Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “website”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Data Validation Package, April and June 2016 Groundwater and Surface Water Sampling at the Gunnison, Colorado, Processing Site, October 2016

This event included annual sampling of groundwater and surface water locations at the Gunnison, Colorado, Processing Site. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and­ analysis-plan-us-department-energy-office-legacy-management-sites). Samples were collected from 28 monitoring wells, three domestic wells, and six surface locations in April at the processing site as specified in the draft 2010 Ground Water Compliance Action Plan for the Gunnison, Colorado, Processing Site. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Domestic wells 0476 and 0477 were sampled in June because the homes were unoccupied in April, and the wells were not in use. Duplicate samples were collected from locations 0126, 0477, and 0780. One equipment blank was collected during this sampling event. Water levels were measured at all monitoring wells that were sampled. See Attachment 2, Trip Reports for additional details. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that requires additional action or follow-up. An assessment of anomalous data is included in Attachment 3. Interpretation and presentation of results, including an assessment ofthe natural flushing compliance strategy, will be reported in the upcoming 2016 Verification Monitoring Report. U.S.

54 ENVIRONMENTAL SCIENCES↗

Fluxes of CO 2 , CH 4 , CO, BVOCs, NOx, and O 3 in an Old Growth Amazonian Forest: Ecosystem Processes, Carbon Cycle, Atmospheric Chemistry, and Feedbacks on Climate

A comprehensive, merged data set of trace gases (NO, NO 2 , CO 2 , CH 4 and O 3 ) along with has been tabulated and subjected to meticulous quality assurance and quality control (QA/QC). The merged data set is being submitted to the ARM website dedicated to the Green Ocean Experiment: https://www.arm.gov/research/campaigns/amf2014goamazon Analysis using the final data set is in progress to determine the magnitudes of the fluxes for CH 4 , H 2 O, CO 2 , O 3 , NO x , sensible and latent heat, momentum, and their seasonal variations. Here are summary statements, from the discussion above: Total NO fluxes were calculated following Keller et al., 1986. A vertical gradient is established in the mixing ratio of NO because it is emitted at the soil surface and mixed upward in the atmosphere (see above). Once in the atmosphere, the NO reacts rapidly with O 3 to produce NO 2 (NO + O 3 → NO 2 + O 2 ). Therefore, if the vertical profiles of the mixing ratios of NO and O 3 are known, the surface flux of NO may be determined. If any other reaction removes NO (e.g., deposition on leaves), FNO should estimate the lower limit to the NO flux from the soil in this forest. Our preliminary results show fluxes of NO averaged 133 x 10 9 molecules cm -2 s -1 , a factor of 4 higher than fluxes previously observed in white sand soils in the Amazon, and a factor of 3 to 14 higher than fluxes observed for yellow clay soils (Bakwin et al., 1990 and references therein). The soil in the km 67 site is predominately oxisol with pockets of sandy ultisols, both having low reduced nutrient contents, mostly due to efficient microorganism decomposition and acid leaching by rain water. Oxisols contain both oxidized and reduced forms of nitrogen, of which concentrations vary independently of leaching (Jordan et al., 1982), with most part of the cycling processes occurring in the top layers. Methane fluxes showed no statistical difference between 2015 wet and dry seasons, and the forest at this site appear to be a methane sink throughout the year. The vertical profiles suggest that if a methane source exists in this forest, it might be in the canopy. Next steps include modeling and analysis using the Master Chemical Mechanism (Jenkin et al., 1997; Saunders et al., 2003 (A/B); http://mcm.leeds.ac.uk/MCM/) and the Ecosystem Demography-2 (ED-2) model. A final manuscript with the results from this work is in preparation and expected to be submitted for publication within the next several months. Publications to date are listed below.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Data Validation Package - June 2016 Groundwater and Surface Water Sampling at the Green River, Utah, Disposal Site

This event included annual sampling of groundwater and surface water locations at the Green River, Utah, Disposal Site. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for US. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lrnldownloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). Samples were collected from 15 monitoring wells and two surface locations at the disposal site as specified in the draft 2011 Ground Water Compliance Action Plan for the Green River, Utah, Disposal Site. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0179. One equipment blank was collected during this sampling event. Water levels were measured at all monitoring wells that were sampled. See Attachment 2, Trip Reports for additional details. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that requires additional action or follow-up.

