Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

AIRSAR South American deployment: Operation plan, version 3.0

The United States National Aeronautics and Space Administration (NASA) and the Brazilian Commission for Space Activities (COBAE) are undertaking a joint experiment involving NASA's DC-8 research aircraft and the Airborne Synthetic Aperture Radar (AIRSAR) system during late May and June 1993. The research areas motivating these activities are: (1) fundamental research in the role of soils, vegetation, and hydrology in the global carbon cycle; and (2) in cooperation with South American scientists, airborne remote sensing research for the upcoming NASA Spaceborne Imaging Radar (SIR)-C/X-SAR flights on the Space Shuttle. A flight schedule and plans for the deployment that were developed are included. Maps of the site locations and schematic indications of flight routes and dates, plots showing swath locations derived from the flight requests and generated by flight planning software, and, most importantly, a calendar showing which sites will be imaged each day are included.

Kobrick, M.↗

A new technology for manufacturing scheduling derived from space system operations

A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

Hornstein, R. S.↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and detection and responses that can be tested in VMET and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM. The plan for VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Design of Fair Charging Algorithm for Smart Electrical Vehicle Charging Infrastructure

Smart charging infrastructure is required to meet the growing demand for Electrical Vehicle (EV) charging from ever more abundant EV owners. WINSmartEV™ is a software based smart charging infrastructure that can monitor, control and manage EV charging. It also can use multiplexing to share scarce charging resources among different EVs plugged in simultaneously. By default WINSmartEV™ uses a round-robin algorithm to schedule charging time between EVs charging on the 120V level one charging device. In order to enhance user acceptance of this technology, charge time allocation fairness is defined and an algorithm to enhance this fairness is proposed.

Chung, Ching-Yen↗

Verification of Spent Fuel Inside Dry Storage Casks by Cask Top Fast Neutron Mapping (FY2023 Mid-Year Report)

This project is developing a prototype scanner array verification system for detection of missing fuel assemblies in spent-fuel storage casks. The prototype consists of six fast-neutron scintillator detectors mounted to a linear actuator frame that is placed on the top of a spent fuel cask to scan across all fuel assembly positions. The scanner array was assembled and tested at LLNL in FY2022. A field test schedule has been requested at the Idaho National Laboratory (INL) Cask Farm site for FY2023. Note that the Cask Farm contractor determines this scheduling and not INL directly. Further system automation will be designed and implemented with the goal of obtaining a level of system operation that meets IAEA needs. This includes integration of the scanner array and data-acquisition control software into a single interface for operator use. In addition, commercial operators and the IAEA may have special requirements for portability, shipping, lifting, and installation. Prior to the Field Test at INL, the system will be operated at LLNL to exercise lifting procedure and linear actuators, monitor stability of detector energy and pulse-shape discrimination calibration, and test system software integration efforts. Following the Field Test, we will present results and discuss the technology with the IAEA. We will incorporate additional improvements to the system based on lessons learned from the field test and feedback from the IAEA. If successful, the technology can be transferred to the IAEA or other stakeholders for assessment.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Galileo mission planning for Low Gain Antenna based operations

The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

Gershman, R.↗

STS-91 Day 05 Highlights

On this fifth day of the STS-91 mission, the flight crew, Cmdr. Charles J. Precourt, Pilot Dominic L. Pudwill Gorie and Mission Specialists Wendy B. Lawrence, Franklin R. Chang-Diaz, Janet L. Kavandi, and Valery Victorovitch Ryumin and cosmonauts continue to move experiment hardware, logistical supplies and water between the two vehicles. They transfer additional bags of water from Discovery to Mir, bringing the total amount of water transferred to 683 pounds. Just over half of the 317 items scheduled to be transferred have now been moved between the two craft. Mission Specialists Wendy Lawrence and Janet Kavandi spend some time today checking out the shuttle's 50-foot long robot arm. This checkout evaluates new electronics and software for use on upcoming assembly missions for the new International Space Station. Today's checkout also tests the arm's dexterity in maneuvering around components of an orbiting space station.

