At least 811 records · Page 45

Application of a Prize Mechanism to Address Data Utilization Challenges at Utilities

The electric industry sector is facing an “explosion” of data from a variety of sources. Electric sector stakeholders need to define how to capitalize on large datasets, both those they create and those from other sources (like data on weather, buildings, electric vehicles, etc.), to improve reliability and resilience and meet the changing system dynamics from renewable integration. For the electricity sector to fully utilize these vast new datasets, it must undergo a transformation in how it manages data quality, storage, and processing. The U.S. Department of Energy (DOE) Office of Electricity (OE) is committed to accelerating research, development, and demonstration of new technologies and tools within the electricity sector to advance reliability, resilience, and affordable operation of the power system. Through the prize mechanism, OE identified two widespread data-related challenges for utilities—load modeling and data analysis automation—and offered an opportunity for utilities and teams of software engineers to identify additional challenges faced by utilities. After completing one round of the American-Made Digitizing Utilities Prize, OE, the National Renewable Energy Laboratory (NREL) as the prize administrator, and Pacific Northwest National Laboratory (PNNL) as the domain experts have compiled the results and lessons learned to feed into the second round of the prize.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Installation of Lysimeters Near Engineered Trench 3

Three new lysimeter stations were installed on the north rim of Engineered Trench 3 (Figure ES-1)at the E-Area Low Level Waste Facility (ELLWF). These stations were designated as ET3-VL-3, ET3-VL-4, and ET3-VL-5. The stations were installed in a line with the two existing stations (ET3-VL-1 and ET3-VL-2) and spaced approximately 100 ft apart. Two lysimeters were installed at each station at the depths shown in Table ES-1. Lysimeter placement was based on borehole lithology and was comparable to the existing lysimeter stations. The deepest lysimeter at each of the three new lysimeter stations was designated as the action-level lysimeter.Following installation, the lysimeters were purged and placed under vacuum for sampling. Sampling occurred in December 2020 with each lysimeter producing 1000 ml of water for tritium analysis. All lysimeters were below the administrative limit for ET3 (43.7 pCi/ml) with all but ET3-VL-5 (222) at background levels. ET3-VL-5 (222) had a tritium concentration of 27.5 pCi/ml.With the addition of the new lysimeters at ET3, the vadose zone monitoring system is now comprised of 309 active lysimeters at 102 lysimeter stations. There are 93 action-level lysimeters at 102 stations

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Postclosure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site

This report presents results of the biennial postclosure site inspection conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Central Nevada Test Area (CNTA), Nevada, Site (Figure 1) surface Corrective Action Unit (CAU) 417. The report has been prepared in accordance with the Post-Closure Monitoring Plan contained in the Closure Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada (NNSA/NV 2001), hereafter called the CAU 417 Closure Report. The site closure process was completed in 2001 in accordance with the amended Federal Facility Agreement and Consent Order (FFACO 1996, as amended) (FFACO) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Responsibility for environmental site restoration was transferred from the DOE National Nuclear Security Administration Nevada Field Office to LM on October 1, 2006. This report summarizes investigation activities associated with CAU 417 that LM conducted from September 2018 through August 2020. A postclosure inspection was conducted in 2020 to document the physical condition of the CAU 417 soil covers, monuments, signs, fencing, and use-restricted areas.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Characterizing the Impact of GPU Power Management on an Exascale System

As GPU-accelerated high-performance computing (HPC) systems approach exascale performance, controlling energy consumption without compromising throughput is essential. Architectures such as the AMD MI250X-based Frontier supercomputer provide runtime mechanisms like frequency and power capping, enabling energy tuning without modifying application code. Although both target energy reduction, they operate via distinct hardware control paths and influence workloads differently. We present a comprehensive evaluation of these strategies on a leadership-class system using diverse HPC proxy applications representative of production workloads. Our study analyzes performance–energy trade-offs across multiple capping levels, node counts (1 and 32), and application profiles. Results show that frequency capping generally achieves higher energy efficiency and scalability, with gains of up to 13.2% without performance loss, while power capping is more effective for single-node runs or bursty GPU utilization. We also provide practical guidelines to help system administrators and users balance energy efficiency and performance in large-scale scientific workloads.

Costa, Mariana [Universidade Federal do Rio Grande↗

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada with ROTC-1

CR loaded to this OSTI record. Just adding new file which includes CR plus new ROTC 1 and update the metadata to the following: This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility. The Record of Technical Change 1 updated the use restriction information.

