Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “tasking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Task 5 Field Scale Stress Modeling Scripts and Data

Project data and Matlab scripts for Task 5 of the project “A Non-Invasive Approach for Elucidating the Spatial Distribution of In Situ Stress in Deep Subsurface Geologic Formations Considered for CO2 Storage”. Project includes the static earth models, grids and other data used for simulation and calibration of the two case studies addressed in the project, referred to herein as the “FutureGen2” model (Illinois) and the “Perch” model (Otsego county, Michigan). Large Dataset, please contact EDXSupport@netl.doe.gov

FutureGen2↗

UNM High Energy Physics: Task B

The High Altitude Water Cherenkov (HAWC) observatory provides a unique window into the "TeV" gamma-ray universe. HAWC provides an important 1 TeV to 1000 TeV high-mass window for indirect searches for dark matter (DM) annihilation or decay. Additional fundamental physics studies benefit from HAWC's sensitivity to variable and/or transient sources. Such transient sources include: gamma ray bursts (GRBs), temporal studies of super massive black holes (specifically Markarian (Mrk) 421 and 501), and most recently searches for gamma-ray counterparts to PeV neutrino sources (observed by IceCube) and gravitational wave sources (observed by LIGO/Virgo). The UNM (Task B) research program includes leadership of the HAWC detector and of HAWC science. During this final reporting period the UNM group includes Professor John Matthews and graduate student Zhixiang Ren with the research goal focused on the development of analysis tools to enhance the sensitivity of HAWC to <1 TeV, gamma rays. This program began in 2016 with an initial focus to work to resolve known problems with the low energy analysis bins in the HAWC data. In 2017 this evolved to the development of new analysis tools to optimize current HAWC <1 TeV sensitivity as well as how HAWC (or a future HAWC-like detector) could be modified to be significantly more sensitive to <1 TeV gamma rays. In these studies Ren lead the development and evaluation of new HAWC <1 TeV analysis tools and Matthews lead the study of possible experimental modifications to HAWC to improve the <1 TeV sensitivity.

79 ASTRONOMY AND ASTROPHYSICS↗

IEA Wind TCP Task 37: Definition of the IEA 15-Megawatt Offshore Reference Wind Turbine

This report describes a 15-megawatt offshore wind turbine with a fixed-bottom monopile support structure. This reference wind turbine is a Class IB direct-drive machine, with a rotor diameter of 240 meters and a hub height of 150 meters. An overview of the design is presented in Figure ES-1 and Table ES-1. The design reflects a joint effort between the National Renewable Energy Laboratory, sponsored by the U.S. Department of Energy, and the Technical University of Denmark, sponsored by the European Union's H2020 Program, through the second work package of International Energy Agency Wind Task 37 on Wind Energy Systems Engineering: Integrated RD&D. A forthcoming report will detail a semisubmersible floating support structure developed by the University of Maine.

15 MW↗

Load Composition Analysis in Support of the NERC Load Modeling Task Force. 2019-2020 Field Test of the Composite Load Model

In 2015, NERC’s reliability standards were revised to require the use of dynamic load models in transmission planning studies. To comply with the standards, planners must use load models that explicitly represent the dynamic behavior of the different constituents of load at each load bus within their transmission planning models. The most important of these constituents are motor-driven and power electronics-based loads. Collectively, these representations are known as composite load models. In anticipation of the compliance date for the new standards, NERC’s Load Modeling Task Force (LMTF), in 2019, initiated a field test of composite load models involving the regional reliability planning entities. In support of the field test, DOE and BPA researchers developed region-specific composite load models that could be assigned to each non-industrial load bus in the planning models for each of the North American interconnections. Separate models were developed for each hour of a summer peak day, a winter peak day, and a spring light-load day. This report is the technical documentation for the load composition analysis that was conducted to develop these non-industrial composite load models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technology Development and Field Monitoring in nZEB - US Country report IEA HPT Annex 49 Task 3

