Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmission deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Emerging Trends and Systemic Issues Influencing Today’s U.S. Electric Grid

With increasing shifts from vertically integrated to horizontally structured operations and from centralized to distributed electric power delivery, today’s electric power grid (the “grid”) operators and designers face the challenge of creating an architecture that accommodates a host of diverse requirements. The grid’s modes of operation must address concerns of reliability and stability, new deployments of renewable energy sources, threats from cyber-attacks and natural disasters, and increasingly distributed system operations. Grid modernization calls for a reliable, affordable, sustainable, agile, secure, and resilient grid. However, the modernization of the U.S. power grid is hampered by mounting complexity and diverging objectives from owners and operators and is consequently risky and fraught with potential missteps. Flawed architecture, design, and implementation will lead to stranded investments and lost opportunities. A principled approach to minimize risk and develop a robust grid of the future is to begin with a sound architecture for the grid to inform the design process. Architecture development starts with the context of influencing factors that provide constraints as well as driving goals. This report provides the context of emerging trends and cross-cutting systemic issues in the U.S. electric power grid and serves as a vital input for grid architecture development.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Community Guide to Regulatory Barriers Affecting Microgrids (Reports 1-3)

In response to growing risks of power outages from extreme weather and aging infrastructure, communities are increasingly exploring the potential of microgrids to provide reliable energy access. Microgrids offer promising solutions to meet this challenge but face a complex landscape of non-technical barriers, particularly regulations concerning the provision and distribution of energy. Most existing legal and regulatory frameworks were designed for a centralized, one-way power system, and are often poorly suited to handle systems that independently balance distributed energy resources with local load. This three-part report series provides a strategic analysis of existing regulatory and legal factors affecting microgrid deployments to help non-technical community leaders and decision-makers better understand the feasibility of a microgrid in their community. -Report No. 1: Foundational Issues Facing Microgrids details the universal policy barriers all microgrids face, including utility interconnection processes, rate structures, and local permitting. -Report No. 2: Single Property Microgrids outlines how direct asset ownership and operating behind-the-meter can bypass some regulatory oversight, using the Blue Lake Rancheria microgrid as a case study. -Report No. 3: Multi-Property Microgrids tackles the complex challenges of crossing public rights-of-way and navigating utility franchise rights, highlighting the Coventry microgrid project. The series equips decision-makers with phased frameworks to navigate financial and regulatory complexities, engage effectively with local utilities and Authorities Having Jurisdiction (AHJs), and structure successful microgrid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancing the EVI-X National Framework to Address Emerging Energy Questions

This project advances the state-of-the-art in infrastructure analysis to better inform deployment strategies. It enhances NLR's EVI-X Suite, a set of tools supporting national network planning, local site design, and financial evaluation. These capabilities will position DOE to provide timely analysis and inform the strategic buildout of the national charging network. EVI-X development is closely coordinated with other DOE-funded efforts to ensure consistent, integrated use of key inputs and outputs, including EV adoption scenarios from NLR's TEMPO model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power-Hardware-in-the-Loop Experiments of a Microgrid With a Grid-Forming Battery Inverter: Preprint

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstrating the data center as a flexible grid asset using a C-HIL setup

Increasing data center demand is outpacing grid infrastructure development. Artificial intelligence workloads and hyperscale cloud growth are creating unprecedented demand for power, while traditional grid expansion faces multiyear development timelines. Verrus is developing an innovative datacenter solution for this challenge, data centers that act as active grid-supportive assets rather than passive loads. Our approach integrates a novel grid-aware power flow management system with battery energy storage systems(BESS) into a microgrid-controlled, medium-voltage power distribution architecture that delivers critical capabilities, such as: * Fast response to grid disturbances such over/ under voltage or over/ under frequency * Demand flexibility that can service requests from the utility within 10 s * Uninterrupted transition to islanded operation during grid outages * Continuous uptime assurance for compute loads while maintaining all customer service level agreements. Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), these capabilities were validated using NREL's Advanced Research on Integrated Energy Systems (ARIES) virtual emulation environment to model a 70-MW grid-interactive data center. This paper outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can provide both critical load resilience and ancillary grid support without compromising uptime requirements. Specifically, we present a digital real time simulation of a 70 MW data center integrated with a physical microgrid controller, and demonstrate the data center response in the event of a grid voltage and frequency event, utility demand response request and utility outage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data-Driven Distribution System Coordinated PV Inverter Control Using Deep Reinforcement Learning

