Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “continuous time system estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

HEMODOSE: A Set of Multi-parameter Biodosimetry Tools

There continues to be important concerns of the possibility of the occurrence of acute radiation syndromes following nuclear and radiological terrorism or accidents that may result in mass casualties in densely populated areas. To guide medical personnel in their clinical decisions for effective medical management and treatment of the exposed individuals, biological markers are usually applied to examine radiation induced biological changes to assess the severity of radiation injury to sensitive organ systems. Among these the peripheral blood cell counts are widely used to assess the extent of radiation induced bone marrow (BM) injury. This is due to the fact that hematopoietic system is a vulnerable part of the human body to radiation damage. Particularly, the lymphocyte, granulocyte, and platelet cells are the most radiosensitive of the blood elements, and monitoring their changes after exposure is regarded as a practical and recommended laboratory test to estimate radiation dose and injury. In this work we describe the HEMODOSE web tools, which are built upon solid physiological and pathophysiological understanding of mammalian hematopoietic systems, and rigorous coarse-grained biomathematical modeling and validation. Using single or serial granulocyte, lymphocyte, leukocyte, or platelet counts after exposure, these tools can estimate absorbed doses of adult victims very rapidly and accurately to assess the severity of BM radiation injury. Some patient data from historical accidents are utilized as examples to demonstrate the capabilities of these tools as a rapid point-of-care diagnostic or centralized high-throughput assay system in a large-scale radiological disaster scenario. HEMODOSE web tools establish robust correlations between the absorbed doses and victim's various types of blood cell counts not only in the early time window (1 or 2 days), but also in very late phase (up to 4 weeks) after exposure.

Hu, Shaowen↗

Impact of acute temperature and air pollution exposures on adult lung function: A panel study of asthmatics

Background Individuals with respiratory conditions, such as asthma, are particularly susceptible to adverse health effects associated with higher levels of ambient air pollution and temperature. This study evaluates whether hourly levels of fine particulate matter (PM 2.5 ) and dry bulb globe temperature (DBGT) are associated with the lung function of adult participants with asthma. Methods and findings Global positioning system (GPS) location, respiratory function (measured as forced expiratory volume at 1 second (FEV 1 )), and self-reports of asthma medication usage and symptoms were collected as part of the Exposure, Location, and Lung Function (ELF) study. Hourly ambient PM 2.5 and DBGT exposures were estimated by integrating air quality and temperature public records with time-activity patterns using GPS coordinates for each participant (n = 35). The relationships between acute PM 2.5 , DBGT, rescue bronchodilator use, and lung function collected in one week periods and over two seasons (summer/winter) were analyzed by multivariate regression, using different exposure time frames. In separate models, increasing levels in PM 2.5 , but not DBGT, were associated with rescue bronchodilator use. Conversely DBGT, but not PM 2.5 , had a significant association with FEV 1 . When DBGT and PM 2.5 exposures were placed in the same model, the strongest association between cumulative PM 2.5 exposures and the use of rescue bronchodilator was identified at the 0–24 hours (OR = 1.030; 95% CI = 1.012–1.049; p-value = 0.001) and 0–48 hours (OR = 1.030; 95% CI = 1.013–1.057; p-value = 0.001) prior to lung function measure. Conversely, DBGT exposure at 0 hours (β = 3.257; SE = 0.879; p-value>0.001) and 0–6 hours (β = 2.885; SE = 0.903; p-value = 0.001) hours before a reading were associated with FEV 1 . No significant interactions between DBGT and PM 2.5 were observed for rescue bronchodilator use or FEV 1 . Conclusions Short-term increases in PM 2.5 were associated with increased rescue bronchodilator use, while DBGT was associated with higher lung function (i.e. FEV 1 ). Further studies are needed to continue to elucidate the mechanisms of acute exposure to PM 2.5 and DBGT on lung function in asthmatics.

60 APPLIED LIFE SCIENCES↗

Designing an Optimal Ensemble Strategy for GMAO S2S Forecast System

GMAO Sub/Seasonal prediction system (S2S) is being readied for a major upgrade to GEOS-S2S Version 3. An important factor in successful extended range forecast is the definition of an ensemble For initialization of the ensemble we propose a combination of lagged and burst initial conditions. We plan to run a relatively large ensemble of 40 members for sub-seasonal forecast (up to 3 months), at which point we sub-sample the ensemble, and continue the forecast with 10 members (up to 12 months). Here we present the results of the extensive testing of various ways to generate the perturbations to the initial conditions and the validation of the stratified sampling strategy we chose.To generate perturbations for the burst ensemble members we used scaled differences of pairs of analysis states separated by 1-10 days, randomly chosen from a corresponding season. We considered perturbing separately only the atmospheric fields or only the ocean or both of the forecast initial conditions. Considering varying separation times between the analysis states, we were able to produce perturbations sampling various modes of variability. Focusing on the ENSO SST indices, we found that all types of perturbations are important for the ensemble spread.Our ensemble size for sub-seasonal forecasts was determined as to maximize the skill of predicting some of the leading modes of boreal winter atmospheric modes, NAO, PNA and AO. It is not feasible to run equally large ensemble for seasonal forecasts. Using a stratified sampling procedure we can identify the emerging directions of error growth. By comparing the stratified ensemble with randomly sampled ensemble of the same size, we were able to show that the former better estimates the mean of the original large ensemble.