The International Energy Agency (IEA) Heat Pumping Technologies (HPT) Annex 49, “Design and Integration of Heat Pumps for Nearly Zero Energy Buildings,” deals with the application of heat pumps (HPs) as a core component of the HVAC system for nearly or net-zero energy buildings. This report covers the Task 3 activities of the US team. Three institutions are involved on the US team and have worked on the following projects. 1) Oak Ridge National Laboratory (ORNL) summarized development activities since the conclusion of IEA HPT Annex 40 for several integrated HP (IHP) systems - electric ground-source IHP and air-source IHP versions and engine-driven AS-IHP version. 2) The University of Maryland partnered with ORNL and Blue Bear Management to develop a personal cooling device called RoCo that can provide personalized conditioned air to occupants in inadequately or unconditioned environments. With RoCo, building facility management can elevate the HVAC thermostat settings without compromising occupants’ thermal comfort. Researchers have found that a 4°F increase in thermostat settings can save 12–30% energy savings. Therefore, RoCo is a promising technology that can help reduce building energy consumption and facilitate achievement of net-zero energy building performance. 3) The National Institute of Standards and Technology (NIST) is working on a field study effort on the NIST Net-Zero Energy Residential Test Facility. Two air-source split-system HPs were installed in a residential, net-zero energy home that was constructed as a laboratory on the NIST campus in Gaithersburg, Maryland. The first HP was a two-stage, 7 kW (2 ton), 15.8 seasonal energy efficiency ratio (SEER), 9.05 heating seasonal performance factor (HSPF) conventionally ducted system; the second HP was a variable-speed, 10.6 kW (3 ton), 14 SEER, 8.35 HSPF, high-velocity ducted system. These two systems operated side by side, using separate supply ducts and a common return duct, on a weekly alternating schedule to condition the home that was operated with very consistent simulated thermal loads. The team wanted to determine whether the high-velocity system could provide comparable energy-use efficiency to the conventional system. The results of this study showed that it did meet the required loads and had slightly greater efficiency; the average cooling coefficient of performance (COP) was (0.40 ± 0.11) higher, and the average heating COP was statistically equal. A new firmware was provided at the end of the heating season that greatly improved the performance of the high-velocity system; its average heating COP went from (1.8 ± 0.9) to (2.5 ± 1.1) at a 95% confidence level. The new firmware heating COP averaged (1.05 ± 0.23) higher than the old firmware over the same outdoor temperatures. The defrost performance is very different for these two systems, yet they consumed equivalent energy per HDD. The conventional system uses a timed-initiate, temperature-terminate algorithm with auxiliary electric resistive heating, whereas the high-velocity system uses calculated evaporator parameters with a hot-gas bypass before a full reverse-cycle defrost with no supplementary resistive heat.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Impact of Individual Traits on Domain Task Performance: Exploring the Dunning-Kruger Effect

Research shows that individuals often overestimate their knowledge and performance without realizing they have done so, which can lead to faulty technical outcomes. This phenomenon is known as the Dunning-Kruger effect (Kruger & Dunning, 1999). This research sought to determine if some individuals were more prone to overestimating their performance due to underlying personality and cognitive characteristics. To test our hypothesis, we first collected individual difference measures. Next, we asked participants to estimate their performance on three performance tasks to assess the likelihood of overestimation. We found that some individuals may be more prone to overestimating their performance than others, and that faulty problem-solving abilities and low skill may be to blame. Encouraging individuals to think critically through all options and to consult with others before making a high-consequence decision may reduce overestimation.

42 ENGINEERING↗

Method Development for Measuring U Isotope Ratios by Laser Ablation MC-ICP-MS. Task 1: Hardware Setup

The aim of this project is to develop methodology to identify and analyze U and Pu containing particles using laser ablation MC-ICP-MS. The final methodology will ultimately be described in a detailed procedural document that will be shared with IAEA-NWAL laboratories. In this report, we describe the Task-1 deliverable; the setup and optimization of hardware required to perform U isotopic analyses by laser ablation MC-ICP-MS.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Considerations for Distributed Energy Resource Integration in Puerto Rico: DOE Multi-Lab Grid Modeling Support for Puerto Rico; Analytical Support for Interconnection and IEEE Std 1547-2018 National Renewable Energy Laboratory (Task 3.0)

To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 9: Viability of Data-Driven Approach for Outage Management (Deliverable D6))

This technical report is provided to US Department of Energy for progress made on the AGGERGATE project led by the Washington State University. This report is specifically related to the deliverable: ’D6: Technical report discussing the viability of the developed data-driven models and co-simulation architecture for models for operation in a real-world operational setting and the results of Tasks 1 to 8, summarizing the project findings and accomplishments to date’.

42 ENGINEERING↗

Integrated Fuel Cycle Materials and Chemistry Program (FY21 Plutonium Science Task Report)

Task 2 of the IFCMCP was designed to utilize vibrational spectroscopy, microscopy, X-ray diffraction, and calorimetry to explore the spectroscopic, structural, and chemical properties of plutonium compounds relevant to the nuclear fuel cycle. An important precursor to this work is production of fresh, high-quality plutonium samples. Given the health hazards and material accountability associated with plutonium, sample production is not trivial and production experiments require extensive planning and coordination by research and support staff. Further, because alpha-emissions from plutonium produce time- and dose dependent radiolysis resulting in structural defects, particularly in the presence of water, freshly prepared plutonium samples must be carefully packaged and analyzed with urgency following their production. In FY21, SRNL and UND engaged in numerous research studies involving production and subsequent characterization of plutonium dioxide, plutonium fluoride, plutonium oxalate, and plutonium nitrate. Specific efforts involving each of these compounds are described in detail in the body of this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Legacy surface change analyses of the 1993 Rock Valley earthquake sequence for direct comparison to planned NA-22 underground conventional high-explosive experiments (Source Physics Experiment 3 (SPE3) - RV/DC Task 1.3 FY22 Final Report)

