable Optics Test Accelerator): Facility and experimental beam physics program

The Integrable Optics Test Accelerator (IOTA) is a storage ring for advanced beam physics research currently being built and commissioned at Fermilab. It will operate with protons and electrons using injectors with momenta of 70 and 150 MeV/c, respectively. The research program includes the study of nonlinear focusing integrable optical beam lattices based on special magnets and electron lenses, beam dynamics of space-charge effects and their compensation, optical stochastic cooling, and several other experiments. In this article, we present the design and main parameters of the facility, outline progress to date and provide the timeline of the construction, commissioning and research. Finally, the physical principles, design, and hardware implementation plans for the major IOTA experiments are also discussed.

43 PARTICLE ACCELERATORS↗

First transmission of electrons and ions through the KATRIN beamline

The Karlsruhe Tritium Neutrino (KATRIN) experiment is a large-scale effort to probe the absolute neutrino mass scale with a sensitivity of 0.2 eV (90% confidence level), via a precise measurement of the endpoint spectrum of tritium β-decay. This work documents several KATRIN commissioning milestones: the complete assembly of the experimental beamline, the successful transmission of electrons from three sources through the beamline to the primary detector, and tests of ion transport and retention. In the First Light commissioning campaign of autumn 2016, photoelectrons were generated at the rear wall and ions were created by a dedicated ion source attached to the rear section; in July 2017, gaseous 83m Kr was injected into the KATRIN source section, and a condensed 83m Kr source was deployed in the transport section. In this paper we describe the technical details of the apparatus and the configuration for each measurement, and give first results on source and system performance. In conclusion, we have successfully achieved transmission from all four sources, established system stability, and characterized many aspects of the apparatus.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The design, construction, and commissioning of the KATRIN experiment

The KArlsruhe TRItium Neutrino (KATRIN) experiment, which aims to make a direct and model-independent determination of the absolute neutrino mass scale, is a complex experiment with many components. More than 15 years ago, we published a technical design report (TDR) to describe the hardware design and requirements to achieve our sensitivity goal of 0.2 eV at 90%C.L. on the neutrino mass. Since then there has been considerable progress, culminating in the publication of first neutrino mass results with the entire beamline operating. In this paper, we document the current state of all completed beamline components (as of the first neutrino mass measurement campaign), demonstrate our ability to reliably and stably control them over long times,and present details on their respective commissioning campaigns.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Rad-hard readout system for Timepix3 Hybrid Pixel Detectors

The Beam Gas Ionisation (BGI) profile monitor, located in the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS) at CERN, requires a radiation-tolerant readout system to transfer data from the challenging accelerator surroundings to the back-end for processing. The system needs to control and acquire data from four Timepix3 Hybrid Pixel Detectors (HPDs) located directly inside the beam pipe, a highly radioactive environment. It must ensure reliability given limited hardware access and preserve signal integrity for the high-speed data (32 channels at 320 MHz). However, due to the unavailability of a suitable rad-hard Timepix3 readout, the Beam Instrumentation PiXeL (BIPXL) readout system was designed to meet these requirements. This system employs radiation-hardened components such as the GBTx and the FEASTMP, both developed at CERN. It will be compatible with forthcoming hybrid pixel detector initiatives in similarly harsh radiation conditions.

47 OTHER INSTRUMENTATION↗

The CMS Phase-2 Fast Beam Condition Monitor prototype test with beam

The Fast Beam Condition Monitor (FBCM) is a standalone luminometer for the High Luminosity LHC (HL-LHC) program of the CMS Experiment at CERN. The detector is under development and features a new, radiation-hard, front-end application-specific integrated circuit (ASIC) designed for beam monitoring applications. The achieved timing resolution of a few nanoseconds enables the measurement of both the luminosity and the beam-induced background. The ASIC, called FBCM23, features six channels with adjustable shaping times, enabling in-field fine-tuning. Each ASIC channel outputs a single binary asynchronous signal encoding time-of-arrival and time-over-threshold information. The FBCM is based on silicon-pad sensors, with two sensor designs presently being considered. This paper presents the results of tests of the FBCM detector prototype using both types of silicon sensors with hadron, muon, and electron beams. Irradiated FBCM23 ASICs and silicon-pad sensors were also tested to simulate the expected conditions near the end of the detector's lifetime in the HL-LHC radiation environment. Based on test results, direct bonding between the sensor and ASIC was chosen, and an optimal bias voltage and ASIC threshold for FBCM operation were proposed. The current design of the front-end test board was validated following the beam test and is now being used for the first front-end module, which is expected to be produced in summer 2025. These results represent a major step forward in validating the FBCM concept, first version of the firmware and establishing a reliable design path for the final detector.

Beam-line instrumentation (beam position and profi↗

Embedded EPICS server for PowerPMAC motion controllers

An embedded server layer of Experimental Physics and Industrial Control System (EPICS) for PowerPMAC motion controllers has been developed and deployed at two undulator beamlines of the National Institute of General Medical Sciences and the National Cancer Institute (GM/CA) Structural Biology Facility at the Advanced Photon Source (APS). This compact, open source solution makes the power and versatility of PowerPMAC motion controls directly accessible to distributed EPICS clients. At GM/CA the system controls about 200 servo and stepper motors — both encoded and unencoded — and multiple digital and analog I/O accessories. The server stack comprises two sublayers: a lower-level driver and database that communicates directly with PowerPMAC, and a facility-specific soft sublayer built on top. The paper describes installing EPICS on PowerPMAC, the implementation of both layers and client examples, including on-the-fly scanning.

