Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Tethered Space Satellite-1 (TSS-1): Technical Roundabouts

In the early 1990's US and Italian scientists collaborated to study the electrodynamics of dragging a satellite on a tether through the electrically charged portion of Earth's atmosphere called the ionosphere. An electrical current induced in the long wire could be used for power and thrust generation for a satellite. Other tether uses include momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization for satellites. Before the Tethered Space Satellite (TSS-1), no long tether had ever been flown, so many questions existed on how it would actually behave. The TSS consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. With the Space Shuttle at an altitude of 160 nautical miles above earth, the satellite was to be deployed by raising it from the Shuttle bay on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism was to slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. Pre-flight testing system level tests involved setting up a tether receiver to catch the 12.5 mile tether onto another reel as it was being unwound by the deployer reel mechanism. Testing only the reel mechanism is straightforward. This test becomes more complicated when the TSS is mounted on the flight pallet at Kennedy Space Center (KSC). The system level tests must be passed before the pallet can be installed into the Space Shuttle cargo bay. A few months before flight, the TSS payload had been integrated onto the Spacelab pallet and system level tests, including unreeling and reeling the tether, had been successfully completed. Some of this testing equipment was then shipped back to the contractor Martin Marietta. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. The coupled loads analysis, as it is called, incorporates any updates to the model due to system level tests, and any changes that were found during integration. The coupled loads analysis revealed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail during operation. Hardware certification rules do not allow for hardware to fly with negative margins, so this issue had to be resolved before the flight. Since there is conservatism in engineering analysis, there is an option to "waive" the margin requirement, and fly the experiment as is. On the other hand, a structural failure of one payload could have serious or catastrophic consequences to other payloads and possibly the mission. Minor design changes or fixes might be feasible within the payload bay prior to launch. Any major design changes that required the spooling test to validate the hardware, or for the pallet to be removed, would cause TSS not to be ready for the Shuttle launch.

O'Connor, Brian↗

Lunar campsite concept: Space transfer concepts and analysis for exploration missions

The lunar Campsite concept responds to a perceived need to identify early manned science and exploration missions that require minimal initial funding. The Campsite concept defers the build-up of many infrastructure components without escalating total program costs. The lunar Campsite has been sized nominally for four crew for 42 days (1 lunar night and 2 lunar days), but can be modified to span two lunar nights up to 60 days. Total mission fulfillment requires five Earth-to-LEO launches, four (100 mt class launch vehicle) for the two vehicle assemblies and one (PLS or NSTS) for the crew. The lunar Campsite mission mode is tandem direct using a booster stage and a lander stage. The booster is separated from the lander after the TLI burn and is expended into the Earth's atmosphere. In the Campsite mode, the lander lands on the surface not to be returned. In the crew delivery mode, the lander is guided to a precision landing about 500 m from the Campsite, and with enough propellant to return the crew to Earth. The Campsite consists of a habitat and airlock, body mounted radiators with a surface shield, sun tracking solar arrays, and an Earth-tracking high-gain antenna. The CV is very similar to the campsite delivery vehicle. The CV does not, however, have radiators or solar arrays. The vehicle stacks are essentially common in that they utilize the same structure system and engines, the same propellant tanks, the same 'cut-out' in which the CRV and payloads are incorporated, and the same RCS locations. The booster and lander stage propellant tank propellant capacities are identical and have margins which would allow additional fueling for propulsive capture of the boost stage into Earth orbit. This contractual study was performed to identify Campsite and vehicle interfaces and vehicle requirements, and to surface issues related to the integration of the Campsite and LTV's.

