Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “minimum”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Should Title 24 Ventilation Requirements Be Amended to include an Indoor Air Quality Procedure?

Minimum outdoor air ventilation rates (VRs) for buildings are specified in standards, including California?s Title 24 standards. The ASHRAE ventilation standard includes two options for mechanically-ventilated buildings ? a prescriptive ventilation rate procedure (VRP) that specifies minimum VRs that vary among occupancy classes, and a performance-based indoor air quality procedure (IAQP) that may result in lower VRs than the VRP, with associated energy savings, if IAQ meeting specified criteria can be demonstrated. The California Energy Commission has been considering the addition of an IAQP to the Title 24 standards. This paper, based on a review of prior data and new analyses of the IAQP, evaluates four future options for Title 24: no IAQP; adding an alternate VRP, adding an equivalent indoor air quality procedure (EIAQP), and adding an improved ASHRAE-like IAQP. Criteria were established for selecting among options, and feedback was obtained in a workshop of stakeholders. Based on this review, the addition of an alternate VRP is recommended. This procedure would allow lower minimum VRs if a specified set of actions were taken to maintain acceptable IAQ. An alternate VRP could also be a valuable supplement to ASHRAE?s ventilation standard.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Doppler Lidar Data Acquired During the Pentagon Shield Field Campaign

Observations from two coherent Doppler lidars deployed during the Pentagon Shield field campaign are analyzed in conjunction with other sensors to characterize the overall boundary-layer structure, and identify the dominant flow characteristics during the entire two-week field campaign. Convective boundary layer (CBL) heights and cloud base heights (CBH) are estimated from an analysis of the lidar signal-to-noise-ratio (SNR), and mean wind profiles are computed using a modified velocity-azimuth-display (VAD) algorithm. Three-dimensional wind field retrievals are computed from coordinated overlapping volume scans, and the results are analyzed by visualizing the flow in horizontal and vertical cross sections. The VAD winds show that southerly flows dominate during the two-week field campaign. Low-level jets (LLJ) were evident on all but two of the nights during the field campaign. The LLJs tended to form a couple hours after sunset and reach maximum strength between 03 and 07 UTC. The surface friction velocities show distinct local maxima during four nights when strong LLJs formed. Estimates of the convective boundary layer height and residual layer height are obtained through an analysis of the vertical gradient of the lidar signal-to-noise-ratio (SNR). Strong minimum in the SNR gradient often develops just above the surface after sunrise. This minimum is associated with the developing CBL, and increases rapidly during the early portion of the daytime period. On several days, this minimum continues to increase until about sunset. Secondary minima in the SNR gradient were also observed at higher altitudes, and are believed to be remnants of the CBL height from previous days, i.e. the residual layer height. The dual-Doppler analysis technique used in this study makes use of hourly averaged radial velocity data to produce three-dimensional grids of the horizontal velocity components, and the horizontal velocity variance. Visualization of horizontal and vertical cross sections of the dual-Doppler wind retrievals often indicated a jet-like flow feature over the Potomac River under southerly flow conditions. This linear flow feature is roughly aligned with the Potomac River corridor to the south of the confluence with the Anatostia River, and is most apparent at low levels (i.e. below ~150 m MSL). It is believed that this flow arises due to reduced drag over the water surface and when the large scale flow aligns with the Potomac River corridor. A so-called area-constrained VAD analysis generally confirmed the observations from the dual-Doppler analysis. When the large scale flow is southerly, wind speeds over the Potomac River are consistently larger than the at a site just to the west of the river for altitudes less than 100 m MSL. Above this level, the trend is somewhat less obvious. The data suggest that the depth of the wind speed maximum may be reduced by strong directional shear aloft.

54 ENVIRONMENTAL SCIENCES↗

Progress Report on Alloy 617 Time Dependent Allowables

Time dependent allowable stresses are required in the ASME Boiler and Pressure Vessel Code for design of components in the temperature range where time dependent deformation (i.e., creep) is expected to become significant. There are time dependent allowable stresses in Section IID of the Code for use in the non-nuclear construction codes, however, there are additional criteria that must be considered in developing time dependent allowables for nuclear components. These criteria are specified in Section III NH. St is defined as the lesser of three quantities: 100% of the average stress required to obtain a total (elastic, plastic, primary and secondary creep) strain of 1%; 67% of the minimum stress to cause rupture; and 80% of the minimum stress to cause the initiation of tertiary creep. The values are reported for a range of temperatures and for time increments up to 100,000 hours. These values are determined from uniaxial creep tests, which involve the elevated temperature application of a constant load which is relatively small, resulting in deformation over a long time period prior to rupture. The stress which is the minimum resulting from these criteria is the time dependent allowable stress St. In this report data from a large number of creep and creep-rupture tests on Alloy 617 are analyzed using the ASME Section III NH criteria. Data which are used in the analysis are from the ongoing DOE sponsored high temperature materials program, form Korea Atomic Energy Institute through the Generation IV VHTR Materials Program and historical data from previous HTR research and vendor data generated in developing the alloy. It is found that the tertiary creep criterion determines St at highest temperatures, while the stress to cause 1% total strain controls at low temperatures. The ASME Section III Working Group on Allowable Stress Criteria has recommended that the uncertainties associated with determining the onset of tertiary creep and the lack of significant cavitation associated with early tertiary creep strain suggest that the tertiary creep criteria is not appropriate for this material. If the tertiary creep criterion is dropped from consideration, the stress to rupture criteria determines St at all but the lowest temperatures.