The deployment of distributed solar photovoltaic (PV) systems has increased consistently over the past decades. High penetrations of PVs could cause a series of adverse grid impacts, such as voltage violations. The recent development of smart inverter technologies rises the incentives of developing PV control solutions that regulate the inverter output power and seeking the optimization on system operational objectives. This paper proposes a data-driven control solution based on deep reinforcement learning (DRL) to optimize PV inverters for voltage regulation. The proposed solution can minimize PV real power curtailment while maintaining network voltage at an acceptable range. Comparison results between the proposed DRL control algorithms with deep deterministic policy gradient (DDPG) and volt-var control on a real feeder in west Colorado highlight the advantage of the proposed framework in controlling the system voltage while minimizing the PV real power curtailment.

deep reinforcement learning↗

Power-Hardware-in-the-Loop Experiments of a Microgrid with a Grid-Forming Battery Inverter

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, the Intuitive Machines IM-1 NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan Anzalone↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, Intuitive Machines NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan J Anzalone↗

Virtual Power Plants: Pilots, Challenges, and Innovations Shaping Future Development

Virtual Power Plants (VPPs) aggregate distributed energy resources (DERs) to provide grid services traditionally delivered by centralized power plants. This article reviews the current state of VPP deployment, highlighting business models, compensation mechanisms, and global pilot projects. While VPPs offer benefits such as grid flexibility, resilience, and cost savings, challenges remain in communication infrastructure, regulatory frameworks, market access, and customer engagement. To address these, we propose a scalable, privacy-preserving hierarchical VPP architecture that coordinates with distribution utilities and preserves customer data. We also present the Integrated T&D Control Room of the Future as a key test bed for validating and accelerating VPP adoption. These innovations can help transition VPPs from pilot programs to integral components of a modern, reliable power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Machine Learning-Based Method to Estimate Transformer Primary-Side Voltages with Limited Customer-Side AMI Measurements

Distribution control applications such as volt/var optimization, network reconfiguration, and distribution automation require accurate knowledge of the distribution system state. The lack of sufficient sensors on the primary side of distribution networks often limits the accuracy of the control decisions by these applications. The deployment of advanced metering infrastructure (AMI) provides utilities an opportunity to translate the AMI data on the secondary onto the primary so that it can be used as pseudo-measurements to augment the limited existing measurements on the primary. This paper develops a machine learning based approach for estimating service transformer primary-side voltages by using limited secondary-side AMI measurement. The machine learning model is developed by using random forest algorithm. The estimated primary-side voltages can be used by utilities as pseudo-measurements for distribution control applications. The detailed secondary model topology, which is an essential input data for many existing algorithms, is not required for the proposed method. The performance of the proposed method is validated by using AMI measurements from the field and an actual distribution feeder model of San Diego Gas & Electric Company.

advanced metering infrastructure↗

Cyber100 Compass: Quantification of Cybersecurity Risks for Systems Transitioning to High Levels of Renewables (Final Report)

The shift to high levels of renewable deployment will entail a significant re-engineering of the grid. As investors, utilities, customers, and others prepare for clean energy transitions, there is need to understand how restructuring the grid to accommodate renewables will change the attack surface of the grid and accompanying cyber risk. However, today the cyber-physical risks associated with electric grids incorporating high levels of renewable deployment remain largely unknown. The Cyber100 Compass proof-of-concept application attempts to quantify future cyber-physical security risks by combining risk data gathered from subject matter experts (SMEs) with input from system planners about conditions they expect to be true about their electric systems in the future. Users provide data about their organization’s tolerance for risk; the value they place on avoiding the consequences of different cyber events; and conditions that they expect to be true on their systems at some point in the future. The SMEs provide baseline probabilities for different cyber events; the probability that an event will be low-, moderate-, or high-impact; and the amount by which user-identified conditions on their systems will change the likelihood of the cyber events. The application takes both the user and SME input and performs a series of Monte Carlo simulations to arrive at a quantification of risk.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Impacts of Spatial Resolution in a High-Fidelity Capacity Expansion Model: An ERCOT Case Study

