Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Empire. a study of early manned interplanetary missions final report, may 26 - nov. 25, 1962

This report summarizes the investigations and results of the EMPIRE Study Program undertaken by Aeronutronic Division of Ford Motor Company for the Future Projects Office, Marshall Space Flight Center, under Contract NAS8-5025. The dual planet flyby missions of the Crocco and Symmetric trajectory classes are discussed. The Crocco mission with an August 1971 launch window requires an interplanetary injection velocity increment of i0.i km/sec, has a return velocity of 13.5 km/sec, and takes approximately 400 days. The Symmetric mission with a July 1970 launch window has an injection velocity increment of 5.3 km/sec, a return velocity of 15.8 km/sec, and takes approximately 630 days. Additional results of the trajectory studies and abort trajectories are reported. The guidance and navigation subsystem, midcourse corrections, and planetary approach corrections are discussed. A detailed analysis of the reentry phase of EMPIRE includes consideration of an Apollo-type, a Drag Brake, and a lifting-type reentry vehicle to return the six-man crew at mission completion or in an aborted condition. The High L/D reentry vehicle is used in the missions considered. The various technological areas required for design criteria are developed and several spacecraft designs are considered. The all chemical propulsion Crocco system is discarded due to weight, complexity, and cost. The nuclear injected Crocco is treated in a similar manner. The lower energy injection for the Symmetric Mission leads to the feasibility of a nuclear injected vehicle with an Earth orbit weight of about 180,000 kilograms (400,000 pounds) before interplanetary transit. In addition, two chemical symmetric vehicles are treated. Conservative radiation exposures are derived, for the 630 day mission, of less than 200 REM and a polyethelene radiation shelter is designed. Scientific aspects of the missions are discussed. Mission Success Probabilities are presented for the various missions considered and for Saturn C-5, Nova, and Super-Nova Earth launch vehicles in light of possible development. The need for acceleration of nuclear rocket engine developments and auxiliary power developments is indicated. Definition of a larger nuclear engine of the order of 200,000 pounds thrust and about 800 seconds burning time or 50,000 pound thrust and 3600 seconds burning time is indicated for the Symmetric Mission in 1970 (energy requirements are higher in 1972 and for later launch due to the less favorable position of Mars)_ Immediate development of this advanced nuclear propulsion capability is recommended. A Development Plan and Funding Schedule is given for the 1970 launch window pinpointing the critical development areas and indicating a total program cost of $12.6 billion independent of other programmed R&D costs. In conclusion, technological feasibility for an early manned dual planet Mars-Venus flyby is believed to be demonstrated in this study. Several areas of accelerated development and experimental confirmation of theory are pinpointed. The necessary funding and development of Nova or orbital operations capability with Saturn C-5's is required. The 1970 launch window appears to offer the least expensive Symmetric Mission for several years into the 1980's.

F. P. Dixon↗

Ares I-X Flight Test--The Future Begins Here

In less than one year, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will send humans to the Moon and beyond. Personnel from the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for a 2009 launch. Ares I-X will be a suborbital development flight test that will gather critical data about the flight dynamics of the integrated launch vehicle stack; understand how to control its roll during flight; better characterize the severe stage separation environments that the upper stage engine will experience during future flights; and demonstrate the first stage recovery system. NASA also will modify the launch infrastructure and ground and mission operations. The Ares I-X Flight Test Vehicle (FTV) will incorporate flight and mockup hardware similar in mass and weight to the operational vehicle. It will be powered by a four-segment Solid Rocket Booster (SRB), which is currently in Shuttle inventory, and will include a fifth spacer segment and new forward structures to make the booster approximately the same size and weight as the five-segment SRB. The Ares I-X flight profile will closely approximate the flight conditions that the Ares I will experience through Mach 4.5, up to approximately 130,000 feet (39,600 meters (m)) and through maximum dynamic pressure ('Max Q') of approximately 800 pounds per square foot (38.3 kilopascals (kPa)). Data from the Ares I-X flight will support the Ares I Critical Design Review (CDR), scheduled for 2010. Work continues on Ares I-X design and hardware fabrication. All of the individual elements are undergoing CDRs, followed by a two-part integrated vehicle CDR in March and July 2008. The various hardware elements are on schedule to begin deliveries to Kennedy Space Center (KSC) in early September 2008. Ares I-X is the first step in the long journey to the Moon and farther destinations. This suborbital test will be NASA's first flight of a new human-rated launch vehicle in more than a generation. This promises to be an exciting time for NASA and the nation, as we reach for new goals in space exploration. A visual presentation is included.

