Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Potential Infrastructure Cost Savings at Hybrid Wind Plus Solar PV Plants

This report documents the creation of NREL's Balance of System model for Hybrid Renewable Energy Systems (HybridBOSSE). Balance of System (BOS) costs account for approximately 30% of the capital expenditure required to install a land-based wind plant, and as much as 40% of the cost of installing a solar PV plant. Hybrid Renewable Energy systems present an opportunity to combine balance of system components to achieve cost savings, and HybridBOSSE aims to provide a component-level model to determine the associated BOS costs in a hybrid renewable energy system. Prior BOS models for hybrid systems (at NREL and elsewhere) have relied on empirical curve fits of legacy industry data, limiting their utility and their predictive ability for new technology combinations and configurations, such as those found in Hybrid Plants. Hybrid plants at the utility scale have considerably more interest in the last number of years, with ever-growing capacities in the interconnection queues, and many large developers pivoting to only consider hybrid plants going forward. As these plants become a commercial reality, the need for a detailed analysis of costs in a hybrid plant to fully exploit the available cost savings grows. The tool developed and documented in this work, HybridBOSSE, provides an open-source, python-based method of assessing the costs in hybrid plants. This analysis capability unlocks greater certainty in hybrid plant costs, as well as the ability to examine scenarios of hybridization and glean combinations that offer the greatest flexibility and cost reduction.

14 SOLAR ENERGY↗

Biological Response Models: Predicting Injury and Mortality of Fish During Downstream Passage through Hydropower Facilities

This report describes the U.S. Department of Energy’s HydroPASSAGE project efforts to develop and collect biological response models for integration into the Biological Performance Assessment (BioPA) toolset and the Hydropower Biological Evaluation Toolset (HBET). These models help understand how fish are likely to respond during dam passage when exposed to hydraulic and physical stressors associated with turbines and other hydropower structures. When fish pass through hydropower facilities, they may encounter several stressors, of which the three most common are collision, rapid decompression, and fluid shear. Specialized equipment has been used to develop 99 biological response models for exposure to blade strike, rapid decompression, or fluid shear. The models were gathered from the literature or developed as part of this effort and include models for 31 different species of fish that have various predicted endpoints (i.e., injury or mortality). Among these models, considerable variation in susceptibility to the stressors has been observed from one species to another, and a species’ susceptibility to one stressor does not necessarily indicate similar susceptibility to another. Although several species have been examined, it is still unclear how many other species, which may have different morphological traits, may respond to these stressors, so further examination of the different species is needed. These models can and have been applied in several different cases, often using the BioPA toolset and HBET, to better understand the potential for injury and mortality that may occur during fish passage at hydropower facilities, including specific applications, such as turbine replacement, the installation of new turbines, or changing operations of currently installed turbines. As hydropower is continually developed to meet the electricity needs of society, tools such as HBET and BioPA, used with the integrated biological response models, will aid in the development of technologies and strategies that avoid, minimize, mitigate, or manage environmental effects.

13 HYDRO ENERGY↗

Cost targets to achieve commercially viable thermal storage in buildings

To mitigate the variation in demand on the electric grid, thermal energy storage (TES) is an alternative to electric batteries or installing new peaking power plants. Stakeholders and policy makers across the United States have expressed interests in promoting TES, as demonstrated by the US Department of Energy’s Grid-Interactive Efficient Buildings program and the efforts of various state legislatures. However, the cost value provided by TES are unclear. If reliable cost benefits were determined, stakeholders would have a clearer picture of the financial returns that can be gained from their investment in TES. In this report, EnergyPlus was used to perform whole-building simulations for two residential buildings in Indianapolis and Atlanta. The HVAC system in both buildings were equipped with phase change material TES. The TES tank was charged in off-peak hours and discharged in peak hours to perform load shifting. First, the economic value implied by existing time-of-use (TOU) rates offered by utility companies was analyzed via whole-building simulation. Second, existing demand reduction (DR) incentives sourced from 3 different electrical grid administrators (i.e., California, Texas, and New England region) were surveyed to determine their implied value. Lastly, the economic value implied by different types of deferred peak power plants were reviewed. The full value of TES to the entire society consists of value to the utility, OEMs, facility installers, and other stakeholders. This report focuses on the value to the utility with emphasis on the deferred capital of peak power plant. The value from the deferred capital of peak power plant is manifested to the customer in the form of demand reduction program and Time-of-Use utility rate program. In this report, an initial proxy of the value of TES is made by assuming the deferred capital cost of power plant is the full value to reduce peak demand. Three levels of financial value of TES systems were assessed. Two are currently available to some residential customers: (1) the benefit from TOU pricing alone and (2) the benefit from TOU pricing in combination with DR incentive programs. The third level was computed as the full cost of deferred capital cost of peaking power plants. This represents the potential value that could be gained by the utilities or conceivably be offered to consumers.