Source record↗

Iris Deep-Space Transponder for SLS EM-1 CubeSat Missions

Several key design upgrades have been recently made to the Iris Deep-Space Transponder baselined to be used on secondary payload missions of the upcoming Space Launch System Exploration Mission One (SLS EM-1). The Iris Transponder is a reconfigurable software-defined radio (SDR) designed for missions requiring interoperability with NASA's Deep Space Network (DSN) on X-band frequencies (7.2 GHz uplink, 8.4 GHz downlink). The transponder provides radiometric tracking support with the DSN to provide navigational products for precise orbit determination while performing standard uplink and downlink communications in a CubeSat/SmallSat-applicable package size. The recent hardware changes include a volume reduction of 30% from previous models, with the main transponder unit weighing less than 1.0 kg, while maintaining total ionizing dose (TID) radiation tolerance of >23 krads (Si) for deep-space missions. Lab tests indicate maximum downlink rates of up to 6.25 Msps can be supported by the transponder in conventional BPSK modulation, but most SLS EM-1 CubeSat missions are link-performance limited to less than 256 kbps. A prototype unit of the flight production units has been assembled and various performance and characterization tests are underway. This talk discusses the key design aspects and specifications of the Iris Transponder and presents preliminary results from early testing of the assembled transponder.

Kobayashi, M. Michael↗

Physics of Colloids in Space: Flight Hardware Operations on ISS

The Physics of Colloids in Space (PCS) experiment was launched on Space Shuttle STS-100 in April 2001 and integrated into EXpedite the PRocess of Experiments to Space Station Rack 2 on the International Space Station (ISS). This microgravity fluid physics investigation is being conducted in the ISS U.S. Lab 'Destiny' Module over a period of approximately thirteen months during the ISS assembly period from flight 6A through flight 9A. PCS is gathering data on the basic physical properties of simple colloidal suspensions by studying the structures that form. A colloid is a micron or submicron particle, be it solid, liquid, or gas. A colloidal suspension consists of these fine particles suspended in another medium. Common colloidal suspensions include paints, milk, salad dressings, cosmetics, and aerosols. Though these products are routinely produced and used, we still have much to learn about their behavior as well as the underlying properties of colloids in general. The long-term goal of the PCS investigation is to learn how to steer the growth of colloidal structures to create new materials. This experiment is the first part of a two-stage investigation conceived by Professor David Weitz of Harvard University (the Principal Investigator) along with Professor Peter Pusey of the University of Edinburgh (the Co-Investigator). This paper describes the flight hardware, experiment operations, and initial science findings of the first fluid physics payload to be conducted on ISS: The Physics of Colloids in Space.

Doherty, Michael P.↗

Tethered Space Satellite-1 (TSS-1): Wound About a Bolt

In the early 1990's US and Italian scientists collaborated to study the electrodynamics on a long tether between two satellites as it moved through the electrically charged portion of Earth's atmosphere called the ionosphere. Potential uses for the electrical current induced in the long wire include power and thrust generation for a satellite, momentum exchange, artificial gravity, deployment of sensors or antennas, and gravity-gradient stabilization. The Tethered Space Satellite (TSS) was a first-of-its-kind experiment with long tethers in space. It consisted of a satellite with science experiments attached to a 12.5 mile long, very thin (0.10 inch diameter) copper wire assembly wound around a spool in the deployer reel mechanism. The whole mechanism sits on a pallet that is installed into the Shuttle bay. At an altitude of 160 nautical miles above earth, the satellite would be deplodeployed from the Shuttle bay by raising it on a boom facing away from Earth. Once cleared of the bay, the deployer mechanism would slowly feed out the 12-plus miles of tether. Scientific data would be collected throughout the operation, after which the satellite would be reeled back in. A receiver spool to catch the 12.5 mile tether as it was being unwound by the deployer reel mechanism was set up to do the system-level test of deployer real mechanism prior to installing the loaded pallet into the Shuttle bay. The system level tests were required before the pallet could be installed into the Space Shuttle cargo bay. A few months before flight, the system level tests, including unreeling and reeling the tether, were completed at Kennedy Space Center (KSC) and the TSS payload was installed onto the Spacelab pallet. Some of this testing equipment was then shipped back to the contractor, Martin Marietta. Integration with the Shuttle began. Systems-level load analyses, which cannot be run until all information about each payload is finalized, was run in parallel with the physical integration of the hardware into the Shuttle payload bay. An analysis, called Coupled loads analysis, incorporates any updates to the model due to system level tests of all the different payloads, and any changes that were found during integration. Engineering analysis examines the worst case scenarios for the loads the hardware will see. The two times during the mission where the dynamic loads are the worst were 1) the first 10-second portion of Shuttle lift off, and 2) a 2-second time during landing when the landing gears hit the ground. The coupled loads analysis using the final verification loads showed that a single bolt attaching the deployer reel mechanism to the support structure had a "negative margin" - which is an indication that it might fail - during touch down. Hardware certification rules do not allow for hardware to fly with negative margins. A structural failure of one payload could have serious or catastrophic consequences to other payloads, or may significantly damage the Orbiter. The issue had to be resolved before the flight.