36 MATERIALS SCIENCE↗

Ultra-High-Performance Concrete And Advanced Manufacturing Methods For Modular Construction

Small modular reactors (SMR) allow for less onsite construction, increase nuclear material security, and provide a flexible and cost-effective energy alternative. SMR can be factory-built as modular components, and shipped to desired locations for fast assembly. This project successfully developed a new class of ultra-high performance concrete (UHPC), which features a compressive strength greater than 22 ksi (150 MPa) without special treatment and self-consolidating characteristics desired for SMR modular construction. With an ultra-high strength and dense microstructure, it will facilitate rapid construction of steel plate-concrete (SC) beams and walls with thinner and lighter modules, and can withstand harsh environments and mechanical loads anticipated during the service life of nuclear power plants. In addition, the self-consolidating characteristics are crucial for the fast construction and assembly of SC modules with reduced labor costs and improved quality. Following the UHPC material development, the capacity of producing self-consolidating UHPC in mass quantities was investigated and compared to accepted self-consolidating concrete standards. With slightly adjusted mixing procedure using large-scale gravity-based mixers (compared with small-scale force-based mixer), the self-consolidating UHPC has been successfully processed at six cubic yards; the product met both minimum compressive strength requirements and self-consolidating concrete standards. Steel plate-UHPC beams (15 ft. long, 12 in. wide and 16 in. deep) and wall panels (40 in. X 40 in. X 3 in.) were then constructed using the self-consolidating UHPC without any external vibration. Quality control guidelines for producing UHPC in large scale were developed. When the concrete is replaced by UHPC in a steel plate concrete (SC) beam, it is critical to evaluate its structural behavior with both flexure and shear-governed failure modes. In recent years, SC has been widely used for buildings and nuclear containment structures to resist lateral forces induced by severe earthquakes and heavy winds. SC modules have good potential for SMR because of their cost-effectiveness and reduced construction time. However, the minimum shear reinforcement (i.e. cross tie) ratio needs to be determined for the steel plate-UHPC (S-UHPC) beams to exhibit a ductile failure mode. In this project, S-UHPC beams were designed and constructed. The beams were tested to evaluate structural capacity and identify the minimum cross ties ratios. In addition, as the bond between UHPC and steel plate is essential for ensuring structural integrity under shear and flexure, it was measured and examined in this project through digital image correlation system and smart piezoelectric aggregate sensors. Large-scale testing and finite element simulation were also performed on S-UHPC wall panels. New bond slip-based constitutive models of steel plate were developed for S-UHPC, which were used in finite element analysis program to predict S-UHPC behavior under shear. The results were well validated through experimental data. The long-term durability of UHPC were established in this project. UHPC specimens were tested under free shrinkage, restrained shrinkage, elevated temperature, water permeation, chloride diffusion, corrosion, and alkali silica reaction. UHPC has demonstrated significantly improved durability compared with control concrete specimens. This research led to a new generation of steel plate-UHPC modules for SMR that can provide large benefits to the electric power industry. Taking advantage of the high strength and durability of UHPC, their modularity and ease of assembly can address the high cost barriers of typical nuclear power plants.

42 ENGINEERING↗

Hydrothermal Liquefaction and Upgrading of Municipal Wastewater Treatment Plant Sludge: A Preliminary Techno-Economic Analysis

A preliminary process model and techno-economic analysis (TEA) was completed for fuel produced from hydrothermal liquefaction (HTL) of sludge waste from a municipal wastewater treatment plant (WWTP) and subsequent biocrude upgrading. The model is adapted from previous work by Jones et al. (2014) for algae HTL, using experimental data generated in fiscal year 2015 (FY15) bench-scale HTL testing of sludge waste streams. Testing was performed on sludge samples received from MetroVancouver’s Annacis Island WWTP (Vancouver, B.C.) as part of a collaborative project with the Water Environment and Reuse Foundation (WERF). The full set of sludge HTL testing data from this effort will be documented in a separate report to be issued by WERF. This analysis is based on limited testing data and therefore should be considered preliminary. Future refinements are necessary to improve the robustness of the model, including a cross-check of modeled biocrude components with the experimental GCMS data and investigation of equipment costs most appropriate at the smaller scales used here. Environmental sustainability metrics analysis is also needed to understand the broader impact of this technology pathway. The base case scenario for the analysis consists of 10 HTL plants, each processing 100 dry U.S. ton/day (92.4 ton/day on a dry, ash-free basis) of sludge waste and producing 234 barrel per stream day (BPSD) biocrude, feeding into a centralized biocrude upgrading facility that produces 2,020 barrel per standard day of final fuel. This scale was chosen based upon initial wastewater treatment plant data collected by the resource assessment team from the EPA’s Clean Watersheds Needs Survey database (EPA 2015a) and a rough estimate of what the potential sludge availability might be within a 100-mile radius. In addition, we received valuable feedback from the wastewater treatment industry as part of the WERF collaboration that helped form the basis for the selected HTL and upgrading plant scales and feedstock credit (current cost of disposal). It is assumed that the sludge is currently disposed of at $16.20/wet ton ($46/dry ton at 35% solids; $50/ton dry, ash-free basis) and this is included as a feedstock credit in the operating costs. The base case assumptions result in a minimum biocrude selling price of $3.8/gge and a minimum final upgraded fuel selling price of $4.9/gge. Several areas of process improvement and refinements to the analysis have the potential to significantly improve economics relative to the base case: • Optimization of HTL sludge feed solids content • Optimization of HTL biocrude yield • Optimization of HTL reactor liquid hourly space velocity (LHSV) • Optimization of fuel yield from hydrotreating • Combined large and small HTL scales specific to regions (e.g., metropolitan and suburban plants) Combined improvements believed to be achievable in these areas can potentially reduce the minimum selling price of biocrude and final upgraded fuel by about 50%. Further improvements may be possible through recovery of higher value components from the HTL aqueous phase, as being investigated under separate PNNL projects. Upgrading the biocrude at an existing petroleum refinery could also reduce the MFSP, although this option requires further testing to ensure compatibility and mitigate risks to a refinery. And finally, recycling the HTL aqueous phase product stream back to the headworks of the WWTP (with no catalytic hydrothermal gasification treatment) can significantly reduce cost. This option is uniquely appropriate for application at a water treatment facility but also requires further investigation to determine any technical and economic challenges related to the extra chemical oxygen demand (COD) associated with the recycled water.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrothermal Liquefaction and Upgrading of Municipal Wastewater Treatment Plant Sludge: A Preliminary Techno-Economic Analysis, Rev.1

