Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational processes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Reliability and Maintainability Engineering - A Major Driver for Safety and Affordability

The United States National Aeronautics and Space Administration (NASA) is in the midst of an effort to design and build a safe and affordable heavy lift vehicle to go to the moon and beyond. To achieve that, NASA is seeking more innovative and efficient approaches to reduce cost while maintaining an acceptable level of safety and mission success. One area that has the potential to contribute significantly to achieving NASA safety and affordability goals is Reliability and Maintainability (R&M) engineering. Inadequate reliability or failure of critical safety items may directly jeopardize the safety of the user(s) and result in a loss of life. Inadequate reliability of equipment may directly jeopardize mission success. Systems designed to be more reliable (fewer failures) and maintainable (fewer resources needed) can lower the total life cycle cost. The Department of Defense (DOD) and industry experience has shown that optimized and adequate levels of R&M are critical for achieving a high level of safety and mission success, and low sustainment cost. Also, lessons learned from the Space Shuttle program clearly demonstrated the importance of R&M engineering in designing and operating safe and affordable launch systems. The Challenger and Columbia accidents are examples of the severe impact of design unreliability and process induced failures on system safety and mission success. These accidents demonstrated the criticality of reliability engineering in understanding component failure mechanisms and integrated system failures across the system elements interfaces. Experience from the shuttle program also shows that insufficient Reliability, Maintainability, and Supportability (RMS) engineering analyses upfront in the design phase can significantly increase the sustainment cost and, thereby, the total life cycle cost. Emphasis on RMS during the design phase is critical for identifying the design features and characteristics needed for time efficient processing, improved operational availability, and optimized maintenance and logistic support infrastructure. This paper discusses the role of R&M in a program acquisition phase and the potential impact of R&M on safety, mission success, operational availability, and affordability. This includes discussion of the R&M elements that need to be addressed and the R&M analyses that need to be performed in order to support a safe and affordable system design. The paper also provides some lessons learned from the Space Shuttle program on the impact of R&M on safety and affordability.

Safie, Fayssal M.↗

Reengineering Deep Space Network Operations

Eight additional antennas are being added to NASA's Deep Space Network (DSN) at the same time that the budget is being decreased. Therefore, the DSN is reengineering its processes to operate more efficiently.

reengineering↗

Operational Intelligence in the ATLAS Continuous Integration System

Describes the role of the ATLAS Continuous Integration (CI) System in the ATLAS offline software development infrastructure • Outlines the CI system components and processes • Details Operational Intelligence techniques to accelerate CI jobs and lower operating costs • Explains the Directed Acyclic Graph (DAG) approach in CI pipelines • Reports achieved improvements

97 MATHEMATICS AND COMPUTING↗

Grand challenges in the digitalisation of wind energy

The availability of large amounts of data is starting to impact how the wind energy community works. From turbine design to plant layout, construction, commissioning, and maintenance and operations, new processes and business models are springing up. This is the process of digitalisation, and it promises improved efficiency and greater insight, ultimately leading to increased energy capture and significant savings for wind plant operators, thus reducing the levelised cost of energy. Digitalisation is also impacting research, where it is both easing and speeding up collaboration, as well as making research results more accessible. This is the basis for innovations that can be taken up by end users. But digitalisation faces barriers. This paper uses a literature survey and the results from an expert elicitation to identify three common industry-wide barriers to the digitalisation of wind energy. Comparison with other networked industries and past and ongoing initiatives to foster digitalisation show that these barriers can only be overcome by wide-reaching strategic efforts, and so we see these as “grand challenges” in the digitalisation of wind energy. They are, first, creating FAIR data frameworks; secondly, connecting people and data to foster innovation; and finally, enabling collaboration and competition between organisations. The grand challenges in the digitalisation of wind energy thus include a mix of technical, cultural, and business aspects that will need collaboration between businesses, academia, and government to solve. Working to mitigate them is the beginning of a dynamic process that will position wind energy as an essential part of a global clean energy future.

17 WIND ENERGY↗

Performance of the Landsat-Data Collection System in a Total System Context

The author has identified the following significant results. This experiment was, and continues to be, an integration of the LANDSAT-DCS with the data collection and processing system of the Geological Survey. Although an experimental demonstration, it was a successful integration of a satellite relay system that is capable of continental data collection, and an existing governmental nationwide operational data processing and distributing networks. The Survey's data processing system uses a large general purpose computer with insufficient redundancy for 24-hour a day, 7 day a week operation. This is significant, but soluble obstacle to converting the experimental integration of the system to an operational integration.

