Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “river”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Online meeting technology for the Savannah River citizens advisory board - 15348

The objective of this report is to examine how board members of the Savannah River Site Citizens Advisory Board (SRS CAB) perceives the use of online meeting technology to achieve their mission and objective. The research focuses on the use of virtual committee meetings that are conducted by the Savannah River Site Citizen Advisory Board (SRS CAB) support team, in accordance with their charter to hold full-board meetings at least six times per year. Research for this report includes a literature review of technology used in meetings, and analysis of interviews and surveys conducted with board members who are served by the technology. By studying the level of current use and perceptions of online meetings with SRS CAB, the current and potential satisfaction of online technology usage of the board members can be ascertained. In addition, unearthing the negative perceptions of online meeting usage may allow the SRS CAB support team the opportunity to review those concerns and provide an opportunity to address those concerns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Edible oil and MicroCED{sup TM} treatability study for enhanced attenuation of cVOCs at P Area, Savannah River Site - 15364

The purpose of the study is to evaluate the capability of Micro-organism Chlorinated Ethene Destruction (MicroCED) to degrade chlorinated volatile organic compounds (cVOCs) in an existing groundwater plume at the Savannah River Site (SRS). MicroCED is similar to other commercially sold Dehalococcoides microbes (i.e., BAV-1 and KB-1) that are used to degrade cVOCs in support of groundwater cleanup actions. However, a primary difference is that this microbe is indigenous to the Twin Lakes area near C Area at the SRS. The Savannah River National Laboratory (SRNL) and Clemson University have been studying the capability and toxicology of the microbe for many years. To assess the potential of MicroCED in an environmental setting, a Treatability Study [5] was developed and submitted to South Carolina Department of Health and Environmental Control (SCDHEC). Approval was received and implementation of the study was conducted during the dates of September 14, 2010 and September 30, 2011. During September - October 2010, approximately 423,966 liters of amendments (pH buffer [AquaBupH{sup TM}] and emulsified oil [EOS{sup TM}) and chase water were injected into a cVOC groundwater plume at P Area at a depth of 26 - 30.5 m below land surface. The amendments were injected to raise the groundwater pH and to convert an oxygenated groundwater system to a reducing environment better suited for MicroCED. MicroCED was injected in January and August 2011; however, only 140 liters of the 6,246 liters needed were injected. The insufficient number of growth chambers and project schedule limited the ability to grow and maintain the required amount of MicroCED needed for the study. Groundwater monitoring of the injection wells and monitoring points were conducted monthly to evaluate and assess changes to the existing cVOC groundwater plumes. Field data collected from the injection wells demonstrated a reducing environment suitable for MicroCED growth. However, nearby monitoring points located within the injection field did not indicate a change in groundwater chemistry. Further analysis of the injected material showed that the actual radius of influence was less than assumed. This resulted in conditions favorable for MicroCED growth to be located near the injection wells versus over a larger area, as expected. Data collected indicates biodegradation of the cVOCs via the MicroCED is encouraging but inconclusive. This could be a result of the insufficient quantity of MicroCED injected and limited time frame of monitoring after MicroCED injections. However, considering that the data were collected within six (6) months of the first MicroCED injection it could also be plausible that microbial growth is limited and is not measurable based on the time frame and quantity of microbes that were injected. But, concentrations of TCE metabolic products have been observed to increase as the study progressed and were most evident after the first MicroCED injection. Due to timing of the second MicroCED injection in August 2011, there are no data available to evaluate subsequent effects of this injection on cVOC concentrations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of performance assessments and 3116 basis documents within the Savannah River Site liquid waste facilities - 15375