A preliminary process model and techno-economic analysis (TEA) was completed for fuel produced from hydrothermal liquefaction (HTL) of sludge waste from a municipal wastewater treatment plant (WWTP) and subsequent biocrude upgrading. The model is adapted from previous work by Jones et al. (2014) for algae HTL, using experimental data generated in fiscal year 2015 (FY15) bench-scale HTL testing of sludge waste streams. Testing was performed on sludge samples received from Metro Vancouver’s Annacis Island WWTP (Vancouver, B.C.) as part of a collaborative project with the Water Environment and Reuse Foundation (WERF). The full set of sludge HTL testing data from this effort will be documented in a separate report to be issued by WERF. This analysis is based on limited testing data and therefore should be considered preliminary. In addition, the testing was conducted with the goal of successful operation, and therefore does not represent an optimized process. Future refinements are necessary to improve the robustness of the model, including a cross-check of modeled biocrude components with the experimental GCMS data and investigation of equipment costs most appropriate at the relatively small scales used here. Environmental sustainability metrics analysis is also needed to understand the broader impact of this technology pathway. The base case scenario for the analysis consists of 10 HTL plants, each processing 100 dry U.S. ton/day (92.4 ton/day on a dry, ash-free basis) of sludge waste and producing 234 barrel per stream day (BPSD) biocrude, feeding into a centralized biocrude upgrading facility that produces 2,020 barrel per standard day of final fuel. This scale was chosen based upon initial wastewater treatment plant data collected by PNNL’s resource assessment team from the EPA’s Clean Watersheds Needs Survey database (EPA 2015a) and a rough estimate of what the potential sludge availability might be within a 100-mile radius. In addition, we received valuable feedback from the wastewater treatment industry as part of the WERF collaboration that helped form the basis for the selected HTL and upgrading plant scales and feedstock credit (current cost of disposal). It is assumed that the sludge is currently disposed of at $16.20/wet ton ($46/dry ton at 35% solids; $50/ton dry, ash-free basis) and this is included as a feedstock credit in the operating costs. The base case assumptions result in a minimum biocrude selling price of $3.8/gge and a minimum final upgraded fuel selling price of $4.9/gge. Several areas of process improvement and refinements to the analysis have the potential to significantly improve economics relative to the base case: •Optimization of HTL sludge feed solids content •Optimization of HTL biocrude yield •Optimization of HTL reactor liquid hourly space velocity (LHSV) •Optimization of fuel yield from hydrotreating •Combined large and small HTL scales specific to regions (e.g., metropolitan and suburban plants) Combined improvements believed to be achievable in these areas can potentially reduce the minimum selling price of biocrude and final upgraded fuel by about 50%. Further improvements may be possible through recovery of higher value components from the HTL aqueous phase, as being investigated under separate PNNL projects. Upgrading the biocrude at an existing petroleum refinery could also reduce the MFSP, although this option requires further testing to ensure compatibility and mitigation of risks to a refinery. And finally, recycling the HTL aqueous phase product stream back to the headworks of the WWTP (with no catalytic hydrothermal gasification treatment) can significantly reduce cost. This option is uniquely appropriate for application at a water treatment facility but also requires further investigation to determine any technical and economic challenges related to the extra chemical oxygen demand (COD) associated with the recycled water.

09 BIOMASS FUELS↗

Bookending the Opportunity to Lower Wind’s LCOE by Reducing the Uncertainty Surrounding Annual Energy Production

Reducing the performance risk surrounding a wind project can potentially lead to a lower weighted-average cost of capital (WACC), and hence a lower levelized cost of energy (LCOE), through an advantageous shift in capital structure, and possibly also a reduction in the cost of capital. Specifically, a reduction in performance risk will move the 1-year P99 annual energy production (AEP) estimate closer to the P50 AEP estimate, which in turn reduces the minimum debt service coverage ratio (DSCR) required by lenders, thereby allowing the project to be financed with a greater proportion of low-cost debt. In addition, a reduction in performance risk might also reduce the cost of one or more of the three sources of capital that are commonly used to finance wind projects: sponsor or cash equity, tax equity, and/or debt. Preliminary internal LBNL analysis of the maximum possible LCOE reduction attainable from reducing the performance risk of a wind project found a potentially significant opportunity for LCOE reduction of ~$10/MWh, by reducing the P50 DSCR to its theoretical minimum value of 1.0 (Bolinger 2015b, 2014) and by reducing the cost of sponsor equity and debt by one-third to one-half each (Bolinger 2015a, 2015b). However, with FY17 funding from the U.S. Department of Energy’s Atmosphere to Electrons (A2e) Performance Risk, Uncertainty, and Finance (PRUF) initiative, LBNL has been revisiting this “bookending” exercise in more depth, and now believes that its earlier preliminary assessment of the LCOE reduction opportunity was overstated. This reassessment is based on two new-found understandings: (1) Due to ever-present and largely irreducible inter-annual variability (IAV) in the wind resource, the minimum required DSCR cannot possibly fall to 1.0 (on a P50 basis), and (2) A reduction in AEP uncertainty will not necessarily lead to a reduction in the cost of capital, meaning that a shift in capital structure is perhaps the best that can be expected (perhaps along with a modest decline in the cost of cash equity as new investors enter the market).

