Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “failure reports”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Status and Evaluation of Microwave Furnace Capabilities at NASA Glenn Research Center

The microwave (MW) furnace is a HY-Tech Microwave Systems, 2 kW 2.45 GHz Single Mode Microwave Applicator operating in continuous wave (CW) with variable power. It is located in Cleveland, Ohio at NASA Glenn Research Center. Until recently, the furnace capabilities had not been fully realized due to unknown failure that subsequently damaged critical furnace components. Although the causes of the problems were unknown, an assessment of the furnace itself indicated operational failure may have been partially caused by power quality. This report summarizes the status of the MW furnace and evaluates its capabilities in materials processing.

Materials↗

Contact and Bending Durability Calculation for Spiral-Bevel Gears

The objective of this project is to extend the capabilities of the gear contact analysis solver Calyx, and associated packages Transmission3D, HypoidFaceMilled, HypoidFaceHobbed. A calculation process for the surface durability was implemented using the Dowson-Higginson correlation for fluid film thickness. Comparisons to failure data from NASA's Spiral Bevel Gear Fatigue rig were carried out. A bending fatigue calculation has been implemented that allows the use of the stress-life calculation at each individual fillet point. The gears in the NASA test rig did not exhibit any bending fatigue failure, so the bending fatigue calculations are presented in this report by using significantly lowered strength numbers.

life↗

Demonstration of Robustness and Integrated Operation of a Series-Bosch System

Manned missions beyond low Earth orbit will require highly robust, reliable, and maintainable life support systems that maximize recycling of water and oxygen. Bosch technology is one option to maximize oxygen recovery, in the form of water, from metabolically-produced carbon dioxide (CO2). A two stage approach to Bosch, called Series-Bosch, reduces metabolic CO2 with hydrogen (H2) to produce water and solid carbon using two reactors: a Reverse Water-Gas Shift (RWGS) reactor and a carbon formation (CF) reactor. Previous development efforts demonstrated the stand-alone performance of a RWGS reactor containing Incofoam(TradeMark) catalyst and designed for robustness against carbon formation, two membrane separators intended to maximize single pass conversion of reactants, and a batch CF reactor with both transit and surface catalysts. In the past year, Precision Combustion, Inc. (PCI) developed and delivered a RWGS reactor for testing at NASA. The reactor design was based on their patented Microlith(TradeMark) technology and was first evaluated under a Phase I Small Business Innovative Research (SBIR) effort in 2010. The Microlith(TradeMark) RWGS reactor was recently evaluated at NASA to compare its performance and operating conditions with the Incofoam(TradeMark) RWGS reactor. Separately, in 2015, a fully integrated demonstration of an S-Bosch system was conducted. In an effort to mitigate risk, a second integrated test was conducted to evaluate the effect of membrane failure on a closed-loop Bosch system. Here, we report and discuss the performance and robustness to carbon formation of both RWGS reactors. We report the results of the integrated operation of a Series-Bosch system and we discuss the technology readiness level. 1

Abney, Morgan B.↗

Aggresome-like structure induced by isothiocyanates is novel proteasome-dependent degradation machinery

Unwanted or misfolded proteins are either refolded by chaperones or degraded by the ubiquitin-proteasome system (UPS). When UPS is impaired, misfolded proteins form aggregates, which are transported along microtubules by motor protein dynein towards the juxta-nuclear microtubule-organizing center to form aggresome, a single cellular garbage disposal complex. Because aggresome formation results from proteasome failure, aggresome components are degraded through the autophagy/lysosome pathway. Here we report that small molecule isothiocyanates (ITCs) can induce formation of aggresome-like structure (ALS) through covalent modification of cytoplasmic {alpha}- and {beta}-tubulin. The formation of ALS is related to neither proteasome inhibition nor oxidative stress. ITC-induced ALS is a proteasome-dependent assembly for emergent removal of misfolded proteins, suggesting that the cell may have a previously unknown strategy to cope with misfolded proteins.