EPICS↗

Synchrotron radiation based beam diagnostics at the Fermilab Tevatron

Synchrotron radiation has been used for many years as a beam diagnostic at electron accelerators. It is not normally associated with proton accelerators as the intensity of the radiation is too weak to make detection practical. Therefore, if one utilizes the radiation originating near the edge of a bending magnet, or from a short magnet, the rapidly changing magnetic field serves to enhance the wavelengths shorter than the cutoff wavelength, which for more recent high energy proton accelerators such as Fermilab's Tevatron, tends to be visible light. This paper discusses the implementation at the Tevatron of two devices. A transverse beam profile monitor images the synchrotron radiation coming from the proton and antiproton beams separately and provides profile data for each bunch. A second monitor measures the low-level intensity of beam in the abort gaps which poses a danger to both the accelerator's superconducting magnets and the silicon detectors of the high energy physics experiments. Comparisons of measurements from the profile monitor to measurements from the flying wire profile systems are presented as are a number of examples of the application of the profile and abort gap intensity measurements to the modelling of Tevatron beam dynamics.

43 PARTICLE ACCELERATORS↗

Longitudinal bunch monitoring at the Fermilab Tevatron and Main Injector synchrotrons

The measurement of the longitudinal behavior of the accelerated particle beams at Fermilab is crucial to the optimization and control of the beam and the maximizing of the integrated luminosity for the particle physics experiments. Longitudinal measurements in the Tevatron and Main Injector synchrotrons are based on the analysis of signals from resistive wall current monitors. This study describes the signal processing performed by a 2 GHz-bandwidth oscilloscope together with a computer running a LabVIEW program which calculates the longitudinal beam parameters.

43 PARTICLE ACCELERATORS↗

Front shielding of the 25-kW beam absorber in Linac-to-Booster transfer line

The 25-kW beam absorber in the Linac-to-Booster transfer line is supposed to take in the beam from PIP-II 800-MeV Linac occasionally, on the average for one hour once a week. Such an operational scenario suggests that residual dose of the absorber front part can be relatively low. In order to simplify access to the front part of the absorber and beam window in case of repair or maintenance, using a slide-in shielding plug is considered as a preferred option.

43 PARTICLE ACCELERATORS↗

A Wide Dynamic-Range Halo Monitor for 8 GeV Proton Beams at FNAL

Eliminating harmful beam halos is the most important technique for high-intensity proton accelerators. Therefore, beam halo diagnosis is indispensable and becomes more and more important. At J-PARC, a wide dynamic range monitor was installed in the beam transport line in 2012. The device is a two-dimensional beam profile monitor [*, **], and it has a dynamic range of approximately six digits of magnitude by using Optical Transition Radiation and fluorescence screens. The FNAL accelerator complex has been upgrading through increased beam intensity and beam quality. A new beam halo diagnostic device is required in the beam transport line between the booster and recycler. It will be manufactured in a collaboration between J-PARC and FNAL as a part of the U.S.-Japan Science and Technology Cooperation Program in High Energy Physics. We are redesigning the monitor to satisfy FNAL specifications for beam energy, intensity, and size. The equipment will be manufactured at J-PARC and then shipped to FNAL in 2024. In this report, the design of the device will be described.

43 PARTICLE ACCELERATORS↗

CW Room Temperature Re-buncher for the PIP-II Linac Front End

At Fermilab there is a plan for improvements to the Fermilab accelerator complex aimed at providing a beam power capability of at least 1 MW on target. The essential element of the plan (the Proton Improvement Plan II – PIP-II) is a new 800 MeV superconducting linac. The PIP-II linac includes a room temperature front-end and high energy part based on five types of superconducting cavities used to cover the entire velocity range required for beam acceleration. The room temperature front end is composed of an ion source, low energy beam transport line (LEBT), radio frequency quadrupole (RFQ), and a medium energy beam transport line (MEBT). The paper reports RF design of the re-buncher for MEBT along with thermal analysis of the cavity.

43 PARTICLE ACCELERATORS↗

PIC Simulations in Low Energy Part of PIP-II Proton Linac

The front end of PIP-II linac is composed of a 30 keV ion source, low energy beam transport line (LEBT), 2.1 MeV radio frequency quadrupole (RFQ), and medium energy beam transport line (MEBT). This configuration is currently being assembled at Fermilab to support a complete systems test. The front end represents the primary technical risk with PIP-II, and so this step will validate the concept and demonstrate that the hardware can meet the specified requirements. SC accelerating cavities right after MEBT require high quality and well defined beam after RFQ to avoid excessive particle losses. In this paper we will present recent progress of beam dynamic study, using CST PIC simulation code, to investigate partial neutralization effect in LEBT, halo and tail formation in RFQ, total emittance growth and beam losses along low energy part of the linac.

43 PARTICLE ACCELERATORS↗

Space charge dominated momentum spread and compensation strategies in the post-linac section of Proton Improvement Plan-II at Fermilab

The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a new 800 MeV superconducting linac and a Beam Transfer Line (BTL) to transport the beam to the existing Booster synchrotron. To mitigate the space charge tune shift associated with a high intensity accumulated beam, the low emittance linac beam is used to paint the ring phase space both transversely and longitudinally. To prevent losses caused by particles injected outside the rf separatrix while painting longitudinal phase space, the momentum spread of the incoming beam should not exceed 2.1 x 10^-4. Detailed simulations showed that due to space charge, the rms momentum spread increases to 4 x 10^-4 while it is transported in the BTL --about twice the allowable limit. In this paper, we outline a mitigation strategy involving a debuncher cavity. We discuss location, operating frequency, and gap voltage under both nominal and perturbed beam conditions, specifically accounting for momentum jitter. The impact of cavity misalignments is also assessed. The paper concludes by recommending an optimized configuration.

43 PARTICLE ACCELERATORS↗