Paulson, R. W.↗

Lepton flavor violation by three units

The conservation of lepton flavor is a prediction of the Standard Model and is still an excellent approximate symmetry despite our observation of neutrino oscillations. Lepton flavor violation by one or two units has been discussed for decades, with several dedicated experiments exploring the vast model landscape but no discoveries so far. Here, we explore operators and processes that violate at least one lepton flavor by three units and identify testable signatures. In the Standard Model effective field theory, such operators already arise at mass dimension 7 and can be tested through their contributions to Michel parameters in leptonic decays. True neutrinoless charged-lepton flavor violation arises at mass dimension 10 and can realistically only be seen in the tau decay channels 𝜏 → $𝑒⁢𝑒⁢𝑒⁢\bar{𝜇}⁢\bar{𝜇}$ or 𝜏 → $𝜇⁢𝜇⁢𝜇\bar{𝑒}\bar{𝑒}$, for example in Belle II. Testable rates for these tau decays require light new particles and subsequently predict an avalanche of remarkably clean but so-far unconstrained collider signatures.

Feynman diagrams↗

Erosion, Transportation, and Deposition on Outer Solar System Satellites: Landform Evolution Modeling Studies

Mass movement and landform degradation reduces topographic relief by moving surface materials to a lower gravitational potential. In addition to the obvious role of gravity, abrasive mechanical erosion plays a role, often in combination with the lowering of cohesion, which allows disaggregation of the relief-forming material. The identification of specific landform types associated with mass movement and landform degradation provides information about local sediment particle size and abundance and transportation processes. Generally, mass movements can be classified in terms of the particle sizes of the transported material and the speed the material moved during transport. Most degradation on outer planet satellites appears consistent with sliding or slumping, impact erosion, and regolith evolution. Some satellites, such as Callisto and perhaps Hyperion and Iapetus, have an appearance that implies that some additional process is at work, most likely sublimation-driven landform modification and mass wasting. A variant on this process is thermally driven frost segregation as seen on all three icy Galilean satellites and perhaps elsewhere. Titan is unique among outer planet satellites in that Aeolian and fluvial processes also operate to erode, transport, and deposit material. We will evaluate the sequence and extent of various landform-modifying erosional and volatile redistribution processes that have shaped these icy satellites using a 3-D model that simulates the following surface and subsurface processes: 1) sublimation and re-condensation of volatiles; 2) development of refractory lag deposits; 3) disaggregation and downward sloughing of surficial material; 4) radiative heating/cooling of the surface (including reflection, emission, and shadowing by other surface elements); 5) thermal diffusion; and 6) vapor diffusion. The model will provide explicit simulations of landform development and thusly predicts the topographic and volatile evolution of the surface and final landscape form as constrained by DEMs. We have also simulated fluvial and lacustrine modification of icy satellites landscapes to evaluate the degree to which fluvial erosion of representative initial landscapes can replicate the present Titan landscape.

erosion↗

Discrete Photodetection and Susskind-Glogower Phase Operators

State reduction processes in different types of photodetection experiments are described by using different kinds of ladder operators. A special model of discrete photodetection is developed by the use of superoperators which are based on the Susskind-Glogower raising and lower operators. The possibility to realize experimentally the discrete photodetection scheme in a micromaser is discussed.

Ben-Aryeh, Y.↗

High Input Voltage, Silicon Carbide Power Processing Unit Performance Demonstration

A silicon carbide brassboard power processing unit has been developed by the NASA Glenn Research Center in Cleveland, Ohio. The power processing unit operates from two sources: a nominal 300 Volt high voltage input bus and a nominal 28 Volt low voltage input bus. The design of the power processing unit includes four low voltage, low power auxiliary supplies, and two parallel 7.5 kilowatt (kW) discharge power supplies that are capable of providing up to 15 kilowatts of total power at 300 to 500 Volts (V) to the thruster. Additionally, the unit contains a housekeeping supply, high voltage input filter, low voltage input filter, and master control board, such that the complete brassboard unit is capable of operating a 12.5 kilowatt Hall effect thruster. The performance of the unit was characterized under both ambient and thermal vacuum test conditions, and the results demonstrate exceptional performance with full power efficiencies exceeding 97%. The unit was also tested with a 12.5kW Hall effect thruster to verify compatibility and output filter specifications. With space-qualified silicon carbide or similar high voltage, high efficiency power devices, this would provide a design solution to address the need for high power electric propulsion systems.