60 APPLIED LIFE SCIENCES↗

Instrumentation and Data Analysis Supporting the Transient Rod Pneumatic System Design Study at the Annular Core Research Reactor

The Sandia National Laboratories Annular Core Research Reactor (ACRR) has been experiencing intermittent failures of its pneumatically operated transient rod system. The most frequent failures have been to the dashpot rod where it connects to the upper aluminum connecting rod. Within the three systems, Transient Rod (TR) A has the most frequent failures. In order to conduct the pulse operations, the Transient Rods are pneumatically driven to quickly remove "poison" from the reactor core. During these pulse operations increased forces and vibrations are placed on the TR system. In an effort to fix these problems, Sandia's TA-V Nuclear Reactor and Systems Engineering Department (Engineering Department) has started an extensive Transient Rod Pneumatic System Design Study. The goal of this study is to determine the causes of the elevated failure rates in TR A. This necessitates an increased understanding of the dynamics in the TR systems. This report will cover the approach taken and reasoning behind the choices of instrumentation, calibration, data collection and data analysis used to diagnose these failures. In order to determine the types and specifications for the sensors that will be installed, estimates of the TR system performance needed to be determined. Using known and assumed parameters, mechanical and thermodynamic models were developed, and calculations performed to estimate ranges of displacement, speed, and acceleration experienced by the transient rod system. After some preliminary data collection, the thermodynamic models were refined for better accuracy. After installation of the full suite of sensors, data can be collected and analyzed in order to determine the cause of the increased failures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

GeoRePORT Case Studies - Coso, WSMR, Dixie Valley, and Chena Hot Springs

The Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) was developed with funding from the U.S. Department of Energy Geothermal Technologies Office to assist in identifying and pursuing long-term investment strategies through the development of a resource reporting protocol. GeoRePORT provides scientists and nonscientists a comprehensive and quantitative means of reporting: (1) features intrinsic to geothermal sites (project grade) and (2) maturity of the development (project readiness). Because geothermal feasibility is not determined by any single factor (e.g., temperature, permeability, permitting), a site?s project grade and readiness are evaluated on 12 attributes pertaining to geological, technical, or socio-economic feasibility. In this paper, we present case studies showing how GeoRePORT can be used to compare geological, technical, and socio-economic attributes between geothermal systems. The consistent and objective assessment protocols used in GeoRePORT allow for comparison of project attributes across unique locations and geological settings. GeoRePORT case studies presented here outline the geological, socio-economic, and technical features of four individual geothermal sites: Coso, Chena, Dixie Valley, and White Sands Missile Range. The case studies illustrate the usefulness of GeoRePORT in evaluating project risk and return, identifying gaps in reported data, evaluating R&D impact, and gathering insights on successes and failures as applicable to future projects.

15 GEOTHERMAL ENERGY↗

Inverse Relationship Between Biochemical Outcome and Acute Toxicity After Image-Guided Radiotherapy for Prostate Cancer

Purpose: Prostate cancer patients exhibit variability in normal tissue reactions and biochemical failure. With the use of image-guided radiotherapy (IGRT), there is a greater likelihood that the differences in normal tissue and tumor response are due to biological rather than physical factors. We tested the hypothesis that prospectively scored acute toxicity is associated with biochemical failure-free rate (BFFR) in prostate cancer patients treated with IGRT. Methods and Materials: We retrospectively analyzed BFFR in 362 patients with localized prostate cancer treated with IGRT. We compared BFFR with prospectively collected Radiation Therapy Oncology Group (RTOG) maximum acute gastrointestinal (GI) and genitourinary (GU) toxicity scores. Median follow-up for all patients was 58.3 months after total radiotherapy doses of 75.6-79.8 Gy. Results: Patients reporting RTOG acute GU or GI toxicity scores of {>=}2 were considered 'sensitive' (n = 141, 39%) and patients reporting scores <2 were considered 'nonsensitive' (n = 221, 61%). When calculating biochemical failure (BF) using the American Society for Therapeutic Radiology and Oncology definition at 5 years, 76% (CI 70-82%) of the 'nonsensitive' patients were failure free, compared with only 53% (CI 43-62%) of the 'sensitive' patients (log-rank test, p < 0.0001). This difference was also observed using the Phoenix definition; 'nonsensitive' 5-year BFFR was 81% (CI 74-86%) vs. 'sensitive' BFFR was 68% (CI 58-76%; log-rank test p = 0.0012). The difference in BF between cohorts remained significant when controlled for radiation dose (75.6 vs. 79.8 Gy), prognostic stratification (T category, prostate-specific antigen, and Gleason score), and prostate volume. Conclusions: This study unexpectedly shows that prostate cancer patients who develop {>=}Grade 2 RTOG acute toxicity during radiotherapy are less likely to remain BFF at 5 years. These results deserve further study and, if validated in other large IGRT cohorts, additional models would be required to study interaction between normal tissue and tumor biology in prostate cancer patients.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Investigation of Bearing Axial Cracking: Benchtop and Full-Scale Test Results