Davis, Stephan R.↗

Rise and Shine: Using Light as a Countermeasure to Sleep Inertia

INTRODUCTION: Sleep inertia describes the phenomenon of sleepiness and poor performance experienced after waking from sleep. This period of impaired alertness and performance is of significant concern to workers who nap on shift, or work on-call and are required to perform safety-critical tasks soon after waking (e.g., emergency services, healthcare, military). Light has been shown to acutely improve alertness during sleep deprivation and circadian misalignment. In this study, we assessed the efficacy of blue-enriched light to improve alertness and mood immediately after waking from SWS, i.e., during the sleep inertia period. METHODS: Twelve participants kept a sleep schedule of 8.5 h for 5 nights and 5 h for one night prior to the overnight laboratory visit (confirmed by actigraphy). Participants went to bed at their scheduled habitual bedtime in the laboratory and were monitored by standard polysomnography. After at least 5 min of SWS, participants were awoken and exposed to either red ambient light (control) or blue-enriched light (light) for 1 h. During this time, participants completed a subjective scale of alertness (Karolinska Sleepiness Scale, KSS) and visual analogue scales (VAS) of mood at 2 min, 17 min, 32 min, and 47 min after waking. Following this sleep inertia measurement period, all lights were turned off and participants were allowed to return to sleep. They were then awoken again from their subsequent SWS period and exposed to the opposite condition (control or light). A linear mixed-effects model with fixed effects of condition, time, and condition*time and a random effect of participant was used to determine the impact of light across the testing period. An average of baseline responses (pre-sleep) was included as a covariate. RESULTS: Compared to the control condition, participants exposed to blue-enriched light reported feeling more alert (KSS: F1,77=4.955, p=.029; VASalert: F1,77=8.226, p=.005), more cheerful (VAScheerful: F1,77=8.615, p=.004), less depressed (VASdepressed: F1,77=4.649, p=.034), and less lethargic (VASlethargic: F1,77=5.652, p=.020). DISCUSSION: Exposure to blue-enriched light immediately after waking from SWS may help to improve subjective alertness and mood. Future analyses will explore whether these findings extend to effects on cognitive performance. This countermeasure to sleep inertia may be suitable for implementation to alert crew members during mid-sleep emergencies but requires further testing in field settings.

alertness↗

Revisiting the Soyuz-1 Parachute Failure in the Context of Safety in the Modern Era

The Soyuz‑1 accident remains one of the most consequential parachute related failures in human spaceflight history and provides enduring lessons for modern Entry, Descent, and Landing (EDL) system design. Occurring during the height of the Cold War and the Space Race, the mission unfolded under extraordinary political and schedule pressure as the Soviet Union sought to maintain its early leadership in space achievements following the death of chief designer Sergei Korolev. Despite unresolved propulsion, electrical, and parachute system deficiencies, Soyuz‑1 proceeded to launch and immediately encountered critical inflight anomalies, including a failed solar panel deployment, attitude control issues, and communication dropouts. Upon reentry, a malfunction in the parachute system, driven by a primary main canopy that failed to deploy, and subsequent entanglement of the reserve main canopy with the primary drogue parachute, resulted in insufficient deceleration and the fatal crash of cosmonaut Vladimir Komarov. Subsequent investigations revealed deep rooted cultural and organizational issues within the Soviet space program, including inadequate testing, suppression of dissent, undocumented last minute design changes, and the absence of integrated parachute system verification. More than 200 design flaws were identified after the accident, and firsthand accounts, including those from Yuri Gagarin, highlighted widespread concern prior to launch. Over time, the Soviet program implemented substantial reforms: systematic design corrections, rigorous process documentation, and an extensive series of drop tests that ultimately transformed the Soyuz system into one of the world’s most reliable human-rated return vehicles. This paper examines the technical architecture of the Soyuz‑1 parachute system, reconstructs the likely deployment sequence and failure mechanism, and analyzes the cultural contributors that shaped the accident. The study draws parallels to modern spacecraft parachute development, emphasizing the critical importance of integrated system testing, transparent engineering culture, and continuous hardware surveillance. These lessons remain directly relevant to today’s NASA and Commercial Crew Programs (CCP), where the Government continues to refine its understanding of aggregate risk and strengthen overall astronaut safety in the face of increasingly complex parachute systems.