Source record↗

Evolving Design Criteria for Very Large Aperture Space Based Telescopes and Their Influence on the Need for Integrated Tools in the Optimization Process

NASA's Advanced Mirror Technology Development (AMTD) program has been developing the means to design and build the future generations of space based telescopes. With the nearing completion of the James Webb Space Telescope (JWST), the astrophysics community is already starting to define the requirements for follow-on observatories. The restrictions of available launch vehicles and the possibilities of planned future vehicles have fueled the competition between monolithic primaries (with better optical quality) and segmented primaries (with larger apertures, but with diffraction, costs and figure control issues). Regardless of the current shroud sizes and lift capacities, these competing architectures share the need for rapid design tools. As part of the AMTD program a number of tools have been developed and tested to speed up the design process. Starting with the Arnold Mirror Modeler (which creates Finite Element Models (FEM) for structural analysis) and now also feeds these models into thermal stability analyses. They share common file formats and interchangeable results. During the development of the program, numerous trade studies were created for 4-meter and 8-meter monolithic primaries, complete with support systems. Evaluation of these results has led to a better understanding of how the specification drives the results. This paper will show some of the early trade studies for typical specification requirements such as lowest mirror bending frequency and suspension system lowest frequency. The results use representative allowable stress values for each mirror substrate material and construction method and generic material properties. These studies lead to some interesting relationships between feasible designs and the realities of actually trying to build these mirrors. Much of the traditional specifications were developed for much smaller systems, where the mass and volume of the primary where a small portion of the overall satellite. JWST shows us that as the aperture grows, the primary takes up the majority of the mass and volume and the established rules need to be adjusted. For example, a small change in lowest frequency requirement can change the cost by millions of dollars. The paper uses numerous trade studies created during the software development phase of the Arnold Mirror Modeler to illustrate the influences of system specifications on the design space. The future telescopes will require better performance, stability and documented feasibility to meet the hurdles of today's budget and schedules realities. AMTD is developing the tools, but the basic system planning mentality also has to adopt to the requirements of these very large and complex physical structures.

Arnold, William R., Sr.↗

Project Management Using Modern Guidance, Navigation and Control Theory

Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

Hill, Terry R.↗

Powering OSCAR

Recycling waste has been an issue on Earth for decades. The OSCAR project seeks to find ways to make sure that it does not become an issue in space. The main focus of OSCAR is the combustion of waste and reclamation of gaseous products in microgravity. The first phase of testing relies on a ground rig that operates both under normal (Earth) gravity and in drop tower tests that briefly simulate a microgravity environment. In the second phase, a test will be performed during a suborbital flight were the experiment will be carried out in microgravity. Throughout the spring term, interns have played an integral part in continuing the progress made by the project. They performed work in upgrading the electrical and mechanical systems that make up OSCAR. They made multiple improvements to the test rig's operating software to improve readability and usability. They prepared and edited documents that were vital to the engineering process. And, they were responsible for performing lab tests and refining the lab operations document and procedure. The interns were a big help in maintaining the rigorous test schedule. OSCAR, which stands for Orbital Syngas Commodity Augmentation Reactor, is to find a way to turn astronaut waste into chemical energy. The two parts of this are important: finding a way to dispose of waste generated in space, and seeing if there is a way to recycle that waste into chemical energy. The importance of the disposal aspect is that there is currently no way to dispose of, or recycle, waste that is created in space other than jettisoning it (which is what the ISS does via empty supply capsules). As manned missions go deeper into space, that method will no longer be viable, as a craft would essentially be littering the space and planets that they visit. Energy reclamation is also important because of the high monetary and spatial costs of sending supplies on space missions. Every little bit extra that can be reused out of what is sent can save room and funds for other supplies. The facet of this problem that the OSCAR project is focusing on is how to combust waste in zero gravity. Combustion in the presence of gravity is one of those things that is taken for granted. When something burns on Earth, the flames rise above the fuel as oxygen flows from underneath. In microgravity, the flames surround the object completely, which restricts the amount of oxygen that can reach the fuel, and retards the combustion. OSCAR uses a vortex reaction chamber to counter this phenomenon. The OSCAR test rig will eventually be tested on a suborbital flight to see if it is an effective solution to the issue in real-world conditions. Currently, there is a prototype test rig that is fully functional. This rig has been previously tested in a 2 second drop test at Glenn Research Center’s (GRC) Zero Gravity Facility (ZGF). (The free-fall conditions of the drop mimic microgravity, if only for a brief period of time). This session’s focus was on upgrading the test rig and software, updating the paperwork, performing additional lab tests, and readying the rig for the five second drop test, again at GRC. II. Upgrades The state of the testing rig at the start of the session was in between its configurations for the two second drop tower and the five second drop tower. The rig needed upgrades to address various insufficiencies that either were discovered during the two second campaign or were a direct result of the differences between the two drop tower setups. The main differences that had to be handled were the increase in shock loads from 30g to 65g, a difference in drop indicating signal (on the falling edge of a pulse instead of a change from high to low), and the ambient pressure of the test apparatus (the two second tower dropped the rig in atmosphere, while the five second tower drops in vacuum).

