Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Construction and testing of sMDT tubes at the University of Michigan for the ATLAS Muon Spectrometer upgrade

This paper reports on the design and construction of infrastructure and test stations for small-diameter monitored drift tube (sMDT) assembly and testing at the University of Michigan (UM) to prepare for the ATLAS Muon Spectrometer upgrade for the high-luminosity program of the Large Hadron Collider. Procedures of the tube assembly and quality assurance and control (QA/QC) tests are described in detail. More than 99% of the tubes meet the tube QA/QC specifications based on 2100 tubes built at UM. The UM test stations are also used for QA/QC testing on the tubes constructed at Michigan State University. Furthermore, these tubes are being used to construct the sMDT chambers which will replace the current MDT chambers of the barrel inner station of the Muon Spectrometer.

47 OTHER INSTRUMENTATION↗

Electrical performances of pre-production staves for the ATLAS ITk Strip Detector Upgrade

The ATLAS experiment is currently preparing for an upgrade of the inner tracking detector for the High-Luminosity LHC. The new tracker, ITk, employs an all-silicon detector with outer strip layers. The building block of the ITk strip barrel is the stave which consists of a low-mass support structure hosting the common electrical, optical and cooling services as well as 28 silicon modules. In this contribution, we outline the challenging aspects of the stave pre-production testing phase at Brookhaven National Laboratory. Here, the electrical characterization of these staves, hosting the final design of all ASICs, will be discussed in detail.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Construction of precision sMDT detector for the ATLAS Muon Spectrometer upgrade

Here, this paper describes the small-diameter monitored drift-tube detector construction at the University of Michigan as a contribution to the ATLAS Muon Spectrometer upgrade for the high-luminosity Large Hadron Collider at CERN. Measurements of the first 30 chambers built at Michigan show that the drift tube wire position accuracy meets the specification of 20 μm. The positions of the platforms for alignment and magnetic field sensors are all installed well within the required precision. The cosmic ray test measurements show single wire tracking resolution of 100 ± 7 μm with an average detection efficiency above 99%. The infrastructure, tooling, techniques, and procedures for chamber production are described in detail. The results from the chamber quality control tests of the first 30 constructed chambers are reported.

47 OTHER INSTRUMENTATION↗

An FPGA-based readout chip emulator for the CMS ETL detector upgrade

Here, we present an FPGA-based readout chip emulator board for the CMS Endcap Timing Layer (ETL) detector upgrade. The emulator board uses an Intel Cyclone 10 GX FPGA to emulate the digital functions of four Endcap Layer Readout Chips (ETROCs). Based on the actual ETROC design, the firmware is implemented and verified. The emulator board is being used for the ETROC digital design verification and system development.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Electronics for the far-forward CMS muon detector upgrade, ME0

Abstract With the High Luminosity upgrade of the Large Hadron Collider (LHC) we expect increased instantaneous luminosities up to 7.5 × 10 34 cm −2 s −1 , or five times more than the original values. In order to maintain performance of the Compact Muon Solenoid (CMS) experiment under these conditions, ME0 is one of three new muon sub-detectors being added, along with GE1/1 and GE2/1, which use the triple Gas Electron Multiplier (GEM) technology. ME0 is designed to cover the forward region of 2.0 < | η | < 2.8, thus improving muon reconstruction at high background rates by supplementing other overlapping muon subsystems up to | η | = 2.4, while also extending the acceptance for the first time to | η | = 2.8. The readout electronics for ME0 must be designed to accommodate high data rates and be sufficiently radiation hard to operate close to the beamline. The Optohybrid (OH) board for ME0, which reads out data from the front-end VFAT3b ASICs, has therefore been designed to operate without an FPGA (unlike GE1/1 and GE2/1) to ensure radiation hardness. The ME0 OH uses the radiation-hard CERN-designed lpGBT ASIC and VTRx+ optical transceiver module for high bandwidth optical links up to 10.24 Gb/s. The backend system is based on the ATCA standard. The design and development status of the readout electronics for ME0 is presented, along with recent results from integration tests performed using the first prototypes.