O'Connor, Brian↗

Development of a High Performance, Low Profile Translation Table with Wire Feedthrough for a Deep Space CubeSat

NEAScout, a 6U cubesat and secondary payload on NASA's EM-1, will use an 85 sq m solar sail to travel to a near-earth asteroid at about 1 Astronomical Unit (about 1.5 x 10(exp 8) km) for observation and reconnaissance1. A combination of reaction wheels, reaction control system, and a slow rotisserie roll about the solar sail's normal axis were expected to handle attitude control and adjust for imperfections in the deployed sail during the 2.5-year mission. As the design for NEAScout matured, one of the critical design parameters, the offset in the center of mass and center of pressure (CP/CM offset), proved to be sub-optimal. After significant mission and control analysis, the CP/CM offset was accommodated by the addition of a new subsystem to NEAScout. This system, called the Active Mass Translator (AMT), would reside near the geometric center of NEAScout and adjust the CM by moving one portion of the flight system relative to the other. The AMT was given limited design space - 17 mm of the vehicle's assembly height-and was required to generate +/-8 cm by +/-2 cm translation to sub-millimeter accuracy. Furthermore, the design must accommodate a large wire bundle of small gage, single strand wire and coax cables fed through the center of the mechanism. The bend radius, bend resistance, and the exposure to deep space environment complicates the AMT design and operation and necessitated a unique design to mitigate risks of wire bundle damage, binding, and cold-welding during operation. This paper will outline the design constraints for the AMT, discuss the methods and reasoning for design, and identify the lessons learned through the designing, breadboarding and testing for the low-profile translation stages with wire feedthrough capability.

Few, Alex↗

Development of a High-Performance, Low-Profile Translation Table with Wire Feedthrough for a Deep Space CubeSat

NEAScout, a 6U cubesat and secondary payload on NASA's EM-1, will use an 85 sq m solar sail to travel to a near-earth asteroid at about 1 Astronomical Unit (about 1.5 x 10(exp 8) km) for observation and reconnaissance1. A combination of reaction wheels, reaction control system, and a slow rotisserie roll about the solar sail's normal axis were expected to handle attitude control and adjust for imperfections in the deployed sail during the 2.5-year mission. As the design for NEAScout matured, one of the critical design parameters, the offset in the center of mass and center of pressure (CP/CM offset), proved to be sub-optimal. After significant mission and control analysis, the CP/CM offset was accommodated by the addition of a new subsystem to NEAScout. This system, called the Active Mass Translator (AMT), would reside near the geometric center of NEAScout and adjust the CM by moving one portion of the flight system relative to the other. The AMT was given limited design space - 17 mm of the vehicle's assembly height-and was required to generate +/-8 cm by +/-2 cm translation to sub-millimeter accuracy. Furthermore, the design must accommodate a large wire bundle of small gage, single strand wire and coax cables fed through the center of the mechanism. The bend radius, bend resistance, and the exposure to deep space environment complicates the AMT design and operation and necessitated a unique design to mitigate risks of wire bundle damage, binding, and cold-welding during operation. This paper will outline the design constraints for the AMT, discuss the methods and reasoning for design, and identify the lessons learned through the designing, breadboarding and testing for the low-profile translation stages with wire feedthrough capability.