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory Floodplain Assessment for Fire Risk Mitigations at the Lower Slobbovia Testing Site in (TA-36)

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take fire pre-suppression actions at Los Alamos National Laboratory (LANL) Technical Area (TA) 36. Constructing a fire break and a fuel break surrounding the Lower Slobbovia explosives testing site in addition to the current vegetation mowing practices would establish a safety perimeter to help prevent fires from spreading away from the firing point. NNSA has prepared this floodplain assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR 1022), which was promulgated to implement DOE requirements under Executive Order 11988 Floodplain Management (EO 1977). A floodplain is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base floodplain as “the 100-year floodplain, that is, a floodplain with a 1.0 percent chance of flooding in any given year (CFR 2003).” This floodplain assessment evaluates potential impacts to floodplain values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

Grand Challenges of Hydrologic Modeling for Food-Energy-Water Nexus Security in High Mountain Asia

Climate-influenced changes in hydrology affect water-food-energy security that may impact up to two billion people downstream of the High Mountain Asia (HMA) region. Changes in water supply affect energy, industry, transportation, and ecosystems (agriculture, fisheries) and as a result, also affect the region's social, environmental, and economic fabrics. Sustaining the highly interconnected food-energy-water nexus (FEWN) will be a fundamental and increasing challenge under a changing climate regime. High variability in topography and distribution of glaciated and snow-covered areas in the HMA region, and scarcity of high resolution (in-situ) data make it difficult to model and project climate change impacts on individual watersheds. We lack basic understanding of the spatial and temporal variations in climate, surface impurities in snow and ice such as black carbon and dust that alter surface albedo, and glacier mass balance and dynamics. These knowledge gaps create challenges in predicting where and when the impact of changes in river flow will be the most significant economically and ecologically. In response to these challenges, the United States National Aeronautics and Space Administration (NASA) established the High Mountain Asia Team (HiMAT) in 2016 to conduct research to address knowledge gaps. This paper summarizes some of the advances HiMAT made over the past 5 years, highlights the scientific challenges in improving our understanding of the hydrology of the HMA region, and introduces an integrated assessment framework to assess the impacts of climate changes on the FEWN for the HMA region. The framework, developed under a NASA HMA project, links climate models, hydrology, hydropower, fish biology, and economic analysis. The framework could be applied to develop scientific understanding of spatio-temporal variability in water availability and the resultant downstream impacts on the FEWN to support water resource management under a changing climate regime.

54 ENVIRONMENTAL SCIENCES↗

Economic Analysis of Changes in Hydropower Operations at the Flaming Gorge Dam and the Aspinall Unit Due to the Upper Colorado River Endangered Fish Recovery Program

This report was prepared by Argonne National Laboratory (Argonne) in support of an economic analysis of operational restrictions at the Flaming Gorge Dam (FG) and the Aspinall Unit conducted for the U.S. Department of Energy’s Western Area Power Administration (WAPA). WAPA markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation (Reclamation). The facilities known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. This report presents detailed findings of an economic analysis of operational restrictions implemented at FG during water years (WYs) 2001 to 2016, and at the Aspinall Cascade during WYs 2013 to 2016. Staff members of Argonne’s Energy Systems Division prepared this document with assistance from staff members of WAPA’s Colorado River Storage Project (CRSP) Management Center and Reclamation, Upper Colorado Region.

13 HYDRO ENERGY↗

Identification and evaluation for the mercury solar photovoltaic array and battery energy storage system, area 23, nevada national security site, nye county, nevada

The U.S. Department of Energy (DOE), in conjunction with the National Nuclear Security Administration Nevada Field Office (NNSA/NFO), proposes to construct a solar photovoltaic (PV) energy generation array and an associated Battery Energy Storage System (BESS) in the town of Mercury at the Nevada National Security Site (NNSS) in Nye County, Nevada. The purposes of the development of this facility are to support long-term efforts to modernize Mercury and to provide energy-resilient infrastructure and climate adaptation needs.

25 ENERGY STORAGE↗

Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan, Revision 2

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO). It addresses URs established under the FFACO for releases related to the development, testing, and production of nuclear weapons that are located on the NNSS and that are accessed through the NNSS main gate. FFACO URs are established at sites where contamination remains at levels exceeding final action levels (FALs) or is forecasted to exceed Safe Drinking Water Act (SDWA) maximum contaminant levels (CFR, 2025a) over the next 1,000 years following completion of corrective actions. Administrative URs are established at Industrial Sites and Soils sites where contamination remains at levels exceeding industrial action levels as defined in the Soils RBCA document. All URs stipulate restrictions sufficient to ensure the protection of human health, safety, and the environment.