54 ENVIRONMENTAL SCIENCES↗

Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site

Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and­ analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells that were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.

54 ENVIRONMENTAL SCIENCES↗

Data Validation Package - June 2015 Groundwater and Surface Water Sampling at the Green River, Utah, Disposal Site

Groundwater samples were collected during the 2015 sampling event from point-of-compliance (POC) wells 0171, 0173, 0176, 0179, 0181, and 0813 to monitor the disposition of contaminants in the middle sandstone unit of the Cedar Mountain Formation. Groundwater samples also were collected from alluvium monitoring wells 0188, 0189, 0192, 0194, and 0707, and basal sandstone monitoring wells 0182, 0184, 0185, and 0588 as a best management practice. Surface locations 0846 and 0847 were sampled to monitor for degradation of water quality in the backwater area of Brown’s Wash and in the Green River immediately downstream of Brown’s Wash. The Green River location 0801 is upstream from the site and is sampled to determine background-threshold values (BTVs). Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). Water levels were measured at each sampled well. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. All six POC wells are completed in the middle sandstone unit of the Cedar Mountain Formation and are monitored to measure contaminant concentrations for comparison to proposed alternate concentration limits (ACLs), as provided in Table 1. Contaminant concentrations in the POC wells remain below their respective ACLs.

54 ENVIRONMENTAL SCIENCES↗

Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016a). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx.

54 ENVIRONMENTAL SCIENCES↗

Pinellas County, Florida Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site June through November 2016 January 2017

This Pinellas County, Florida, Site Environmental Restoration Project Semiannual Progress Report for the 4.5 Acre Site describes environmental restoration activities for the 4.5 Acre Site located in Pinellas County, Largo, Florida (Figure 1). The former U.S. Department of Energy (DOE) Pinellas Plant facility consisted of the 4.5 Acre Site and what is now the STAR Center (Young - Rainey Science, Technology, and Research Center). Both the 4.5 Acre Site and the STAR Center are part of the overall Pinellas County, Florida, Site (Figure 2). The 4.5 Acre Site is located immediately northwest of the STAR Center, in the northeast quarter of Section 13, Township 30 South, Range 15 East. DOE owned this parcel from 1957 to 1972, at which time it was sold to a private landowner. During the period of DOE ownership, the property was used for the disposal of drums of waste resins and solvents. As a result of this practice, the surficial aquifer was impacted by volatile organic compounds (VOCs)—trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), vinyl chloride (VC), and benzene. Detailed background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx. Recent remediation activities consist of the injection of emulsified soybean oil and the microorganism Dehalococcoides mccartyi (formerly known as Dehalococcoides ethenogenes) into the subsurface in February 2010 and again in July 2013 to enhance contaminant biodegradation (hereafter described as bioinjection). Monitoring the performance of these actions, in the form of monitoring well sampling, is ongoing.

2016 Pinellas County↗

Release Notes for Whisper-1.1

Whisper is a statistical analysis package developed in 2014 to support nuclear criticality safety (NCS) validation [1-3]. It uses the sensitivity profile data for an application as computed by MCNP6 [4-6] along with covariance files [7,8] for the nuclear data to determine a baseline upper-subcritical-limit (USL) for the application. Whisper version 1.0 was first developed and used at LANL in 2014 [3]. During 2015-2016, Whisper was updated to version 1.1 [9] and is to be included with the upcoming release of MCNP6.2. This document describes the Whisper-1.1 package that will be included with the MCNP6.2 release during 2017. Specific details are provided on the computer systems supported, the software quality assurance (SQA) procedures, installation, and testing. This document does not address other important topics, such as the importance of sensitivity-uncertainty (SU) methods to NCS validation, the theory underlying SU methodology, tutorials on the usage of MCNP-Whisper, practical approaches to using SU methodology to support and extend traditional validation, etc. There are over 50 documents included with Whisper-1.1 and available in the MCNP Reference Collection on the MCNP website (mcnp.lanl.gov) that address all of those topics and more. In this document, however, a complete bibliography of relevant MCNP-Whisper references is provided.