The end of the Cold War has left a legacy of over 136 million liters (36 million gallons) of radioactive waste in the aging waste tanks at the Department of Energy's Savannah River Site (SRS). A robust program is in place to remove waste from these tanks, treat the waste to separate it into a relatively small volume of high-level waste and a large volume of low-level waste, and to actively dispose of the low-level waste on-site. This process allows the US Department of Energy (DOE) to move forward with closure of the cleaned waste tanks and associated ancillary structures. To support performance-based, risk decision making for closure and disposal activities, three individual performance assessments (PAs) have been developed - salt-stone Disposal Facility, F-Tank Farm and H-Tank Farm. In addition, three Waste Determinations (WDs) have been made by the Secretary of Energy, in consultation with the Nuclear Regulatory Commission (NRC), under the authority of Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA Section 3116). To support these waste determination decisions, individual '3116 Basis Documents' were developed that describe the assumptions and conditions under which the criteria outlined in NDAA Section 3116 are met. The development of each of the PAs represented a long and arduous effort that involved the development of both deterministic and probabilistic conceptual models of the facilities, the development of assumptions and associated ranges, uncertainty and sensitivity analyses, model data collection and analyses, writing of the actual performance assessment, internal and external peer reviews, and ultimately approval by DOE. Similarly, the development of the 3116 Basis Documents represents similar time and financial commitments. At the end of these efforts, after years of preparation and millions of dollars in investment, we have thousands of pages of highly technical text, tables of data and hundreds of graphs and charts all contained in a series of thick binders that fit neatly on the shelf of a bookcase. We were done - right? Actually, we were just getting started. Performance Assessments and 3116 Basis Documents are living documents that shape day-to-day and long-term decision making in the operation of a low-level waste disposal facility (e.g., salt-stone Disposal Facility) or in area closure activities (e.g., F-Tank Farm or H-Tank Farm). Although these documents do not contain specifically described requirements per se, they do utilize specific assumptions that, if changed significantly, could result in no longer being able to demonstrate that there is reasonable assurance that the required performance objectives or the criteria from NDAA Section 3116 can be met. Savannah River Remediation LLC (SRR), the contractor responsible for Liquid Waste operations at SRS, has not only developed the PAs and 3116 Basis Documents to support this work and shepherded these documents through the DOE approval process, but has also developed the processes and procedures to ensure the successful implementation and integration of these documents into day-to-day decision making within the associated facilities. This paper describes these processes, including the Un-reviewed Waste Management Question process and the PA Maintenance process, and provides specific examples of their successful implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-service inspection of radioactive waste tanks at the Savannah River Site - 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks, will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leaning the tank closure process at the Savannah River Site - 15515

The Savannah River Site liquid waste system consists of multiple facilities that safely receive and store legacy radioactive waste prior to treatment and disposition. The liquid radioactive waste is stored in large underground tanks. The waste inventory currently stored in these tanks is a complex mixture of insoluble metal hydroxide solids and soluble salt supernate. The high-level (radioactive) portion of the waste is vitrified into a glass waste form, while the low-level waste is immobilized into a cementitious grout waste form called salt-stone. Once the waste is retrieved and processed, the tanks are closed. The closure process includes; waste removal, characterizing residuals, isolating the tank systems, and stabilizing the tank with tailored grout formulations. The core of Lean is to eliminate waste or non-value added steps from processes to maximize customer value. From the perspective of the customer, 'value' is defined as any action or process for which a customer would willingly pay. In this case our product is to safely and efficiently remove waste from the underground storage tanks and demonstrate operational closure to the State of South Carolina. Savannah River Remediation (SRR) initiated the use of the Lean process in late 2013 and identified the Tank Closure process as one of the targeted areas to improve. The first step in the Lean process is to 'map' out the value stream and identify areas where non-value added steps are present and then prioritize Rapid Improvement Events (RIE). Based on this mapping process, there were a number of areas that SRR determined warranted further evaluation for improvements, including; standard equipment design, characterization, standard work packages, regulatory documentation, tank characterization, structural evaluations, engineering documentation and equipment re-use. This paper focuses on the application of the Lean process at SRR and more specifically, effective application to the Tank Closure Process. This paper discusses the value stream mapping process for Tank Closures, as well as, summarizes the RIEs and demonstrate the realized benefits. Benefits can come in a variety of forms, from schedule compression to decreased costs. Through the Lean process we have been able to identify close to $10 M in savings over the life cycle of the tank closure process and a 4 year schedule compression. Cost and schedule savings are used to accomplish further risk reduction efforts. In addition to hard benefits, there are also soft benefits. These soft benefits are a result of the process itself and help drive improved efficiencies through better communication with key stakeholders, such as regulators and customers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Success of the River Corridor Closure Project - A Look at the Last 10 Years - 16105

Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office (DOE-RL) to manage the River Corridor Closure Project (RCCP), a 10-year contract in which WCH will clean up 572 km{sup 2} (220 mi{sup 2}) of contaminated land at the Hanford Site in Richland, Washington. Since 2005, WCH has safely and efficiently performed field remediation and building demolition activities along the Columbia River corridor. To date, 99% of the buildings have been demolished and field remediation is 88% complete. These numbers represent work on 323 buildings and 571 waste sites, respectively. From a safety perspective, WCH has experienced an outstanding safety record with a total of 230 first aid cases, 47 recordable only cases, 2 restricted work day cases, and 7 lost work day cases. WCH exceeded 6 million hours worked without a lost time injury on September 30, 2015, for the second time in the contract period. The project has worked a total of 23,217,840 hours. WCH has experienced extensive successes over the last 10 years. These successes include, but are not limited to, explosive demolition, technological applications, and creative land restoration techniques. Efficiencies in work planning, execution, and subcontracting will also be shared. The photographs showing how the landscape has changed are impressive, as is some of the video captured during explosive demolition of a reactor stack in the 100-N Area of the Hanford Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Speciation in Savannah River Site High-Level Waste: Determination and Implications for Waste Handling and Disposal - 16178

As part of a larger program to address mercury issues at the Savannah River Site, a number of samples from across the salt processing flowsheet have been collected and analyzed for several mercury species. The results indicate the presence of organomercury species, predominately methylmercury cation. This result was not expected, and it represents a significant paradigm shift in the understanding of mercury chemistry in high-level tank waste. Concentrations of total and soluble mercury have been measured as high as 0.5 g/L with methylmercury concentrations of at least fifty percent of that value. The distribution of mercury species being observed have ramifications to waste processing strategies. In particular, the mercury behavior across the cesium solvent extraction process has been examined. Leachates, from toxicity testing of the cementitious waste form used for decontaminated salt waste at Savannah River, have been tested and shows methylmercury as the dominant extractable species. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Integrated Hydrological Model for Simulation of Surface Runoff and Stream Flow in Tims Branch Watershed, Savannah River Site, South Carolina - 16203

This research is part of continued efforts to develop an integrated transport model to predict the distribution of tin within the overland flow in Tims Branch Watershed (TBW) at Savannah River Site (SRS), South Carolina. Tin was introduced into TBW during the application of an innovative mercury remediation technology implemented by the U.S. Department of Energy's Office of Environmental Management, which involved the injection of stannous (tin) chloride into mercury contaminated groundwater. Understanding the fate and transport of tin and its compounds is of primary importance due to their potential impact on the environment. In this study, we developed an overland hydrology model (MIKE SHE) capable of simulating surface hydrology throughout the TBW. The modeling application used historical precipitation, groundwater levels, geological data, and river discharges that were retrieved from government databases and input to the model. The model was developed to simulate spatio-temporal distribution of flow discharges, flow duration, and water levels in the TBW. The preliminary simulation results indicated that the model was capable of predicting flow depth and velocity within the study area during extreme climate events. The developed hydrology model will later on be coupled with transport model to simulate tin distribution within Tims Branch stream during seasonal storm events. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

H-Canyon Ventilation System Exhaust Tunnel Inspection at the Savannah River Site - 18052