Borovikov, Anna↗

Final Technical Report: Commercial Advanced Lighting Control (ALC) Demonstration and Deployment

This three-year demonstration and deployment project sought to address market barriers to accelerating the adoption of Advanced Lighting Controls (ALCs), an underutilized technology with low market penetration. ALCs are defined as networked, addressable lighting control systems that utilize software or intelligent controllers to combine multiple energy-saving lighting control strategies in a single space (e.g., smart-time scheduling, daylight harvesting, task tuning, occupancy control, personal control, variable load-shedding, and plug-load control). The networked intelligent aspect of these systems allows applicable lighting control strategies to be combined in a single space, layered over one another, maximizing overall energy-savings. The project included five real building demonstrations of ALCs across the Northeast US region. The demonstrations provided valuable data and experience to support deployment tasks that are necessary to overcome market barriers. These deployment tasks included development of training resources for building designers, installers, and trades, as well as development of new energy efficiency rebates for the technology from Efficiency Forward’s utility partners. Educating designers, installers, and trades on ALCs is a critical task for reducing the cost of the technology that is currently inflated due to perceived complexity and unfamiliarity with how to design and install the systems. Further, utility and non-utility energy efficiency programs continue to relegate the technology to custom or ill-suited prescriptive program designs that do not effectively deploy the technology at scale. This project developed new, scalable rebate approaches for the technology. Efficiency Forward utilized their DesignLights Consortium® (DLC) brand and network of 81 DLC member utilities to develop and deploy the results of the project. The outputs of the project have included five published case studies, a six-hour ALC technology training curriculum that has already been deployed in five US states, and new rebates offered for the technology that have been deployed by a dozen utilities across the US. Widespread adoption of ALC technology in commercial buildings would provide tremendous benefits. The current market penetration of ALC systems is estimated at <0.1% in commercial buildings. If ALC systems were installed in all commercial buildings, approximately 1,051 TBtu of energy could be saved. This would translate into customer cost savings of approximately $10.7 billion annually.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Component-Specific Measurements to Develop Emission Factors for Compressors and Gas Gathering Lines

The Department of Energy (DOE) National Energy Technology Laboratory (NETL) and other critical stakeholders (e.g., U.S. Environmental Protection Agency (USEPA), state regulators, and industry) seek to more accurately characterize and quantify methane emissions from compressors and gathering lines within the Gathering and Boosting (G&B) segment of the natural gas system network. These efforts will reduce uncertainties in emissions estimates in USEPA’s current Green House Gas Inventory (GHGI) under their Greenhouse Gas Reporting Program (GHGRP). For this study, four G&B stations in the Gulf Coast Area were visited four times over the course of one year. Components were classified according to equipment and component type and emissions from select components were measured using multiple measurement technologies. The following major equipment types were considered: i) compressors, ii) separators, iii) dehydrators, iv) coalescers, v) slug catchers, vi) yard piping, vii) tanks, and viii) gathering lines. Individual components on each equipment type were further divided into the following main categories: i) connectors, ii) valves, iii) pressure relief valves (PRV), iv) meters, v) gauges, vi) regulators, vii) pneumatic device vents, and viii) compressor vents (e.g., distance piece vents [DPVs] and rod packing vents [RPVs]). Components were screened for the presence of leaks and venting emissions with an optical gas imaging (OGI) camera, and methane emission rates were measured using a microdilution high volume sampler. Downwind emissions were measured using an Open Path Fourier Transform Infrared (OP-FTIR) Spectrometer. Data were evaluated to assess correlation with site, equipment, time, and operational variables. Key findings and recommendations from the study include: A) Different counting methodologies can result in vastly different component counts, thus influencing total emissions calculations using Subpart W population EFs. A standard methodology should be adopted for classifying and counting components in order to minimize inconsistencies across studies and instruct stakeholders responsible for GHGI reporting. B) Results support current component subcategories listed in USEPA Subpart W, including the subdivision of connectors (flanged and “other”) and pneumatic device vents (intermittent, continuous low bleed, and continuous high bleed). C) Emission rates vary across sites and a relationship between higher emissions and compressor age was observed for some components. D) Component emission rates varied between field campaigns. The type of components contributing to overall measured emissions also varied among field campaigns. However, the emission rate variability was larger between different components (of the same category) than the variability in one component over the four field campaigns. Therefore, when calculating emission factors, it is not necessary to take repeat measurements to capture component variability. E) Measuring the emission rate of a sample for an extended period of time is not necessary to capture the average component emission rate. F) For reporting purposes, excluding liquid lines from site-wide screening may have a negligible effect on component-related emissions. However, from a site management perspective, malfunctioning components were not uncommon on liquid lines and contributed substantially to fugitive emissions at some sites. G) Population EFs, whether including or excluding liquid lines, were a conservative estimate of fugitive emissions. Leaker EFs consistently underestimated emissions at the field sites. Measurements at more sites, particularity sites in other areas of the country, need to be completed before determining the accuracy of EFs.

