Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “bolts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

STS-41 Ulysses Breakfast, Suit-up, C-7 Exit, Launch and ISOS Cam Views

Live footage shows the crewmembers of STS-41, Commander Richard N. Richards, Pilot Robert D. Cabana, Mission Specialists William M. Shepherd, Bruce E. Melnick, and Thomas D. Akers, participating in the traditional activities the day of their flight. The crew are seen eating breakfast, suiting-up, walking out to the Astronaut-Van, putting on life vests in the 'White Room' area, and entering the crew module of the Discovery Orbiter. Footage also includes preparation of the Ulysses Payload. Engineers are seen loading Ulysses to the upper stage, transferring Discovery to an upright position, bolting Discovery to the external tank, rolling Discovery out to the launch pad, and finally installing the Ulysses Payload inside Discovery. Also shown are both night and morning panoramic shots of the shuttle on the pad, main engine start, ignition, liftoff, booster separation, and various camera views of the launch.

Source record↗

MPLM On-Orbit Interface Dynamic Flexibility Modal Test

Now that the International Space Station (ISS) is being constructed, payload developers have to not only verify the Shuttle-to-payload interface, but also the interfaces their payload will have with the ISS. The Multi Purpose Logistic Module (MPLM) being designed and built by Alenia Spazio in Torino, Italy is one such payload. The MPLM is the primary carrier for the ISS Payload Racks, Re-supply Stowage Racks, and the Resupply Stowage Platforms to re-supply the ISS with food, water, experiments, maintenance equipment and etc. During the development of the MPLM there was no requirement for verification of the on-orbit interfaces with the ISS. When this oversight was discovered, all the dynamic test stands had already been disassembled. A method was needed that would not require an extensive testing stand and could be completed in a short amount of time. The residual flexibility testing technique was chosen. The residual flexibility modal testing method consists of measuring the free-free natural frequencies and mode shapes along with the interface frequency response functions (FRF's). Analytically, the residual flexibility method has been investigated in detail by, MacNeal, Martinez, Carne, and Miller, and Rubin, but has not been implemented extensively for model correlation due to difficulties in data acquisition. In recent years improvement of data acquisition equipment has made possible the implementation of the residual flexibility method as in Admire, Tinker, and Ivey, and Klosterman and Lemon. The residual flexibility modal testing technique is applicable to a structure with distinct points (DOF) of contact with its environment, such as the MPLM-to-Station interface through the Common Berthing Mechanism (CBM). The CBM is bolted to a flange on the forward cone of the MPLM. During the fixed base test (to verify Shuttle interfaces) some data was gathered on the forward cone panels. Even though there was some data on the forward cones, an additional modal test was performed to better characterize its behavior. The CBM mounting flange is the only remaining structure of the MPLM that no test data was available. This paper discusses the implementation of the residual flexibility modal testing technique on the CBM flange and the modal test of the forward cone panels.

Bookout, Paul S.↗

Modeling Thermal Contact Resistance

One difficulty in using cryocoolers is making good thermal contact between the cooler and the instrument being cooled. The connection is often made through a bolted joint. The temperature drop associated with this joint has been the subject of many experimental and theoretical studies. The low temperature behavior of dry joints have shown some anomalous dependence on the surface condition of the mating parts. There is also some doubts on how well one can extrapolate from the test samples to predicting the performance of a real system. Both finite element and analytic models of a simple contact system have been developed. The model assumes (a) the contact is dry (contact limited to a small portion of the total available area and the spaces in-between the actual contact patches are perfect insulators), (b) contacts are clean (conductivity of the actual contact is the same as the bulk), (c) small temperature gradients (the bulk conductance may be assumed to be temperature independent), (d) the absolute temperature is low (thermal radiation effects are ignored), and (e) the dimensions of the nominal contact area are small compared to the thickness of the bulk material (the contact effects are localized near the contact). The models show that in the limit of actual contact area much less than the nominal area (a much less than A), that the excess temperature drop due to a single point of contact scales as a(exp -1/2). This disturbance only extends a distance approx. A(exp 1/2) into the bulk material. A group of identical contacts will result in an excess temperature drop that scales as n(exp -1/2), where n is the number of contacts and n dot a is constant. This implies that flat rough surfaces will have a lower excess temperature drop than flat polished surfaces.

Kittel, Peter↗

Gasket Assembly for Sealing Mating Surfaces

A gasket assembly for securing a pair of surface together wherein an electrically conductive gasket base having a central opening is provided with a pair of layers secured to opposite sides of the gasket base, with the layers being a fusible alloy, a brazing alloy or a synthetic, thermoplastic material which will melt, without degrading, when the gasket base is heated. The surfaces may be secured to each other by a plurality of bolts to squeeze the gasket assembly there between or by some other clamping means. An electrical current is passed through the gasket base to heat it to a temperature sufficient to melt the layers to seal the surfaces to opposite sides of the gasket base.