The Department of Energy (DOE) H-Canyon Facility at the Savannah River Site (SRS) is operated by Savannah River Nuclear Solutions (SRNS). The Facility Structural Integrity Program (SIP) performs periodic visual inspections to confirm the component is capable of performing its safety function. This Program provides the process to document the conditions of safety related structural systems and components, their damage mechanisms, and recommend repairs if required before there is impact on the safety envelope. The H-Canyon Exhaust Tunnel is part of the H-Canyon Exhaust Ventilation System and is periodically inspected under the Structural Integrity Program. The Tunnel performs a Safety Class passive design feature function that is available 100% of the time. The Tunnel directs Canyon process air from the Canyon to the Sand Filter System. The radiological and chemical airborne activity coupled with the physical configuration of the tunnel precludes a manned entry into the tunnel. Tunnel inspections have been performed using cameras on a stick, referred to as pole cameras prior to CY2003. Since CY2003, five camera equipped crawlers have been used with varying levels of inspection success. With each successive crawler inspection, expectations have increased to perform tasks beyond visual examinations. The 2017 crawler performed the visual inspection but also included improvements on crawler performance, such as testing the use of wireless capability and remediation of crawler travel route, to the addition of stationary cameras and lighting at key locations. The latest 2017 crawler successfully traveled the entire length of the tunnel between the Canyon and Sand Filter System for the second time since development, thus providing key visual data for the integrity program [2]. In addition, several access ports were installed in 2017 following the removal of concrete core samples that allow for new visual inspection of the Canyon Crossover tunnel, thus providing information for an area that was generally inaccessible for monitoring. Planning for the 2019 crawler inspection is underway with the expectations to improve upon inspection cameras and also introduce mapping technologies such as LIDAR. The challenge to obtain meaningful data from the remote inspections of a 60+ year operating Canyon Exhaust tunnel continues to be a complex endeavor requiring close coordination of multiple organizations, adherence to Conduct of Operations, Radiological Safety, Worker Safety, etc. principles as well as alignment with Facility Safety Basis requirements. This paper discusses the continuing improvements in inspection techniques and the challenges associated these inspections. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Florida International University Research on Soil and Groundwater Contamination at DOE's Hanford and Savannah River Sites - 18547

Nuclear weapons production and other defense-related activities at U.S. Department of Energy (DOE) sites have resulted in radionuclide and heavy metal contamination in surface and subsurface environments nationwide. The DOE Office of Environmental Management (DOE EM) faces a number of environmental challenges that are technically complex and unique to EM with tremendous associated cleanup costs. The success of the DOE EM mission will require development and insertion of innovative approaches and novel technologies to address the significant challenges associated with the remaining cleanup of contaminated sites. A key focus of the applied research portfolio addresses data gaps related to the behavior and chemistry of radionuclides of concern as well as the co-mingling of these contaminants in groundwater at EM sites such as Hanford, Savannah River, Oak Ridge and others. Florida International University (FIU) is conducting research in conjunction with Pacific Northwest National Laboratory (PNNL) and savannah River National Laboratory (SRNL) scientists to support environmental remediation efforts at Hanford and SRS. This research is focused on remediation technologies for contaminated soil and groundwater as well as the assessment of the fate and transport of contaminants in the environment. The overall objective is to reduce contaminant mobility through the development and application of state-of-the-art scientific and environmental remediation technologies. The FIU strategy is to conduct basic science research that fills knowledge gaps and complements work conducted at DOE sites. Support to Hanford includes contributing to the understanding of {sup 99}Tc chemistry and the fate and transport mechanisms of co-mingled contaminants including {sup 99}Tc, U(VI), Cr, and iodine (I). FIU has also provided basic science research that supports a treatability study currently underway at Hanford, which uses ammonia gas injection to manipulate pH and immobilize U(VI) in the subsurface. In addition, support for long-term monitored natural attenuation is provided through geophysical research that monitors subsurface contaminant and microbial responses. Research to evaluate the environmental factors that control the fate and transport of contaminants and co-contaminants in soil and groundwater is being performed for SRS. This research has contributed to the development, design, and deployment of innovative strategies to enhance the natural attenuation processes and to validate novel in situ remediation technologies. The SRS EM test bed demonstrations directly benefit SRS cleanup initiatives. Current investigations focus on natural organic compounds, such as humate, as a potential amendment for the treatment of uranium in groundwater associated with the SRS F-Area Seepage Basins plume, investigates the synergy between humate and silica to optimize the pH adjustment strategy for uranium remediation and investigates the interaction of Tc and I with soil from the Four Mile Branch wetland. Collaborative relationships between FIU and the national laboratories have provided synergy and benefits over the years to FIU, the national laboratories, the DOE complex, and the DOE EM mission. By working closely with the national laboratories, FIU research is not only closely aligned with the cleanup mission priorities at the DOE sites, but complements and supports the work at national laboratories. This coordination and leveraging of research efforts results in time- and cost-savings, and accelerates progress in the DOE EM environmental restoration mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Decade of Innovative Approaches to Treating and Dispositioning Radioactive Waste at the Savannah River Site - 20620