Few, Alex↗

Autonomous Space Shuttle

The continued assembly and operation of the International Space Station (ISS) is the cornerstone within NASA's overall Strategic P an. As indicated in NASA's Integrated Space Transportation Plan (ISTP), the International Space Station requires Shuttle to fly through at least the middle of the next decade to complete assembly of the Station, provide crew transport, and to provide heavy lift up and down mass capability. The ISTP reflects a tight coupling among the Station, Shuttle, and OSP programs to support our Nation's space goal . While the Shuttle is a critical component of this ISTP, there is a new emphasis for the need to achieve greater efficiency and safety in transporting crews to and from the Space Station. This need is being addressed through the Orbital Space Plane (OSP) Program. However, the OSP is being designed to "complement" the Shuttle as the primary means for crew transfer, and will not replace all the Shuttle's capabilities. The unique heavy lift capabilities of the Space Shuttle is essential for both ISS, as well as other potential missions extending beyond low Earth orbit. One concept under discussion to better fulfill this role of a heavy lift carrier, is the transformation of the Shuttle to an "un-piloted" autonomous system. This concept would eliminate the loss of crew risk, while providing a substantial increase in payload to orbit capability. Using the guidelines reflected in the NASA ISTP, the autonomous Shuttle a simplified concept of operations can be described as; "a re-supply of cargo to the ISS through the use of an un-piloted Shuttle vehicle from launch through landing". Although this is the primary mission profile, the other major consideration in developing an autonomous Shuttle is maintaining a crew transportation capability to ISS as an assured human access to space capability.

Siders, Jeffrey A.↗

Small Payload Launch Integrated Testing Services (SPLITS) - SPSDL

My experience working on the Small Payload Launch Integrated Testing Services project has been both educational and rewarding. I have been given the opportunity to work on and experiment with a number of exciting projects and initiatives, each offering different challenges and opportunities for teamwork and collaboration. One of my assignments is to aid in the design and construction of a small-scale two stage rocket as part of a Rocket University initiative. My duties include programming a microcontroller to control the various sensors on the rocket as well as process and transmit data. Additionally, I am writing a graphical user interface application for the ground station that will receive the transmitted data from the rocket and display the information on screen along with a 3D rendering displaying the rocket orientation. Another project I am working on is to design and develop the avionics that will be used to control a high altitude balloon flight that will test a sensor called a Micro Dosimeter that will measure the total ionizing dose absorbed by electrical components during a flight. This includes assembling and soldering the various sensors and components, programming a microcontroller to input and process data from the Micro Dosimeter, and transmitting the data down to a ground station as well as save the data to an on-board SD card. Additionally, I am aiding in the setup and development of ITOS (Integrated Test and Operations System) capability in the SPSDL (Spaceport Processing System Development Lab).

Intern↗

Does the International Space Station Leak DNA? Preliminary Results from the ISS External Microorganisms Payload