03 NATURAL GAS↗

Analysis of Phase Transformation Studies in Solute Addition Alloys

Components serving in a nuclear reactor plant must withstand a very harsh environment including extended time at elevated temperatures, neutron irradiation, stress, and/or corrosive media. The many modes of degradation are complex and very depending on material and service locations. However, understanding and managing materials degradation is paramount for the continued safe and reliable operation of nuclear power plants. For the reactor core and primary systems, several key areas have been identified. Thermomechanical considerations such as aging and fatigue must be examined. Irradiation-induced processes must also be considered for higher fluences under the life extension consideration of the current light water reactors (LWRs), which particularly includes the influence of radiation-induced segregation (RIS), swelling, and precipitation on component hardening and embrittlement. Corrosion takes many forms within the reactor core, although irradiation-assisted stress corrosion cracking (IASCC) and primary water stress corrosion cracking (PWSCC) are of high interest in extended life scenarios. Research in these areas can build upon other ongoing programs in the LWR industry as well as other reactor materials programs (such as fusion and fast reactors) to help resolve these issues for extended LWR life. Type 304 and 316 stainless steels are classic structural materials used in LWRs. A set of well designed type 304 and 316 variants by changing the amount of a single solute element were irradiated using the BOR-60 fast breeder reactor at ~320°C in Russia. This set of alloy samples has been used in this task to characterize detailed microstructural evolution and measure magnetic phase, swelling and hardness. This report summarizes the detailed microstructural results, characterized using conventional and scanning transmission electron microscopy (CTEM/STEM) and energy dispersive X-ray spectroscopy (EDS), and the newly developed model of strength factor for estimating radiation hardening. The results provide invaluable insights into understanding degradation mechanisms of key components and assists in the prediction of the life of similar materials and the base knowledge required to develop advanced radiation resistant alloys. The effect of solute elements on microstructural evolution under neutron irradiation is explored. The approximate correlation between microstructure changes and radiation hardening is established. The major results and implications are discussed below.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FUSRAP Case Study - Benefits and Lessons Learned from Implementation of a Modern Data Solution at Maywood - 18399

This paper focuses on data production and management practices dating back to 1999 that continue to evolve to support the project today. In 2000, the FUSRAP Maywood Project began using a software environmental data management system and laboratory information management system, developed by a single database administrator (DA) and authored in Microsoft Access{sup TM} (MS Access). The original databases included basic functionality including sample number assignment and label generation, tracking of LIMS gamma spec QC and assignment of basic qualifiers and basic database queries. The DA continued over the next fifteen years to refine the EDMS/LIMS by integrating project-specific data evaluation guidance document processes and Quality Assurance/Quality Control (QA/QC) charting and excursion warning tools. With the retirement of the original DA, the U.S. Army Corps of Engineers (USACE)-Cabrera Team procured and implemented a commercial-leaning solution using modern database tools and an established EDMS vendor. For the database transition process, the project team established and configured the new EDMS/LIMS with basic architecture and accessibility; evaluated existing workflows; established/revised LIMS and EDMS-related documentation (manuals and procedures); and conducted dry runs and validation testing. The overall team coordinated closely to facilitate a seamless transition from initial assessment and authoring, to data migration, and finally to resumption of normal ongoing operations. Key features of the new EDMS Subcontractor's software included lookup tables, an import wizard, data checking options and unique indexes. Since the database systems became operational, the technical staff gathered useful feedback from end users (e.g., lab staff, field engineers, task managers, and the third-party data validator) to refine the EDMS/LIMS operation. This feedback triggered improvements in the performance of onsite laboratory qualification forms, promoted consistency in sample ID numbers between the database sample planning screens and field chain-of-custodies, corrected bugs in the LIMS Duplicate Evaluation Report, eliminated data import issues such as blank, inconsistent or missing data from key fields. One of the advantages of the commercial database solution was that it allowed the project to cut cost over time due to the lower cost of database maintenance provided by the commercial database vendor versus the cost of an on-staff DA. Cost savings are estimated at $40,000 per year. There were also indirect cost savings resulting from implementation of the new database since it allowed better integration of the LIMS and EDMS. While there will always be challenges associated with long term records/data management for any old remediation site, the Maywood Team's approach to an upgraded EDMS/LIMS implementation serves as one element of the overall effort to enhance the integrity and reproducibility of critical data that supports the remediation program while at the same time, more effectively using available resources. These lessons-learned will enhance implementation of cost-effective solutions for similar environmental remediation sites. (authors)

97 MATHEMATICS AND COMPUTING↗

Optimization of a Mixed Fleet of Aerial Drones for Medical Supplies: A Case Study of Blood Delivery Logistics

Aerial drones have emerged as an innovative solution for faster transportation of time-sensitive items (e.g., emergency medical supplies), potentially reducing the transmission of contagious diseases and enhancing healthcare availability through contactless autonomous delivery. We study fleet sizing and efficient scheduling of a mixed fleet of drones for delivering time-sensitive medical items having distinct release and due times to minimize the required fleet size and fleet composition, the required number of additional batteries, and the total energy consumption. We continuously track the remaining battery energy of drones to determine the optimal timing for battery replacement, rather than replacing the battery at each node. Using actual drone flight test data, we employed a machine learning (ML) method to estimate the energy consumption of different drone types during flight segments for different operating parameters. We present a novel mixed-integer programming model to efficiently formulate the problem that integrates the estimated energy consumption functions from ML. We propose a new greedy heuristic (GH) algorithm and a customized genetic algorithm (GA) for solving large-scale instances of this problem faster. Results demonstrate that the GH algorithm is substantially faster than the accelerated CPLEX and the GA, while sacrificing the solution quality by a small amount. Results based on an actual blood sample delivery case study from Pendleton, Oregon, United States, show that using a mixed fleet of drones reduces the total cost and total energy consumption up to 18.18% and 28.7%, respectively, compared to using a homogeneous fleet.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Full-Scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System

