Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

A Data System for a Rapid Evaluation Class of Subscale Aerial Vehicle

A low cost, rapid evaluation, test aircraft is used to develop and test airframe damage diagnosis algorithms at Langley Research Center as part of NASA's Aviation Safety Program. The remotely operated subscale aircraft is instrumented with sensors to monitor structural response during flight. Data is collected for good and compromised airframe configurations to develop data driven models for diagnosing airframe state. This paper describes the data acquisition system (DAS) of the rapid evaluation test aircraft. A PC/104 form factor DAS was developed to allow use of Matlab, Simulink simulation code in Langley's existing subscale aircraft flight test infrastructure. The small scale of the test aircraft permitted laboratory testing of the actual flight article under controlled conditions. The low cost and modularity of the DAS permitted adaptation to various flight experiment requirements.

Hogge, Edward F.↗

Active Control of the Forced and Transient Response of a Finite Beam

When studying structural vibrations resulting from a concentrated source, many structures may be modelled as a finite beam excited by a point source. The theoretical limit on cancelling the resulting beam vibrations by utilizing another point source as an active controller is explored. Three different types of excitation are considered, harmonic, random, and transient. In each case, a cost function is defined and minimized for numerous parameter variations. For the case of harmonic excitation, the cost function is obtained by integrating the mean squared displacement over a region of the beam in which control is desired. A controller is then found to minimize this cost function in the control interval. The control interval and controller location are continuously varied for several frequencies of excitation. The results show that control over the entire beam length is possible only when the excitation frequency is near a resonant frequency of the beam, but control over a subregion may be obtained even between resonant frequencies at the cost of increasing the vibration outside of the control region. For random excitation, the cost function is realized by integrating the expected value of the displacement squared over the interval of the beam in which control is desired. This is shown to yield the identical cost function as obtained by integrating the cost function for harmonic excitation over all excitation frequencies. As a result, it is always possible to reduce the cost function for random excitation whether controlling the entire beam or just a subregion, without ever increasing the vibration outside the region in which control is desired. The last type of excitation considered is a single, transient pulse. A cost function representative of the beam vibration is obtained by integrating the transient displacement squared over a region of the beam and over all time. The form of the controller is chosen a priori as either one or two delayed pulses. Delays constrain the controller to be causal. The best possible control is then examined while varying the region of control and the controller location. It is found that control is always possible using either one or two control pulses. The two pulse controller gives better performance than a single pulse controller, but finding the optimal delay time for the additional controllers increases as the square of the number of control pulses.

Post, John Theodore↗

Manager's Role in Electromagnetic Interference (EMI) Control

This presentation captures the essence of electromagnetic compatibility (EMC) engineering from a project manager's perspective. It explains the basics of EMC and the benefits to the project of early incorporation of EMC best practices. The EMC requirement products during a project life cycle are identified, along with the requirement verification methods that should be utilized. The goal of the presentation is to raise awareness and simplify the mystique surrounding electromagnetic compatibility for managers that have little or no electromagnetics background

Safety↗

Cost-Benefit Assessment of Additive Manufacturing for Injection Molds

This report presents an additive-manufacturing (AM) technology, where AM Cyclic Olefin Resin (COR) molds would be used for injection molding. The National Laboratory of the Rockies (NLR) team has focused on the costs and economics of this developing technology. This report presents a cost-benefit analysis of using the polySpectra AM COR molds made of COR, at the start of the project (Present') and the potential lifetime, cost-effectiveness, and performance by the end of the project period (Period 3'). The analysis of the AM COR molds is compared to traditional Computer Numerical Control (CNC) machined aluminum molds across the time periods. A cost-benefit model framework has been developed to evaluate AM COR molds. This model accounts for mold delivery to customers, current and future levels of technology readiness, the type of material injected, and various business cases. AM COR molds offer a major advantage in lead time, reducing production setup from weeks or months (with CNC machining) to as little as two to five days. This enables faster prototyping, quicker design cycles, and accelerated time-to-market, critical in industries like electronics, aerospace, medical devices, and automotive. Even modest improvements in the durability of polySpectra AM COR molds show the potential for these molds to complement traditional tooling. With further development, AM COR mold technology could provide significant time and cost savings while supporting increased domestic manufacturing capacity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modal cost analysis for linear matrix-second-order systems