54 ENVIRONMENTAL SCIENCES↗

EVSE Cybersecurity and Resilience

Consequence-driven Cybersecurity Analysis for Extreme Fast Charging Electric Vehicle Infrastructure Electric vehicle (EV) development and associated charging infrastructure are expected to advance rapidly. Thirty percent of all global vehicle sales may be EVs and hybrid EVs by 2025, and they will rely on increasingly sophisticated strategies for grid integration. Next-generation EV charging infrastructure is expected to include interconnected renewable resources, such as photovoltaic (PV) arrays and battery storage systems, along with grid-edge devices. Although distributed energy resources (DERs) are useful in several ways, such as peak shaving at high demand times and backup supply for added resilience, the integration of vehicle charging and DERs could create more avenues for cyberattack. Physical and/or remote access to EV charging station components, including charge ports, power electronics, controllers, and local generation (e.g., PV and energy storage) could be paths to cause power fluctuations, leading to altered operations at the charging station, escalated privileges to administrative systems, exfiltration of financial information (including personally identifiable information), and reduced grid stability. One compromised EV supply equipment component can open the door to a variety of exploitable vulnerabilities. Cloud computing and mobile application control have the potential to expand the threat surface to non-repudiation and firmware integrity challenges. Vendor clouds have access to hundreds of chargers, and if compromised, can scale the attack surface exponentially. The high power and voltage levels of xFC infrastructure (e.g., 400 kW at 1000- V DC) increase the hazards and ability to impact the grid and vehicles more than lower-power charging systems. Legacy communications systems and protocols could also put EV infrastructure at risk of cyberattacks requiring a robust patch management process. Communications networks link EVs and chargers to several stakeholders - including charging station operators, grid operators, vendors/manufacturers, and aggregators - who have both physical and network access to share information for control, monitoring, and analytics. Information in these networks that is vulnerable to compromise includes the state of charge, charging duration, payment information, electricity price, and load control. Analyzing and prioritizing these interconnections risks could help address cybersecurity related to data leakage and manipulation.

charging↗

Sequim Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of ten U.S. Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences, and data analytics laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the- art equipment, and mission-ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and other federal agencies and industry through strategic partnership projects on a not-to-interfere basis. Currently operated by Battelle Memorial Institute, PNNL occupies more than 2.3 million gross square feet (GSF) of buildings and employs approximately 4,700 staff members. PNNL has implemented a rolling 10-year campus strategy, initiated in fiscal year 2013, designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. This strategy is incorporated into PNNL’s annual Laboratory Plan, which serves as DOE-SC’s equivalent of the Five- Year Site Plan required by DOE Order 430.1C Chg. 1, Real Property Asset Management. The PNNL Sequim Campus is located in Clallam County, just outside of Sequim, Washington. PNNL Sequim builds upon a rich history of research related to marine and coastal resources, environmental chemistry, water resources modeling, ecotoxicology, biotechnology, and national security. Facilities at the PNNL Sequim Campus were designed to take advantage of two unique locational assets: the pristine coastal ocean water in Sequim Bay and the region’s exceptionally clean air. Research facilities on the waterfront are supplied with up to 200 gallons per minute (gpm) of seawater and/or groundwater that enables research on aquatic systems ranging from fully seawater to fresh water, with an onsite water treatment system that removes all biological and hazardous chemical residues prior to discharge. Multiple large seawater tanks outside the waterfront laboratories, along with a boat ramp, pier, and floating dock, enable lab-to-field research. The uplands facility takes advantage of the amazing air quality and is built and operated to enable ultratrace chemical/radiological analytical chemistry. This combination of capabilities is not available at any other marine laboratory in the nation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Antihypertensive effect of quinoa protein under simulated gastrointestinal digestion and peptide characterization

Abstract BACKGROUND Quinoa protein is a potential source of bioactive peptides. Although some studies have demonstrated its angiotensin converting enzyme (ACE) inhibitory properties, research into its in vivo effect on blood‐pressure regulation and peptide characterization remains limited. RESULTS Quinoa protein hydrolyzate (QPH) was prepared by simulated gastrointestinal digestion. QPH lowered the systolic blood pressure (SBP) and diastolic blood pressure (DBP) in spontaneously hypertensive model rats (SHRs) from 2 h to10 h after oral administration, effectively controlling blood pressure in these SHRs. An in vitro study showed that QPH is capable of inhibiting ACE activity. This was attributed to the activity of a number of low‐molecular‐weight peptides. With relatively high scores predicted by PeptideRanker, three promising bioactive peptides, FHPFPR, NWFPLPR, and NIFRPF, were further studied and their ACE‐inhibition effects were confirmed with IC 50 values of 34.92, 16.77, and 32.40 μM, respectively. A molecular docking study provided insights into the binding of ACE with peptides, and revealed that the presence of specific amino acids in the peptide sequence (Pro, Phe, and Arg at the C‐terminal, and Asn at the N‐terminal) could contribute to the interaction between ACE and peptides. CONCLUSION These results demonstrated the potential of QPH for the management of hypertension, which indicates that it could be a good candidate for inclusion in functional foods to control high blood pressure. © 2020 Society of Chemical Industry