This document presents and discusses results from Cooperative Agreement DE-FC26-06NT42778, 'Full-scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System,' which was conducted over the time-period July 24, 2006 through June 30, 2010. The objective of the project was to demonstrate at full scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in pulverized-coal-fired flue gas. Oxidized mercury is removed downstream in wet flue gas desulfurization (FGD) absorbers and collected with the byproducts from the FGD system. The project was co-funded by EPRI, the Lower Colorado River Authority (LCRA), who also provided the host site, Great River Energy, Johnson Matthey, Southern Company, Salt River Project (SRP), the Tennessee Valley Authority (TVA), NRG Energy, Ontario Power and Westar. URS Group was the prime contractor and also provided cofunding. The scope of this project included installing and testing a gold-based catalyst upstream of one full-scale wet FGD absorber module (about 200-MW scale) at LCRA's Fayette Power Project (FPP) Unit 3, which fires Powder River Basin coal. Installation of the catalyst involved modifying the ductwork upstream of one of three wet FGD absorbers on Unit 3, Absorber C. The FGD system uses limestone reagent, operates with forced sulfite oxidation, and normally runs with two FGD modules in service and one spare. The full-scale catalyst test was planned for 24 months to provide catalyst life data. Over the test period, data were collected on catalyst pressure drop, elemental mercury oxidation across the catalyst module, and mercury capture by the downstream wet FGD absorber. The demonstration period began on May 6, 2008 with plans for the catalyst to remain in service until May 5, 2010. However, because of continual increases in pressure drop across the catalyst and concerns that further increases would adversely affect Unit 3 operations, LCRA decided to end the demonstration early, during a planned unit outage. On October 2, 2009, Unit 3 was taken out of service for a fall outage and the catalyst upstream of Absorber C was removed. This ended the demonstration after approximately 17 months of the planned 24 months of operation. This report discusses reasons for the pressure drop increase and potential measures to mitigate such problems in any future application of this technology. Mercury oxidation and capture measurements were made on Unit 3 four times during the 17-month demonstration. Measurements were performed across the catalyst and Absorber C and 'baseline' measurements were performed across Absorber A or B, which did not have a catalyst upstream. Results are presented in the report from all four sets of measurements during the demonstration period. These results include elemental mercury oxidation across the catalyst, mercury capture across Absorber C downstream of the catalyst, baseline mercury capture across Absorber A or B, and mercury re-emissions across both absorbers in service. Also presented in the report are estimates of the average mercury control performance of the oxidation catalyst technology over the 17-month demonstration period and the resulting mercury control costs.

01 COAL, LIGNITE, AND PEAT↗

NEXT Long-Duration Test Plume and Wear Characteristics after 16,550 h of Operation and 337 kg of Xenon Processed

The NASA s Evolutionary Xenon Thruster (NEXT) program is developing the next-generation ion propulsion system with significant enhancements beyond the state-of-the-art. The NEXT ion propulsion system provides improved mission capabilities for future NASA science missions to enhance and enable Discovery, New Frontiers, and Flagship-type NASA missions. As part of a comprehensive thruster service life assessment utilizing both testing and analyses, a Long-Duration Test (LDT) was initiated to validate and qualify the NEXT propellant throughput capability to a qualification-level of 450 kg, 1.5 times the mission-derived throughput requirement of 300 kg. This wear test is being conducted with a modified, flight-representative NEXT engineering model ion thruster, designated EM3. As of June 25, 2008, the thruster has accumulated 16,550 h of operation: the first 13,042 h at the thruster full-input-power of 6.9 kW with 3.52 A beam current and 1800 V beam power supply voltage. Operation since 13,042 h, i.e., the most recent 3,508 h, has been at an input power of 4.7 kW with 3.52 A beam current and 1180 V beam power supply voltage. The thruster has processed 337 kg of xenon (Xe) surpassing the NSTAR propellant throughput demonstrated during the extended life testing of the Deep Space 1 flight spare. The NEXT LDT has demonstrated a total impulse of 13.3 106 N s; the highest total impulse ever demonstrated by an ion thruster. Thruster plume diagnostics and erosion measurements are obtained periodically over the entire NEXT throttle table with input power ranging 0.5 to 6.9 kW. Observed thruster component erosion rates are consistent with predictions and the thruster service life assessment. There have not been any observed anomalous erosion and all erosion estimates indicate a thruster throughput capability that exceeds ~750 kg of Xe, an equivalent of 36,500 h of continuous operation at the full-power operating condition. This paper presents the erosion measurements and plume diagnostic results for the NEXT LDT to date with emphasis on the change in thruster operating condition and resulting impact on wear characteristics. Ion optics grid-gap data, both cold and operating, are presented. Performance and wear predictions for the LDT throttle profile are presented.

Herman, Daniel A.↗

The NASA Soil Moisture Active Passive (SMAP) Mission - Algorithm and Cal/Val Activities and Synergies with SMOS and Other L-Band Missions