Instruments & Instrumentation↗

Analysis of humidity sensitivity of silicon strip sensors for ATLAS upgrade tracker, pre- and post-irradiation

During the prototyping phase of the new ATLAS Inner-Tracker (ITk) strip sensors, a degradation of the device breakdown voltage at high humidity was observed. Although the degradation was temporary, showing a fast recovery in dry conditions, the study of the influence of humidity on the sensor performance was critical to establish counter-measures and handling protocols during production testing in order to ensure the proper performance of the upgraded detector. The work presented here has the objective to study for the first time the breakdown voltage deterioration in presence of ambient humidity of ATLAS ITk production-layout strip sensors with different surface properties, before and after proton, neutron and gamma irradiations. A study of the humidity sensitivity of miniature ATLAS ITk strip sensors, before and after proton irradiations, is also presented to compare the sensitivity of devices with different sizes. The sensors were also exposed for several days to high humidity with the aim to recreate and evaluate the influence of the detector integration environment expected during the Large Hadron Collider (LHC) Long Shutdown 3 (LS3) in 2026, where the sensors will be exposed to ambient humidity for prolonged times.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Hardware design and testing of the generic rear transition module for the global trigger subsystem of ATLAS Phase-II Upgrade

Abstract In the framework of the ATLAS experiment’s Phase-II Upgrade at the High-Luminosity Large Hadron Collider (HL-LHC), new and improved trigger hardware and algorithms will be implemented onto a single-level, 10 μs-latency architecture. The Global Trigger is a new subsystem which will bring event-filter capabilities by performing offline-like algorithms on full-granularity calorimeter data. The implementation of the functionality is firmware-focused and composed of several processing nodes, which are hosted on identical hardware, made up of an Advanced Telecommunications Computing Architecture (ATCA) front board, called Global Common Module (GCM), and a rear transition module (RTM), called Generic RTM (GRM). The GRM, which was developed to mitigate the risks deriving from the complex design and power management of the GCM, features an advanced Xilinx Versal Prime system-on-chip and can handle communication with the GCM and Front-End Link eXchange (FELIX) subsystem and trigger processors through 124 25.8 Gb/s transceiver links, for readout and control. Additionally, the GRM mounts a Low-Power GigaBit Transceiver (lpGBT) chip which enables emulation of the detector front-ends for integration tests. This paper presents the GRM hardware design and its testing.

Instruments & Instrumentation↗

Establishing the Quality Assurance programme for the strip sensor production of the ATLAS tracker upgrade including irradiation with neutrons, photons and protons to HL-LHC fluences

The successful pre-production delivery of strip sensors for the new Inner Tracker (ITk) for the upgraded ATLAS detector at the High Luminosity LHC (HL-LHC) at CERN was completed and based on their performance full production has commenced. The overall delivery period is anticipated to last 4 years to complete the approximately 22000 sensors required for the ITk. For Quality Assurance (QA), a number of test structures designed by the collaboration, along with a large area diode and miniature version of the main sensor, are produced in every wafer by the foundry Hamamatsu Photonics K.K (HPK). As well as Quality Control (QC) checks on every main sensor, samples of the QA pieces from each delivery batch are tested both before and after irradiation with results after exposure to neutrons, gammas or protons to fluences and doses corresponding to those anticipated after operation at the HL-LHC to roughly 1.5 times the ultimate integrated luminosity of 4000 fb -1 . In this paper the procedures are presented and the studies carried out to establish that the seven ITk QA Strip Sensor irradiation and test sites meet all the requirements to support this very extensive programme throughout the strip sensor production phase for the ITk project.

47 OTHER INSTRUMENTATION↗

An 8 GeV linac as the Booster replacement in the Fermilab Power Upgrade

Increasing the Main Injector beam power above ~ 1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In this paper, we consider an 8 GeV linac Booster replacement that produces 8 GeV H$^{-}$ beam for injection into the Recycler Ring or Main Injector. This upgrade will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation frontier experiments. The 8 GeV linac takes ~ 1 GeV beam from the PIP-II Linac and accelerates it to ~ 2 GeV in a650 MHz superconducting RF linac, followed by a ~ 2 to 8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in superconducting RF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed, including use of an8 GeV Accumulator Ring. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

43 PARTICLE ACCELERATORS↗

Neutron irradiation and electrical characterisation of the first 8” silicon pad sensor prototypes for the CMS calorimeter endcap upgrade

