Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “eds”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

STS-26 Preflight Press Briefing: Other Payloads

This NASA KSC video release presents a press conference that discusses the commercial development and NASA science Mid-deck payloads of Discovery STS-26. Larry Delucas (Univ. Alabama-Birmingham, Center for Macromolecular Crystallography), Chris Podsiadly (3-M Co., Marshall Space Flight Center's (MSFC's) Rep. for Material Processing) and Ed Valentine (MSFC) present discussions of the science and commercial development that surround the Physical Vapor Transport of Organic Solids-2 (PVTOS-2) payload. Their presentations are followed by a question and answer period for journalists from scientific journals.

Source record↗

Hubble Space Telescope Briefing: HST Science Overview

This NASA Kennedy Space Center video release presents a broad overview of the science that is now possible as a result of the servicing of the Hubble Space Telescope (HST). Dr. Ed Weiler (HST Program Scientist, NASA Headquarters), Dr. Dave Leckrone (HST, Senior Project Scientist, Goddard Space Flight Center (GSFC)), Dr. John Trauger (Wide Field Planetary Camera 2 (WFPC2) Principal Investigator, Jet Propulsion Lab. (JPL)), Dr. Chris Burrows (WFPC2 Co-Investigator, Space Telescope Science Inst.(STSci)-European Space Agency (ESA), Jim Crocker ((Corrective Optics Space Telescope Axial Replacement) COSTAR Team Leader, STSci), Dr. Holland Ford (COSTAR Project Scientist, Johns Hopkins Univ., STSci), and Dr. Duccio Machetto (European Space Agency (ESA)) give brief presentations, which feature images of stars and galaxies taken from the ground, from WFPC1 (prior to the servicing mission), and from WFPC2 (after the servicing mission). The main theme of the discussions center around the spherical aberration that was found in the images prior to servicing and the corrected images seen without the aberration following servicing. A question and answer period rounds out the press conference, with questions posed from scientific journalists at GSFC and other NASA centers.

Source record↗

High Energy Continuum of High Redshift Quasars

Discussion with the RXTE team at GSFC showed that a sufficiently accurate background subtraction procedure had now, been derived for sources at the flux level of PKS 2126-158. However this solution does not apply to observations carried out before April 1997, including our observation. The prospect of an improved solution becoming available soon is slim. As a result the RXTE team agreed to re-observe PKS2126-158. The new observation was carried out in April 1999. Quasi-simultaneous optical observations were obtained, as Service observing., at the 4-meter Anglo-Australian Telescope, and ftp-ed from the AAT on 22April. The RXTE data was processed in late June, arriving at SAO in early July. Coincidentally, our collaborative Beppo-SAX observation of PKS2126-158 was made later in 1999, and a GTO Chandra observation (with which we are involved) was made on November 16. Since this gives us a unique monitoring data for a high redshift quasar over a broad pass-band we are now combining all three observations into a single comprehensive study Final publication of the RXTE data will thus take place under another grant.

Elvis, Martin↗

STS-93/ Chandra Science Briefing

This video shows a press briefing, reviewing the type of information which scientist hope to get from the Chandra X-ray Telescope. The telescope is scheduled to be launched during the STS-93 flight. The participants in the briefing are: Don Savage, of NASA Headquarters; Ed Weiler, Associate Administrator for Space Sciences; Alan Bunner, Chandra Project Scientist and Michael Turner, an astrophysicist at the University of Chicago. After the introduction by Mr. Savage, the broad scientific goals of the Chandra mission are reviewed by Dr. Weiler. This is followed by an acknowledgement of many of the people who participated in the development of the Chandra Telescope. This is followed by a discussion of the astrophysics and the information which the telescope should provide. Mrs. Chandrasekhar, the widow of Subrahmanyan Chandrasekhar, was in the audience. She was introduced and spoke briefly about the late Nobel Laureate astrophysicist.

Source record↗

STS-99 Countdown Status Briefing

Live footage shows the participants in the Press Conference disclosing the status of the STS-99 flight. The panelists consists of NASA's test Director Steve Altemus, the STS-99 Payload Manager Scott Higginbotham, and the Shuttle Weather Officer Ed Priselac. Joel Wells NASA's Public Affairs introduces each panelist as they discuss the problems with the left hand ignition cable, the potential change of the GPS receiver, payload status, and favorable weather conditions. The panel members also answered questions from members of the audience. Also shown are various shots of the Shuttle on the launch pad.

Source record↗

STS-99 Countdown Status Press Conference

Live footage shows the participants in the Press Conference disclosing the status of the STS-99 flight. The panelists consists of NASA's test Director Jeff Spaulding, the STS-99 Payload Manager Scott Higginbotham, and the Shuttle Weather Officer Ed Priselac. Bruce Buckingham NASA's Public Affairs introduces each panelist as they discuss the servicing of fuel tanks, checkout, closeouts, payload status, and favorable weather conditions. The panelists also answer questions from the audience. Also shown are various shots of the Shuttle on the launch pad.

Source record↗

STS-99 Countdown Status Briefing

After an introduction by Bruce Buckingham (NASA Public Affairs), participants Jeff Spaulding (NASA Test Director, Scott Higginbotham (STS-99 Payload Manager), and Ed Priselac (Shuttle Weather Officer) proceed with the countdown status briefing. They expressed that the opening countdown was proceeding well and servicing of the cryotanks was completed. The launch pad closeouts continued and the tanking process was in order. There was a card failure in the data handling processor, so a backup system was used.