Capacity expansion models are important tools in examining the evolution of the electric power sector. Embedded in these tools are many modeling choices with consequential impacts on computational burden and associated analysis. In this study, we adjust the spatial resolution of the Regional Energy Deployment System (ReEDS) to understand the implications of higher-fidelity modeling on energy system projections and model solve times. The native ReEDS regions capture the contiguous United States in 134 balancing areas whereas the regions in the higher-resolution version are defined by over 3,000 U.S. counties. Using both resolutions, we conduct a case study of the Texas Interconnection (The Electric Reliability Council of Texas [ERCOT]) to explore differences in model projections and to inform appropriate applications of high spatial resolution in a large-scale, applied capacity expansion model.

county↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

Investigating Net-Zero Carbon Microgrids for DOE’s National Laboratory Facilities: A Case Study for Idaho National Laboratory

The concept of net-zero carbon microgrids (NZMs) has received significant interest in recent years considering its promises to provide both energy resilience and carbon reduction. This paper investigates the practical constraints of NZM deployment in a government facility, exploring various cases revolving around the objectives of cost, emission, and energy resilience. The technoeconomic results for one of the Idaho National Laboratory (INL) facilities are discussed to identify a practical and economic approach to achieve the net-zero target considering both present and future scenarios. The study shows the carbon reduction, resilience, and economic success of net-zero initiatives are tied directly to the energy portfolio of its electricity provider. The NZMs typically required a hybrid mix of renewable generation and storage assets to maximize onsite clean generation and to provide reliable power during grid outages. Besides supporting the ongoing net-zero effort at INL, this work also provides a framework that can be directly used in other facilities aspiring to become a net zero in the future.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Factors Influencing Building Demand Flexibility

The U.S. Department of Energy’s National Roadmap for Grid-interactive Efficient Buildings (GEB) acknowledged that building demand flexibility (DF) is both an important strategy to decarbonizing the buildings sector and an important resource for meeting the changing needs of the electrical grid such as improving grid reliability. However, understanding the complexity and uncertainties in real building field performance of DF strategies is a large gap hindering stakeholders on both grid and buildings side to make investments on deploying such strategies. The research work in this report intended to advance understanding of the variability and influential factors in building demand flexibility. Adding such knowledge based on lab testing results and measured performance data from real buildings is an important contribution. The report uses standardized metrics and methods to quantify DF performance from field-measured DF datasets of two significant building groups of big-box retail and medium office buildings to present the challenge of building DF variability in multiple dimensions. The report presents findings related to how several key factors influence building demand flexibility from implementing a common, cost-effective DF control strategy (i.e., adjusting zone temperatures). The findings are supported by full-scale lab testing, field data analysis and simulation research. The authors also provided application-oriented recommendations to stakeholders such as building aggregators, utility program design professionals, sophisticated building portfolio owners, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Phase Identification in Real Distribution Networks with High PV Penetration Using Advanced Metering Infrastructure Data

Many distribution network monitoring and control applications - including state estimation, volt/VAR optimization, and network reconfiguration - rely on accurate network models; however, the network models maintained by utilities can become outdated because of restoration activities, network reconfiguration, and missing data. With the widespread deployment of advanced metering infrastructure (AMI), abundant measurement data from low-voltage secondary networks are available. The AMI measurement data can be used for phase identification to improve the network models. Although the existing phase identification techniques work well in passive distribution feeders that do not have photovoltaic (PV) generation, they can fail to accurately identify the phases in the presence of PV. This paper proposes a robust phase identification algorithm based on supervised machine learning that accurately identifies the AMI meter phase connectivity in the presence of significant PV generation. The proposed algorithm does not require network topology information or feeder head measurement data. The algorithm is validated using the AMI measurement data collected in the field and the field-validated phase connectivity database on two real distribution feeders from San Diego Gas & Electric Company that have significant PV generation.

advanced metering infrastructure↗