As part of its HL-LHC upgrade program, the CMS collaboration is replacing its existing endcap calorimeters with a high-granularity calorimeter (CE). The new calorimeter is a sampling calorimeter with unprecedented transverse and longitudinal readout for both electromagnetic and hadronic compartments. Due to its compactness, intrinsic time resolution, and radiation hardness, silicon has been chosen as active material for the regions exposed to higher radiation levels. The silicon sensors are fabricated as 20 cm (8”) wide hexagonal wafers and are segmented into several hundred pads which are read out individually. As part of the sensor qualification strategy, 8” sensor irradiation with neutrons has been conducted at the Rhode Island Nuclear Science Center (RINSC) and followed by their electrical characterisation in 2020-21. The completion of this important milestone in the CE's R&D program is documented in this paper and it provides detailed account of the associated infrastructure and procedures.The results on the electrical properties of the irradiated CE silicon sensors are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evaluation of planar silicon pixel sensors with the RD53A readout chip for the Phase-2 Upgrade of the CMS Inner Tracker

The Large Hadron Collider at CERN will undergo an upgrade inorder to increase its luminosity to7.5 × 10$^{34}$ cm$^{-2}$s$^{-1}$. The increased luminosityduring this High-Luminosity running phase, starting around 2029,means a higher rate of proton-proton interactions, hence a largerionizing dose and particle fluence for the detectors. The currenttracking system of the CMS experiment will be fully replaced inorder to cope with the new operating conditions. Prototype planarpixel sensors for the CMS Inner Tracker with square50 μm × 50 μm and rectangular100 μm × 25 μm pixels read out by theRD53A chip were characterized in the lab and at the DESY-II testbeamfacility in order to identify designs that meet the requirements ofCMS during the High-Luminosity running phase. A spatial resolutionof approximately 3.4 μm (2 μm) is obtained using themodules with 50 μm × 50 μm(100 μm × 25 μm) pixels at the optimalangle of incidence before irradiation. After irradiation to a 1 MeVneutron equivalent fluence ofΦ$_{eq}$ = 5.3 × 10$^{15}$ cm$^{-2}$, a resolution of9.4 μm is achieved at a bias voltage of 800 V using a modulewith 50 μm × 50 μm pixel size. All modulesretain a hit efficiency in excess of 99% after irradiation tofluences up to 2.1 × 10$^{16}$ cm$^{-2}$. Further studies ofthe electrical properties of the modules, especially crosstalk, arealso presented in this paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Characterization of the ATLAS Liquid Argon Front-End ASIC ALFE2 for the HL-LHC upgrade

In this study, ALFE2 is an ATLAS Liquid Argon Calorimeter (LAr) Front-End ASIC designed for the HL-LHC upgrade. ALFE2 comprises four channels of pre-amplifiers and CR-(RC) 2 shapers with adjustable input impedance. ALFE2 features two separate gain outputs to provide 16-bit dynamic-range coverage and an optimum resolution. ALFE2 is characterized using a Front-End Test Board (FETB) based on a Zynq UltraScale+ MPSoC and two octal-channel 16-bit high-speed ADCs. The test results indicate that ALFE2 fulfills or greatly exceeds all specifications on gain, noise, linearity, uniformity, and radiation tolerance.

47 OTHER INSTRUMENTATION↗

ETROC1: the first full chain precision timing prototype ASIC for CMS MTD endcap timing layer upgrade

We present the design and characterization of the first fullchain precision timing prototype ASIC, named ETL Readout Chipversion 1 (ETROC1) for the CMS MTD endcap timing layer (ETL)upgrade. The ETL utilizes Low Gain Avalanche Diode (LGAD) sensors todetect charged particles, with the goal to achieve a time resolutionof 40–50 ps per hit, and 30–40 ps per track with hits from twodetector layers. The ETROC1 is composed of a 5 × 5 pixelarray and peripheral circuits. The pixel array includes a4 × 4 active pixel array with an H-tree shaped networkdelivering clock and charge injection signals. Each active pixel iscomposed of various components, including a bump pad, a chargeinjection circuit, a pre-amplifier, a discriminator, adigital-to-analog converter, and a time-to-digital converter. Thesecomponents play essential roles as the front-end link in processingLGAD signals and measuring timing-related information. Theperipheral circuits provide clock signals and readoutfunctionalities. The size of the ETROC1 chip is7 mm× 9 mm. ETROC1 has been fabricated in a 65 nmCMOS process, and extensively tested under stimuli of chargeinjection, infrared laser, and proton beam. The time resolution ofbump-bonded ETROC1 + LGAD chipsets reaches 42–46 ps per hit in thebeam test.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The effect of radiation damage on the light yield and uniformity of candidate plastic scintillator tiles for the CMS hadron calorimeter upgrade