Source record↗

STS-106 Crew Activity Report/Flight Day 11 Highlights

Live animation of the Space Shuttle Atlantis slowly pulling away from the International Space Station is presented. Pilot Scott Altman flew the Atlantis away from the I.S.S. and describes this process. A live view of Commander Terry Wilcutt, Pilot Scott Altman and Mission Specialists Ed Lu, Rick Mastracchio, Dan Burbank, Yuri Malenchenko and Boris Morukov aboard the Space Shuttle Atlantis is shown. The astronauts then answered questions inside the SpaceHab module about the living conditions aboard the I.S.S. and preparations that were made to the I.S.S. for the next crew to arrive.

Source record↗

STS-50 Countdown Status

George Diller of the NASA Public Affairs Office introduces Mike Leinbach, NASA Shuttle Test Director, Russ Lunnen, Kennedy Space Center (KSC) USML Payload Manager, and Ed Priselac, U.S. Airforce/KSC Weather Officer to give a briefing on the countdown status for STS-50. Leinbach gives an overview of when certain tests are run and what problems are encountered. Lunnen outlines the payload activities for the shuttle. Priselac describes the current weather as well as the conditions needed for launch. They also take questions from the press.

Source record↗

STS-97 Countdown Status

Joel Wells, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, David Flowers, P-6 Truss Integration Engineer, and Ed Priselac, Shuttle Weather Officer. Mr. Altemus describes the successful countdown thus far, and some of the prelaunch activities. Mr. Flowers gives an overview of the P-6 Truss and its role on the International Space Station (ISS). Mr. Priselac gives a forecast for good launching weather. The men then answer questions from the press.

Source record↗

STS-97 Countdown Status

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, David Flowers, P-6 Truss Integration Engineer, and Ed Priselac, Shuttle Weather Officer. Mr. Spaulding discusses the Shuttle status, successful countdown, and preflight preparations. Mr. Priselac describes a good weather forecast for the upcoming STS-97 Endeavour launch. The men then answer questions from the press.

Source record↗

STS-106 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Scott Higginbotham, KSC Payload Manager, and Ed Priselac, Shuttle Weather Officer. Mr. Spaulding discusses the successful countdown thus far and some of the prelaunch activities. Mr. Higginbotham describes the stow operations and possible changes in the payload configuration. Mr. Priselac forecasts good weather for the upcoming launch. The men then answer questions from the press.

Source record↗

STS-106 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Scott Higgenbotham, Kennedy Space Center Payload Manager, and Ed Priselac, Shuttle Weather Officer, who give an overview of the successful countdown for the STS-106 Atlantis mission thus far. Prelaunch activities and the payload status are described. The weather forecast for the upcoming launch is given. The men then answer questions from the press.

Source record↗

STS-106 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, Scott Higgenbotham, Kennedy Space Center Payload Manager, and Ed Priselac, Shuttle Weather Officer, who give an overview of the successful countdown for the STS-106 Atlantis mission thus far. Prelaunch activities are described, such as the engine preparations, the communications systems power up, final flight close outs, and payload status. The weather forecast for the upcoming launch is given. The men then answer questions from the press.

Source record↗

STS-53 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Mike Leinbach, Shuttle Test Director, and Ed Prisella, Shuttle Weather Officer, USAF. They give a summary of the countdown for the launch of STS-53 Discovery and information on the weather for the launch time. They then answer questions from the press.

Source record↗

CTE Measurements of Carbon Fibers in ESEM

The strong appeal of carbon fiber reinforced ceramic matrix and carbon-carbon composites arises from their promising high temperature performance within laboratory-simulated nozzle, leading edge and combustor environments. The main drawback in these systems are two fold; namely oxidation affinity and CTE mismatch. To date the emphasis has been on axial CTE mismatch with the push on estimating (component) laminate level data. However, in heterogeneous and anisotropic systems, all failure mechanisms are at micro or nano scales. This paper will report plans and progress on single carbon fibers efforts in order to develop its temperature dependent, anisotropic thermophysical and thermomechanical properties using combination of x-ray spectroscopy and environmental scanning electron microscopy to capture circumferential expansion from 20-900 C in within the SEM chamber. Surface roughness measurements were also determined. Crystallinity was also determined by the quality of the electron diffraction (ED) patterns.

Effinger, Michael↗

STS-102 Countdown Status

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Glenn Chin, Leonardo Payload Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Spaulding gives an overview of the status of the Discovery Orbiter, including the prelaunch procedures (payload inspection and closure, avionics check, and the loading of the onboard cyrogenic tanks), the countdown and built in time holds, launch window, Discovery launch, and the landing. Mr. Chin discusses the payload status, including specifications on the Multi-Purpose Logistics Module, and the hardware contamination inspection. Mr. Priselac describes the weather forecast for the upcoming launch. The men then answer questions from the press.

Source record↗

STS-102 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Pete Nickolenko, NASA Test Director, Glenn Chin, Leonardo Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Nickolenko gives an overview of the countdown and built-in hold times, the launch window, and prelaunch activities (such as activation and checkout of the onboard computer systems, closing the payload bay doors, servicing of the onboard cryogenic cell tanks, main engine tests, and power-up of the ground communications systems). Mr. Chin confirms that the payload is in the final flight configuration and is ready for launch. Mr. Priselac gives the weather forecast for the launch date. The men then answer questions from the press.

Source record↗