Aaron L Morris↗

NASA Langley Research Center Systems Analysis & Concepts Directorate Participation in the Exploration Systems Architecture Study

The NASA Langley Research Center (LaRC) Systems Analysis & Concepts Directorate (SACD) began studying human exploration missions beyond low Earth orbit (LEO) in the year 1999. This included participation in NASA s Decadal Planning Team (DPT), the NASA Exploration Team (NExT), Space Architect studies and Revolutionary Aerospace Systems Concepts (RASC) architecture studies that were used in formulating the new Vision for Space Exploration. In May of 2005, NASA initiated the Exploration Systems Architecture Study (ESAS). The primary outputs of the ESAS activity were concepts and functional requirements for the Crewed Exploration Vehicle (CEV), its supporting launch vehicle infrastructure and identification of supporting technology requirements and investments. An exploration systems analysis capability has evolved to support these functions in the past and continues to evolve to support anticipated future needs. SACD had significant roles in supporting the ESAS study team. SACD personnel performed the liaison function between the ESAS team and the Shuttle/Station Configuration Options Team (S/SCOT), an agency-wide team charged with using the Space Shuttle to complete the International Space Station (ISS) by the end of Fiscal Year (FY) 2010. The most significant of the identified issues involved the ability of the Space Shuttle system to achieve the desired number of flights in the proposed time frame. SACD with support from the Kennedy Space Center performed analysis showing that, without significant investments in improving the shuttle processing flow, that there was almost no possibility of completing the 28-flight sequence by the end of 2010. SACD performed numerous Lunar Surface Access Module (LSAM) trades to define top level element requirements and establish architecture propellant needs. Configuration trades were conducted to determine the impact of varying degrees of segmentation of the living capabilities of the combined descent stage, ascent stage, and other elements. The technology assessment process was developed and implemented by SACD as the ESAS architecture was refined. SACD implemented a rigorous and objective process which included (a) establishing architectural functional needs, (b) collection, synthesis and mapping of technology data, and (c) performing an objective decision analysis resulting in technology development investment recommendations. The investment recommendation provided budget, schedule, and center/program allocations to develop required technologies for the exploration architecture, as well as the identification of other investment opportunities to maximize performance and flexibility while minimizing cost and risk. A summary of the trades performed and methods utilized by SACD for the Exploration Systems Mission Directorate (ESAS) activity is presented along with how SACD is currently supporting the implementation of the Vision for Space Exploration.

Keyes, Jennifer↗

Challenges of CPAS Flight Testing

The Crew Exploration Vehicle Parachute Assembly System (CPAS) is being designed to land the Orion Crew Module (CM) at a safe rate of descent at splashdown via a series of Drogue, Pilot, and Main parachutes. Because Orion is considerably larger and heavier than Apollo, many of the flight test techniques developed during the Apollo program must be modified. The Apollo program had a dedicated C-133 aircraft, which was modified to allow a simple airdrop of "boilerplate" flight test vehicles. However, the CPAS program must use either commercial or military assets with minimal modifications to airframes or procedures. Conceptual envelopes from 2-Degree Of Freedom trajectories are presented for several existing and novel architectures. Ideally, the technique would deliver a representative capsule shape to the desired altitude and dynamic pressure at test initiation. However, compromises must be made on the characteristics of trajectories or the fidelity of test articles to production hardware. Most of the tests to date have used traditional pallet and weight tub or missile-shaped test vehicles. New test vehicles are being designed to better incorporate Orion structural components and deploy parachutes in a more representative fashion. The first attempt to test a capsule-shaped vehicle failed due to unexpected events while setting up the test condition through a series of complex procedures. In order to avoid the loss of another expensive test article which will delay the program, simpler deployment methods are being examined and more positive control of the vehicle will be maintained. Existing challenges include interfacing with parent aircraft, separating test vehicles, achieving test conditions, and landing within limited test ranges. All these challenges must be met within cost and schedule limits.