Reduced models and reduced controllers for systems governed by matrix-second-order differential equations are obtained by retaining those modes which make the largest contributions to quadratic control objectives. Such contributions, expressed in terms of modal data, used as mode truncation criteria, allow the statement of the specific control objectives to influence the early model reduction from very high order models which are available, for example, from finite element methods. The relative importance of damping, frequency, and eigenvector in the mode truncation decisions are made explicit for each of these control objectives: attitude control, vibration suppression and figure control. The paper also shows that using modal cost analysis (MCA) on the closed loop modes of the optimally controlled system allows the construction of reduced control policies which feedback only those closed loop modal coordinates which are most critical to the quadratic control performance criterion. In this way, the modes which should be controlled (and hence the modes which must be observable by choice of measurements), are deduced from truncations of the optimal controller.

Skelton, R. E.↗

The Discounted Method and Equivalence of Average Criteria for Risk-Sensitive Markov Decision Processes on Borel Spaces

This note concerns discrete-time controlled Markov chains with Borel state and action spaces. Given a nonnegative cost function, the performance of a control policy is measured by the superior limit risk-sensitive average criterion associated with a constant and positive risk sensitivity coefficient. Within such a framework, the discounted approach is used (a) to establish the existence of solutions for the corresponding optimality inequality, and (b) to show that, under mild conditions on the cost function, the optimal value functions corresponding to the superior and inferior limit average criteria coincide on a certain subset of the state space. The approach of the paper relies on standard dynamic programming ideas and on a simple analytical derivation of a Tauberian relation.

97 MATHEMATICS AND COMPUTING↗

Virtualization - A Key Cost Saver in NASA Multi-Mission Ground System Architecture

With science team budgets being slashed, and a lack of adequate facilities for science payload teams to operate their instruments, there is a strong need for innovative new ground systems that are able to provide necessary levels of capability processing power, system availability and redundancy while maintaining a small footprint in terms of physical space, power utilization and cooling.The ground system architecture being presented is based off of heritage from several other projects currently in development or operations at Goddard, but was designed and built specifically to meet the needs of the Science and Planetary Operations Control Center (SPOCC) as a low-cost payload command, control, planning and analysis operations center. However, this SPOCC architecture was designed to be generic enough to be re-used partially or in whole by other labs and missions (since its inception that has already happened in several cases!)The SPOCC architecture leverages a highly available VMware-based virtualization cluster with shared SAS Direct-Attached Storage (DAS) to provide an extremely high-performing, low-power-utilization and small-footprint compute environment that provides Virtual Machine resources shared among the various tenant missions in the SPOCC. The storage is also expandable, allowing future missions to chain up to 7 additional 2U chassis of storage at an extremely competitive cost if they require additional archive or virtual machine storage space.The software architecture provides a fully-redundant GMSEC-based message bus architecture based on the ActiveMQ middleware to track all health and safety status within the SPOCC ground system. All virtual machines utilize the GMSEC system agents to report system host health over the GMSEC bus, and spacecraft payload health is monitored using the Hammers Integrated Test and Operations System (ITOS) Galaxy Telemetry and Command (TC) system, which performs near-real-time limit checking and data processing on the downlinked data stream and injects messages into the GMSEC bus that are monitored to automatically page the on-call operator or Systems Administrator (SA) when an off-nominal condition is detected. This architecture, like the LTSP thin clients, are shared across all tenant missions.Other required IT security controls are implemented at the ground system level, including physical access controls, logical system-level authentication authorization management, auditing and reporting, network management and a NIST 800-53 FISMA-Moderate IT Security plan Risk Assessment Contingency Plan, helping multiple missions share the cost of compliance with agency-mandated directives.The SPOCC architecture provides science payload control centers and backup mission operations centers with a cost-effective, standardized approach to virtualizing and monitoring resources that were traditionally multiple racks full of physical machines. The increased agility in deploying new virtual systems and thin client workstations can provide significant savings in personnel costs for maintaining the ground system. The cost savings in procurement, power, rack footprint and cooling as well as the shared multi-mission design greatly reduces upfront cost for missions moving into the facility. Overall, the authors hope that this architecture will become a model for how future NASA operations centers are constructed!