The most common failure mode in wind turbine gearboxes is axial cracking in intermediate and high-speed-stage bearings, also commonly called white-etching cracks (WECs). Although these types of cracks have been reported for over a decade, the conditions leading to WECs, the process by which this failure culminates, and the reasons for their apparent prevalence in wind turbine gearboxes are all highly debated. This paper summarizes the state of a multipronged research effort to examine the causes of WECs in wind turbine gearbox bearings. Recent efforts have recreated WECs on a benchtop test rig in highly loaded sliding conditions, wherein it was found that the formation of a dark etching microstructure precedes the formation of a crack, and a crack precedes the formation of white-etching microstructure. A cumulative frictional sliding energy criterion has been postulated to predict the presence of WECs. Bearing loads have also been measured and predicted in steady state and transient drivetrain operations in dynamometer testing. In addition, both loads and sliding at full scale will be measured in planned uptower drivetrain testing. If the cumulative frictional sliding energy is the dominant mechanism that causes WECs, understanding the amount of frictional sliding energy that wind turbine bearings are subjected to in typical operations is the next step in the investigation. If highly loaded sliding conditions are found uptower, similar to the examined benchtop levels, appropriate mitigation solutions can be examined, ranging from new bearing coatings and improved lubricants to changes in gearbox designs and turbine operations.

17 WIND ENERGY↗

Status of the NASA continuing investigation of catastrophic balloon failures

The findings and status of the continuing NASA investigation of catastrophic balloon failures, conducted following the adoption in 1984 of a new material specification, are reported on. Current efforts include a microstructual analysis, balloon stress studies, and seal investigations. Attention is given to the Recovery Plan, a program to demonstrate the use of the existing film and to develop an improved film is discussed. No specific cause for the increased occurrence of catastrophic failures has been identified.

Needleman, H. C.↗

Static stability of the Space Station solar array FASTMast structure

The combined loads test of the 3-Bay FASTMast marks the end of the Lewis Research Center (LeRC) effort to characterize the behavior of the principal Space Station solar array support structure. The primary objective of this test and analysis effort was to develop a method to predict structural stability failure modes under flight-like applied loads. Included at the beginning of this report is a brief historical perspective of the hardware design development and FASTMast structural stability problem evolution. Once an understanding of the solution process has been established, test and analysis details are presented and related to the postulated failure theories. The combined load test series subjected the structure to a combination of transverse, moment, and torsion loads similar to that expected in the service environment. Nonlinear finite element (FE) models were developed and large displacement analyses were performed to support the test effort and failure mode predictions. Details of the test configuration as well as test and analysis results are presented. The results were then critiqued to establish valid and successful support of the failure mode assessments. Finally, study conclusions are drawn and recommendations for safe operation of the FASTMast structure are presented for consideration.

Shaker, John F.↗

Preliminary System Interface Failure Mode Analysis for Two Advanced Reactors

This study explores two distinct Balance of Plant (BOP) configurations: the Rankine cycle for a sodium-cooled fast reactor (SFR) and the Brayton cycle for a gas-cooled reactor (GCR). As representative designs, the Power Reactor Innovative Small Module (PRISM) by GE Hitachi Nuclear Energy was selected for the SFR, while the Gas Turbine Modular Helium Reactor (GT MHR) by General Atomics was chosen for the gas-cooled reactor. Both configurations were adapted to deliver high-quality heat for industrial applications. A Failure Modes and Effects Analysis (FMEA) was conducted for each system to identify critical failure modes affecting key components. This study marks the first phase of a two-step design optimization approach, integrating FMEA into the design process. Based on the analysis, design modifications and mitigation strategies were proposed to enhance system resilience. The second phase, to be detailed in a subsequent report, will focus on the role of the control system in mitigating these failures. The FMEA serves as a foundation for defining the control topology, ensuring system resilience against component failures that could compromise essential functions, such as electricity and heat production.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MARVEL Reactor Fuel Performance Report (Rev.2)