A study has been performed to understand the effects of radiation damage on various plastic scintillator tiles considered for a possible upgrade of the hadron calorimeter of the CMS detector. Measurements were made with unirradiated tiles and with tiles that had been irradiated in the CMS collision hall to a dose of 44 kGy. Results are presented for the tiles of different shapes in terms of the energy spectrum, efficiency as a function of the position at which each tile was hit, as well as light yield. All the tiles showed a light reduction of up to about 50%. The tiles with the shape currently used in the CMS detector did not see increased non-uniformity of light collection, while a significant disuniformity was observed for the tiles considered as alternatives.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RD53 pixel readout integrated circuits for ATLAS and CMS HL-LHC upgrades

The RD53 collaboration has since 2013 developed new hybrid pixel detector chips with 50 × 50 μm2 pixels for the HL-LHC upgrades of the ATLAS and CMS experiments at CERN. A common architecture, design and verification framework has been developed to enable final pixel chips of different sizes to be designed, verified and tested to handle extreme hit rates of 3 GHz/cm2 (up to 12 GHz per chip) together with an increased trigger rate of 1 MHz and efficient readout of up to 5.12 Gbits/s per pixel chip. Tolerance to an extremely hostile radiation environment with 1 Grad over 10 years and induced SEU (Single Event Upset) rates of up to 100 upsets per second per chip have been major challenges to make reliable pixel chips. Three generations of pixel chips, and many specific mixed signal building blocks and radiation test chips, have been submitted and extensively tested to get to final production chips. The large, complex and high rate pixel chips have been developed with a strong emphasis on low power consumption together with a concurrent development and qualification of novel serial powering at chip, module and system level, to minimize detector material budget.

Alimonti, G↗

Development of a test system for data links of the ATLAS Inner Tracker (ITk) upgrade silicon pixel detector

This contribution introduces a novel test system developed to evaluate the signal transmission quality in high-speed data links for the 2026 Inner Tracker (ITk) upgrade of the ATLAS experiment. Using an FPGA-based data acquisition (DAQ) framework, the setup can run simultaneous Bit Error Rate (BER) tests for up to 64 channels and generate virtual eye diagrams, for qualifying the ∼26k electrical links at the ATLAS ITk data rate of 1.28 Gb/s. The paper includes results from system calibration, yielding its contribution to the measured losses, and preliminary results from tests of prototype and pre-production assemblies of on-detector links of the three ATLAS ITk Pixel subsystems.

47 OTHER INSTRUMENTATION↗

Upgrades to the TRIUMF Fast Ion Counter, TRIFIC

TRIFIC, the TRIUMF Fast Ion Counter, is a downstream ionization chamber which provides beam composition monitoring and recoil tagging for in-beam reaction experiments. TRIFIC has been commissioned and deployed for use with radioactive isotope beams at the TRIUMF-ISAC facility. Recently, the detector has been upgraded to include an improved gas window that can accommodate higher beam rates and position-sensitive electrode grids for better position reconstruction.

Gaseous detectors↗

Commissioning and operational results of helium refrigeration system at JLab for the 12GeV upgrade

The new 4.5 K refrigerator system at the Jefferson Lab (JLab) Central Helium Liquefier (CHL-2) for the 12 GeV upgrade was commissioned in late spring of 2013, following the commissioning of the new compressor system, and has been supporting 12 GeV LINAC commissioning since that time. Six design modes were tested during commissioning, consisting of a maximum capacity, nominal capacity, maximum liquefaction, maximum refrigeration, maximum fill and a stand-by/reduced load condition. The maximum capacity was designed to support a 238 g/s, 30 K and 1.16 bar cold compressor return flow, a 15 g/s, 4.5 K liquefaction load and a 12.6 kW, 35-55 K shield load. The other modes were selected to ensure proper component sizing and selection to allow the cold box to operate over a wide range of conditions and capacities. The cold box system is comprised of two physically independent cold boxes with interconnecting transfer-lines. The outside (upper) 300-60 K vertical cold box has no turbines and incorporates a liquid nitrogen pre-cooler and 80-K beds. The inside (lower) 60-4.5 K horizontal cold box houses seven turbines that are configured in four expansion stages including one Joule-Thompson expander and a 20-K bed. The helium compression system has five compressors to support three pressure levels in the cold box. This paper will summarize the analysis of the test data obtained over the wide range of operating conditions and capacities which were tested.

Knudsen, Peter N.↗