Cauvel, Thomas↗

Bridging paradigms: Designing for HPC-Quantum convergence

Here, this paper presents a comprehensive software stack architecture for integrating quantum computing (QC) capabilities with High-Performance Computing (HPC) environments. While quantum computers show promise as specialized accelerators for scientific computing, their effective integration with classical HPC systems presents significant technical challenges. We propose a hardware-agnostic software framework that supports both current noisy intermediate-scale quantum devices and future fault-tolerant quantum computers, while maintaining compatibility with existing HPC workflows. The architecture includes a quantum gateway interface, standardized APIs for resource management, and robust scheduling mechanisms to handle both simultaneous and interleaved quantum–classical workloads. Key innovations include: (1) a unified resource management system that efficiently coordinates quantum and classical resources, (2) a flexible quantum programming interface that abstracts hardware-specific details, (3) A Quantum Platform Manager API that simplifies the integration of various quantum hardware systems, and (4) a comprehensive tool chain for quantum circuit optimization and execution. We demonstrate our architecture through implementation of quantum–classical algorithms, including the variational quantum linear solver, showcasing the framework’s ability to handle complex hybrid workflows while maximizing resource utilization. This work provides a foundational blueprint for integrating QC capabilities into existing HPC infrastructures, addressing critical challenges in resource management, job scheduling, and efficient data movement between classical and quantum resources.

97 MATHEMATICS AND COMPUTING↗

Illinois Express Quantum Network (IEQNET): metropolitan-scale experimental quantum networking over deployed optical fiber

The Illinois Express Quantum Network (IEQNET) is a program to realize metro-scale quantum networking over deployed optical fiber using currently available technology. IEQNET consists of multiple sites that are geographically dispersed in the Chicago metropolitan area. Each site has one or more quantum nodes (Qnodes) representing the communication parties in a quantum network. Q-nodes generate or measure quantum signals such as entangled photons and communicate the results via standard, classical, means. The entangled photons in IEQNET nodes are generated at multiple wavelengths, and are selectively distributed to the desired users via optical switches. Here we describe the network architecture of IEQNET, including the Internet-inspired layered hierarchy that leverages software-defined-networking (SDN) technology to perform traditional wavelength routing and assignment between the Q-nodes. Specifically, SDN decouples the control and data planes, with the control plane being entirely classical. Issues associated with synchronization, calibration, network monitoring, and scheduling will be discussed. An important goal of IEQNET is demonstrating the extent to which the control plane can coexist with the data plane using the same fiber lines. This goal is furthered by the use of tunable narrow-band optical filtering at the receivers and, at least in some cases, a wide wavelength separation between the quantum and classical channels. We envision IEQNET to aid in developing robust and practical quantum networks by demonstrating metro-scale quantum communication tasks such as entanglement distribution and quantum-state teleportation.