Existing crewed spacecraft like the ISS (International Space Station) leak by design. The ISS routinely releases gas to maintain life support systems and when astronauts exit the station to perform space walks. The chemical component of this leakage is well characterized, but the biological components are not. The ISS is not subject to planetary protection requirements, but planned missions to Mars will use similar systems and will be subject to planetary protection requirements. If detectable microorganisms are escaping through vents and or airlocks we may need to redesign our crewed habitats to minimize this type of contamination. To test the hypothesis that microorganisms from inside ISS are detectable on exterior surfaces an astronaut used the ISS External Microorganisms sampling kit (Rucker et al. 2018) to sample exterior surfaces of the ISS during an EVA (Extra Vehicular Activity) in January of 2025. These samples were returned to Earth for DNA extraction and sequencing. We successfully, extracted and sequenced bacterial, fungal and viral DNA from these samples that was not present in the negative controls. These results should help NASA refine the planetary protection requirements for crewed missions. Methods: The samples were collected using sterile, DNA free, buccal swabs (23 mm. diameter) housed in custom canisters. Each canister uses a 0.2 μm Teflon filter to maintain sterility as the caddy, holding 8 swabs moves in and out of vacuum. The astronaut sampled the: 1) airlock vestibule, 2) airlock thermal cover, 3) a gap in the micrometeorite shielding near the airlock, 4) a handrail near the airlock, 5) the Carbon Dioxide Removal Assembly vent, and 6) the Vacuum Exhaust System vent. The seventh swab was exposed to vacuum during the EVA without touching it to a surface. The eighth swab, a negative control, was not opened until the caddy returned to Earth. DNA was extracted from the swabs using a QIamp UCP Pathogen kit and prepared for sequencing on an Aviti (Element Biosciences) sequencer (Arslan et al. 2024). The resulting sequences were analyzed using the EDGE Bioinformatics platform (Li et al. 2017). The sequences were analyzed individually using tools like BLAST, GOTTCHA2, Kraken2, and PanGIA. The data were also assembled into metagenome assembled genomes) using tools like CONCOCT, MaxBin2 and MetaBAT2. Results: We successfully extracted and sequenced bacterial, archaeal, fungal and viral DNA from all seven samples. The handrail swab had the lowest number of reads (768,651) and the airlock thermal cover had the highest number of reads (8,819,230). These samples contain DNA from human associated bacteria (e.g. Crynebacterium riegelii ), fungi (.e.g. Penicillium rubens ), and viruses (e.g Alphapapillomavirus ). Conclusion: Preliminary interpretation suggest that the airlock and the space suits themselves are the largest sources of contaminant DNA. Most if not all of the DNA is from organisms known to be present inside the ISS. Vents attached to life support systems may be a lesser source of biological contamination. Further analysis should help NASA address planetary protection knowledge gaps for crewed missions.

Aaron B Regberg↗

Process Engineering Technology Center Initiative

NASA's Kennedy Space Center (KSC) is developing as a world-class Spaceport Technology Center (STC). From a process engineering (PE) perspective, the facilities used for flight hardware processing at KSC are NASA's premier factories. The products of these factories are safe, successful shuttle and expendable vehicle launches carrying state-of-the-art payloads. PE is devoted to process design, process management, and process improvement, rather than product design. PE also emphasizes the relationships of workers with systems and processes. Thus, it is difficult to speak of having a laboratory for PE at KSC because the entire facility is practically a laboratory when observed from a macro level perspective. However, it becomes necessary, at times, to show and display how KSC has benefited from PE and how KSC has contributed to the development of PE; hence, it has been proposed that a Process Engineering Technology Center (PETC) be developed to offer a place with a centralized focus on PE projects, and a place where KSC's PE capabilities can be showcased, and a venue where new Process Engineering technologies can be investigated and tested. Graphics for showcasing PE capabilities have been designed, and two initial test beds for PE technology research have been identified. Specifically, one test bed will look into the use of wearable computers with head mounted displays to deliver work instructions; the other test bed will look into developing simulation models that can be assembled into one to create a hierarchical model.

Centeno, Martha A.↗

Process Engineering Technology Center Initiative

NASA's Kennedy Space Center (KSC) is developing as a world-class Spaceport Technology Center (STC). From a process engineering (PE) perspective, the facilities used for flight hardware processing at KSC are NASA's premier factories. The products of these factories are safe, successful shuttle and expendable vehicle launches carrying state-of-the-art payloads. PE is devoted to process design, process management, and process improvement, rather than product design. PE also emphasizes the relationships of workers with systems and processes. Thus, it is difficult to speak of having a laboratory for PE at K.S.C. because the entire facility is practically a laboratory when observed from a macro level perspective. However, it becomes necessary, at times, to show and display how K.S.C. has benefited from PE and how K.S.C. has contributed to the development of PE; hence, it has been proposed that a Process Engineering Technology Center (PETC) be developed to offer a place with a centralized focus on PE projects, and a place where K.S.C.'s PE capabilities can be showcased, and a venue where new Process Engineering technologies can be investigated and tested. Graphics for showcasing PE capabilities have been designed, and two initial test beds for PE technology research have been identified. Specifically, one test bed will look into the use of wearable computers with head mounted displays to deliver work instructions; the other test bed will look into developing simulation models that can be assembled into one to create a hierarchical model.