This year marks the 70. anniversary of the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina. SRS is a key industrial complex responsible for environmental stewardship, environmental cleanup, waste management, and disposition of nuclear materials. SRS also continues to have a role in critical defense-related activities and the reprocessing of used reactor fuel. The SRS encompasses 803 square kilometers (310 square miles) in parts of Aiken, Barnwell, and Allendale counties. The Liquid Waste Mission starts with the safe receipt and storage of radioactive liquid waste in the waste tanks, which principally includes Cold War legacy waste, but also waste from support of National Aeronautics Space Administration missions, medical isotope production, and research activities. This 133,000 cubic meters (m{sup 3}) (35 million gallons [Mgal]) of high-level radioactive waste (HLW) is currently held in 43 large underground waste tanks. The capacity of each of these tanks range from 2,800 m{sup 3} to 5,000 m{sup 3} (0.75 to 1.33 Mgal) and were placed in operation between 1954 and 1986. In July 2009, the DOE awarded a stand-alone contract to execute the Liquid Waste Mission at SRS. The Liquid Waste Contractor selected was Savannah River Remediation LLC1 (SRR), which is responsible for receipt, storage, retrieval and treatment of all HLW, disposal of the decontaminated low-activity waste fraction, as well as operationally closing cleaned HLW tanks. Since July 2009, SRR has successfully grouted and operationally closed six large underground tanks, poured 1,476 canisters of vitrified HLW (a stable glass waste form), treated approximately 34,200 m{sup 3} (9.0 Mgal) of HLW, and dispositioned over 41,200 m{sup 3} (10.9 Mgal) of decontaminated salt solution as low-level waste (LLW) into the Saltstone Disposal Units (SDUs) being constructed by SRR on site. The innovative work performed by SRR in the LLW portion of its mission has earned it the Richard S. Hodes Award. The work conducted by SRR is the same work championed by the late Richard S. Hodes, a respected physician, statesmen, and Chairman of the Southeast Compact Commission for Low-Level Radioactive Waste Management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of H-Canyon Ventilation Exhaust Tunnel Inspection at the Savannah River Site - 20052