17 WIND ENERGY↗

Project 57 Air Monitoring Report: January 1 through December 31, 2017

On April 24, 1957, the Atomic Energy Commission (AEC) (now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley northeast of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DOD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a non-nuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DOD. Various radiological surveys were performed in the area and in 2007, the DOE expanded the demarked Contamination Area (CA) by posting signs 200 to 400 ft (60 to 120 m) outside of the original fence. Plutonium in soil attaches preferentially to smaller particles (Tamura, 1985; Friesen, 1992; Murarik et al., 1992; and Misra et al., 1993). Therefore, redistribution of soil particles by wind (dust) and water are the mechanisms most likely to transport plutonium beyond the boundary of the Project 57 CA. Monitoring was implemented in 2011 by Desert Research Institute (DRI) to determine if radionuclide contamination was detectable in samples of airborne dust and to characterize meteorological and environmental parameters that influence dust transport. Initially, two monitoring stations consisting of radiological, meteorological, and dust sampling equipment were installed near the southeast and northeast corners of the CA. In January 2015, the original monitoring stations were dismantled and moved farther to the west along the CA boundary. This move was made to place the monitoring stations downwind of ground zero and the High Contamination Area (HCA) during the dominant northerly and southerly winds. Samples of particles suspended in the air are collected every two weeks and submitted for laboratory assessments of gross alpha and gross beta radioactivity, and for determinations of gamma-emitting radionuclides. In calendar year (CY) 2017, the mean gross alpha concentration at monitoring station P57-4 was approximately 4.25 times the value at monitoring station P57-3. In CY2015 and CY2016, the difference in mean gross alpha concentration at the two stations was approximately 1.5. The mean gross alpha concentrations at P57-3 and P57-4 were approximately 1.9 and 7.9 times, respectively, the mean gross alpha concentrations at the surrounding Community Environmental Monitoring Program (CEMP) stations. The minimum gross alpha concentrations reported for the Project 57 stations are in the range of the minimum values observed at the CEMP stations. However, maximum gross alpha concentrations are greater than the maximum concentrations observed at the surrounding CEMP stations. Gamma spectroscopy analyses resulted in the detection of seven radionuclides. Except for americium-241 (Am-241), all reported radionuclides occur naturally in the environment. The Am-241 detection by gamma spectroscopy was confirmed by alpha spectroscopy. During each quarter of CY2017, four suspended particulate matter samples were selected for alpha spectroscopy analysis. Two were selected each quarter from the regular biweekly samples collected at each of the two monitoring stations. Of the eight samples from P57-3, one was reported to have plutonium-238 (Pu-238) above the minimum detectable activity (MDA) and five were reported to have plutonium 239/240 (Pu-239/240) above the MDA. Of the eight samples from P57-4, three were reported to have Pu-238 above the MDA and six were reported to have Pu-239/240 above the MDA. Soil material is also transported by saltation, which is a wind driven phenomena that bounces sand-sized soil particles across the land surface because they are too heavy to be suspended in the air. Samples of particles transported by saltation were collected downwind and upwind of the CA at both monitoring stations in May 2017 after a 190-day deployment and again in September 2017 after a 114-day deployment. Mass of the saltation samples was determined after oven drying. The September sample had greater mass than the May sample. The same relationship was observed for the suspended particulate matter samples during periods of saltation sample collection. The difference in the collected mass appears to be because of the amount of soil moisture. Higher soil moisture exerts additional isotopic bonds between soil particles and water molecules, and between water molecules that envelop soil particles, making it more difficult for wind to raise the particles as dust. In general, samples collected from saltation traps facing south contained more material than samples collected from traps facing north. This suggests that although saltation material may have been moving back and forth in conjunction with the two dominant wind directions, there was a net trend for saltation material to be transported toward the north. Radiological analyses of the saltation samples show that the smaller particle size faction (<63 μm) generally produced the highest activity levels of Am-241, Pu-238, and Pu-239/240. In general, the isotope activity levels decreased as the particle size increased. These results are consistent with the expectation that the greatest potential for transport of radiological contamination is with the smaller particles. Thermoluminescent dosimeters (TLDs) indicated that the average annual external radioactivity dose at the monitoring stations is slightly higher than the dose determined at the surrounding CEMP stations, but approximately half of the estimated national average dose received by the general public from exposure to natural sources. The TLDs at the Project 57 monitoring stations are exposed to both natural sources (terrestrial and cosmic) and radioactive releases from the Project 57 CA. Winds in excess of approximately 15 mph (24 km/hr) begin to generate dust movement by saltation or suspension, as determined by the monitoring instruments. Saltated particles, PM10 (i.e., inhalable dust), and PM2.5 (i.e., fine particulate dust) exhibit an approximately exponential increase with increasing wind speed. The greatest concentrations of dust occurred for winds exceeding 20 mph (32 km/hr). When the wind/dust analysis was performed for winds separated into the dominant northerly and southerly wind directions, it was evident that the northerly winds generated the higher PM10 concentrations and had the dominate influence on the PM10 concentration determined for all wind speeds when all wind directions were evaluated together. During the year, winds in excess of 20 mph (32 km/hr) occurred approximately one percent of the time. Although winds sufficient to generate dust occur at the Project 57 site, they are infrequent and of short duration. A preliminary assessment of individual wind events suggests that dust generation in response to specific wind conditions is highly variable. Wind speeds that would be expected to generate noticeable dust may not do so in every instance. Additionally, saltation transport in response to wind conditions was less common than expected. These variations were likely because of the influence of meteorological and environmental parameters other than wind.