The Microreactor Applications Research Validation and EvaLuation (MARVEL) project is producing a high temperature liquid metal-cooled nuclear test bed at Idaho National Laboratory (INL) to ultimately improve the integration of microreactors to end-user applications. This ambitious effort seeks to design, authorize, construct, test, and operate the reactor within five years. In order to construct and operate the MARVEL reactor in a timely manner, the system will utilize materials and component designs which have already been used, qualified, or licensed from previous reactors. The MARVEL reactor will be located at the INL Transient Reactor Test (TREAT) facility in the north high-bay equipment pit and will use the existing 304 stainless steel-clad U-ZrH1.6 pin-type fuel system developed by General Atomics and purchased from TRIGA International. This fuel has been previously qualified under the United States Department of Energy’s (US DOE) Reduced Enrichment for Research and Test Reactors (RERTR) Program. Even though the regulator of the MARVEL reactor is the US DOE, the standards and overall approach recommended by the Nuclear Regulatory Commission is well-defined and utilized here. Following NUREG-1537 regulatory guidance, this report documents the authorization case for the MARVEL fuel system’s application to MARVEL and establishes stable and predictable fuel performance during the most thermophysically unfavorable conditions achievable in the MARVEL reactor. To that end, this report provides a comprehensive survey of the known thermophysical properties, performance, and quantitative relationships associated with the MARVEL reactor fuel element and uses this information to determine its mechanical integrity and risk of reaching unacceptable conditions during the most extreme accident scenarios predicted for the reactor using the most conservative assumptions available. The information contained herein is compiled from a combination of historical reports and peer reviewed scientific publication manuscripts. Known mechanisms under which the fuel is susceptible to failure are highlighted and compared to conditions that could exist in the MARVEL reactor during an unanticipated transient or accident scenario. The two scenarios considered for analysis in this report are (1) an unprotected loss of flow accident and (2) a hypothetical unprotected loss of coolant accident during the loss of flow accident. Preliminary 2D steady-state analyses herein indicate that both fuel-cladding chemical interactions and fuel-cladding mechanical interactions are negligible throughout the fuel’s operational cycle under both normal and high temperature accident scenario conditions. Although higher fidelity 3D time-dependent modeling and simulations are planned, the following may be concluded presently. The MARVEL fuel element maintains its geometric stability and structural integrity during the most extreme accident scenarios predicted for the MARVEL reactor. The hoop stress during the unprotected loss of flow accident reaches about -1.27 MPa; this negative stress indicates that it is compressive rather than tensile. The compressive stress is a result of the NaK pressure on the outside of the fuel element, caused by the restricted thermal expansion of the NaK coolant, exceeding the internal pressures generated inside of the fuel element. The hoop stress generated in the cladding during the unprotected loss of coolant accident reaches a maximum of about approximately 10 MPa, which is nearly an order of magnitude less than the predicted yield strength of the cladding under high-temperature accident scenario conditions. Calculations were compared with results from high performance computational simulations using BISON and are in very close agreement. A conservative MARVEL fuel meat peak temperature limit of 900 °C is recommended presently, which is about 180 °C higher than the peak fuel temperature predicted to occur during the most extreme accident. Based on the known properties and behavior of the MARVEL fuel element, the fuel successfully meets its design and safety requirements under normal and most extreme accident conditions with a large safety margin.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MARVEL Reactor Fuel Performance Report