The Department of Energy (DOE) H-Canyon Facility at the Savannah River Site (SRS) is operated by Savannah River Nuclear Solutions (SRNS). The Facility Structural Integrity Program [1] provides a process to inspect, evaluate, and document the conditions of passive safety related structural systems and components, their degradation mechanisms and their impact on the safety envelope. The Structural Integrity Program performs periodic visual inspections to confirm the systems and components can perform their safety function and recommend corrective actions before the function is compromised. The H-Canyon Exhaust Tunnel is part of the H-Canyon Ventilation System and is periodically inspected under the Structural Integrity Program. The Tunnel performs a Safety Class passive design feature function that is available 100% of the time. The underground reinforced concrete Tunnel directs Canyon process air from the Canyon to the Sand Filter System. The radiological and chemical airborne activity coupled with the physical configuration of the tunnel precludes a manned entry into the tunnel to perform the inspection. Unlike active systems that can be subjected to physical testing to confirm capability, qualification calculations, including modeling, is performed to assess passive design feature capabilities relative to operational, accident and natural phenomena hazards events. Input for these calculations come from knowledge of field conditions, design drawings and conservative assumptions. The knowledge of field conditions comes from concrete and soil testing activities as well as inspection data. The use of cameras on crawlers to obtain inspection data and how that data is used in qualification calculations is the focus of this discussion. Remote Tunnel inspections have been performed using cameras on a stick, referred to as pole cameras, prior to Calendar Year 2003 (CY2003). Since CY2003, six camera equipped crawlers have been used. Crawlers have evolved and improved by incorporating lessons learned from the previous inspections. The latest 2019 crawler successfully traveled the entire length of the tunnel between the Canyon and Sand Filter System and captured images that were previously unseen, thus providing key visual data for the Structural Integrity Program report [2]. The inspection data serves as 1) input to qualification calculations, 2) validates current conditions remain bounded by qualification calculations, and 3) documents a record of change over time. This data is vital for the effective evaluation of the tunnel structure and aids with predicting the life cycle service life safety envelope to protect the public, environment, and facility worker. The goal of the 2019 deployment was to use a more robust vehicle to ensure travel over obstacles, perform the inspection with higher resolution cameras, and have the ability to elevate the cameras to view surfaces previously obscured by abandon-in-place ducts in the tunnel. The inspection information will serve to strengthen the input basis for qualification calculations, versus using excessive conservative calculation assumptions. This 2019 inspection was compared with previous crawler visual evidence to identify change over time to project remaining service life and confirm field conditions remain bounded by qualification calculations. The results of the 2019 Exhaust Tunnel inspection continue to improve and provide a firm basis to make sound engineering judgements regarding tunnel capability and approaches in projecting remaining service life with an aging system and component. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of UV-light and pH on the Fate of Tc, I, and U in Wetlands at Savannah River Site - 20230

The Savannah River Site (SRS) is one of the major nuclear facilities owned by the U.S Department of Energy. During the Cold War, these facilities produced large amounts of radioactive and hazardous waste. On site, three unlined seepage basins in the F-Area received approximately 1.8 billion gallons of low-level waste containing nitric acid, radionuclides, and dissolved metals due to plutonium and tritium production operations. The acidic nature of the waste created a source of relatively mobile radionuclides below the basins. Radionuclides previously disposed of within the F-Area, including uranium isotopes (U), technetium-99 (Tc-99), and iodine-129 (I-129), are moving with groundwater towards Four Mile Branch Wetland, where they are subsequently upwelling and interacting with natural organic matter (NOM). Many environmental factors including redox conditions, porewater composition, pH, light, and temperature affect the degradation of organic matter as well as interactions with Tc-99, U, and I-129. In particular, the high concentrations of nitrate from the acidic waste may increase the formation of reactive oxygen species (ROS) that impact both degradation of NOM and behavior of contaminants. In the presence of sunlight, I-129, Tc-99, and U speciation and complexation behavior may be affected by ROS and NOM degradation products in addition to the factors generally considered in subsurface systems in the absence of light. This research aims to determine whether the interactions between radionuclides, NOM, and nitrate affect the fate of I-129, Tc-99, and U and which processes are controlling their behavior. Experiments were conducted at variable pH in the presence of NaNO{sub 3} in order to determine the impact of light and pH on NOM degradation and to evaluate the impact on the fate of contaminants of concern. Soil samples high in NOM collected from two sites in the Southeastern United States (Savannah River Site and the Everglades) were studied. Batch experiments were conducted with NOM and the following aqueous contaminants, U, I-129, Tc-99 with exposure to ultraviolet (UV) light in an environmental chamber. This study was conducted in a sterile environment in order to exclude the potential for microbial degradation of organic matter. Results indicated photodegradation of NOM and significant interaction of radionuclides with NOM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aging of Concrete for the Evaluation of Repair Materials to Protect the Walls of the HCAEX Tunnel at Savannah River - 20301