25 ENERGY STORAGE↗

Rooftop Solar PV Quality and Safety in Developing Countries - Key Issues and Potential Solutions

To scale solar photovoltaic (PV) deployment in developing countries, the technology must be safe and reliable, meeting both customer and utility expectations. However, challenges exist in achieving these goals. Because PV systems are novel and complex, the majority of consumers are unable to distinguish between low- and high-quality systems; many may invest based on price alone. Suboptimal PV system performance and safety incidents can have downstream impacts on the solar industry and customer adoption because of unmet expectations and negative publicity. Rooftop solar system components vary in quality, and inadequate training could lead to poor installation practices. And even if inspection checklists, certification procedures, and standards are available, they may not be widely used in countries if they are not mandatory, the workforce is not aware of them, or installers lack the technical capacity to comply. Despite the numerous solar quality and safety challenges developing countries may face, lessons learned and best practices from around the world can address them.

14 SOLAR ENERGY↗

Experimental Plan for the Vermiculite Study

Homes in which vermiculite, which can contain asbestos, is present are often deferred under the DOE Weatherization Assistance Program (WAP) because of uncertainty in how to safely weatherize such homes from a client and worker perspective and the potential costs associated with alternative approaches. Recognizing this situation, the Department of Energy (DOE) tasked the Oak Ridge National Laboratory (ORNL) to perform a research project that scientifically identifies the asbestos exposure risks in weatherizing homes with existing vermiculite insulation. Current approaches being used by Grantees and Subgrantees to weatherize homes with existing vermiculite insulation were identified as part of the development of this experimental plan based on a review of Grantee Health and Safety Plans and communications with weatherization program staff from seven states. Other than deferral, these approaches include the following:1.) Abating (i.e., removing) the existing vermiculite using funding sources other than WAP (e.g., state funds, utility funds, the Zonolite Attic Insulation Trust Fund, and possibly homeowner contributions) because abatement is not allowed using WAP funds per Weatherization Program Notice (WPN) 17-7. 2.) Weatherizing the house as normal after testing reveals that the vermiculite contains less than 1% asbestos. 3.) Avoiding areas of the house where vermiculite is installed and weatherizing the remaining areas of the house as normal. 4.) Encapsulating the existing vermiculite insulation in an attic by blowing cellulose or other insulation over it. 5.) Weatherizing the areas of the house where vermiculite is installed using unique/alternative approaches developed specifically for that house. Blower door testing is also impacted by the presence of vermiculite due to the concern of bringing asbestos fibers into the space. Some states address this by performing pressurized blower door tests, whereas other states prohibit blower door testing entirely when vermiculite is present. This research project will focus on gathering data on home occupant and weatherization worker exposures to asbestos before, during, and/or after the weatherization of the homes containing vermiculite insulation using five of the six approaches identified above. Abatement of the existing vermiculite insulation will not be studied because it is not allowed using WAP funding per WPN 17-7 and, thus, is not a sustainable approach for WAP.

36 MATERIALS SCIENCE↗

AMS Thermal Cooling System (Final Report)

The Alpha Magnetic Spectrometer (AMS) is a U.S. Department of Energy-sponsored particle physics experiment on the International Space Station (ISS). AMS is exploring some of the most fundamental questions in physics such as understanding dark matter, antimatter, the origin of cosmic rays and their characteristics as well as searching for new physics phenomena in the universe. It has recorded more than 200 billion cosmic rays since its launch in May 2011. Over time, anomalies associated with the dedicated cooling system of the AMS Silicon Tracker system were observed, leading to the discovery of progressive deterioration in the functioning of the cooling system's four redundant pumps. The Tracker is crucial to the scientific mission of AMS, as it is the only subdetector that can distinguish matter from antimatter. This report details the successful program of work for the installation of the Upgraded Tracker Thermal Pump System (UTTPS) on AMS. This program included: identifying the root cause of deterioration in the original pumps; design, production, testing, and integration of the new UTTPS cooling system; launch of the UTTPS to ISS; installation of the UTTPS in AMS across a series of four complex extra-vehicular activities (EVAs); and establishment of a dedicated Flight Simulator Laboratory to test the performance of the UTTPS under various thermal conditions. This program was critical to the success of the AMS experiment, and its successful completion will enable AMS to continue taking data through 2030.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Demand for a Domestic Offshore Wind Energy Supply Chain