Ground System Architecture↗

Synthesis Study on Transitions in Signal Infrastructure and Control Algorithms for Connected and Automated Transportation

Documenting existing state of practice is an initial step in developing future control infrastructure to be co-deployed for heterogeneous mix of connected and automated vehicles with human drivers while leveraging benefits to safety, congestion, and energy. With advances in information technology and extensive deployment of connected and automated vehicle technology anticipated over the coming decades, cities globally are making efforts to plan and prepare for these transitions. CAVs not only offer opportunities to improve transportation systems through enhanced safety and efficient operations of vehicles. There are also significant needs in terms of exploring how best to leverage vehicle-to-vehicle (V2V) technology, vehicle-to-infrastructure (V2I) technology and vehicle-to-everything (V2X) technology. Both Connected Vehicle (CV) and Connected and Automated Vehicle (CAV) paradigms feature bi-directional connectivity and share similar applications in terms of signal control algorithm and infrastructure implementation. The discussion in our synthesis study assumes the CAV/CV context where connectivity exists with or without automated vehicles. Our synthesis study explores the current state of signal control algorithms and infrastructure, reports the completed and newly proposed CV/CAV deployment studies regarding signal control schemes, reviews the deployment costs for CAV/AV signal infrastructure, and concludes with a discussion on the opportunities such as detector free signal control schemes and dynamic performance management for intersections, and challenges such as dependency on market adaptation and the need to build a fault-tolerant signal system deployment in a CAV/CV environment. The study will serve as an initial critical assessment of existing signal control infrastructure (devices, control instruments, and firmware) and control schemes (actuated, adaptive, and coordinated-green wave). Also, the report will help to identify the future needs for the signal infrastructure to act as the nervous system for urban transportation networks, providing not only signaling, but also observability, surveillance, and measurement capacity. The discussion of the opportunities space includes network optimization and control theory perspectives, and the current states of observability for key system parameters (what can be detected, how frequently can it be reported) as well as controllability of dynamic parameters (this includes adjusting not only the signal phase and timing, but also the ability to alter vehicle trajectories through information or direct control). The perspective of observability and controllability of the dynamic systems provides an appropriate lens to discuss future directions as CAV/CV become more prevalent in the future.

33 ADVANCED PROPULSION SYSTEMS↗

Developing Software For A Flight-Control System

Improved process for development of flight-control software devised by integrating conventional software-development process with conventional control-system-analysis process. Reduces costs of development, eliminates need for reengineering, and almost eliminates production errors. Concept applicable to design of other control systems and of complicated hardware-and-software systems in general.

Murray, Jonathan↗

Power line communication system and method of auto-commissioning system nodes

A power line communication system and method permit auto-commissioning of multiple device control modules on a DC power line during the power up of the system. Device control modules associated with the peripheral devices are powered up sequentially and a unique address is assigned to each device controller when it is powered up. The device control modules have a unique circuit configuration that allows the use of inexpensive and mostly passive components. The cost effectiveness of the device controller design becomes particularly significant in applications, such as multi-panel OLED lighting fixtures, with high node counts.

97 MATHEMATICS AND COMPUTING↗

Field Demonstration of the Brick Ontology to Scale up the Deployment of ASHRAE Guideline 36 Control Sequences