H-Canyon, located in the Savannah River site, is a unique facility for chemical reprocessing of plutonium, highly-enriched uranium, and other radioactive materials. The exhaust gases of the H-Canyon are sent through the H-Canyon Exhaust (HCAEX) tunnel for contamination removal. Robotic inspections of the tunnel revealed significant degradation of the reinforced concrete structure that was associated with acid attack, and could compromise the structural stability of the tunnel. Thus, the identification and evaluation of potential repair materials that could be applied on the degraded walls to mitigate and prevent further degradation is of significant interest to the Department of Energy and the Savannah River representatives. This research effort has been divided into two phases: 1) Development and evaluation of aged concrete under accelerated aging conditions (which is the focus of this paper) and 2) Evaluation of potential repair materials applied on aged and non-aged concrete under simulated aggressive conditions. In order to develop and evaluate concrete samples exposed to accelerated aging conditions in simulated aggressive environments, a literature review of the HCAEX tunnel was conducted that included 1) characterization and extent of the concrete damage, 2) environmental conditions inside the tunnel and 3) primary deterioration mechanisms. In addition, potential coatings and/or repair materials for degraded concrete surfaces exposed to aggressive environments (primarily acidic) were selected from the literature review and the most common testing and measurements for evaluating acid attack phenomena, erosion, etc. were reviewed. From the literature review findings, a preliminary bench-scale test plan for the concrete aging was developed, including accelerated aging tests with aggressive conditions (acid fumes, humidity, etc.). Concrete samples were exposed to the aging accelerated conditions (e.g. immersion in acid solutions) and visual inspection, mass loss and pH change (acid solution) were recorded over time. Correlations between the visual inspection, mass loss and pH changes results and the aging time or the aging conditions were developed. Specimens submitted to the highest acid concentration showed the fastest and most intense degradation. The type of coarse aggregate (limestone) used for the concrete seemed to be the cause of the fastest aging observed, compared to the cement paste. The research findings created the foundation for the ongoing investigation, in which new concrete samples with a mix design similar to the HCAEX tunnel will be tested and will serve as the substrate for testing the selected coatings and /or repair materials. In this paper, the literature review and preliminary results from the aging tests are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site High Level Radioactive Waste Tank Sample Thermolytic Hydrogen Generation - 20346

To support the revision of flammability calculations and controls for the Savannah River Site (SRS) High-Level Radioactive Waste (HLW) tanks, Savannah River National Laboratory (SRNL) conducted laboratory measurements with the goal of quantifying hydrogen produced in HLW by non-radiolytic chemical reactions (i.e., thermolysis). Testing was performed with HLW tank supernate samples that represented a cross section of types of waste at SRS, including tanks that store typical evaporator concentrate, dissolved salt-cake, dilute recycle stream from the Defense Waste Processing Facility (DWPF), evaporator concentrate of the recycle stream from DWPF, fresh waste from the canyon separations facility, and waste that has been through salt processing cesium removal. Non-radioactive simulant testing included the classes of organic compounds historically introduced into the HLW tanks that were recently shown to be the most active toward the thermolytic generation of hydrogen. The reaction rate equations developed for thermolytic hydrogen generation from each class of organic compound showed direct proportionality to organic compound concentration and hydroxide concentration. Simulant testing identified that highly concentrated waste with high hydroxide concentration had the highest rates of thermolytic hydrogen generation. Using the radioactive tank sample thermolysis measurements at high temperatures and the mechanistic salt dependence of the simulant models, a global model was developed for tank waste thermolytic hydrogen generation as a function of total organic carbon content of SRS HLW. Through the primary functionality of the global model (organic carbon and free hydroxide concentration), the relative reactivity of the organic carbon in the waste was quantified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River nuclear solutions criticality safety training and qualification program and professional development/retention - 14507