Centeno, Martha A.↗

An Alternative Approach to Human Servicing of Crewed Earth Orbiting Spacecraft

As crewed spacecraft have grown larger and more complex, they have come to rely on spacewalks, or Extravehicular Activities (EVA), for assembly and to assure mission success. Typically, these spacecraft maintain all of the hardware and trained personnel needed to perform an EVA on-board at all times. Maintaining this capability requires up-mass, volume for storage of EVA hardware, crew time for ground and on-orbit training, and on-orbit maintenance of EVA hardware. This paper proposes an alternative methodology, utilizing either launch-on-need hardware and crew or regularly scheduled missions to provide EVA capability for space stations in low Earth orbit after assembly complete. Much the same way that one would call a repairman to fix something at their home these EVAs are dedicated to maintenance and upgrades of the orbiting station. For crew safety contingencies it is assumed the station would be designed such the crew could either solve those issues from inside the spacecraft or use the docked Earth to Orbit vehicles as a return lifeboat, in the same manner as the International Space Station (ISS) which does not rely on EVA for crew safety related contingencies. This approach would reduce ground training requirements for long duration crews, save Intravehicular Activity (IVA) crew time in the form of EVA hardware maintenance and on-orbit training, and lead to more efficient EVAs because they would be performed by specialists with detailed knowledge and training stemming from their direct involvement in the development of the EVA. The on-orbit crew would then be available to focus on the immediate response to any failures such as IVA systems reconfiguration or jumper installation as well as the day-to-day operations of the spacecraft and payloads. This paper will look at how current unplanned EVAs are conducted on ISS, including the time required for preparation, and offer an alternative for future spacecraft. As this methodology relies on the on-time and on-need launch of spacecraft, any space station that utilized this approach would need a robust transportation system, possibly including more than one launch vehicle capable of carrying crew. In addition, the fault tolerance of the future space station would be an important consideration in how much time was available for EVA preparation after the failure. Ideally the fault tolerance of the station would allow for the maintenance tasks to be grouped such that they could be handled by regularly scheduled maintenance visits and not contingency launches. Each future program would have to weigh the risk of on-time launch against the increase in available crew time for the main objective of the spacecraft. This is only one of several ideas that could be used to reduce or eliminate a station's reliance on rapid turnaround EVAs using on-board crew. Others could include having shirt-sleeve access to critical systems or utilizing low pressure temporarily pressurized equipment bays.

Mularski, John R.↗

IAF 15 Draft Paper

With the International Space Station Program transition from assembly to utilization, focus has been placed on the optimization of essential resources. This includes resources both resupplied from the ground and also resources produced by the ISS. In an effort to improve the use of two of these, the ISS Engineering teams, led by the ISS Program Systems Engineering and Integration Office, undertook an effort to modify the techniques use to perform several key on-orbit events. The primary purposes of this endeavor was to make the ISS more efficient in the use of the Russian-supplied fuel for the propulsive attitude control system and also to minimize the impacts to available ISS power due to the positioning of the ISS solar arrays. Because the ISS solar arrays are sensitive to several factors that are present when propulsive attitude control is used, they must be operated in a manner to protect them from damage. This results in periods of time where the arrays must be positioned, rather than autonomously tracking the sun, resulting in negative impacts to power generated by the solar arrays and consumed by both the ISS core systems and payload customers. A reduction in the number and extent of the events each year that require the ISS to use propulsive attitude control simultaneously accomplishes both these goals. Each instance where the ISS solar arrays normal sun tracking mode must be interrupted represent a need for some level of powerdown of equipment. As the magnitude of payload power requirements increases, and the efficiency of the ISS solar arrays decreases, these powerdowns caused by array positioning, will likely become more significant and could begin to negatively impact the payload operations. Through efforts such as this, the total number of events each year that require positioning of the arrays to unfavorable positions for power generation, in order to protect them against other constraints, are reduced. Optimization of propulsive events and transitioning some of them to non-propulsive CMG control significantly reduces propellant usage on the ISS leading to the reduction of the propellant delivery requirement. This results in move available upmass that can be used for delivering critical dry cargo, additional water, air, crew supplies and science experiments.