97 MATHEMATICS AND COMPUTING↗

USACM Thematic Workshop On Uncertainty Quantification And Data-Driven Modeling.

The USACM Thematic Workshop on Uncertainty Quantification and Data-Driven Modeling was held on March 23-24, 2017, in Austin, TX. The organizers of the technical program were James R. Stewart of Sandia National Laboratories and Krishna Garikipati of University of Michigan. The administrative organizer was Ruth Hengst, who serves as Program Coordinator for the USACM. The organization of this workshop was coordinated through the USACM Technical Thrust Area on Uncertainty Quantification and Probabilistic Analysis. The workshop website (http://uqpm2017.usacm.org) includes the presentation agenda as well as links to several of the presentation slides (permission to access the presentations was granted by each of those speakers, respectively). Herein, this final report contains the complete workshop program that includes the presentation agenda, the presentation abstracts, and the list of posters.

97 MATHEMATICS AND COMPUTING↗

SDN Project

The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information technology and operational technology engineers, to be the ones centrally administering the technology and responding to events; Simplifies network configuration, improving deterministic Ethernet transport times, and providing instant visualization on where the communication circuits are and how all circuits are impacted when changes (e.g., configuration changes, failures or intrusions) happen, allowing operators to minimize downtime; and Improves the ability to identify deviations in network behavior resulting in detection and analysis of potential cyber intrusions and faster response times Results: This project has forever changed the way critical infrastructure networks are designed, secured, deployed and maintained. The cybersecurity and performance advantages achieved are significant, simply put traditional networking has been obsoleted while the team maintained Ethernet interoperability avoiding any legacy concerns. The team commercially released technology that accomplished all the cybersecurity goals outlined in the SOPO and completed it by executing the project management plan approved in the initial contract. The resulting Energy sector SDN flow controller model number is SEL-5056 and can be freely downloaded from the www.SELinc.com website. This technology not only improves the cybersecurity of control systems but has measured results that it improves the performance and reliability of the control system as well. This means the system owners can confidently apply it to their systems knowing that it will, “first do no harm” but actually improve the system as well. Success of the project is best measured by the sales and deployment of the technology. System owners in industrial, electric, defense, and oil and gas only months after commercial release have approved plans for deployment.

42 ENGINEERING↗

Plugged In: How Americans Charge Their Electric Vehicles

This report summarizes key findings in two national plug-in electric vehicle charging infrastructure demonstrations: The EV Project and ChargePoint America. It will be published to the INL/AVTA website for the general public.

33 ADVANCED PROPULSION SYSTEMS↗

2016 FACET-II Science Workshop Summary Report

The second in a series of FACET-II Science Workshops was held at SLAC National Accelerator Laboratory on October 17-19, 2016 [1]. The workshop drew thirty-five participants from eighteen different institutions including CERN, DESY, Ecole Polytechnique, FNAL, JAI, LBNL, LLNL, Radiabeam, Radiasoft, SLAC, Stony Brook, Strathclyde, Tech-X, Tsinghua, UC Boulder, UCLA and UT Austin. The 2015 workshop [2, 3] helped prioritize research directions for FACET-II. The 2016 workshop was focused on understanding what improvements are needed at the facility to support the next generation of experiments. All presentations are linked to the workshop website as a permanent record.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Construction and Skilled Trades (CAST) Test Preparation, Final Report for period 10/1/2016 - 03/31/2017