Many years ago, at the Savannah River Site, the need for technically competent and qualified criticality safety (CS) staff was identified. Over the intervening years an extensive training and qualification (T and Q) program was developed. In 2008 Savannah River Nuclear Solutions (SRNS), the current site M and O contractor, inherited the T and Q program developed by the prior site contractors. Since then SRNS has initiated changes to the T and Q program to better fit the current regulatory environment, ensuring compliance with ANSI/ANS-8.26 [1], and implementing the idea of continuous improvement. Currently, a significant fraction of the SRNS CS staff either will be or are eligible for retirement. Therefore, SRNS is pursuing recent Nuclear Engineering college graduates and/or experienced criticality engineers. The challenges associated with hiring and maintaining criticality staff include, but are not limited to, increased workforce mobility and increased competition for fewer criticality resources. For example, the recent trend in company benefits is to eliminate longer term benefits such as pensions to make the benefits more transportable in terms of 401 Ks and Health Savings Accounts. In addition, there have been reductions in DOE funding for professional development through participation in ANS committees or attendance at Criticality related conferences. SRNS has investigated a number of possibilities on how to retain CS staff, but in the current environment has not identified any 'golden eggs'. Regardless, SRNS is exploring additional paths to incentivize the engineers to stay long term. SRNS is working to improve/maintain its workforce by creating a CS engineer pipeline. SRNS provides a training budget for new engineers and offers a formalized and mentored training program. For experienced criticality engineers, the SRNS T and Q program is flexible enough to allow 'credit' for previous accomplishments at other sites. SRNS is also striving to be proactive in supporting professional development by identifying specific monies in the planning phases of the annual budget requests. The current posture of SRNS is to maintain 'open' requisitions for both experienced staff looking for other opportunities, and for recent college graduates. As opportunities arise, either from within or without, SRNS evaluates the potential candidates and advances offers of employment. Until the longer term need is met SRNS intends to hire at least two staff members per year. Those staff members then enter the T and Q program and when appropriate, based on their experience and/or training accomplishments, begin assisting the current staff with program/facility CS support. (authors)

42 ENGINEERING↗

Snowmelt controls on concentration-discharge relationships and the balance of oxidative and acid-base weathering fluxes in an alpine catchment, East River, Colorado: ACID-BASE VERSUS OXIDATIVE WEATHERING FLUXES

Although important for riverine solute and nutrient fluxes, the connections between biogeochemical processes and subsurface hydrology remain poorly characterized. We investigate these couplings in the East River, CO, a high-elevation shale-dominated catchment in the Rocky Mountains, using concentration-discharge (C-Q) relationships for major cations, anions, and organic carbon. Dissolved organic carbon (DOC) displays a positive C-Q relationship with clockwise hysteresis, indicating mobilization and depletion of DOC in the upper soil horizons and emphasizing the importance of shallow flowpaths during snowmelt. Cation and anion concentrations demonstrate that carbonate weathering, which dominates solute fluxes, is promoted by both sulfuric acid derived from pyrite oxidation in the shale bedrock and carbonic acid derived from subsurface respiration. Sulfuric acid weathering dominates during baseflow conditions when waters infiltrate below the inferred pyrite oxidation front, whereas carbonic acid weathering plays a dominant role during snowmelt as a result of shallow flowpaths. Differential C-Q relationships between solutes suggest that infiltrating waters approach calcite saturation before reaching the pyrite oxidation front, after which sulfuric acid reduces carbonate alkalinity. This reduction in alkalinity results in CO 2 outgassing when waters equilibrate to surface conditions, and reduces the riverine export of carbon and alkalinity by roughly 33% annually. In conclusion, future changes in snowmelt dynamics that control the balance of carbonic and sulfuric acid weathering may substantially alter carbon cycling in the East River. Ultimately, we demonstrate that differential C-Q relationships between major solutes can provide unique insights into the complex subsurface flow and biogeochemical dynamics that operate at catchment scales.

54 ENVIRONMENTAL SCIENCES↗