54 ENVIRONMENTAL SCIENCES↗

FY 2017 Progress Report on the Argonne Sodium Draining and Refilling Experiments

The main incentive for utilization of compact diffusion-bonded sodium-to-CO 2 heat exchangers for a Sodium-Cooled Fast Reactor (SFR) with a supercritical carbon dioxide ( s CO 2 ) Brayton cycle power converter is the potential for reduction in heat exchanger size and cost relative to traditional shell-and-tube technology. There is an incentive for the designer to reduce the width of the sodium and CO 2 channels as much as possible to realize the greatest size and cost reductions. However, there are practical limits on minimum channel size due to fundamental phenomena particular to sodium and CO 2 . One is that the channel size must be large enough to enable the rapid draining of sodium from the heat exchanger sodium channels in the event that a sodium leak is detected in an intermediate sodium heat transport system loop, in order to rapidly drain the sodium into the loop sodium storage vessel/tank and thereby limit the sodium mass released that could potentially burn if exposed to air. Information about the minimum sodium channel size can only be obtained by actually draining sodium from representative wetted stainless steel sodium channels under prototypical conditions. It is not possible to obtain such information through modeling and simulation or through simulant experiments. The ANL Sodium Draining and Refilling experiment facility has been designed and is being assembled to obtain data on the draining of sodium from compact diffusion-bonded sodium-to-carbon dioxide heat exchanger sodium channels including the mass of sodium drained versus time, the mass of sodium retained inside of the channels, and the potential for sodium to bridge the channel, freeze, and form a plug inside the channel versus the channel size. This information is needed to determine the minimum sodium channel size required to meet the requirements for sodium draining without bridges being left inside of the channels. Initial shakedown testing has been initiated using water and glass and plastic tubes before transitioning to sodium and stainless steel test sections. For the latter, the test sections will be heated to high temperature to promote rapid sodium wetting of the stainless steel prior to draining. Testing with sodium will be initiated in FY 2018.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Metrics and Benchmarks for Quantum Processors: State of Play

A compelling narrative has taken hold as quantum computing explodes into the commercial sector: Quantum computing in 2018 is like classical computing in 1965. In 1965 Gordon Moore wrote his famous paper about integrated circuits, saying: "At present, [minimum cost] is reached when 50 components are used per circuit. But... the complexity for minimum component costs has increased at a rate of roughly a factor of two per year... by 1975, the number of components per integrated circuit for minimum cost will be 65,000." This narrative is both appealing (we want to believe that quantum computing will follow the incredibly successful path of classical computing!) and plausible (2018 saw IBM, Intel, and Google announce 50-qubit integrated chips). But it is also deeply misleading. Here is an alternative: Quantum computing in 2018 is like classical computing in 1938. In 1938, John Atanasoff and Clifford Berry built the very first electronic digital computer. It had no program, and was not Turing-complete. Vacuum tubes — the standard "bit" for 20 years — were still 5 years in the future. ENIAC and the achievement of "computational supremacy" (over hand calculation) wouldn't arrive for 8 years, despite the accelerative effect of WWII. Integrated circuits and the information age were more than 20 years away. Neither of these analogies is perfect. Quantum computing technology is more like 1938, while the level of funding and excitement suggest 1965 (or later!). But the point of the cautionary analogy to 1938 is simple: Quantum computing in 2018 is a research field. It is far too early to establish metrics or benchmarks for performance. The best role for neutral organizations like IEEE is to encourage and shape research into metrics and benchmarks, so as to be ready when they become necessary. This white paper presents the evidence and reasoning for this claim. We explain what it means to say that quantum computing is a "research field", and why metrics and benchmarks for quantum processors also constitute a research field. We discuss the potential for harmful consequences of prematurely establishing standards or frameworks. We conclude by suggesting specific actions that IEEE or similar organizations can take to accelerate the development of good metrics and benchmarks for quantum computing.

