Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “delivery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Energy absorbing system for mechanical impacts

System is described based on use of arrangement of crushable hollow spheres bonded together in layers of progressively different diameter, with largest diameter spheres positioned to receive impact forces initially. System is particularly useful for delivery of payloads by air-drop techniques.

Collins, E. R., Jr.↗

In-space propellant logistics and safety

Preliminary guidelines for the basic delivery system and safety aspects of the space shuttle configuration in connection with the transport, handling, storage, and transfer of propellants are developed. It is shown that propellants are the major shuttle space load and influence shuttle traffic modeling significantly.

Source record↗

Apollo 14 mission food preparation unit leakage

A bubble of water collected on the delivery probe of the food preparation unit after hot water was dispensed by the Apollo 14 crew. Postflight tests showed that dimensional interference between the cylinder and the piston at hot water temperatures produced the apparent leak by causing erratic and slow stroke time of the valve assembly.

Source record↗

Space shuttle phase B extension, volume 1

In order to define a system which would significantly reduce payload delivery costs, activities were extended to modifications of the reusable space shuttle design concept. Considered were systems using orbiters with external propellant tanks and an interim expendable booster which allowed phased development of the usable orbiter and booster. Analyzed were: Merits of internal and external propellant tanks and the impact of external LH2 compared to L02 and LH2; impact of cargo bay size; impact abort; merit of expendable booster options; and merit of a phased development program. Studies showed that external L02/LH2 and the continued use of the J-2S engine on the orbiter reduced program cost and risk.

Source record↗

Preparation and evaluation of Apollo 14 composite experiments

An account is given of the work aimed at flight experiments on Apollo 14, in relation to space manufacturing processes. Evaluation of suitable materials, definition of in-flight processing procedures, preparation of preprocessed materials and delivery, and evaluation of the space-processed samples after return from the Apollo 14 flight are presented.

Steurer, W. H.↗

Specification, space station program (modular)

The modular concepts of a long-term manned scientific laboratory in earth orbit using the space shuttle for orbital buildup and logistics delivery are presented. The specifications defining the performance, design and verification requirements for the Modular Space Program are included.

Source record↗

A shuttle and space station manipulator system for assembly, docking, maintenance, cargo handling and spacecraft retrieval (preliminary design). Volume 3: Concept analysis. Part 2: Development program

A preliminary estimate is presented of the resources required to develop the basic general purpose walking boom manipulator system. It is assumed that the necessary full scale zero g test facilities will be available on a no cost basis. A four year development effort is also assumed and it is phased with an estimated shuttle development program since the shuttle will be developed prior to the space station. Based on delivery of one qualification unit and one flight unit and without including any ground support equipment or flight test support it is estimated (within approximately + or - 25%) that a total of 3551 man months of effort and $17,387,000 are required.

Source record↗

Study of optimum propellant production facilities for launch of space shuttle vehicles

An integrated propellant manufacturing plant and distribution system located at Kennedy Space Center is studied. The initial planned propellant and pressurant production amounted to 160 tons/day (TPD) LH2, 10 TPD GH2, 800 TPD LO2, 400 TPD LN2, and 120 TPD GN2. This was based on a shuttle launch frequency of 104 per year. During the study, developments occurred which may lower cryogen requirements. A variety of plant and processing equipment sizes and costs are considered for redundancy and supply level considerations. Steam reforming is compared to partial oxidation as a means of generating hydrogen. Electric motors, steam turbines, and gas turbines are evaluated for driving compression equipment. Various sites on and off Government property are considered to determine tradeoffs between costs and problems directly associated with the site, product delivery and storage costs, raw material costs, and energy costs. Coproduction of other products such as deuterium, methanol, and ammonia are considered. Legal questions are discussed concerning a private company's liabilities and its rights to market commercial products under Government tax and cost shelters.

Laclair, L. M.↗

Applicability of NASA contract quality management and failure mode effect analysis procedures to the USGS Outer Continental Shelf oil and gas lease management program

An approach that might be used for determining the applicability of NASA management techniques to benefit almost any type of down-to-earth enterprise is presented. A study was made to determine the following: (1) the practicality of adopting NASA contractual quality management techniques to the U.S. Geological Survey Outer Continental Shelf lease management function; (2) the applicability of failure mode effects analysis to the drilling, production, and delivery systems in use offshore; (3) the impact on industrial offshore operations and onshore management operations required to apply recommended NASA techniques; and (4) the probable changes required in laws or regulations in order to implement recommendations. Several management activities that have been applied to space programs are identified, and their institution for improved management of offshore and onshore oil and gas operations is recommended.