Recent work under two previous phases of the NNSA NA-22 Source Physics Experiment (SPE) have shown that underground chemical high-explosive experiments can produce detectable surface changes that differ in spatial extent and vertical magnitude depending on the geologic media at the site (Schultz-Fellenz et al., 2018; 2020; Crawford et al., 2021). Neither of these two prior phases of SPE identified natural earthquake-related surface effects in the same region that occurred at a similar depth as the explosive experiments for direct comparison. While earthquakes can also produce surface changes that are detectable using remote sensing data analyses, it is expected that the pattern and spatial extent of surface changes would vary between earthquakes and explosions. However, no direct-observed surface-change signature comparison between earthquakes and explosions has ever been performed. The SPE Phase 3 Rock Valley/Direct Comparison (RV/DC) program presents a unique opportunity to investigate and characterize co-occurrence of both earthquakes and explosions. In this project, we worked to address five tasks in a workflow, as follows: 1. Identify and obtain existing high-resolution legacy satellite and aerial imagery as close in time before and after the 1993 Rock Valley earthquake sequence to temporally constrain the analyses. 2. Transform these pre-earthquake and post-earthquake datasets into digital elevation models (DEMs) using geospatial analysis software packages (e.g., ArcGIS, Agisoft Metashape, and Google Earth Engine). 3. Perform DEM differencing analyses to assess and quantify earthquake-related changes from the 1993 sequence, and develop map products that visualize these analyses. 4. Use the analyses from (3) to: (a) assess spatial distribution and magnitude of surface changes due to the 1993 Rock Valley earthquake sequence, and (b) determine parameters of forthcoming, planned explosion-related surface change data collection from sensors mounted on unmanned aerial vehicles (UAVs) (e.g., spatial extent of collection, design and density of survey control, sensors to deploy, forward speed and line spacing of UAV flight lines, flight altitude). 5. Develop a summary report on the analyses, including how the analyses define parameters and identify focus areas for any future surface change analytical field campaigns related to the explosive experiment. Analyzing these legacy data and identifying whether they can detect any surface changes related to the earthquake sequence facilitates opportunities for direct signature comparison of surface change from explosions at one location, which has never previously been performed. Comparing the surface change signatures from a co-located and depth-equivalent earthquake and an explosion could help to advance remote sensing event discrimination techniques. This report summarizes the work completed toward this ambitious goal.

42 ENGINEERING↗

Wabash CarbonSAFE Static and Dynamic Modeling: Task 9.0 (Technical Report)

The objective of the Wabash CarbonSAFE project’s static and dynamic modeling task is to assess the feasibility of storing 50 million tonnes (1.67 million metric tonnes annually; MMTA) of industrially-sourced carbon dioxide (CO 2 ) in a commercial-scale geological storage complex at Wabash Valley Resources LLC (WVR) gasification facility near Terre Haute, Indiana over a period of 30 years. The targeted formations for storing CO 2 are: 1) Mt. Simon Sandstone (MSS) and the 2) Potosi Dolomite (Knox Group). All of the available data from the recently drilled Wabash #1 stratigraphic test well (now plugged and abandoned) were used in the construction of both the static and dynamic models. Geologic models were constructed to characterize both the Mt. Simon Sandstone and Potosi Dolomite storage complexes. Dynamic simulation models were constructed and used to assess the feasibility of injecting CO 2 into the Mt. Simon and Potosi formations. The geocellular models for the Potosi Dolomite and Mt. Simon Sandstone were built using Petrel™, Schlumberger’s reservoir modeling software. The dynamic simulations were run using Landmark’s Nexus ® reservoir simulation software.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dimensionally Reduced Model for Rapid and Accurate Prediction of Gas Saturation, Pressure, and Brine Production in a CO 2 Storage Application: Case Study Using the SACROC Field as Part of SMART Task 5

This technical report presents work conducted by the sub surface analysis team of the Strategic Systems Analysis & Engineering group at NETL for Task 5 of SMART Phase 1. This study involved the development of deep learning models for CO 2 geologic storage that are capable of accurate prediction of spatio-temporal outputs of CO 2 saturation, pressure, and brine production in three dimensional space over a storage operation's injection and post-injection timeframes. The model framework involves ensembling multi-layer encoder networks that provide dimesionality reduction of geologic inputs with fully connected long short-term memory (LSTM) neural networks that generate time-series prediction This approach offers a means to maximize training time efficiency, reduce computational memory burden, and minimize prediction turnaround.