Many commercial buildings have a vast network of sensors as part of their building automation systems (BAS) that allows opportunities for energy consumption and cost savings by deploying advanced control sequences. However, this resource is often underutilized since BAS are typically programmed with simple control sequences with limited potential to deliver on these opportunities. The recent availability of ASHRAE Guideline 36 (G36) with advanced HVAC control sequences supports control retrofits in existing buildings to unlock much of the savings potential. However, barriers such as the lack of standard naming convention of building assets and data points, proprietary equipment and BAS, and the inherent uniqueness of buildings and their systems prevent building stakeholders from adopting any “plug-and-play” implementation of G36. Instead, control vendors must often undertake the manual and labor-intensive point mapping process to identify a data stream’s functional and spatial relationship within the HVAC system along with other relevant contexts and map it to the new control sequences. The vendor must carry out the point mapping process in each individual building since the mapping is unlikely to port over to another building. Even for the same building, the point mapping process can occur multiple times if various control vendors implement different control retrofits and/or multiple control retrofits happen over the lifecycle of the building. Then, there is the likelihood that G36 control sequences are programmed uniquely to the building, preventing the same implementation from being reused in another. Therefore, this paper presents a field demonstration of how we leveraged the Brick ontology with BACnet, OpenBuildingControl’s Control Description Language (CDL), and open-source support tools to implement scalable and portable advanced building controls. These tools provide standardized semantic descriptions and relationships of the building’s assets and data points (Brick), standardized communication protocol to read from and write to the building’s BAS (BACnet), and standardized code implementations (CDL) of standardized advanced control strategies (G36). We implemented G36’s hot water supply temperature setpoint reset in a Berkeley, CA building for this field demonstration. This field demonstration aims to show how integrating these tools may streamline the deployment of advanced control sequences such as G36 in a consistent manner regardless of differences found across buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Moore vs. Murphy: Tradeoffs between complexity and reliability in distributed energy system scheduling using software-as-a-service

Software-based optimization of building control strategies, including scheduling, has the potential to improve the performance of existing complex heating, ventilation, and air conditioning (HVAC), storage, and other systems—especially if temporally variable energy production, such as solar thermal or photovoltaics, is included. If reductions in energy bills can be achieved using optimized control strategies that take advantage of cost-saving opportunities, such as time-of-use pricing, the additional bill savings can cover further efficiency investment costs. As computer processing becomes cheaper over time (Moore's Law), opportunities to perform complex control optimization become more abundant, and these can be performed remotely as software-as-a-service (SaaS). However, by “perfecting” our control strategies, we run an increased risk that when something unexpected happens (Murphy's Law), the consequences of failure are greater. This study used simulation to explore the potential benefits of HVAC schedule optimization, delivery, and implementation using a SaaS paradigm, at various levels of complexity. Implementing optimal schedules in a model of an efficient building's HVAC system, the study predicts energy cost savings of up to 10% compared to the naïve reference control strategy. Optimizing more system control variables increases the potential energy cost savings; however, these savings could be compromised by failures in communication inherent in delivering schedules via SaaS. The additional cost of energy resulting from the risk of increased demand charges generally increased with increased communication failure to a much larger extent than the risk of increased energy use charges. This work suggests that moderate improvements in performance, achieved at low cost by simple means, may be more effective than highly optimized schemes, which are more susceptible to failure due to their dependence on complex interactions between systems.

42 ENGINEERING↗

Active control of the forced and transient response of a finite beam

Structural vibrations from a point force are modelled on a finite beam. This research explores the theoretical limit on controlling beam vibrations utilizing another point source as an active controller. Three different types of excitation are considered, harmonic, random, and transient. For harmonic excitation, control over the entire beam length is possible only when the excitation frequency is near a resonant frequency of the beam. Control over a subregion may be obtained even between resonant frequencies at the cost of increasing the vibration outside of the control region. For random excitation, integrating the expected value of the displacement squared over the required interval, is shown to yield the identical cost function as obtained by integrating the cost function for harmonic excitation over all excitation frequencies. As a result, it is always possible to reduce the cost function for random excitation whether controlling the entire beam or just a subregion, without ever increasing the vibration outside the region in which control is desired. The last type of excitation considered is a single, transient pulse. The form of the controller is specified as either one or two delayed pulses, thus constraining the controller to be casual. The best possible control is examined while varying the region of control and the controller location. It is found that control is always possible using either one or two control pulses.