The Microreactor Applications Research Validation and EvaLuation (MARVEL) project is producing a high temperature liquid metal-cooled nuclear test bed at Idaho National Laboratory (INL) to ultimately improve the integration of microreactors to end-user applications. This ambitious effort seeks to design, authorize, construct, test, and operate the reactor within five years. In order to construct and operate the MARVEL reactor in a timely manner, the system will utilize materials and component designs which have already been used, qualified, or licensed from previous reactors. The MARVEL reactor will be located at the INL Transient Reactor Test (TREAT) facility in the north high-bay equipment pit and will use the existing 304 stainless steel-clad U-ZrH1.6 pin-type fuel system developed by General Atomics and purchased from TRIGA International. This fuel has been previously qualified under the United States Department of Energy’s (US DOE) Reduced Enrichment for Research and Test Reactors (RERTR) Program. Even though the regulator of the MARVEL reactor is the US DOE, the standards and overall approach recommended by the Nuclear Regulatory Commission is well-defined and utilized here. Following NUREG-1537 regulatory guidance, this report documents the authorization case for the MARVEL fuel system’s application to MARVEL and establishes stable and predictable fuel performance during the most thermophysically unfavorable conditions achievable in the MARVEL reactor. To that end, this report provides a comprehensive survey of the known thermophysical properties, performance, and quantitative relationships associated with the MARVEL reactor fuel element and uses this information to determine its mechanical integrity and risk of reaching unacceptable conditions during the most extreme accident scenarios predicted for the reactor using the most conservative assumptions available. The information contained herein is compiled from a combination of historical reports and peer reviewed scientific publication manuscripts. Known mechanisms under which the fuel is susceptible to failure are highlighted and compared to conditions that could exist in the MARVEL reactor during an unanticipated transient or accident scenario. The two scenarios considered for analysis in this report are (1) an unprotected loss of flow accident and (2) a hypothetical unprotected loss of coolant accident during the loss of flow accident. Preliminary 2D steady-state analyses herein indicate that both fuel-cladding chemical interactions and fuel-cladding mechanical interactions are negligible throughout the fuel’s operational cycle under both normal and high temperature accident scenario conditions. Although higher fidelity 3D time-dependent modeling and simulations are planned, the following may be concluded presently. The MARVEL fuel element maintains its geometric stability and structural integrity during the most extreme accident scenarios predicted for the MARVEL reactor. The hoop stress during the unprotected loss of flow accident reaches about -1.27 MPa; this negative stress indicates that it is compressive rather than tensile. The compressive stress is a result of the NaK pressure on the outside of the fuel element, caused by the restricted thermal expansion of the NaK coolant, exceeding the internal pressures generated inside of the fuel element. The hoop stress generated in the cladding during the unprotected loss of coolant accident reaches a maximum of about approximately 10 MPa, which is nearly an order of magnitude less than the predicted yield strength of the cladding under high-temperature accident scenario conditions. Calculations were compared with results from high performance computational simulations using BISON and are in very close agreement. A conservative MARVEL fuel meat peak temperature limit of 900 °C is recommended presently, which is about 180 °C higher than the peak fuel temperature predicted to occur during the most extreme accident. Based on the known properties and behavior of the MARVEL fuel element, the fuel successfully meets its design and safety requirements under normal and most extreme accident conditions with a large safety margin.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned Study Final Report for the Exploration Systems Mission Directorate

This report is the final product of a 90-day study performed for the Exploration Systems Mission Directorate. The study was to assemble lessons NASA has learned from previous programs that could help the Exploration Systems Mission Directorate pursue the Exploration vision. It focuses on those lessons that should have the greatest significance to the Directorate during the formulation of program and mission plans. The study team reviewed a large number of lessons learned reports and data bases, including the Columbia Accident Investigation Board and Rogers Commission reports on the Shuttle accidents, accident reports from robotic space flight systems, and a number of management reviews by the Defense Sciences Board, Government Accountability Office, and others. The consistency of the lessons, findings, and recommendations validate the adequacy of the data set. In addition to reviewing existing databases, a series of workshops was held at each of the NASA centers and headquarters that included senior managers from the current workforce as well as retirees. The full text of the workshop reports is included in Appendix A. A lessons learned website was opened up to permit current and retired NASA personnel and on-site contractors to input additional lessons as they arise. These new lessons, when of appropriate quality and relevance, will be brought to the attention of managers. The report consists of four parts: Part 1 provides a small set of lessons, called the Executive Lessons Learned, that represent critical lessons that the Exploration Systems Mission Directorate should act on immediately. This set of Executive Lessons and their supporting rationale have been reviewed at length and fully endorsed by a team of distinguished NASA alumni; Part 2 contains a larger set of lessons, called the Selected Lessons Learned, which have been chosen from the lessons database and center workshop reports on the basis of their specific significance and relevance to the near-term work of the Exploration Directorate. These lessons frequently support the Executive lessons but are more general in nature; Part 3 consists of the reports of the center workshops that were conducted as part of this activity. These reports are included in their entirety (approximately 200 pages) in Appendix G and have significance for specific managers; Part 4 consists of the remainder of the lessons that have been selected by this effort and assembled into a database for the use of the Explorations Directorate. The database is archived and hosted in the Lessons Learned Knowledge Network, which provides a flexible search capability using a wide variety of search terms. Finally, a spreadsheet lists databases searched and a bibliography identifies reports that have been reviewed as sources of lessons for this task. NASA has been presented with many learning opportunities. We have conducted numerous programs, some extremely successful and others total failures. Most have been documented with a formal lessons learned activity, but we have not always incorporated these learning opportunities into our normal modes of business. For example, the Robbins Report of 2001 clearly indicates that many project failures of the past two decades were the result of violating well documented best practices, often in direct violation of management instructions and directives. An overarching lesson emerges: that disciplined execution in accordance with proven best practices is the greatest single contributor to a successful program. The Lessons Learned task team offers a sincere hope that the lessons presented herein will be helpful to the Exploration Systems Directorate in charting and executing their course. The success of the Directorate and of NASA in general depends on our collective ability to move forward without having to relearn the lessons of those who have gone before.