NASA's Soil Moisture Active Passive (SMAP) mission, planned for launch in late 2014, has as its key measurement objective the frequent, global mapping of near-surface soil moisture and its freeze-thaw state. SMAP soil moisture and freeze/thaw measurements at 10 km and 3 km resolutions respectively, would enable significantly improved estimates of water, energy and carbon transfers between the land and atmosphere. Soil moisture control of these fluxes is a key factor in the performance of atmospheric models used for weather forecasts and climate projections Soil moisture measurements are also of great importance in assessing floods and for monitoring drought. In addition, observations of soil moisture and freeze/thaw timing over the boreal latitudes can help reduce uncertainties in quantifying the global carbon balance. The SMAP measurement concept utilizes an L-band radar and radiometer sharing a rotating 6-meter mesh reflector antenna. The SMAP radiometer and radar flight hardware and ground processing designs are incorporating approaches to identify and mitigate potential terrestrial radio frequency interference (RFI). The radar and radiometer instruments are planned to operate in a 680 km polar orbit, viewing the surface at a constant 40-degree incidence angle with a 1000-km swath width, providing 3-day global coverage. Data from the instruments would yield global maps of soil moisture and freeze/thaw state to be provided at 10 km and 3 km resolutions respectively, every two to three days. Plans are to provide also a radiometer-only soil moisture product at 40-km spatial resolution. This product and the underlying brightness temperatures have characteristics similar to those provided by the Soil Moisture and Ocean Salinity (SMOS) mission. As a result, there are unique opportunities for common data product development and continuity between the two missions. SMAP also has commonalities with other satellite missions having L-band radiometer and/or radar sensors applicable to soil moisture measurement, such as Aquarius, SAO COM, and ALOS-2. The algorithms and data products for SMAP are being developed in the SMAP Science Data System (SDS) Testbed. The algorithms are developed and evaluated in the SDS Testbed using simulated SMAP observations as well as observational data from current airborne and spaceborne L-band sensors including SMOS. The SMAP project is developing a Calibration and Validation (Cal/Val) Plan that is designed to support algorithm development (pre-launch) and data product validation (post-launch). A key component of the Cal/Val Plan is the identification, characterization, and instrumentation of sites that can be used to calibrate and validate the sensor data (Level I) and derived geophysical products (Level 2 and higher). In this presentation we report on the development status of the SMAP data product algorithms, and the planning and implementation of the SMAP Cal/Val program. Several components of the SMAP algorithm development and Cal/Val plans have commonality with those of SMOS, and for this reason there are shared activities and resources that can be utilized between the missions, including in situ networks, ancillary data sets, and long-term monitoring sites.

Njoku, Eni↗

Multi-Phased, Post-Accident Support of the Fukushima Dai-Ichi Nuclear Power Plant - 12246

In the wake of the March 11 earthquake and tsunami and the subsequent flooding of several of the Fukushima Dai-Ichi reactors, Japan and the Japanese utility TEPCO faced a crisis situation with incredible challenges: substantial amounts of radioactive mixed seawater and freshwater accumulated in the basements of four reactor and other buildings on the site. This water held varying levels of contamination due to the fact that it had been in contact with damaged fuel elements in the cores and with other contaminated components. The overall water inventory was estimated at around 110,000 tons of water with contamination levels up to the order of 1 Ci/l. Time was of the essence to avoid overflow of this accumulated water into the ocean. AREVA proposed, designed and implemented a water treatment solution using a proven chemical coprecipitation process with ppFeNi reagent, which is currently in use for effluent treatment on several nuclear sites including AREVA sites. In addition to the extremely short schedule the other challenge was to adapt the chemical treatment process to the expected composition of the Fukushima water and, in particular, to evaluate the impact of salinity on process performance. It was also necessary to define operating conditions for the VEOLIA equipment that had been selected for implementation of the process in the future facility. The operation phase began on June 17, and by the end of July more than 30,000 tons of highly radioactive saltwater had been decontaminated - the Decontamination Factor (DF) for Cesium was ∼10{sup 4}. It allowed recycling the contaminated water to cool the reactors while protecting workers and the environment. This paper focuses on the Actiflo{sup TM}-Rad water treatment unit project that was part of the TEPCO general water treatment scheme. It presents a detailed look at the principles of the Actiflo{sup TM}-Rad, related on-the-fly R and D, an explanation of system implementation challenges, and a brief summary of operation results to date. AREVA's response to the Fukushima Dai-Ichi crisis was multi-phased: emergency aid and relief supply was sent within days after the accident; AREVA-Veolia engineering teams designed and implemented a water treatment solution in record time, only 3 months; and AREVA continues to support TEPCO and propose solutions for waste management, soil remediation and decontamination of the Fukushima Dai-Ichi site. Despite the huge challenges, the Actiflo{sup TM}-Rad project has been a success: the water treatment unit started on time and performed as expected. The performance is the result of many key elements: AREVA expertise in radioactive effluents decontamination, Veolia know-how in water treatment equipments in crisis environment, and of course AREVA and Veolia teams' creativity. The project success is also due to AREVA and Veolia teams' reactivity and high level of commitment with engineering teams working 24/7 in Japan, France and Germany. AREVA and Veolia deep knowledge of the Japanese industry ensured that the multi-cultural exchanges were not an issue. Finally the excellent overall project management and execution by TEPCO and other Japanese stakeholders was very efficient. The emergency water treatment was a key step of the roadmap towards restoration from the accident at Fukushima Dai-Ichi that TEPCO designed and keeps executing with success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OP09O-OP404-9 Wide Field Camera 3 CCD Quantum Efficiency Hysteresis

The HST/Wide Field Camera (WFC) 3 UV/visible channel CCD detectors have exhibited an unanticipated quantum efficiency hysteresis (QEH) behavior. At the nominal operating temperature of -83C, the QEH feature contrast was typically 0.1-0.2% or less. The behavior was replicated using flight spare detectors. A visible light flat-field (540nm) with a several times full-well signal level can pin the detectors at both optical (600nm) and near-UV (230nm) wavelengths, suppressing the QEH behavior. We are characterizing the timescale for the detectors to become unpinned and developing a protocol for flashing the WFC3 CCDs with the instrument's internal calibration system in flight. The HST/Wide Field Camera 3 UV/visible channel CCD detectors have exhibited an unanticipated quantum efficiency hysteresis (QEH) behavior. The first observed manifestation of QEH was the presence in a small percentage of flat-field images of a bowtie-shaped contrast that spanned the width of each chip. At the nominal operating temperature of -83C, the contrast observed for this feature was typically 0.1-0.2% or less, though at warmer temperatures contrasts up to 5% (at -50C) have been observed. The bowtie morphology was replicated using flight spare detectors in tests at the GSFC Detector Characterization Laboratory by power cycling the detector while cold. Continued investigation revealed that a clearly-related global QE suppression at the approximately 5% level can be produced by cooling the detector in the dark; subsequent flat-field exposures at a constant illumination show asymptotically increasing response. This QE "pinning" can be achieved with a single high signal flat-field or a series of lower signal flats; a visible light (500-580nm) flat-field with a signal level of several hundred thousand electrons per pixel is sufficient for QE pinning at both optical (600nm) and near-UV (230nm) wavelengths. We are characterizing the timescale for the detectors to become unpinned and developing a protocol for flashing the WFC3 CCDs with the instrument's internal calibration system in flight. A preliminary estimate of the decay timescale for one detector is that a drop of 0.1-0.2% occurs over a ten day period, indicating that relatively infrequent cal lamp exposures can mitigate the behavior to extremely low levels.