Menkin, Evgeny↗

Growth as an Alternative Approach to the Construction of Extra-Terrestrial Habitats

A critical component of human space exploration and eventual settlement is the ability to construct habitats while minimizing payload mass launched from Earth. To respond to this challenge, we have proposed the use of fungal bio-composites for ‘growing’ extra-terrestrial structures, directly at the destination, significantly lowering the mass of structural materials transported from Earth and minimizing the need for high mass robotic operations and infrastructure preparations. Throughout human history, the construction of habits has used biologically produced materials, from bone and skins to wood and limestone. Traditionally, the materials are used only after they die. Currently, the idea of working with living biological organisms, and the phenomenon of growth itself, is increasing in interest both, in architecture and space applications. Here we describe the use of mycelium-based composites as an alternative, biological approach for constructing regenerative and adaptive extraterrestrial habitats, a continuation of our research program initiated under the auspices of the ‘Myco-architecture Off Planet’ NASA NIAC Team. These composites, which are fire-resistant, insulating, do not consist of volatile organic compounds from petrochemical products and can be used independently or in conjunction with regolith, could employ the living biological growth in a controlled environment, for the process of material fabrication, assembly, maintenance, and repair, providing structures resilient to extra-terrestrial hazards. The paper will outline the potential and challenges of using bio-composites for space applications and will present how these might be addressed, in order to make this biological approach feasible, providing new, growing materials for design habitats on long-duration missions.

Monika Brandić Lipińska↗

Options for Offloading a 90-Ton Common Habitat from its Lander on the Surface of Mars

The Common Habitat is a large, long-duration habitat being explored as part of a conceptual study (not an active NASA program) that uses an SLS core stage liquid oxygen (LOX) tank as its primary structure. Measuring 8.4 meters in diameter and 15.6 meters in length, it is manufactured as a habitat and launched as such into space. It is intended for use on the Moon as part of a permanently occupied outpost, on Mars as part of an outpost that will be occupied for hundreds of days at a time, and in deep space as part of the Deep Space Exploration Vehicle where it will support crewed missions up to 1200 days in duration. A study of internal orientation and crew size resulted in a Common Habitat configuration sized for a crew of eight with a three-deck horizontal orientation. There are obvious challenges associated with the delivery of such a large habitat, which may mass as much as 90-tons when initially deployed. The Mars destination in particular imposes extreme challenges due to Martian gravity. This paper identifies initial options for the offloading of a 90-ton Common Habitat from a lander spacecraft on the surface of Mars. On Mars, the Common Habitat is part of a surface outpost where a Habitation Zone includes the Common Habitat docked to a two-chamber airlock node, up to two logistics modules, and up to two pressurized rovers. It is connected by underground conduit to a radiator farm and communications tower assembly. These elements and other surface infrastructure, including robotic systems for surface preparation, are landed prior to the Common Habitat. In the baseline Common Habitat Architecture, the Common Habitat is delivered on the third heavy cargo flight. The Habitation Zone configuration dictates that the Common Habitat needs to be offloaded from the lander. All of the docked elements require direct access to the surface and the Common Habitat must actually be placed in a trench to lower its docking ports to be level with those of the mated elements. Additionally, the habitat must be emplaced in a horizontal configuration, while for any conceivable Earth launch system it must be launched in a vertical configuration. It is true that the Common Habitat must be offloaded from its lander on both the Moon and Mars and a common offloading system must therefore work in both destinations. Mars, however, is considered the driving case for offloading in most, but not all, aspects. A four-day internal study in 2021 recommended that a modified Starship be used to land the Common Habitat on Mars and considered multiple approaches to offload the Common Habitat from the payload section and lower it to the surface. The topic was presented at a public hackathon organized by the Johnson Space Center’s Emerge Employee Resource Group. One team took on the challenge and proposed a concept in some ways similar to the previously considered jib crane. Despite the excellent innovation in the team’s work, a number of study refinements are necessary to truly establish feasibility. These and other future work needed to mature the concept are discussed in this work.