In March of 2021, the Biden-Harris Administration established a National Offshore Wind Target to install 30 GW by 2030. This ambitious goal was not only intended to help reduce dependencies on fossil fuels, but also represents an opportunity to establish a new and sustainable industry in the United States. The announcement referenced the potential benefits of establishing a domestic supply chain, including the opportunity for existing suppliers to produce thousands of components while creating tens of thousands of jobs over the course of the decade. This vision by the Biden-Harris Administration aligns with the perspective of the offshore wind industry. At a Leadership 100 event hosted by the Business Network for Offshore wind in 2019, offshore wind developers and manufacturers identified the need for a roadmap outlining a pathway to a domestic supply chain as the top priority facing the industry. Building up domestic manufacturing capabilities will not only energize local industries but can potentially de-risk individual project by reducing reliance on importing resources from European or Asian markets. Although establishing a domestic supply chain will require significant investment, it has the potential to create substantial benefits throughout the industry and, by extension, on the decarbonization goals of the United States. This study characterizes the challenges and opportunities facing the growth of a domestic supply chain industry and evaluates the potential benefits that could be achieved through the creation of the supply chain. This report is the first of a two-part series which will describe the full supply chain roadmap and the associated benefits; the current report focuses on the high-level deployment, workforce, and component requirements that need to be met to achieve the National Offshore Wind Target. We will present: 1. A deployment pipeline that demonstrates the pathway to 30 GW, the associated demand for major fixed-bottom and floating offshore wind components (turbines, foundations, cables, substations), and the vessel and port requirements to support these installation activities. 2. A series of sensitivity analyses showing how the demand for components, ports, and vessels changes for different technology pathways and availability of the global supply chain. 3. An estimate of the total number of jobs that would be required to support these deployment scenarios under varying levels of assumed domestic content. 4. A comprehensive list of the Tier 1, 2, and 3 components (finished components, subassemblies, and subcomponents) required to construct fixed-bottom and floating offshore wind projects. 5. A discussion of critical path components that represent a significant challenge, bottleneck, or risk for a future domestic supply chain.

17 WIND ENERGY↗

Plasma Ignition and Combustion Stabilization Technology to Improve Flexible Operation, Reliability and Economics of an Existing Coal-Fired Boiler

GE Steam Power, Inc. (GE) proposed to improve reliability, flexibility, and economics of an existing coal-fired power plant by applying a new advanced technology developed by GE, a plasma-assisted pulverized fuel firing system. The objective of this program is to demonstrate the achievement of lower load by improved flame stabilization and therefore lower operating costs in a full-scale field installation at coal-fired electric utility. GE’s Plasma Ignition and Combustion Stabilization System is designed to operate continuously to support low load operation. With the plasma on, the flame will be attached and stable, removing the firing system as a limitation to low load operation. In addition, GE’s exclusively from ABENZ company licensed AC based technology has a 90+% system efficiency compared to all other systems at which are DC and operate with ~75% efficiency. Plant operating costs are lowered by eliminating use of expensive support fuel as well as the ability to operate at lower loads. The utilities’ ability to better match the demand curve will result in significant savings. Maintenance is lower for an AC system than a DC system as it operates at lower current. This eliminates the need for a demineralized cooling water system and provides longer electrode life which translates into both material and labor savings. It is the objective of GE to not only demonstrate the additional low load achievable with a plasma system after best achievable tuning, sensor and software approach has been exhausted, but also the increased stability of the flame at all loads with plasma assistance as well as cost savings at all low loads using plasma instead of oil. Upon successful completion of this project, GE will have sufficient field experience to rapidly deploy the Plasma Technology. The project objectives were achieved through the implementation of plasma ignitor technology at PacifiCorp Hunter Station Unit 3. A plasma ignitor system was retrofitted on ten wall-fired burners, Mill 3-4 combustion system. The Plasma Ignitors installed at Hunter proved that this GE technology is a direct and complete replacement for the original oil ignitors. The Hunter Unit 3 burner management system allows the plasma system to be used in all applications that originally required oil to be burned. This includes any time the Mill 3-4 is started or stopped for any reason including boiler starts, load changes, and low load support.