Collins, Nick↗

Modeling and Analysis of Coupled Flow Through Packed Beds as a Diagnostic Tool for Packed Bed Reactor Health - 17172

The US Department of Energy, Office of River Protection, is building the Waste Treatment and Immobilization Plant (WTP) in Richland, Washington, to immobilize the hundreds of millions of liters of radioactive waste stored at the Hanford Site in Washington state. The offgas generated during vitrification of these wastes requires treatment to remove and/or destroy chemical and radioactive hazardous components before release to the atmosphere. In particular, volatile and semi-volatile hydrocarbon components are to be catalytically oxidized to carbon dioxide and water, whereas nitrogen oxides (NOx) are to be catalytically reduced to nitrogen and water. These tasks are accomplished in a series of packed bed reactors. Achieving the requisite Destruction/Removal Efficiency (DRE) for each of the tracked components is highly dependent on the flow characteristics of the offgas through the packed beds. The flow kinetics may be monitored and characterized during the initial warm-up of the system. The gases, initially at 76 deg. C (169 deg. F), (a) flow through one side of a countercurrent heat exchanger to recover heat from the exiting gases (which have already passed through the catalytic beds), (b) are then further heated electrically to approximately 400 deg. C (750 deg. F; the preferred operating temperature of the Thermo Catalytic Oxidizer (TCO)), (c) pass through the TCO where the reduced components of the offgas are oxidized over a supported Pt catalyst bed, (d) are partially cooled to approximately 315 deg. C (600 deg. F) by addition of approximately 25% (by weight) diluted ammonia/air mixture, (e) pass through the Selective Catalytic Reducer (SCR) where the NOx components are converted to N{sub 2} and H{sub 2}O over a supported V2O{sub 5}/TiO{sub 2} catalyst bed, and (f) exit through the hot side of the countercurrent heat exchanger. The electrical heater is not powerful enough to raise the temperature of the offgas to the desired 400 deg. C without the contribution of the heat recovered in the heat exchanger. Moreover, the thermal mass of the beds and housings of the TCO and SCR require a significant input of thermal energy to reach the desired operating temperatures; the better part of a day is required to bring the unit from ambient temperatures to operating temperatures. Therefore, the temperature of the stream during the initial warm-up of the system at each point in the system is dependent upon the thermal mass, flow dispersion, and permeability of the components, quantified as characteristic/representative volumes and residence times. By monitoring the temperature of the offgas as it enters and exits each portion of the system during this warm-up period one may model the system as a series of small Continuously Stirred Tank Reactors (CSTR)s (referred to as 'CSTRlets') to explain the flow kinetics through the catalyst beds. These component CSTRlets are adjustable in size and number, that one may model the flow profile of the gases through the catalyst beds. For example, a single large CSTR will present an effluent temperature profile with a simple exponential decay shape. Concatenating more CSTRlets generate more complex sigmoidal responses. Concatenating one CSTRlet significantly larger than the others in the train also alters the shape of the effluent temperature profile, in a fashion not replicable by a train of equal-sized CSTRlets. The ultimate goal is to accurately emulate the entire system as a representative CSTRlet train. Once accomplished, this characterization may be used in subsequent warm-ups (following shutdown for catalyst maintenance, for example) or by an intentional step change in inlet offgas temperature to detect/diagnose anomalies in flow through the beds (e.g., channeling or partial blockage.) This work presents development of this model through analytical, calculational, and empirical means. - The analytic model is accomplished by Laplace transform analysis of each component to recover component process transfer functions. - The calculational portion is performed via brute force finite element calculation. - Fitting empirical data from the warm-up of the TCO skid allows one to select the hypothetical CSTRlet trains which best fit the TCO and SCR beds for the analytical and finite element calculations. The first portion of this paper presents the development of the analytical (Laplace space) model of the coupled system. Estimated values for the initial temperature, mass, specific heat, electrical heat, and relative quantities of the offgas, catalyst beds, stainless steel housings, and ammonia dilution stream are used to generate expected temperature profiles at several selected junctures of the system. The number and size of the component hypothetical CSTRlets are calculated from the analytical model and are used to predict temperature profiles at the exit of the system and at intermediate junctions between system components (where thermocouples are present in the actual unit.) The finite element calculations employ a series of CSTRlet volumes to produce a similar suite of temperature profiles, for comparison with the analytical model results. Finally, empirical data from the Factory Acceptance Test system warm-up are used to select and compare the results from each modeling strategy to select the CSTRlet train(s) which best model the behavior of the actual system. This work presents a novel method of system component characterization, of value to the WTP plant and similar vitrification facilities as well as chemical process industries unrelated to waste management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A computational modeling framework for pre-clinical evaluation of cardiac mapping systems