Dyer, M. K.↗

NASA work unit system users manual

The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles to indicate how much effort is being expended to what types of research, where the effort is being expended, and how funds are being distributed. The user obtains information by entering requests on the keyboard of a time-sharing terminal. Responses are received as video displays or typed messages at the terminal, or as lists printed in the computer room for subsequent delivery by messenger.

Source record↗

Space station data flow

The results of the space station data flow study are reported. Conceived is a low cost interactive data dissemination system for space station experiment data that includes facility and personnel requirements and locations, phasing requirements and implementation costs. Each of the experiments identified by the operating schedule is analyzed and the support characteristics identified in order to determine data characteristics. Qualitative and quantitative comparison of candidate concepts resulted in a proposed data system configuration baseline concept that includes a data center which combines the responsibility of reprocessing, archiving, and user services according to the various agencies and their responsibility assignments. The primary source of data is the space station complex which provides through the Tracking Data Relay Satellite System (TDRS) and by space shuttle delivery data from experiments in free flying modules and orbiting shuttles as well as from the experiments in the modular space station itself.

Source record↗

Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

Source record↗

Development and fabrication of insulator seals for thermionic diodes

Eight different types of cermet seals for thermionic diodes were investigated: (1) 1 micron Al2O3 with Nb spheres; (2) 200 A Al2O3 with Nb spheres; (3) 1 micron Al2O3 with Nb 1% Zr spheres; (4) 200 A Al2O3 with Nb 1% Zr spheres; (5) Pure Y2O3 with Nb 1% Zr spheres; (6) Y2O3 3% ZrO2 with Nb 1% Zr spheres; (7) Y2O3 10% ZrO2 with Nb 1% Zr spheres; and (8) ZrO2 12% Y2O3 with Nb 1% Zr spheres. Investigations were made to determine the most favorable fabrication techniques and the effect of the bonding cycle, (length of bonding time and shutdown sequences). The analysis of the seals included tensile test, vacuum test, electrical test and metallurgical examination. At the conclusion of the development phase, 36 seals were fabricated for delivery for evaluation.

Poirier, V. L.↗

Safety in earth orbit study. Volume 2: Analysis of hazardous payloads, docking, on-board survivability

Detailed and supporting analyses are presented of the hazardous payloads, docking, and on-board survivability aspects connected with earth orbital operations of the space shuttle program. The hazards resulting from delivery, deployment, and retrieval of hazardous payloads, and from handling and transport of cargo between orbiter, sortie modules, and space station are identified and analyzed. The safety aspects of shuttle orbiter to modular space station docking includes docking for assembly of space station, normal resupply docking, and emergency docking. Personnel traffic patterns, escape routes, and on-board survivability are analyzed for orbiter with crew and passenger, sortie modules, and modular space station, under normal, emergency, and EVA and IVA operations.

Source record↗

Extraterrestrial consumables production and utilization

Potential oxygen requirements for lunar-surface, lunar-orbit, and planetary missions are presented with emphasis on: (1) emergency survival of the crew, (2) provision of energy consumables for vehicles, and (3) nondependency on an earth supply of oxygen. Although many extraterrestrial resource processes are analytically feasible, this study has considered hydrogen and fluorine processing concepts to obtain oxygen or water (or both). The results are quite encouraging and are extrapolatable to other processes. Preliminary mission planning and sequencing analysis has enabled the programmatic evaluation of using lunar-derived oxygen relative to transportation cost as a function of vehicle delivery and operational capability.

Sanders, A. P.↗

Solar electric low-thrust Mercury orbiter missions.

Results of a preliminary study of unmanned Mercury orbiter missions which might be flown in the early 1980s. Five different levels of orbiter size and complexity are considered, ranging from a small orbiter carrying 22 kg of low data-rate instruments to a dual satellite mission employing 110 kg of science instruments emphasizing regional and local scale surface imagery. An Intermediate-20 class launch vehicle is required to deliver a minimal surface-imaging science package into Mercury orbit using a ballistic mission mode. Employment of a 15 kW solar electric low-thrust stage permits delivery of the more capable dual satellite package with a Titan IIID (5)/Centaur.

Klopp, D. A.↗

Satellites for U.S. education - Needs, opportunities and systems.

This paper presents results of a continuing interdisciplinary study of the potential applications of Fixed- and Broadcast-Satellites for educational information transfer in the United States for the period 1975-1985. The status of U.S. education is examined and needs, trends and issues are discussed. The existing educational telecommunications infrastructure is examined and opportunities for satellite services are defined. Potential uses include networking of educational institutions and service centers for delivery of public and instructional television, computer-aided instruction, computing and information resources to regions and groups not now adequately served. Systems alternatives and some of the organizational and economic issues inherent in the deployment of an educational satellite system are discussed.-

Morgan, R. P.↗