Guo, Huimin↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LandScan Global 30 Arcsecond Annual Global Gridded Population Datasets from 2000 to 2022

Abstract Oak Ridge National Laboratory (ORNL) annually develops the LandScan Global (LSG) dataset, a 30 arcsecond global gridded population dataset representing global ambient human population distribution. This multivariable dasymetric model disaggregates census counts within administrative boundaries using ancillary data. Each country’s distribution reflects cultural and socioeconomic patterns; manual validations yield a unique global dataset for assessing populations at risk. For over two decades, LSG has been a standard for estimating populations at risk, aiding U.S. federal government, academia and humanitarian organizations. During disasters such as the 2004 Indian Ocean tsunami and the 2010 Haiti earthquake and geopolitical crises such as the Syrian civil war and the 2022 Russian invasion of Ukraine, LSG supported scientific and operational communities in emergency response and recovery. In 2022, LSG datasets from 2000 onward were made publicly available through ORNL’s LandScan Portal. This data descriptor details our methodology and the application of geospatial science and machine learning to geographic and demographic data, highlighting uses in urban resiliency, emergency management, disaster response, and human health and security.

Science & Technology - Other Topics↗

Creating Apptainer Workflows with Docker-Compose-like Utilities

Creating Apptainer Workflows with Docker-Compose-like Utilities In this presentation, I will explore the utilization of a tool called process-compose, inspired by docker-compose, to create Apptainer-based services. This approach allows for easy deployment and management of fully containerized applications on High Performance Computing (HPC) systems without requiring elevated privileges. Benefits to the Ecosystem: By incorporating process-compose and Apptainer, I aim to address several key challenges in the HPC ecosystem: Simplified Workflow Management: Process-compose provides a user-friendly interface for defining and managing complex containerized application services, reducing the setup time and lowering the barrier to entry for new users. Enhanced Portability: Apptainer ensures that containerized applications can run consistently across different HPC environments, promoting greater portability and reducing compatibility issues. Process-compose is also a single binary that does not need to be installed by admin level users. Community Driven Solutions: This approach aligns with the goals of the High Performance Software Foundation (HPSF) to advance community-driven solutions. By sharing our experiences and insights, I hope to foster collaboration and innovation within the HPC community. Increased Productivity: The combination of process-compose and Apptainer streamlines the serve deployment process, allowing researchers and developers to focus more on their scientific work rather than the intricacies of system or service administration. Through this presentation, attendees will gain valuable insights into the practical implementation of containerized workflows on HPC systems, learn about the benefits of using process-compose and Apptainer, and understand how these tools can contribute to a more efficient HPC ecosystem.

97 - MATHEMATICS AND COMPUTING↗

Chemical Waste Landfill Annual Post-Closure Care Report, Calendar Year 2019

The Chemical Waste Landfill (CWL) at Sandia National Laboratories/New Mexico (SNL/NM) is a remediated hazardous waste landfill that underwent closure in accordance with Title 20, Chapter 4, Part 1 of the New Mexico Administrative Code (20.4.1.600 NMAC), incorporating Title 40, Code of Federal Regulations (CFR), Part 265, (40 CFR § 265) Subpart G, and the CWL Final Closure Plan (SNL/NM December 1992 and subsequent revisions). The CWL Post- Closure Care Permit (PCCP) (NMED October 2009), which became effective June 2, 2011 (Kieling June 2011) and as modified, defines all post-closure requirements. This ninth CWL Annual Post-Closure Care Report documents all activities and results as required by the PCCP Attachment 1, Section 1.12.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Vault National Security Then & Now (2021 Annual)

Looking back, I can say with certainty that we rose to the challenge. Like other entities all around the globe, the National Security Research Center was tested by the COVID-19 pandemic. As a young organization (we celebrated our second anniversary in June 2021) and one that is critical to Los Alamos National Laboratory’s national security charge, we faced the difficult task of continuing our mission-essential work while keeping our staff safe. The NSRC is one of the largest libraries in the United States, and it houses the country’s most-comprehensive collections of nuclear weapons-related national security material. The NSRC contains millions of documents, films, photos, and other materials on the development, testing, and production of nuclear weapons. These are accessed on a daily basis by scientists, engineers, and researchers at Los Alamos and other National Nuclear Security Administration’s labs and sites, as well as partners in the Department of Defense. It was not an option for us to close our doors - our nation’s security depended on us not to. Not only did we continue operating under new safety protocols, we successfully accomplished many pre-pandemic goals. Thanks to the NSRC’s dedicated staff, our accomplishments during our second year are too numerous to list, though two in particular come to mind.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