Van Laak, Jim↗

What Went Wrong: A Survey of Wildfire UAS Mishaps through Named Entity Recognition

Increasingly, unmanned aircraft systems (UAS) are being applied to wildfire incidents for tasks such as mapping, aerial ignition, and delivery. As a result, aviation incident reporting systems for wildfires are beginning to accumulate data related to UAS mishaps in wildfire response. In this research, we apply state-of-the-art natural language processing (NLP) techniques to develop a custom Named Entity Recognition (NER) model which extracts entities relevant to safety analysts. The custom NER model is built by fine-tuning an existing Bidirectional Encoder Representations from Transformers (BERT) model, resulting in a generalizable NER model that can extract engineering relevant entities including failure modes, causes, effects, control processes, and recommendations from failure-relevant text. This model performs passably, with a weighted average f1 score of 0.33 across entity types, indicating more labeled training data is needed. Extracted entities are used to form a Failure Modes and Effects Analysis (FMEA)-style survey of wildfire UAS mishaps reported using the SAFECOM system. Similar mishaps are manually clustered and reported as single rows within an FMEA. Foreach cluster, we compute frequency, severity, and overall riskin accordance with FAA standards. This methodology can beapplied as part of a broader safety management system totrack trends in mishaps (e.g., likelihood, severity) and discoverknowledge (e.g., causes, effects) that can be utilized to improvesafety outcomes and system performance.

Machine Learning↗

Analyses of SPERT-CDC test 859 by FEMAXI-7 and RANNS codes

In the current Japanese regulation concerning fuel safety of water-cooled reactors, the criterion of fuel failure due to pellet-cladding mechanical interaction (PCMI) in a burnup range of 25-40 GWd/t is determined substantially based on the result of SPERT-CDC test 859 (SPERT859). However, there is room for discussion if the result of SPERT859 test rod with a burnup of 31.8 GWd/t represents the failure behavior of the fuel rod for commercial light water reactor because it was reported in some literatures that the cladding of SPERT859 test rod corroded excessively during pre-irradiation. On the other hand, the oxide thickness on the cladding of SPERT859 test rod was not reported in the data of its post-irradiation examinations (PIEs) after pre-irradiation, and the probability of the excessive corrosion on the cladding of the test rod and the effect of such excessive corrosion on the fuel enthalpy at failure of the test rod has not yet been clarified. In this study, the oxide thickness of the cladding formed on the cladding outer surface of SPERT859 test rod and its fuel enthalpy at failure due to PCMI under this corrosion condition were analyzed by using fuel performance codes FEMAXI-7 and RANNS. From the analysis results of FEMAXI-7, it was found that the excessive corrosion of the cladding of the test rod should be assumed to reproduce the fuel outer diameter measured in PIEs after pre-irradiation. The fuel enthalpy at failure of the test rod was calculated by using RANNS, and the calculated fuel enthalpy at failure was relatively close to the value of SPERT859 test rod. These results suggested that the fuel enthalpy at failure of SPERT859 was affected by the excessive corrosion on the cladding of the test rod and was likely lower than that of the typical fuel for light water reactors. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

System Study: Emergency Power System 1998–2018

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from 1998 through 2018 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the EPS results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2020

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from 1998 through 2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in the industry-wide estimates of EPS system start-only mission as well as EPS system unreliability (8-hour mission).

99 GENERAL AND MISCELLANEOUS↗