Ray, Eric S.↗

Hazards of Lunar Surface Exploration: Determining the Immunogenicity/Allergenicity of Lunar Dust

There are multiple Apollo program reports of lunar dust (LD) exposure leading to significant upper respiratory symptoms in select crewmembers. Possible mechanisms include particulate irritation, oxidization and release of noxious gas, or legitimate adaptive immune-mediated response. Although sterile non-protein matter would not be expected to be an allergen, one Apollo flight surgeon reported increasing symptoms upon repeated exposure, with associated eosinophilia indicative of allergy (*Acta Astronautica. 2008 63 (7–10): 980–987). Many ISS crews display a pattern of persistent immune system dysregulation and latent virus reactivation (NPJ Microgravity. 2015 Sep 3; 1:15013; NPJ Microgravity. 2017 Apr 12; 3:11). Some ISS crews manifest atypical respiratory and/or dermatitis symptoms which could have an allergic pathogenesis (J Allergy Clin. Immunol. Pract. 2016 Jul-Aug; 4(4):759-762.e8). It is logical to anticipate crew immune dysregulation would worsen during prolonged deep space missions. Planetary surface hazards will only complicate crew health risks. This study hypothesizes that LD exposure can alter susceptible individuals’ immune responses such that repeated exposure will elicit an IgE mediated allergic response either to the LD itself or concomitant antigen exposure during spaceflight. This will adversely increase clinical and operational impacts for long-duration lunar astronauts and affect countermeasure requirements for surface vehicles. Specific aims for this study are (1) Does in vitro LD exposure result in increased histamine from human peripheral blood basophils? (2) Can LD impact the capacity of CD4+ helper and/or CD19+ B-cell mediated IgE production? To address these questions, a set of in-vitro cell culture experiments will be employed (short and long term) using human peripheral blood mononuclear cells (PBMC) and basophils from both atopic and non-atopic individuals, as well as established human basophil and mast cell lines. Cells will be co-cultured with cellular mitogens, common recall antigens (tetanus, Der p1), nickel (as a possible allergenic component of LD), with or without graded amounts of LD, to study whether LD exposure for varying time intervals will alter the generation of selective immune responses associated with clinical allergic reactions. Measured outputs include supernatant-derived IgE, tryptase, histamine and selected cytokine levels. Cellular activation will be monitored by assessing activation markers via flow cytometry. EM/x-ray analysis will be used to determine cellular interactions with dust particles. The minimal amount of LD (Apollo 14 dust) and controls/simulants have been requested. This study, originally planned as an FY20/21 activity, was delayed due to the COVID pandemic. It is now scheduled to be performed during FY22.

Brian Crucian↗

STS-109 Mission Highlights Resource Tape: Flight Days 4 & 5 - Part 2 of 4

This video, Part 2 of 4, shows the activities of the STS-109 crew (Scott Altman, Commander; Duane Carey, Pilot; John Grunsfeld, Payload Commander; Nancy Currie, James Newman, Richard Linnehan, Michael Massimino, Mission Specialists) during flight days 4 and 5. The activities from other flights days can be seen on 'STS-109 Mission Highlights Resource Tape' Part 1 of 4 (internal ID 2002139471), 'STS-109 Mission Highlights Resource Tape' Part 3 of 4 (internal ID 2002139476), and 'STS-109 Mission Highlights Resource Tape' Part 4 of 4 (internal ID 2002137577). The primary activities during these days were EVAs (extravehicular activities) to replace two solar arrays on the HST (Hubble Space Telescope). Footage from flight day 4 records an EVA by Grunsfeld and Linnehan, including their exit from Columbia's payload bay airlock, their stowing of the old HST starboard rigid array on the rigid array carrier in Columbia's payload bay, their attachment of the new array on HST, the installation of a new starboard diode box, and the unfolding of the new array. The pistol grip space tool used to fasten the old array in its new location is shown in use. The video also includes several shots of the HST with Earth in the background. On flight day 5 Newman and Massimino conduct an EVA to change the port side array and diode box on HST. This EVA is very similar to the one on flight day 4, and is covered similarly in the video. A hand operated ratchet is shown in use. In addition to a repeat of the previous tasks, the astronauts change HST's reaction wheel assembly, and because they are ahead of schedule, install installation and lubricate an instrument door on the telescope. The Earth views include a view of Egypt and Israel, with the Nile River, Red Sea, and Mediterranean Sea.