97 MATHEMATICS AND COMPUTING↗

Fluid Dynamics Effects on Microstructure Prediction in Single Laser Tracks for Additive Manufacturing

The Laser Powder Bed Fusion Additive Manufacturing (LPBFAM) is one of the most important processes for the production of lightweight, cost-effective, complex, and high-performance enduse parts. At present, the cost and time associated with LPBFAM process development is very high due to a lack of fundamental process understanding. In this project, a multi-physics model was developed on a highly parallel open-source code, Truchas, with the ultimate goal of providing experimentally validated process maps for tailoring microstructure to achieve desired performance for LPBFAM. As a critical step towards fully LPBFAM modeling, modeling of single-track laser fusion (STLF) were conducted. Multi-physics simulations were conducted using Truchas for STLF by considering heat transfer, phase-change, fluid dynamics, surface tension phenomena, and evaporation. In order to assess the effect of the fluid dynamics on the solidification and ensuing microstructure, a heat transfer-and-solidification-only (HTS) model and a fully coupled heat-transfer-solidification and fluid-dynamics (HTS-FD) model were considered. In the HTS_FD model, the fluid flow was considered to be laminar while the molten alloy surface is assumed to be flat and non-deformable. This study is one the first attempt to understand the effect of the fluid flow on microstructure in STLF and LPBFAM. The results show that the fluid flow affects the solidification and ensuing microstructure in STLF. In order to validate Truchas for STLF and LPBFAM modeling, experimental data, which was obtained at GE Global Research (GEGR) for liquid pool shape and microstructure, were compared with those from numerical simulation results. For the keyhole regime case, numerical simulation results indicate that the melt-pool shape was typical to that of the conduction case with very large deviations from the measured melt-pool depths. Two sensitivity studies were conducted by varying the evaporation flux and the surface tension coefficient at fixed laser absorptivities of 0.5 and 0.3, respectively. The minimum value for the overall combined error, between the calculated values with the HTS_FD model and measured values for both the width and height of the melt-pool, was attained for a surface tension coefficient of -0.75e-4 N/m. An analytical solidification model for the columnar-to-equiaxed transition (CET) in rapid solidification was used to assess the microstructure variation within the melt-pool. From numerical simulation results, thermal gradient, G, and solidification velocity, V, were obtained in order to predict the microstructure type (e.g., dendritic, cellular). For the fluid-flow HTS_FD model, G was found to exhibit a maximum at the extremity of the solidified pool (i.e., at the free surface). By contrast, for HTS simulations, G was found to exhibit a maximum around the entire edge of the solidified pool. For the HTS_FD simulations, the minimum values of the cooling rate, GV, were found to be approximately half than their corresponding values for HTS simulations. By contrast with the min GV values, the maximum values for GV were found to occur for the HTS_FD simulations. Thus, HTS_FD simulations were found to exhibit a wider range of cooling rates than the HTS simulations. Concerning the solidification maps, the variation of the solidification velocity, V, as function of the thermal gradient, G, was obtained. It was found that the fluid flow model results (HTS_FD) exhibited an increased spread in the V(G) variation within the melt pool with respect to the HTS model results (without the fluid flow). A preliminary correlation model for the primary dendrite arm spacing (PDAS) based on a power law dependence on thermal gradient and solidification velocity was used to estimate PDAS from HTS and HTS_FD simulations. For low laser powers and low laser speeds, the PDAS obtained 6 with the fluid dynamics model (HTS_FD) was larger by more than 30% with respect to the PDAS calculated with the simple HTS model. In the second part of the project, fifty-seven simulations were conducted in order to obtain data on microstructure variables that can be used for process map development. In order to cover the entire processing space, thirty-three cases were selected STLF process simulations at six power levels and six laser scanning speeds. The 57 STLF process simulations were conducted as follows: 33 simulations with the heat-transfer-only (HTS) model and 24 simulations with the fluid flow model (HTS_FD). The solidification map data shows that for all simulations, a columnar dendritic microstructure would be expected. It was found that the minimum, average, and maximum thermal gradient exhibit exponential variations with respect to a process variable defined as the ratio between the power and square root of scan speed.

36 MATERIALS SCIENCE↗

High-current density CORC® wires for use in accelerator magnets

Next generation accelerator magnets capable of generating magnetic fields in excess of 16 T require high-temperature superconductors (HTS) such as Conductor on Round Core (CORC®) cables and wires, wound from RE-Ba 2 Ca 3 O 7-δ (ReBCO, Re = rare earth) coated conductor tapes.1 The severe operating requirements of an engineering current density (J e ) of at least 400 Amm -2 at 4.2 K and 20 T, high operating currents of 5-20 kA, tolerance to Lorentz stresses in excess of 150 MPa, and in many cases cable bending diameters as small as 30 mm, make accelerator magnets one of the most challenging applications for any HTS material. Advanced Conductor Technologies (ACT) has been developing CORC® cables and wires wound from ReBCO tapes containing substrates of 30-50 µm thickness to meet these requirements. Although these requirements could each be met separately with current CORC® technology, meeting the requirements at the same time requires thinner, more powerful CORC® wires wound from tapes with even thinner substrates. The purpose of this Phase I SBIR program was to determine the feasibility to develop ReBCO tapes containing 25 µm thick substrates on an industrial scale and wind thinner CORC® wires from these tapes that could eventually meet the stringent performance specifications for accelerator magnets. The results of the Phase I program clearly demonstrated the feasibility of developing thinner, more powerful CORC® wires using ReBCO tapes with 25 µm substrate that would likely meet the stringent requirements for use in accelerator magnet by the end of the potential Phase II program. SuperPower Inc., as the subcontractor on the Phase I program, was successful in developing tapes with 25 µm substrate at minimum piece lengths of 30-40 m with a clear path towards industrial production. A total length exceeding 350 meters of 2 mm wide ReBCO tape with critical current (I c ) of between 45 and 65 A at 77 K was delivered to ACT during the Phase I program. The thinner tapes allowed us to reduce the CORC® core (former) from 2.5 mm to 2.0 mm, resulting in a higher current density conductor with enhanced flexibility. Several CORC® wires were manufactured to reach the Phase I goal of a Je of at least 300-400 Amm -2 at 20 T at a minimum bending diameter to less than 50 mm. Several CORC® wires were wound and analyzed after bending by identifying the location of peak stresses and causes of tape damage. Data was compared to 3D finite element models that included parametric studies to identify key parameters leading to the observed tape failure modes. The models suggest that flexibility is heavily dependent on the friction coefficient between tapes in a CORC® wire and the width of the tapes used. These studies provide a clear and straightforward path to improve conductor flexibility within the proposed Phase II program to reach our goal of minimum bending diameters below 30 mm with minimal I c reduction. We were successful in developing a flexible, 3.3 mm thick, high-J e CORC® wire containing 30 ReBCO tapes that carried > 80 % of its original I c after bending to diameters down to 44 mm. The CORC® wires showed no cyclic degradation due to in-field testing up to 57 stress cycles at 12 T. Another CORC® wire of 3.4 mm thickness had a J e as high as 451 Amm -2 when extrapolated to 20 T at a bending diameter of 63 mm, which is a new high-field performance record. We were also able to design a CORC® wire with increased tensile strength of 240 MPa at 76 K. The results of the Phase I program allow us to propose a very strong Phase II program with a high likelihood of reaching the ultimate goal of CORC® accelerator magnets wires with I c exceeding 8-10 kA and J e exceeding 600 Amm -2 at 20 T while bent to a 30 mm diameter.