01 COAL, LIGNITE, AND PEAT↗

Residential Solar-Adopter Income and Demographic Trends: 2021 Update [Slides]

The report describes income, demographic, and other socio-economic trends among U.S. residential rooftop solar adopters. The report is based on data for roughly 1.9 million residential rooftop solar systems installed through 2019, representing 82% of all U.S. systems. With its unique size, geographic scope, and level of detail, this report is intended to serve as a foundational reference document for policy-makers, industry stakeholders, and researchers. Key findings include the following: Solar adopters generally skew towards higher incomes, though that trend continues to diminish over time. Solar adopter incomes vary considerably and encompass many low-to-moderate income (LMI) households. Solar-adopter incomes are consistently higher for systems paired with battery storage, for host-owned systems, and for systems installed on single-family homes. Solar adopters differ from the broader U.S. population in terms of a variety of other demographic and socioeconomic measures. State-level comparisons indicate that solar-adopters tend to live in neighborhoods with relatively high non-Hispanic White and Asian populations, and with relatively low Hispanic and Black populations. In conjunction with the report, Berkeley Lab has published an updated accompanying set of online data visualizations that allow users to further explore the underlying data. Berkeley Lab is also offering related analytical support to states, local agencies, and other organizations on issues related to solar adoption among low-to-moderate income households.

14 SOLAR ENERGY↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar Automated Permit Processing Software for Distributed PV (Cooperative Research and Development Final Report, CRADA Number CRD-19-00825)

NREL and its project partners built and commercialized the novel Solar Automated Permitting Processing Plus (SolarAPP+) software platform that delivers instant residential rooftop solar permits. The tool provides installers with a standard portal for entering permit information for residential solar systems across all Authorities Having Jurisdiction (AHJs) using SolarAPP+, thereby providing a streamlined plan review form, transparency into permitting timelines, and required specifications. The project has proven to reduce permitting timelines from as many as 20 business days to zero, delivering solar projects faster in the four participating AHJs using the platform. Streamlining permitting timelines, all else equal, results in consumers installing their systems and reducing their electricity bills faster. The continued expansion of SolarAPP+ features and adoption nationwide will expand the benefits of the SolarAPP+ beyond the current user base.

14 SOLAR ENERGY↗

Thermocouple Testing in Support of the AGR-5/6/7 Experiment

This report documents thermocouple testing performed in IRC Lab C-15 over a period of seven years. This testing supported selection and characterization of the thermocouple set used in the AGR-5/6/7 experiment. The following summary was taken directly from the report. Temperature measurement is a challenging aspect of very high temperature irradiation experiments because commonly used high-temperature commercial thermocouples such as platinum-rhodium (Types S, R, and B) and tungsten-rhenium (Type C), suffer dramatic drift because of neutron-induced transmutation. As a result, these types of thermocouples, which are used routinely for industrial temperature measurements outside of reactors, are used only in very special circumstances for reactor experiments. Conversely, because of their low neutron cross-sections, Type N thermocouples are affected to only a limited extent by neutron irradiation. However, the use of these nickel-based thermocouples is limited when the temperature exceeds 1050°C due to drift arising from minor alloying elements migrating from the thermocouple's metal sheath to the thermoelements. This change in the composition of the thermo-elements results in significant decalibration of the signal. The issues described above were recognized during the early planning stages of the final AGR experiment (designated AGR-5/6/7), and a thermocouple furnace testing program was performed over a seven-year period (2014-2019, 2021) to first select and then characterize the best thermocouple set for the high temperature regions of the AGR-5/6/7 irradiation experiment. The calculated temperature range of the AGR-5/6/7 experiment was 600–1500°C. For temperatures below 1000°C standard Type N thermocouples were deemed adequate. The furnace testing campaign identified two thermocouple types suitable for measuring temperatures above 1000°C, a Mo/Nb thermocouple developed at INL called HTIR-TC, and a Type N thermocouple developed by Cambridge University (called herein Cambridge Type N), which featured a custom high nickel alloy sheath. One of the original goals of the furnace testing program was to identify a thermocouple capable of low drift operation near the peak temperature expected in AGR-5/6/7, i.e., about 1400°C. The HTIR-TC design appeared promising in this regard, however a manufacturing difficulty proved to be a barrier and instead the furnace testing focused on drift performance at 1250°C. The manufacturing difficulty was that the Nb sheaths of the HTIR-TCs experienced extreme embrittlement when heat treated at 1600°C or greater. Heat treatment is needed to stabilize the emf output of this TC type, and the higher the heat treatment temperature the higher the peak temperature of stable operation. Because of the sheath embrittlement the heat treatment temperature had to be lowered to 1450°C resulting in a stable operating temperature of about 1250°C. One of the successes of the furnace testing program was identification of a shortcoming in the heat treatment procedure that had been traditionally used in the production of HTIR-TCs. The shortcoming was that the entire heated length of the HTIR-TC sensor was not being heat treated, but rather only the part of the sensor expected to experience temperatures above 1000°C. The problem manifested itself when the thermocouples were removed from the heat treat furnace and placed in another furnace with a different geometry, their indicated temperatures would be widely scattered, but mostly in the negative direction. The solution was to heat treat the entire heated length of the sensor. Since the deepest immersion depth in the AGR-5/6/7 experiment was about 40 inches, a heat treatment length of 48 inches was used. After this change was implemented, thermocouples which were moved into a new environment with a different temperature profile (i.e., a different furnace), produced accurate temperature measurements. Although assembly of the AGR-5/6/7 experiment was completed in September of 2017 (and irradiation begun in 2018), furnace testing of thermocouples continued in 2018 and 2019. The main purpose of this testing was to establish very long-term drift characteristics of the HTIR and Cambridge Type N thermocouples installed in the experiment. Representative thermocouples from the same lots as those installed in the AGR-5/6/7 experiment were used. Additionally, thermocouples of different designs, (particularly variations on the HTIR-TC design) were "piggy-backed" on this testing program to provide insights for instrumenting future very high temperature irradiation experiments. This two-year testing program demonstrated that HTIR-TCs and Cambridge Type N TCs could operate at 1250°C for up to 10,000 hrs (and in some cases longer) while experiencing negative drifts on the order of 2-4°C/1000 hrs. This performance was considered acceptable given the extreme operating environment the sensors faced.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