Lander Offloading↗

The Origins Space Telescope Integration and Testing

This paper describes the plans, flows, key facilities, test beds, pathfinders, simulators and ground support equipment that could be used to fully integrate, functionally test and qualify the Origins Space Telescope (Origins). The Origins Observatory consists of the Spacecraft Bus Module (SBM) and the Cryogenic Payload Module (CPM), which comprises the telescope and three science instruments. The telescope is a Three Mirror Anastigmat (TMA) and is composed of four mirrors: three with optical power (the elliptical primary, hyperbolic secondary, and elliptical tertiary mirrors) and a flat field-steering mirror (FSM). The three science instruments spanning the wavelength range 2.8 to 588 μm provide the powerful new spectroscopic and imaging capabilities required to achieve the scientific objectives. The Origins Survey Spectrometer (OSS) uses six gratings in parallel to take multi-beam spectra simultaneously across the 25 to 588 μm window through long slits enabling deep 3D extra-galactic surveys. The Far-IR Imager/Polarimeter (FIP) provides imaging and polarimetric measurement capabilities at 50 and 250 μm. Its fast mapping enables rapid follow-up of transient or variable sources and efficient monitoring campaigns. The Mid-Infrared Spectrometer (MISC-T) provides spectroscopy simultaneously over 2.8 to 20 μm with exquisite stability and precision (<5 ppm between 2.8 to 10 μm, <20 ppm between 11 to 20 μm). All the instruments are delivered for Integration and Test fully qualified and calibrated. The Integration and Test program implemented at each level of assembly is discussed as well as the separation of thermal vacuum testing between the hot and cold zones of the Observatory. Portions of this manuscript appear in the Origins Study Final Report.

Origins↗

Implementation of a Hybrid Edge Node-Centroid Node Approach for the Generation of Reduced Thermal Models

Reduced thermal models are often required for delivery to organizations that manage models at the highest levels of assembly. The effort to generate/verify these models against their detailed counterparts is a challenge not yet conclusively solved. Higher level organizations often place a limit on the node count for delivered models, assuming smaller models result in faster computation. The burden of producing and verifying the accuracy of reduced models is primarily on the lower-level organizations, which consumes resources to produce these models. Limiting the number of allowable nodes may prevent users from taking full advantage of software capabilities that allow for faster generation of models, such as finite elements, which require more nodes than centroid based models. A methodology using Thermal Desktop was described in 2010 using: (1) finite elements and edge nodes for the conduction matrix, (2) centroid nodes for capacitance and radiative computations, and (3) the super network feature to produce a conduction matrix based only on the centroid nodes. While the methodology was clear, the implementation would have had to be done manually; with the inclusion of the OpenTD Application Programming Interface, this methodology can now be implemented programmatically and be a viable approach for the generation of reduced models. The approach was implemented at NASA-Goddard for the Capture-Containment-and-Return-System (CCRS) payload, resulting in the TCYEE tool. CCRS requires delivery with node limitations through the European Space Agency to its contractors. TCYEE generated the reduced model for delivery and the predictions compared favorably to the detailed model. Furthermore, TCYEE is being explored for potential use on the Roman Space Telescope (RST) for the generation of reduced models for delivery to the launch provider, which also has node limit requirements. This paper describes the methodology, implementation, and the performance of reduced models compared to their detailed counterparts.

Computer Programming and Software↗