43 PARTICLE ACCELERATORS↗

Encapsulant Void Breakdown Voltage Modeling & Experiments

For high voltage electrical devices, prevention of high voltage breakdown is critical for device function. Use of polymeric encapsulation such as epoxies is common, but these may include air bubbles or other voids of varying size. The present work aimed to model and experimentally determine the size dependence of breakdown voltage for voids in an epoxy matrix, as a step toward establishing size criteria for void screening. Effects were investigated experimentally for both one-dimensional metal/epoxy/air/epoxy/metal gap sizes from 50 μm to 10 mm, as well as spherical voids of 250 μm, 500 μm, 1 mm and 2 mm sizes. These experimental results were compared to modified Paschen curve and particle-in-cell discharge models; minimum breakdown voltages of 6 - 8.5 kV appeared to be predicted by 1D models and experiments, with minimum breakdown voltage for void sizes of 0.2 - 1 mm. In a limited set of 3D experiments on 250 μm, 500 μm, 1 mm and 2 mm voids within epoxy, the minimum breakdown voltages observed were 18.5 - 20 kV, for 500 μm void sizes. These experiments and models are aimed at providing initial size and voltage criteria for tolerable void sizes and expected discharge voltages to support design of encapsulated high voltage components.

42 ENGINEERING↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NDE Technology Engineering Program for Hanford DST Non-Visual Volumetric Inspection Technology: Phase II RAVIS Radiation Tolerance Test Report

This test report provides the results of radiation tolerance robustness testing that was performed on samples of robotic components and an ultrasonic guided wave air-slot sensor that represent components/sub-systems of the Robotic Air-slot Volumetric Inspection System (RAVIS) that has been engineered for volumetric inspection of Hanford tank bottom plates via under-tank refractory pad air-slots. The specific components tested for 1) functionality during active irradiation and 2) tolerance to cumulative radiation dose (until failure or upon reaching a cumulative dose test limit) were: • four samples each of a printed circuit board (PCB) and direct current (DC) motor, which are robotic components, and • 26 ultrasonic piezoelectric elements (samples) inside an air-slot sensor. The robotic components are part of the RAVIS air-slot inspection crawler drive control system that is responsible for remote communication with and actuation of the air-slot inspection crawler. The failure of either of these components during under-tank deployment would require manual retrieval via the crawler’s tether, which risks damage to the robot/refractory/tank. Preemptive replacement of the components at appropriately conservative dose/time intervals informed by failure dose would reduce the likelihood of under-tank failure. The components were included in radiation tolerance testing to quantify their failure doses to inform replacement intervals. The air-slot sensor is responsible for collecting ultrasonic inspection data (scan images) for the tank bottom plates during under-tank deployment. Compromised signal quality due to elevated noise levels caused by gamma radiation would compromise inspection performance. The air-slot sensor was included in radiation tolerance testing to quantify the impact of active irradiation on sensor signal quality. The irradiation and in-situ functional tests of the PCBs, DC motors and air-slot sensor took place in June and July 2020 at the Pacific Northwest National Laboratory. Testing was performed at a gamma dose rate near 300 rad/hr., which, in the absence of under-tank dose rate data, has been conservatively estimated to be the upper-bound dose rate beneath the primary tanks at Hanford. Irradiation took place at elevated temperatures of 150-200°F to determine failure doses that reflect the compounding effects of gamma radiation and heat. The test results revealed: • The DC motors can tolerate being actively irradiated at the high dose rate at 200°F and can tolerate a cumulative dose of 300,000 rad, that which would be incurred after 5 years of service at the 300 rad/hr dose rate. The component therefore meets minimum and preferred radiation tolerance and lifecycle requirements for robotic components. • The air-slot sensor can tolerate being actively irradiated at the high dose rate at 150°F and can tolerate a cumulative dose of 60,000 rad, that which would be incurred after 1 year of service at the 300 rad/hr dose rate. The sensor therefore meets minimum radiation tolerance and lifecycle requirements. • The PCB can tolerate being actively irradiated at the high dose rate, but can only tolerate a cumulative dose of 19,000 rad at 150-200°F. The PCB does not meet minimum radiation tolerance and lifecycle requirements; however, because the component is considered replaceable, it can be replaced before a cumulative dose of 19,000 rad is reached, determined through either monitoring with a dosimeter or scheduled time intervals that are calculated based on conservative estimates of under-tank dose rates.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Development of a Direct Neutral Density Diagnostic for Fusion Edge Plasmas