Within the energy and utilities sectors, the most significant barrier for consideration and submittal of diverse applicants for skilled labor opportunities is their inability to successfully pass the industry’s Construction And Skilled Trades (CAST) examination. The exam is collectively accepted as the benchmark for prospective candidates and assess if they have the baseline skills and knowledge to apply for skilled positions within those industries. It is an exam that was created by the Edison Electric Institute. Students were taught for a full 40-hr week M-F. We conducted one class in each of the following locations: Philadelphia, Chicago and Washington, DC. The students learned and practiced curriculum prepared by the utility industry for increased success for the examination. They were also taught how to successfully navigate the final barrier of employment opportunity: behavior-based interviewing. They were then directed to the website in order to apply for the positions they desired, and then scheduled to take the exam. We were targeting at least 70% of those who sit for the exam to pass the first time. If they were unsuccessful, candidates could re-test within 3 months. We then sent their resumes directly to the hiring recruiters and managers so that they received prime consideration. Our target number of applicants who were successful in being invited for interviews was 15 candidates.

99 GENERAL AND MISCELLANEOUS↗

From Policy to Compliance: Federal Energy Efficient Product Procurement

Federal buyers are required to purchase energy-efficient products in an effort to minimize energy use in the federal sector, save the federal government money, and spur market development of efficient products. The Federal Energy Management Program (FEMP)’s Energy Efficient Product Procurement (EEPP) Program helps federal agencies comply with the requirement to purchase energy-efficient products by providing technical assistance and guidance and setting efficiency requirements for certain product categories. Past studies have estimated the savings potential of purchasing energy-efficient products at over $500 million per year in energy costs across federal agencies.1 Despite the strong policy support for EEPP and resources available, energy-efficient product purchasing operates within complex decision-making processes and operational structures; implementation challenges exist that may hinder agencies’ ability to comply with purchasing requirements. The shift to purchasing green products, including energy-efficient products, relies on “buy in” from a variety of potential actors throughout different purchasing pathways. Challenges may be especially high for EEPP relative to other sustainable acquisition programs given that efficient products frequently have a higher first cost than non-efficient ones, which may be perceived as a conflict with fiscal responsibility, or more simply problematic for agency personnel trying to stretch limited budgets. Federal buyers may also face challenges in determining whether a given product is subject to EEPP requirements. Previous analysis on agency compliance with EEPP, conducted by the Alliance to Save Energy (ASE), shows that federal agencies are getting better at purchasing energy-efficient products. ASE conducted two reviews of relevant solicitations for product and service contracts listed on Federal Business Opportunities (FBO), the centralized website where federal agencies are required to post procurements greater than $25,000. In 2010, ASE estimated a compliance rate of 46% in 2010, up from an estimate of 12% in 2008. Our work updates and expands on ASE’s 2010 analysis to gauge agency compliance with EEPP requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

GeoVision Analysis: Reservoir Maintenance and Development Task Force Report (GeoVision Analysis Supporting Task Force Report : Reservoir Maintenance and Development)

This report documents the key findings from the Reservoir Maintenance and Development (RM&D) Task of the U.S. Department of Energy's (DOE), Geothermal Technologies Office (GTO) Geothermal Vision Study (GeoVision Study). The GeoVision Study had the objective of conduc ting analyses of future geothermal growth based on sets of current and future geothermal technology developments. The RM&D Task is one of seven tasks within the GeoVision Study with the others being, Exploration and Confirmation, Potential to Penetration, Institutional Market Barriers, Environmental and Social Impacts, Thermal Applications, and Hybrid Systems. The full set of findings and the details of the GeoVision Study can be found in the final GeoVision Study report on the DOE-GTO website. As applied here, RM&D refers to the activities associated with developing, exploiting, and maintaining a known geothermal resource. It assumes that the site has already been vetted and that the resource has been evaluated to be of sufficient quality to move towards full-scale development. It also assumes that the resource is to be developed for power generation, as opposed to low-temperature or direct use applications. This document presents the key factors influencing RM&D from both a technological and operational standpoint and provides a baseline of its current state. It also looks forward to describe areas of research and development that must be pursued if the development geothermal energy is to reach its full potential.