US HL-LHC Accelerator Upgrade Project (MQXFA Final Design Report)

The MQXFA Quadrupole magnets will be installed in High Luminosity LHC to form the Q1 and Q3 inner triplet optical elements in front of the interaction points 1 (ATLAS) and 5 (CMS). A pair of MQXFA units is assembled in a stainless steel helium vessel, including the end domes, to make the Q1 Cold Mass or the Q3 Cold Mass. The US HL LHC Accelerator Upgrade Project* is responsible for the design, manufacturing and test of the Q1/Q3 Cold Masses and the complete MQXFA magnets. CERN provides the cryostat components and is responsible for integration and installation in HL LHC. The MQXFA quadrupoles have 150 mm aperture, 4.2 m magnetic length, nominal gradient of 132.2 T/m, and coil peak field of 11.3 T. They use Nb_3Sn conductor and a support structure made of segmented aluminum shells pre-loaded by using bladders and keys. This report presents the final design of the MQXFA quadrupole magnets.

43 PARTICLE ACCELERATORS↗

Upgrade of Core Conduction Cooldown Test Facility Control System

The CCCTF was designed and installed at ORNL in the 1990s for high-temperature gas-cooled reactor accident simulation. It is located within a modular hot cell housed in the IFEL facility. In 2008 and 2009, modifications were made to the CCCTF in preparation for AGR safety testing. A new airlock was designed and installed to better support periodic exchange of the fission product deposition cups while maintaining the fuel at safety test temperature, and modifications were made to add routines to the existing user interface software for computer-controlled automation of the He sweep gas flow and liquid nitrogen supply to the 85Kr cold traps. However, the furnace control hardware and software remained essentially unchanged. At the conclusion of the AGR-1 and AGR-2 PIE campaigns, continued use of the CCCTF was in question because of the gradual obsolescence of the hardware and software used to control the furnace and ancillary systems that make up the CCCTF. Therefore, an effort was undertaken to replace all the obsolete components with new hardware and update the software to increase system reliability and ensure this capability’s maintenance for future research and fuel qualification efforts. The modifications included creating a new National Instruments (NI) LabVIEW-based control system with a graphical user interface (GUI).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessing the New Home Market Opportunity: Case Study and Cost Modeling for Solar and Storage in 2030

In 2020, the United States had a cumulative 19 gigawatts (GWdc) of residential solar photovoltaic (PV) capacity. A growing percentage of these solar installations are paired with battery storage, up from 0.1% in 2015 to 8.1% in 2020. Some states are considering or have already adopted policy mandates to require solar and storage systems. The cost of installing residential solar and battery storage projects remains a barrier to widespread adoption nationwide. For example, the cost of a typical residential retrofit solar and storage system ranges from $\$ 26,153$ to $\$ 37,909$, which is 38% to 100% higher than a standalone PV system.

14 SOLAR ENERGY↗

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

Commercial Building Fenestration Market Study

This study characterizes and assesses the U.S. commercial fenestration market. It analyzes a groundbreaking amount of data that will ultimately support an estimate of national savings potential of energy efficient fenestration products in commercial applications to demonstrate the benefits of efficient façade and fenestration systems. This study provides data and analysis on: commercial fenestration market and fenestration selection process, installed commercial fenestration stock across the U.S. and fenestration sales estimates, and current commercial building fenestration codes and market trends of installation to or above code.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