Source record↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

BACKGROUND This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. METHODS Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. RESULTS The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. DISCUSSION These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

Background: This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. Methods: Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. Results: The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. Discussion: These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Assessing fatigue

Despite impressive advances in aircraft technology over the past several decades and an overall decline in the airline accident rate since the introduction of turbine-powered aircraft, flight crew performance problems continue to dominate air transport accident statistics. Researchers have offered many hypotheses to explain this finding, and interest in pilot fatigue has stimulated a large volume of laboratory research. Much of this work, however, is difficult to generalize and to apply to the real world of flight operations, and researchers disagree about the extent and operational significance of fatigue-related reductions in pilot performance. As a result, in 1980 Congress asked the National Aeronautics and Space Administration to undertake a comprehensive research program to assess whether fatigue-related problems are prevalent in long- and short-haul flying. The two major goals of this project are: (1) to assess the psychophysiological effects on pilot performance of flying various types of flight and duty cycles, and (2) to determine the operational significance to flight safety and efficiency of flying these flight and duty cycles.

NASA Discipline Space Human Factors↗

The Life Cycle Application of Intelligent Software Modeling for the First Materials Science Research Rack

Marshall Space Flight Center (MSFC) has been funding development of intelligent software models to benefit payload ground operations for nearly a decade. Experience gained from simulator development and real-time monitoring and control is being applied to engineering design, testing, and operation of the First Material Science Research Rack (MSRR-1). MSRR-1 is the first rack in a suite of three racks comprising the Materials Science Research Facility (MSRF) which will operate on the International Space Station (ISS). The MSRF will accommodate advanced microgravity investigations in areas such as the fields of solidification of metals and alloys, thermo-physical properties of polymers, crystal growth studies of semiconductor materials, and research in ceramics and glasses. The MSRR-1 is a joint venture between NASA and the European Space Agency (ESA) to study the behavior of different materials during high temperature processing in a low gravity environment. The planned MSRR-1 mission duration is five (5) years on-orbit and the total design life is ten (IO) years. The MSRR-1 launch is scheduled on the third Utilization Flight (UF-3) to ISS, currently in February of 2003). The objective of MSRR-1 is to provide an early capability on the ISS to conduct material science, materials technology, and space product research investigations in microgravity. It will provide a modular, multi-user facility for microgravity research in materials crystal growth and solidification. An intelligent software model of MSRR-1 is under development and will serve multiple purposes to support the engineering analysis, testing, training, and operational phases of the MSRR-1 life cycle development. The G2 real-time expert system software environment developed by Gensym Corporation was selected as the intelligent system shell for this development work based on past experience gained and the effectiveness of the programming environment. Our approach of multi- uses of the simulation model and its intuitive graphics capabilities is providing a concurrent engineering environment for rapid prototyping and development. Operational schematics of the MSRR-1 electrical, thermal control, vacuum access, and gas supply systems, and furnace inserts are represented graphically in the environment. Logic to represent first order engineering calculations is coded into the knowledge base to simulate the operational behavior of the MSRR-1 systems. An example of engineering data provided includes electrical currents, voltages, operational power, temperatures, thermal fluid flow rates. pressures, and component status indications. These type of data are calculated and displayed at appropriate instrumentation points, and the schematics are animated to reflect the simulated operational status of the MSRR-1. The software control functions are also simulated to represent appropriate operational behavior based on automated control and response to commands received by the crew or ground controllers. The first benefit of this simulation environment is being realized in the high fidelity engineering analysis results from the electrical power system G2 model. Secondly, the MSRR-1 simulation model will be embedded with a hardware mock-up of the MSRR-1 to provide crew training on MSRR-1 integrated payload operations. G2 gateway code will output the simulated instrumentation values, termed as telemetry, in a flight-like data stream so that the crew has realistic and accurate simulated MSRR-1 data on the flight displays which will be designed for crew use. The simulation will also respond appropriately to crew or ground initiated commands, which will be part of normal facility operations. A third use of the G2 model is being planned; the MSRR-1 simulation will be integrated with additional software code as part of the test configuration of the primary onboard computer, or Master Controller, for MSRR-1. We will take advantage of the G2 capability to simulate the flight like data stream to test flight software responses and behavior. A fourth use of the G2 model will be to train the Ground Support Personnel that will monitor the MSRR-1 systems and payloads while they are operating aboard the ISS. The intuitive, schematic based environment will provide an excellent foundation for personnel to understand the integrated configuration and operation of the MSRR-1, and the anticipated telemetry feedback based on operational modes of the equipment. Expert monitoring features will be enhanced to provide a smart monitoring environment for the operators. These features include: (1) Animated, intuitive schematic-based displays which reflect telemetry values, (1) Real-time plotting of simulated or incoming sensor values, (3) High/Low exception monitoring for analog data, (4) Expected state monitoring for discrete data, (5) Data trending, (6) Automated malfunction procedure execution to diagnose problems, (7) Look ahead capability to planned MSRR-1 activities in the onboard timeline. And finally, the logic to calculate telemetry values will be deactivated, and the same environment will interface to the incoming data for the real-time telemetry stream to schematically represent the onboard hardware configuration. G2 will be the foundation for the real-time monitoring and control environment. In summary, our MSRR-1 simulation model spans many elements of the life cycle development of this project: Engineering Analysis, Test and Checkout, Training of Crew and Ground Personnel, and Real-time monitoring and control. By utilizing the unique features afforded by an expert system development environment, we have been able to synergize a powerful tool capable of addressing our project needs at every phase of project development.