Power↗

High Input Voltage, Silicon Carbide Power Processing Unit Performance Demonstration

A silicon carbide brassboard power processing unit has been developed by the NASA Glenn Research Center in Cleveland, Ohio. The power processing unit operates from two sources - a nominal 300-Volt high voltage input bus and a nominal 28-Volt low voltage input bus. The design of the power processing unit includes four low voltage, low power supplies that provide power to the thruster auxiliary supplies, and two parallel 7.5 kilowatt power supplies that are capable of providing up to 15 kilowatts of total power at 300-Volts to 500-Volts to the thruster discharge supply. Additionally, the unit contains a housekeeping supply, high voltage input filter, low voltage input filter, and master control board, such that the complete brassboard unit is capable of operating a 12.5 kilowatt Hall Effect Thruster. The performance of unit was characterized under both ambient and thermal vacuum test conditions, and the results demonstrate the exceptional performance with full power efficiencies exceeding 97. With a space-qualified silicon carbide or similar high voltage, high efficiency power device, this design could evolve into a flight design for future missions that require high power electric propulsion systems.

Technology↗

Extraction and Capture of Water from Martian Regolith Experimental Proof-of-Concept

Mars Design Reference Architecture 5.0:Lists in-situ resource utilization (ISRU) as enabling for robust human Mars missionsLO2LCH4 ascent propulsion 25,000 kg oxygen from atmosphere for ascent and life support Atmospheric based ISRU processes less operationally complex than surface based limited concept evaluation to date and Mars surface water property and distribution uncertainty would not allow [Mars soil water processing] to be base lined at this time Limited Concept Evaluation to Date Lunar regolith O2 extraction processing experience Lunar regolith is fluidized and heated to high temperatures with H2 to produce H2O from iron-bearing minerals Mars similarity concept: Soil placed in fluidized bed reactor Heated to moderate temperatures Inert gas flow used to fluidize the bed and help with water desorption Challenges: High-temperature dusty seals Working gas requires downstream separation and recycling to reduce consumables loss Batch process heating thermally inefficient.

in situ resource utilization↗

Human Factors Operability Timeline Analysis to Improve the Processing Flow of the Orion Spacecraft

The Constellation Program (CxP) Orion vehicle goes through several areas and stages of processing before its launched at the Kennedy Space Center. In order to have efficient and effective processing, all of the activities need to be analyzed. This was accomplished by first developing a timeline of events that included each activity, and then each activity was analyzed by operability experts and human factors experts with spacecraft processing experience. This papers focus is to explain the results and the process for developing this human factors operability timeline analysis to improve the processing flow of Orion.

Schlierf, Roland↗

Launch and Landing Effects Ground Operations (LLEGO) Model

LLEGO is a model for understanding recurring launch and landing operations costs at Kennedy Space Center for human space flight. Launch and landing operations are often referred to as ground processing, or ground operations. Currently, this function is specific to the ground operations for the Space Shuttle Space Transportation System within the Space Shuttle Program. The Constellation system to follow the Space Shuttle consists of the crewed Orion spacecraft atop an Ares I launch vehicle and the uncrewed Ares V cargo launch vehicle. The Constellation flight and ground systems build upon many elements of the existing Shuttle flight and ground hardware, as well as upon existing organizations and processes. In turn, the LLEGO model builds upon past ground operations research, modeling, data, and experience in estimating for future programs. Rather than to simply provide estimates, the LLEGO model s main purpose is to improve expenses by relating complex relationships among functions (ground operations contractor, subcontractors, civil service technical, center management, operations, etc.) to tangible drivers. Drivers include flight system complexity and reliability, as well as operations and supply chain management processes and technology. Together these factors define the operability and potential improvements for any future system, from the most direct to the least direct expenses.

Source record↗

Closed-loop pressure retarded osmosis draw solutions and their regeneration processes: A review

Pressure-Retarded Osmosis (PRO) is an osmotic process that has been used to harvest energy from salinity gradients using a semi permeable membrane. A comparison between open-loop PRO (OLPRO) and closed-loop PRO (CLPRO) was made regarding their performance and costs. In CLPRO, where the diluted draw solution is re-concentrated in the regeneration system to be reutilized in the process, has recently received an intensive focus as the most viable configuration for a standalone power plant. The choice of the PRO draw solution in CLPRO is crucial to garner a high osmotic pressure as the key for the feasibility of the process. Here, in this review, the draw solutions are critically evaluated in the literature in terms of energy output as well as the method of regeneration used to recirculate them. A set of practical criteria has been suggested to appraise the adequacy of the solution for CLPRO application. It was concluded that NH 3 – CO 2 theoretically can produce 170 W/m 2 of power density. Inorganic draw solutes such as NaCl can generate high power density up to 87 W/m 2 . Organic draw solutes with their remarkably low reverse salt flux (RSF) have promising potential for future application in PRO. Similarly, the regeneration systems of the diluted draw solutions have also been reviewed and discussed. How the energy consumption of the regeneration process affects the feasibility of CLPRO is explained. For the specific case of osmotic heat engines (OHEs), when the energy of the regeneration process is supplied by heat waste, the range of applicability of the heat waste in CLPRO in terms of efficiency is defined and compared to Organic Rankine Cycle (ORC). The results showed that CLPRO has better efficiency than ORC for temperatures T < 80 °C, which makes it a promising process or low-grade heat energy recovery. In addition, a PRO-RO hybrid system coupled with solar power can reduce the net specific energy consumption (SEC) to 0.39 kWh/m 3 . The conditions that regeneration processes should operate under to make PRO viable are discussed in the last section. Overall, the study indicates the key factors for optimizing the performance of CLPRO process.