Chung, Joaquin↗

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗

The 30/20 GHz demonstration system SSUS-D/BSE

The systems consisting of a 30/20 GHz communication satellite featuring a multiple fixed beam and scanning beam antenna, SS-TDMA, onboard processing and high power TWT's and IMPATT amplifiers, a trunking space-diversity Earth station, a customer premise system (CPS) portable Earth station and a Master Control Station. Hardware, software and personnel are included to build and launch one satellite and to carry on a two year experimentation and demonstration period of advanced Ka-band systems concepts and technology. Included are first level plans identifying all tasks, a schedule for system development and an assessment of critical technology and risk and a preliminary experiments plan.

Source record↗

On Why It Is Impossible to Prove that the BDX90 Dispatcher Implements a Time-sharing System

The Software Implemented Fault Tolerance SIFT system, is written in PASCAL except for about a page of machine code. The SIFT system implements a small time sharing system in which PASCAL programs for separate application tasks are executed according to a schedule with real time constraints. The PASCAL language has no provision for handling the notion of an interrupt such as the B930 clock interrupt. The PASCAL language also lacks the notion of running a PASCAL subroutine for a given amount of time, suspending it, saving away the suspension, and later activating the suspension. Machine code was used to overcome these inadequacies of PASCAL. Code which handles clock interrupts and suspends processes is called a dispatcher. The time sharing/virtual machine idea is completely destroyed by the reconfiguration task. After termination of the reconfiguration task, the tasks run by the dispatcher have no relation to those run before reconfiguration. It is impossible to view the dispatcher as a time-sharing system implementing virtual BDX930s running concurrently when one process can wipe out the others.

Boyer, R. S.↗

International Ultraviolet Explorer Observatory operations

This volume contains the final report for the International Ultraviolet Explorer IUE Observatory Operations contract. The fundamental operational objective of the International Ultraviolet Explorer (IUE) program is to translate competitively selected observing programs into IUE observations, to reduce these observations into meaningful scientific data, and then to present these data to the Guest Observer in a form amenable to the pursuit of scientific research. The IUE Observatory is the key to this objective since it is the central control and support facility for all science operations functions within the IUE Project. In carrying out the operation of this facility, a number of complex functions were provided beginning with telescope scheduling and operation, proceeding to data processing, and ending with data distribution and scientific data analysis. In support of these critical-path functions, a number of other significant activities were also provided, including scientific instrument calibration, systems analysis, and software support. Routine activities have been summarized briefly whenever possible.

Source record↗

Designing a configuration control mechanism for a flight software validation facility

Embedded computer systems and supporting operating systems have recently enabled the automation of many time-critical flight functions. This automation requires the integration of computer hardware and software, aircraft hardware, and the flight application. To properly integrate and control these critical functions requires a real-time environment that is provided by the onboard flight computer, a real-time operating system, and a real-time flight application that supplies the input commands to the aircraft and responds to the resulting actions. The increased complexity of developing and testing such real-time applications can best be supported by a separate test facility that provides the processing visibility and control which is virtually impossible in the actual real-time operating environment. Such a flight software validation facility has been developed at the NASA Langley Research Center to support applications using the Shuttle real-time language HAL/S. The development and control of this facility are described. Some of the management techniques used were project schedules, status monitoring, code walk-throughs, configuration control, phased releases, validation suites, and modern programming techniques.

Smith-Taylor, R.↗

Automated Planning and Scheduling for Goal-Based Autonomous Spacecraft

Automated planning and scheduling technology - we'll call it automated planning systems, for the sake of brevity-is applicable to a wide spectrum of spaceflight missions, from those with limited onboard computational capabilities, such as Lunar Prospector, to those with highly sophisticated software, such as Cassini.

automated planning systems command mission operati↗