Post, John T.↗

Convex Relaxations of the Network Flow Problem Under Cycle Constraints

In this paper, we consider the problem of optimizing the flows in a lossless flow network with additional nonconvex cycle constraints on nodal variables; such constraints appear in several applications, including electric power, water distribution, and natural gas networks. This problem is a nonconvex version of the minimum-cost network flow problem (NFP), and to solve it, we propose three different approaches. One approach is based on solving a convex approximation of the problem, obtained by augmenting the cost function with an entropy-like term to relax the nonconvex constraints. We show that the approximation error, for which we give an upper bound, can be made small enough for practical use. An alternative approach is to solve the classical NFP, that is, without the cycle constraints, and solve a separate optimization problem afterwards in order to recover the actual flows satisfying the cycle constraints; the solution of this separate problem maximizes the individual entropies of the cycles. The third approach is based on replacing the nonconvex constraint set with a convex inner approximation, which yields a suboptimal solution for the cyclic networks with each edge belonging to at most two cycles. We validate the practical usefulness of the theoretical results through numerical examples, in which we study the standard test systems for water and electric power distribution networks.

42 ENGINEERING↗

Evaluation of the Emission, Transport, and Deposition of Mercury and Fine Particulate Matter from Coal-Based Power Plants in the Ohio River Valley Region

As stated in the proposal: Ohio University, in collaboration with CONSOL Energy, Advanced Technology Systems, Inc (ATS) and Atmospheric and Environmental Research, Inc. (AER) as subcontractors, evaluated the impact of emissions from coal-fired power plants in the Ohio River Valley region as they relate to the transport and deposition of mercury and associated fine particulate matter. This evaluation involved two interrelated areas of effort: ambient air monitoring and regional-scale modeling analysis. The scope of work for the ambient air monitoring included the deployment of a surface air monitoring (SAM) station in southeastern Ohio. The SAM station contains sampling equipment to collect and measure mercury (including speciated forms of mercury and wet and dry deposited mercury), particulate matter (PM) mass, PM composition, and gaseous criteria pollutants (CO, NOx, SO2, O3, etc.). Laboratory analyses of time-integrated samples were used to obtain chemical speciation of ambient PM composition and mercury in precipitation. Nearreal- time measurements were used to measure the ambient concentrations of PM mass and all gaseous species including Hg0 and RGM. Approximately 30 months of field data were collected at the SAM site to validate the proposed regional model simulations for episodic and seasonal model runs. The ambient air quality data provides mercury, and fine particulate matter data that can be used by Ohio Valley industries to assess performance on multi-pollutant control systems. The scope of work for the modeling analysis includes (1) development of updated inventories of mercury emissions from coal plants and other important sources in the modeled domain; (2) adapting an existing 3-D atmospheric chemical transport model to incorporate recent advancements in the understanding of mercury transformations in the atmosphere; (3) analyses of the flux of Hg0, RGM, and fine particulate matter in the different sectors of the study region to identify key transport mechanisms; (4) comparison of cross correlations between species from the model results to observations in order to evaluate characteristics of specific air masses associated with long-range transport from a specified source region; and (5) evaluation of the sensitivity of these correlations to emissions from regions along the transport path. This is accomplished by multiple model runs with emissions simulations switched on and off from the various source regions. To the greatest extent possible, model results were compared to field data collected at other air monitoring sites in the Ohio Valley region, operated independently of this project. These sites may include (1) the DOE National Energy Technologies Laboratory’s monitoring site at its suburban Pittsburgh, PA facility; (2) sites in Pittsburgh (Lawrenceville) PA and Holbrook, PA operated by ATS; (3) sites in Steubenville, OH and Pittsburgh, PA operated by the USEPA and/or its contractors; and (4) sites operated by State or local air regulatory agencies. Field verification of model results and predictions provides critical information for the development of cost effective air pollution control strategies by the coal-fired power plants in the Ohio River Valley region.

01 COAL, LIGNITE, AND PEAT↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microwave power transmission system studies. Volume 3, section 8: Mechanical systems and flight operations

The efforts and recommendations associated with preliminary design and concept definition for mechanical systems and flight operations are presented. Technical discussion in the areas of mission analysis, antenna structural concept, configuration analysis, assembly and packaging with associated costs are presented. Technology issues for the control system, structural system, thermal system and assembly including cost and man's role in assembly and maintenance are identified. Background and desired outputs for future efforts are discussed.

Maynard, O. E.↗