Rice, Amanda↗

The NASA Bed Rest Project

NASA s National Vision for Space Exploration includes human travel beyond low earth orbit and the ultimate safe return of the crews. Crucial to fulfilling the vision is the successful and timely development of countermeasures for the adverse physiological effects on human systems caused by long term exposure to the microgravity environment. Limited access to in-flight resources for the foreseeable future increases NASA s reliance on ground-based analogs to simulate these effects of microgravity. The primary analog for human based research will be head-down bed rest. By this approach NASA will be able to evaluate countermeasures in large sample sizes, perform preliminary evaluations of proposed in-flight protocols and assess the utility of individual or combined strategies before flight resources are requested. In response to this critical need, NASA has created the Bed Rest Project at the Johnson Space Center. The Project establishes the infrastructure and processes to provide a long term capability for standardized domestic bed rest studies and countermeasure development. The Bed Rest Project design takes a comprehensive, interdisciplinary, integrated approach that reduces the resource overhead of one investigator for one campaign. In addition to integrating studies operationally relevant for exploration, the Project addresses other new Vision objectives, namely: 1) interagency cooperation with the NIH allows for Clinical Research Center (CRC) facility sharing to the benefit of both agencies, 2) collaboration with our International Partners expands countermeasure development opportunities for foreign and domestic investigators as well as promotes consistency in approach and results, 3) to the greatest degree possible, the Project also advances research by clinicians and academia alike to encourage return to earth benefits. This paper will describe the Project s top level goals, organization and relationship to other Exploration Vision Projects, implementation strategy, address Project deliverables, schedules and provide a status of bed rest campaigns presently underway.

Rhodes, Bradley↗

Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are underway with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex S.↗

Using Open Standards and NASA Open Source Simulation Tools to Model Artemis Base Camp Mission Timelines