42 ENGINEERING↗

Remote sensing data processing - Two years ago, today, and two years from today

Certain technical problems arising in the recent past (1975) in the field of the processing of remote sensing data are reviewed including approaches to the analysis of Landsat MSS data and technical difficulties which must be overcome to achieve operational data processing. The current status of remote sensing data processing is then examined with emphasis on such current technical issues as training selection and labeling, sampling schemes and classification and mensuration. Hardware projections are made for the near future (1979) relative to the development of remote sensing data processing.

Holmes, Q. A.↗

Shuttle operations era planning for flight operations

The Space Transportation System (STS) provides routine access to space for a wide range of customers in which cargos vary from single payloads on dedicated flights to multiple payloads that share Shuttle resources. This paper describes the flight operations planning process from payload introduction through flight assignment to execution of the payload objectives and the changes that have been introduced to improve that process. Particular attention is given to the factors that influence the amount of preflight preparation necessary to satisfy customer requirements. The partnership between the STS operations team and the customer is described in terms of their functions and responsibilities in the development of a flight plan. A description of the Mission Control Center (MCC) and payload support capabilities completes the overview of Shuttle flight operations.

Holt, J. D.↗

The design, fabrication, and test of a new VLSI hybrid analog-digital neural processing element

A hybrid analog-digital neural processing element with the time-dependent behavior of biological neurons has been developed. The hybrid processing element is designed for VLSI implementation and offers the best attributes of both analog and digital computation. Custom VLSI layout reduces the layout area of the processing element, which in turn increases the expected network density. The hybrid processing element operates at the nanosecond time scale, which enables it to produce real-time solutions to complex spatiotemporal problems found in high-speed signal processing applications. VLSI prototype chips have been designed, fabricated, and tested with encouraging results. Systems utilizing the time-dependent behavior of the hybrid processing element have been simulated and are currently in the fabrication process. Future applications are also discussed.

Deyong, Mark R.↗

Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Lunar Surface Construction Activity at NASA Marshall Space Flight Center

Introduction: The goal of the Moon to Mars Planetary Autonomous Construction Technology (MMPACT) Project at NASA Marshall Space Flight Center (MSFC) is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure elements on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms, and blast shields using lunar regolith-based materials. MSFC has strong collaborations with industry, academia, and other NASA Centers to accomplish this goal. The MMPACT project consists of three elements. The first focuses on the development of an autonomous construction system. The second focuses on construction feedstock materials development. The third element focuses on the development of a microwave sintering construction capability. The team plans to demonstrate construction on a small Commercial Lunar Payload Services (CLPS) lander in the 2025 timeframe, with a future goal of constructing a subscale landing pad in 2028-2029.The MMPACT project is funded through the Lunar Surface Innovation Initiative, which is part of the Space Technology Mission Directorate. Technology Development: The MMPACT team will evaluate multiple autonomous construction and microwave construction technologies, materials, and construction element forms. Selected technologies will be matured; processes and operations will be defined for the two flight missions. Evaluations of materials, as well as the technology itself, will be demonstrated in simulated lunar environments as part of the technology maturation process. The team is keenly aware of the properties of the lunar environment. Its temperature swings, negligible exosphere, and unprepared site foundations factor into the materials for both construction and hardware, the concept of operations, and the technology’s interdependencies. Materials: The team is looking at materials that can be produced from in-situ resources in an effort to make lunar construction cost-effective. The particular focus of the materials team is cementitious materials, metals, and sintered and melted regolith. These materials will be studied for tensile, compressive, and flexural strength. They will also be tested for their ability to handle thermal swings and vacuum. They will be fully characterized using various microscopy techniques to examine micro-structures, chemistry, and crystal formation. Interdependencies: There are many interdependencies that MMPACT has already identified. These include: •Excavation interface •Regolith feedstock beneficiation •Regolith feedstock storage and provision •Requirements for structures •Site-to-site mobility systems •Availability of lunar simulant •Lander off-loading capabilities •Navigation systems •Power •Regolith composition and mineralogy •Lander specifications •Communication protocols Technology developments in these additional areas would be beneficial to MMPACT.

Moon to Mars Planetary Autonomous Construction Tec↗