As magnetically confined plasmas progress towards ignition and long pulse experiments, measurement and control of the neutral density in the plasma edge has become a critical issue for stability, formation of transport barriers, and fueling. Recent experiments by our research group have demonstrated that is possible to use two-photon absorption laser induced fluorescence (TA-LIF) to directly measure the density of neutral hydrogen in helicon sources and in the HIT-SI3 spheromak. While those experiments validated key elements of a diagnostic system that would enable similar measurements in tokamak plasmas, they did not fully address the issue of performance optimization in the presence of intense background light at the fluorescence wavelength and they also identified a number of other issues that must be resolved before successful TALIF neutral density measurements in a tokamak are likely to be achieved. Additional specific concerns raised during design reviews with the leadership of the DIII-D tokamak facility included: the minimum detection threshold for this TALIF diagnostic (currently ~ 5 x 10 15 m -3 ) and the rate at which neutral density measurements could be obtained. Improving the system performance to reduce the minimum detection threshold and demonstrating a faster rate of density determination are required to advance this diagnostic to the level where it could be considered for implementation on a major tokamak facility in the USA. The key issues that will be addressed through additional technological development are: validation of a new, chromatic aberration-free, xenon calibration scheme; increasing the output power of the laser; and suppression of background emission at the fluorescence wavelength through optimization of the collection optics and gating of the photomultiplier detector with a goal of obtaining a minimum detection threshold of 5 x 10 14 m -3 . Another key technological development, so far only tested in helicon source experiments, is the validation of Doppler-free TALIF as a means of obtaining higher speed, calibrated, neutral density measurements in tokamak-like conditions at the full cadence of the pulsed TALIF laser. In this work, we propose to complete these technological advancements through installation and testing of our prototype TALIF system on the proto-MPEX experiment at Oak Ridge National Laboratory (ORNL). The proto-MPEX facility will provide plasma conditions similar to the edge plasma of a major tokamak experiment but with pulse lengths and pulse repetition rates ideally suited for extensive development of a TALIF neutral density diagnostic. Measurement of the absolute neutral density in the edge of a magnetically confined plasma is necessary for plasma density control; calculation of charge-exchange power losses; control of plasma-wall interactions; determination of the braking of plasma flow; determination of the fuel mixture in deuterium-tritium plasma; and understanding the dynamics of the divertor region in the plasma edge. In terms of potential impact on the worldwide fusion program, we note that in burning plasma experiments, such as ITER, a 100 mJ/pulse Doppler-free TALIF diagnostic should be capable of directly measuring the deuterium/tritium (D/T) isotope ratio in the outer 0.5 to 1.0 m of the plasma radius. The D/T ratio is a critically important parameter for the control and optimization of burning plasmas. Therefore, development of the diagnostic system proposed here is also relevant to long-term US participation in diagnostic development for large tokamaks.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Particle scale impacts on deconstruction energy of pine residues

The goal of this Case Study was to quantify the impacts of variable moisture and ash on hammer mill throughput and energy consumption and on generation of fines that are not able to be fed to conversion, as compared to a status quo Base Case system. Also considered was convertible carbon content (minimum carbon specification) and maximum ash content and the delivered feedstock cost impacts of not being able to feed residue not meeting both specifications to the conversion reactor. Laboratory data on the impacts of input particle size and moisture content on the exit particle size were received from FCIC Subtask 5.2 from their single particle impact population balance modeling study. Additional throughput and energy consumption data were obtained from FCIC Subtask 5.2 for the same grinder with a 6 mm screen in place. These data were utilized to develop the necessary response surface equations to perform throughput analysis using discrete event simulation. Because the ash contents in the separated fines had not been analyzed in the laboratory at the time of the model runs, we chose to assume that the ash distributed proportionally with total mass into the overs and unders in the disk screen following grinding. Key takeaways from this Case Study are that it is significantly more cost effective to hammer mill the residue prior to drying, even though the grinder throughput is lower and energy consumption is higher versus drying first before grinding. An effect of dry grinding versus high moisture grinding is the production of higher amounts of fines during dry grinding, leading to significantly more of the ground feedstock being rejected by conversion for being below a minimum particle size. With wet grinding the system is still able to produce more preprocessed feedstock meeting the minimum particle size specification even though the instantaneous throughput is lower than for the case of grinding dry feedstock. Additionally, even without the higher fines production from dry grinding, the status quo would still be more costly than wet grinding because the material is rejected after the drying energy has already been input for the dry grinding case. Finally, significant reductions in drying energy are obtained by drying after grinding, and those reductions are of far greater magnitude than the grinding energy increase.

09 BIOMASS FUELS↗

LAW Melter Offgas System Design Basis Flowsheets (11/15/2019)

The overall objective of this calculation is to develop design basis flowsheets for confirmation of equipment and piping design associated with the LAW melter offgas system (Systems LOP and LVP). Three flowsheet cases are developed. Minimum, maximum, and nominal offgas cases are developed assuming two melters in operation. The minimum, maximum, and nominal cases are expected during normal operation of the offgas system. An additional minimum case is developed assuming one melter is operating.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