The United States’ National Aeronautics and Space Administration (NASA) has announced that the Artemis Program will return humans to the Moon, establishing a persistent presence with the Artemis Base Camp (ABC), and extend human exploration to Mars. The NASA Exploration Systems Simulations (NExSyS) team at NASA’s Johnson Space Center is using internationally developed simulation interoperability standards and NASA open source simulation tools to support Artemis concept, analysis, designs, development, training, and ultimately operations. The NExSyS team has been tasked to support early ABC architecture and mission analysis using mission time lines developed by the crew operations mission planning team. The NExSyS team is developing a distributed simulation framework with initial Artemis element implementations to model the ABC mission timelines using the international simulation interoperability standard High Level Architecture (HLA), the Simulation Interoperability Standards Organization’s Space Reference Federation Object Model (SpaceFOM), the NASA open source Trick Simulation Environment, and another NASA open source interface package called TrickHLA. The ABC architecture is composed of a number of key surface elements and resources. Some examples of modeled elements (also known as entities) are landers, habitats, rovers, logistics carriers, and astronauts. Some examples of modeled transferable and consumable resources are power, water, oxygen, nitrogen, scientific samples, and food. These entities and resources are modeled in a collection of individual simulations called Federates. A coordinated collection of interoperable federates is called a Federation and when these federates are tied together in a coordinated simulation run, it is referred to as a Federation Execution. The federates communicate through HLA using data exchange formats defined by a collection of machine readable files called Federation Object Models (FOMs). These FOM files are based on extensions to the SpaceFOM. This enables the instantiation and sharing of objects and interactions between federates in the federation. These provide for entity and resource tracking, object transfer, and data collection. Federate interactions are used to trigger events and notify federates of entity or resource transfers. For the initial implementation, the constituent federates are Trick-based simulations that use TrickHLA to provide the required HLA-base interoperability. These Trick-based simulations provide the required modeling for the individual Artemis elements along with the associated element resources. These federates provide a means to explore traverses between surface elements and exploration sites as scheduled in a mission timeline and explore the affects traverse times have on the overall mission timeline. The mission time lines are modeled using a Trick input file event handling capabilities. Each timeline operation is handled as individual simulation events, and triggered based on previous event status, time of operation, and simulated task completions. In addition, the ABC Federation can be used to perform Monte Carlo analysis. The Monte Carlo tool can vary the inputs, timings, and malfunctions to show how various contingencies in the mission can affect the mission timeline.

Keaton Craig Dodd↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity (Pilot Egress Fitness)

As NASA prepares for exploration missions, it will be critical to understand and build upon known crew capabilities. Specifically, we need to know the functional capacities of crew at different stages of a mission and characterize these profiles so that the appropriate vehicle requirements and mission concepts of operations (ConOps) can be developed. One of the most complex phases of any missions is when there is a transition between gravity environments. For instance, both physiological adaptation to microgravity and subsequent re-entry into a gravity environment result in reduced functional capacity, even with rigorous adherence to inflight countermeasures. Quantification of the astronauts’ post-landing functional performance is necessary to design ConOps for exploration missions. Specifically, these two high-risk tasks may have to be performed soon after gravity transitions: •Unassisted capsule egress task after return to Earth •Planetary extravehicular activity (EVA) soon after landing on Mars or the Moon This study has been broken down into two phases. A pilot phase to assess the overall feasibility and demonstrate the capability to do these tasks shortly after landing and the full Egress Fitness study, which will be part of the CIPHER complement. This study uses a functional task approach to characterize performance of these high-risk tasks in long-duration ISS crewmembers before flight and shortly after return to Earth. Prior to any testing, each astronaut subject completes a suit fit check to ensure adequate sizing and mobility to be able to complete the EVA tasks. Pilot Egress Fitness pre-flight and post-flight testing includes an Earth based emergency egress out of a functional capsule mockup, and a short Mars gravity EVA simulation including suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. Pre-flight testing can occur almost anytime pre-flight, but post-flight scheduling is much more critical with the capsule egress test occurring 1-4 hours after landing and the planetary EVA approximately 18-36 hours after landing. Data collected for both tasks includes task completion time, photo, and video. The EVA portion also includes collection of metabolic and heart rate. Pilot Egress Fitness study has completed baseline pre-flight testing on 3 astronaut subjects. Post-flight testing of the first two subjects will be completed in November 2021 and the final subject around March 2022. Results and lessons learned from this pilot study will inform the full Egress Fitness study, which will incorporate additional pre-flight sessions, longer EVA tasks, and post-flight testing on R+1, 4, and 7 to characterize the timeframe of recovery

J R Norcross↗

NASA's Space Launch System: Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are under way with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances the odds of mission success. SLS will be powered by four liquid fuel RS-25 engines and two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex↗