54 ENVIRONMENTAL SCIENCES↗

H2@Scale Program Multi-Party Cooperative Research and Development Agreement: California Hydrogen Infrastructure Research Consortium Task (Cooperative Research and Development Final Report, CRADA Number CRD-18-00754)

Many stakeholders are working on hydrogen and fuel cell products, markets, requirements, mandates, and policies. California has been leading the way for hydrogen infrastructure and fuel cell electric vehicle (FCEV) deployment. This leadership has advanced a hydrogen network that is not duplicated anywhere in the United States and is unique in the world for its focus on providing a retail fueling experience. In addition, the advancements have identified many lessons learned for hydrogen infrastructure development, deployment, and operation. Other interested states and countries are using California's experience as a model case, making success in California paramount to enabling market acceleration and uptake in the United States. The technical research capability of the national laboratories can be used to assist California in decisions and evaluations, as well as to verify solutions to problems impacting the industry. Because these challenges cannot be addressed by one agency or one laboratory, a hydrogen research consortium has been organized to combine and collaborate. The collaboration aims to ensure that data are available to evaluate projects and inform decision makers, independently verify and validate component solutions, provide experimental results for future hydrogen infrastructure, increase the availability of technical experts for quick-need issues for California hydrogen infrastructure development, deployment, operation, and technology advances. The proposed tasks include data collection from operational stations, component failure fix verification (i.e. nozzle freeze lock), new fueling methods for medium and heavy duty applications, and ensuring hydrogen quality is maintained. U.S. leadership for hydrogen technologies is rooted in California, a location for implementing many H2@Scale pathways such as reducing curtailment and stranded resources, reducing petroleum use and emissions, and developing and creating jobs.

08 HYDROGEN↗

DECOVALEX 2023 Task D -- Interim Report from SNL

The capability of a 1-D PFLOTRAN model to simulate the S1-3 bentonite saturation experiment has been demonstrated and validated against experimental data. Work remains to be done to refine 1-D PFLOTRAN simulations of the experiment S1-4 which include evaluation of parameter sensitivities on the prediction of material saturation and relative permeabilities. This and further testing of PFLOTRAN capabilities will be done as part of DECOVALEX 2023 Task D contributions by the SNL team in the coming months.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Project Risk Assessment and Monitoring for CarbonSAFE Illinois - Macon County (Task 2)

A risk evaluation performed for CarbonSAFE Macon County included performing a risk assessment for the overall project and the identification of technical project risks. These tasks were accomplished through a combination of risk assessment meetings, workshops, expert solicitation, and identifying and implementing risk mitigation or prevention activities. Information from previous carbon storage projects and from the execution of the project (including drilling a test well and conducting 2D seismic survey) were assessed to identify future risks towards the development of a storage complex.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Non-Invasive Approach for Elucidating the Spatial Distribution of In-Situ Stress in Deep Subsurface Geologic Formations Considered for CO 2 Storage (Task 3 Report Laboratory Characterization of Stress Dependent Wavespeed)

This report presents a summary of Task 3 (Laboratory Experimental Characterization of Stress Dependent Wavespeed in Rocks and Application for In-Situ Stress Estimation) of the project titled “A Non-Invasive Approach for Elucidating the Spatial Distribution of In-Situ Stress in Deep Subsurface Geologic Formations Considered for CO 2 Storage”. The main objective of this component of the project was to employ non-destructive techniques to determine how compressional (P)-wave and shear (S)-wave propagation velocities are related to triaxial-stress conditions in laboratory test samples of targeted reservoir rocks. The overarching principle is that such laboratory measurements can provide a basis whereby field measurements of wave-propagation velocities in rocks can be used to ascertain the stress state that would be expected to generate the observed wave-propagation behavior.

58 GEOSCIENCES↗

NDCS Group Meeting Work overview: NCSP Task ORNL IP&D-5 [Slides]

The presentation discusses the primary goal of the NCSP Task IP&D-5 which is to use available data from HPRR operation to create a benchmark report for inclusion in the ICSBEP, as a Criticality Accident Alarm System (CAAS) shielding benchmark. The presentation elaborates on the HPRR operation and how it relates to the KENO VI model, sulfur pellets measurements, and calculation methodology between KENO and MAVRIC FW-CADIS. The presentation concludes by stating that some work is still needed to evaluate uncertainties and to explain the discrepancy computation/experiment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