There are a variety of difficulties in evaluating clinical cardiac mapping systems, most notably the inability to record the transmembrane potential throughout the entire heart during patient procedures which prevents the comparison to a relevant “gold standard”. Cardiac mapping systems are comprised of hardware and software elements including sophisticated mathematical algorithms, both of which continue to undergo rapid innovation. The purpose of this study is to develop a computational modeling framework to evaluate the performance of cardiac mapping systems. The framework enables rigorous evaluation of a mapping system’s ability to localize and characterize (i.e., focal or reentrant) arrhythmogenic sources in the heart. The main component of our tool is a library of computer simulations of various dynamic patterns throughout the entire heart in which the type and location of the arrhythmogenic sources are known. Our framework allows for performance evaluation for various electrode configurations, heart geometries, arrhythmias, and electrogram noise levels and involves blind comparison of mapping systems against a “silver standard” comprised of computer simulations in which the precise transmembrane potential patterns throughout the heart are known. A feasibility study was performed using simulations of patterns in the human left atria and three hypothetical virtual catheter electrode arrays. Activation times (AcT) and patterns (AcP) were computed for three virtual electrode arrays: two basket arrays with good and poor contact and one high-resolution grid with uniform spacing. The average root mean squared difference of AcTs of electrograms and those of the nearest endocardial action potential was less than 1 ms and therefore appears to be a poor performance metric. In an effort to standardize performance evaluation of mapping systems a novel performance metric is introduced based on the number of AcPs identified correctly and those considered spurious as well as misclassifications of arrhythmia type; spatial and temporal localization accuracy of correctly identified patterns was also quantified. This approach provides a rigorous quantitative analysis of cardiac mapping system performance. Proof of concept of this computational evaluation framework suggests that it could help safeguard that mapping systems perform as expected as well as provide estimates of system accuracy.

59 BASIC BIOLOGICAL SCIENCES↗

Modular Undersea Compressed Air Energy Storage (UCAES) System

This project has been devoted to the design, optimization, and cost analysis of a unique power plant with integral energy storage. The proposed facility combines a novel underwater compressed air energy storage (UCAES) system with a customized gas turbine generator, providing exceptional power management and overall efficiency. Unlike conventional CAES, opportunities for underwater storage are plentiful and proximal to the power grid. The UCAES system provides coastal and island communities a practical means for managing the volatility of large-scale wind and solar power resources. The result is higher renewable energy absorption and improved electrical reliability with reduced fossil fuel consumption. The UCAES power plant is composed of three major subsystems: The underwater air containment system (ACS), the air transport pipe (ATP), and the land-based power conversion system (PCS). The underwater ACS is made up of modular concrete shell units, structurally optimized for minimal material usage while employing conventional production methods and equipment. Each shell is designed to receive and control loose fill or gravel, serving as the ballast. The static nature of the final structures make them an asset to marine habitats and includes features intended to permit safe and cost-effective deployment. The ATP Connects the ACS modules to each other and to the on-land power conversion system and utilizes high density polyethylene (HDPE) pipe for low cost and long life. The PCS Houses the turbine-generator ‘expander modules’, with peak capacity of 12.3 MWe each, engineered from existing gas turbine equipment and includes electrically driven commercial 3-stage intercooled centrifugal compressors, each nominally drawing 6.6 MWe when matching the turbine flow requirements. The subsystems listed above are designed with the intent to serve as building-blocks to achieve a peak power output rating in the 40 to 120 MWe range, with 0.25 to 4 hours of energy storage capacity. The modular facility with integral energy storage provides some remarkable transient maneuvers and load-following features unachievable by competing technologies. The system can operate as a dispatchable power plant with a fuel-to-electric efficiency over 41%; substantially better that the average existing Hawaiian peak power generation assets. Optimal efficiency can be maintained while load-following due to modular PCS design and is operable with a range of liquid or gaseous fuels while meeting the most stringent California (CARB) emission standards. The system can operate as a peaking energy plant in discharge mode. Power ramp-up equivalent to 215% of continuous load rating within 1 second accomplished by simply turning off the electric compressor(s). Contrarily, the system can offer energy absorption during periods of grid surplus generation. The electric compressors may be sequenced on to absorb power within seconds. More moderate transitions are easily achieved with standard compressor control functions. The system offers unique features as compared to energy storage systems. ‘Round-trip efficiency’, as calculated by industry standard methods, is in the 90% range. The PCS equipment has a mean-time between overhauls of 80,000 hours, with maintenance costs of less than $0.005/kW-hr of electricity delivered. The underwater ACS structures and piping employ materials and designs specified to achieve a 75 year life. With the underwater containment modules qualified as a marine habitat, there would be no decommissioning costs. In conjunction with the engineering work invested in the design of the UCAES power plant, Brayton Energy has employed a team of manufacturing specialists, marine construction engineers, and power industry experts to create a comprehensive economic model that captures the many site-related variables and configuration options. The cost results and methodology have been validated by suppliers, engineers, and deployment specialists through a detailed case study on Hawaii. While creation of the parametric cost model was based on inputs specific to Hawaii, the proposed construction and deployment steps were chosen to be general enough to allow extrapolation across locations world-wide. Analysis of the proposed system shows it to be a viable option and addresses the principal challenges described by the Department of Energy by offering competitive costs, validated safety and reliability, consideration of the regulatory environment, and utilization of industry accepted practices and equipment. The UCAES system is recommended for immediate consideration in Hawaii. Estimation of time to complete planning, design, and construction of the facility is anticipated to take 3 to 5 years. Other coastal and island communities world-wide should realize similar benefits; as the results presented in this report are considered generally transferable to other locations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Characterization of the Triassic Newark Basin of New York and New Jersey for geologic storage of carbon dioxide