15 GEOTHERMAL ENERGY↗

Student Summary of the U.S. Department of Energy Portsmouth Annual Site Environmental Report (ASER) for 2014

The purpose of the full ASER document is to provide details of environmental activities, primarily environmental monitoring, for calendar year 2014. This summary report of the full 2014 ASER provides details in which DOE demonstrates compliance with local, state and federal regulations within environmental programs - both radiological and non-radiological monitoring and groundwater monitoring (DOE, 2016). This report is not intended to present all of the monitoring activities at PORTS and more information can be found at the PORTS Environmental Information Center and website, which is http://energy.gov/pppo/portsmouth-environmental-center.

54 ENVIRONMENTAL SCIENCES↗

Light Water Reactor Sustainability Program, U.S. Efforts in Support of Examinations at Fukushima Daiichi-2017 Evaluations

Although the accident signatures from each unit at the Fukushima Daiichi Nuclear Power Station (NPS) [Daiichi] differ, much is not known about the end-state of core materials within these units. Some of this uncertainty can be attributed to a lack of information related to cooling system operation and cooling water injection. There is also uncertainty in our understanding of phenomena affecting: a) in-vessel core damage progression during severe accidents in boiling water reactors (BWRs), and b) accident progression after vessel failure (ex-vessel progression) for BWRs and Pressurized Water Reactors (PWRs). These uncertainties arise due to limited full scale prototypic data. Similar to what occurred after the accident at Three Mile Island Unit 2, these Daiichi units offer the international community a means to reduce such uncertainties by obtaining prototypic data from multiple full-scale BWR severe accidents. Information obtained from Daiichi is required to inform Decontamination and Decommissioning activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This document, which has been updated to include FY2017 information, summarizes results from U.S. efforts to use information obtained by TEPCO Holdings to enhance the safety of existing and future nuclear power plant designs. This effort, which was initiated in 2014 by the Reactor Safety Technologies Pathway of the Department of Energy Office of Nuclear Energy Light Water Reactor (LWR) Sustainability Program, consists of a group of U.S. experts in LWR safety and plant operations that have identified examination needs and are evaluating TEPCO Holdings information from Daiichi that address these needs. Each year, annual reports include examples demonstrating that significant safety insights are being obtained in the areas of component performance, fission product release and transport, debris end-state location, and combustible gas generation and transport. In addition to reducing uncertainties related to severe accident modeling progression, these insights are being used to update guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, reduced uncertainties in modeling the events at Daiichi will improve the realism of reactor safety evaluations and inform future D&D activities by improving the capability for characterizing potential hazards to workers involved with cleanup activities. Highlights in this FY2017 report include new insights with respect to the forces required to produce the observed Daiichi Unit 1 (1F1) shield plug endstate, the observed leakage from 1F1 components, and the amount of combustible gas generation required to produce the observed explosions in Daiichi Units 3 and 4 (1F3 and 1F4). This report contains an appendix with a list of examination needs that was updated after U.S. experts reviewed recently obtained information from examinations at Daiichi. Additional details for higher priority, near-term, examination activities are also provided. This report also includes an appendix with a description of an updated website that has been reformatted to better assist U.S. experts by providing information in an archived retrievable location, as well as an appendix summarizing U.S. Forensics activities to host the TMI-2 Knowledge Transfer and Relevance to Fukushima Meeting that was held in Idaho Falls, ID, on October 10-14, 2016.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Scalable Data Management, Analysis, and Visualization

This report is the entire final report for the SciDAC project authored by the whole team. OSU is part of the contributors to the report. This report is organized into sections and subsections, each covering an area of development and deployment of technologies applied to scientific applications of interest to the Department of Energy. Each sub-section includes: 1) a summary description of the research, development, and deployment carried out, the results and the extent to which the stated project objectives were met; 2) significant results, including major findings, developments, or conclusions; 3) products, such as publications and presentations, software developed, project website(s), technologies or techniques, inventions, awards, etc., and 4) conclusions of the projects and future directions for research, development, and deployment in this technology area.

97 MATHEMATICS AND COMPUTING↗