The Newark Basin is a Triassic-aged rift basin underlying densely populated, industrialized sections of New York, New Jersey and Pennsylvania. The Basin is an elongate half-graben encompassing an area of more than 7,510 square-kilometers (2,900 square-miles), and could represent a key storage component for commercial scale management of carbon dioxide emissions via geologic sequestration. The project team first acquired published reports, surface and subsurface maps, and seismic data, which formed the basis for a three-dimensional model framework for the northern end of the Basin incorporating stratigraphic, hydrologic, and water quality data. Field investigations included drilling, coring, and logging of two stratigraphic test borings in Clarkstown, NY (Exit 14 Tandem Lot Well No. 1), drilled to a depth of 2,099 meters (6,885 feet); and Palisades, NY (Lamont-Doherty Earth Observatory Test Well No. 4) drilled to a depth of 549 meters (1,802 feet). Two two-dimensional seismic reflection data lines arrayed perpendicularly were acquired by Schlumberger/WesternGeco to help characterize the structure and stratigraphy and as part of pre-drilling field screening activities for the deep stratigraphic borehole. A total of 47 meters (155 feet) of continuous whole core was recovered from the Tandem Lot boring from depths of 1,393 meters (4,570 feet) to 1,486 meters (4,877 feet). Twenty-five horizontal rotary cores were collected in mudstones and sandstones in the surface casing hole and fifty-two cores were taken in various lithologies in the deep borehole. Rotary core plugs were analyzed by Weatherford Laboratories for routine and advanced testing. Rotary core plug trim end thin sections were evaluated by the New York State Museum for mineralogical analysis and porosity estimation. Using core samples, Lawrence Berkley National Laboratory designed and completed laboratory experiments and numerical modeling analyses to characterize the dissolution and reaction of carbon dioxide with formation brine and minerals, and resulting effects on injection rate, pressure, effective storage volume, and carbon dioxide migration within a prospective sandstone reservoir. $$Three potential porous and permeable sandstone units were identified in the Passaic Formation at the New York State Thruway Exit 14 location. Potential Flow Unit 1, at a depth of 643 meters (2,110 feet) to 751 meters (2,465 feet); Potential Flow Unit 2 at a depth of 853 meters (2,798 feet) to 1,000 meters (3,280 feet); and Potential Flow Unit 3, at a depth of 1,114 meters (3,655 feet) to 1,294 meters (4,250 feet). Reactive transport simulations of interactions between carbon dioxide, brine and formation minerals were carried out to evaluate changes in formation water chemistry, mineral precipitation and dissolution reactions, and any potential resulting effects on formation permeability. The experimental and modeling analyses suggest that mineral precipitation and dissolution reactions (within the target formation) are not expected to lead to significant changes to the underground hydrologic system over time frames (~30 years) typically relevant for carbon dioxide injection operations. Key findings of this basin characterization study include an estimate of carbon dioxide storage capacity in the Newark Basin. Assuming an average porosity of twelve percent and an aquifer volume of 6.1E+12 meters3, calculated ranges of likely storage capacity range from 1.9 – 20.2 gigatonnes under high temperature (low carbon dioxide density) conditions; and 2.9 – 30.2 gigatonnes under low temperature (low carbon dioxide density) conditions. Intra-basin faulting, geometry of the Palisades Sill, and the presence of altered meta-sediments above and below the Sill, increase potential compartmentalization within the basin. A structural/stratigraphic trap type may occur where porous/permeable sediments are cross-cut by the Palisades Sill. Potential injection intervals are present within the Stockton Formation of the Newark Basin. Additional porous/permeable intervals may be present within sandstones of the Passaic Formation, increasing projected storage capacity. Deeper wedges of strata are likely present in the deeper portions of the basin in southern New York and into northern New Jersey. Abundant mudstones are present in the Passaic, Lockatong, and Stockton Formations. These intervals have the requisite petrophysical properties to form effective primary and secondary containment intervals to industrial-scale sequestration of carbon dioxide in the Newark Basin. Hydro-thermally altered meta-sediments in the region immediately surrounding the top and base of the Palisades Sill is devoid of porosity/permeability and forms an additional effective lateral/vertical sealing cap rock.

58 GEOSCIENCES↗

Summary Describing Integration of ERM Methodology into Supervisory Control Framework with Software Package Documentation; Advanced Reactor Technology Milestone: M4AT-16PN2301052

This project involved the development of enhanced risk monitors (ERMs) for active components in Advanced Reactor (AdvRx) designs by integrating real-time information about equipment condition with risk monitors. Health monitoring techniques in combination with predictive estimates of component failure based on condition and risk monitors can serve to indicate the risk posed by continued operation in the presence of detected degradation. This combination of predictive health monitoring based on equipment condition assessment and risk monitors can also enable optimization of maintenance scheduling with respect to the economics of plant operation. This report summarizes PNNL’s multi-year project on the development and evaluation of an ERM concept for active components while highlighting FY2016 accomplishments. Specifically, this report provides a status summary of the integration and demonstration of the prototypic ERM framework with the plant supervisory control algorithms being developed at Oak Ridge National Laboratory (ORNL), and describes additional case studies conducted to assess sensitivity of the technology to different quantities. Supporting documentation on the software package to be provided to ONRL is incorporated in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