Bryant, Melvin A., III↗

X-33 Tank Failure During Autoclave Fabrication

The composite liquid hydrogen tank (tank #1 of 2) for the X-33 flight vehicle is made up of four lobes that have a sandwich construction, bonded to a frame of longerons. Lobes 1 and 4 showed local disbonds to the longerons they were bonded to. The 'bad' areas were cut away and patched with new material. The new material was cured by placing the entire tank in a heated autoclave with no pressure. Upon removal from the autoclave, it was noted that lobe 1 had severe skin/core disbonds on the inner and outer skins. The skins on this lobe were cracked as well. The core was disbonded from the inner skin across the entire acreage, except for spots around the lobe perimeter. The outer skin was separated from the core in a region near the center of the lobe. Lobe 1 was removed from the tank on January 13, 1999. Bolts were placed through the lobe to hold it together and the cuts on the inner skin were not continuous, but 'tabs' were left for final cutting and removal. Upon closer inspection of the disbonded basesheet, it was noted that there was a lack of filleting into the honeycomb core. Good fillets are critical to bond strength.

Nettles, Alan T.↗

Comparison of Jovian and Terrestrial Lightning as Observed from Space

We compare the images of Jovian lightning taken by Galileo spacecraft with the images of terrestrial lightning observed by Lightning Imaging Spectrometer (LIS) onboard the TERRA spacecraft. Both data sets have good spatial resolution: Galileo's pixel is 25 km, or about half the atmospheric scale height, LIS pixel is 3-6 km, also about half of the scale height. This good resolution allows us to see that both Jovian and terrestrial lightning spots look diffuse because of the scattering in the clouds above. Previously we used the appearance of the diffuse spots on Jupiter to model lightning depths and the opacity and shape of the overlying clouds (Dyudina and Ingersoll, 2000). The comparison with LIS data allowed us to verify that the model is valid for terrestrial lightning. The irregular shapes of large terrestrial lightning suggests 30-km scale horizontal bolts. On Jupiter the spots, projected onto the horizontal plane, are nearly circular suggesting that the large size of the spots is mostly due to the horizontal diffusion of the photons scattered in the clouds. Unlike the Galileo observations, LIS has fine temporal resolution of 2 ms, or about 250 frames per single lightning flash. We will discuss the temporal evolution of terrestrial flashes and its implications for Jupiter.

Dyudina, Ulyana A.↗

Issues Related to Cleaning Complex Geometry Surfaces with ODC-Free Solvents

Implementing ozone depleting chemicals (ODC)-free solvents into full-scale reusable solid rocket motor cleaning operations has presented problems due to the low vapor pressures of the solvents. Because of slow evaporation, solvent retention is a problem on porous substrates or on surfaces with irregular geometry, such as threaded boltholes, leak check ports, and nozzle backfill joints. The new solvents are being evaluated to replace 1,1,1-trichloroethane, which readily evaporates from these surfaces. Selection of the solvents to be evaluated on full-scale hardware was made based on results of subscale tests performed with flat surface coupons, which did not manifest the problem. Test efforts have been undertaken to address concerns with the slow-evaporating solvents. These concerns include effects on materials due to long-term exposure to solvent, potential migration from bolthole threads to seal surfaces, and effects on bolt loading due to solvent retention in threads. Tests performed to date have verified that retained solvent does not affect materials or hardware performance. Process modifications have also been developed to assist drying, and these can be implemented if additional drying becomes necessary.

Bradford, Blake F.↗

Monte Carlo Radiative Transfer Modeling of Lightning Observed in Galileo Images of Jupiter

We study lightning on Jupiter and the clouds illuminated by the lightning using images taken by the Galileo orbiter. The Galileo images have a resolution of 25 km/pixel and axe able to resolve the shape of the single lightning spots in the images, which have full widths at half the maximum intensity in the range of 90-160 km. We compare the measured lightning flash images with simulated images produced by our ED Monte Carlo light-scattering model. The model calculates Monte Carlo scattering of photons in a ED opacity distribution. During each scattering event, light is partially absorbed. The new direction of the photon after scattering is chosen according to a Henyey-Greenstein phase function. An image from each direction is produced by accumulating photons emerging from the cloud in a small range (bins) of emission angles. Lightning bolts are modeled either as points or vertical lines. Our results suggest that some of the observed scattering patterns axe produced in a 3-D cloud rather than in a plane-parallel cloud layer. Lightning is estimated to occur at least as deep as the bottom of the expected water cloud. For the six cases studied, we find that the clouds above the lightning are optically thick (tau > 5). Jovian flashes are more regular and circular than the largest terrestrial flashes observed from space. On Jupiter there is nothing equivalent to the 30-40-km horizontal flashes which axe seen on Earth.

Dyudine, U. A.↗

NASTRAN DMAP Fuzzy Structures Analysis: Summary of Research

The main proposed tasks of Cooperative Agreement NCC1-382 were: (1) developing MSC/NASTRAN DMAP language scripts to implement the Soize fuzzy structures approach for modeling the dynamics of complex structures; (2) benchmarking the results of the new code to those for a cantilevered beam in the literature; and (3) testing and validating the new code by comparing the fuzzy structures results to NASA Langley experimental and conventional finite element results for two model test structures representative of aircraft fuselage sidewall construction: (A) a small aluminum test panel (SLP, single longeron panel) with a single longitudinal stringer attached with bolts; and (B) a 47 by 72 inch flat aluminum fuselage panel (AFP, aluminum fuselage panel) including six longitudinal stringers and four frame stiffeners attached with rivets.

Sparrow, Victor W.↗

My Big Wall

It was June and I was in Yosemite National Park in California, 2,000-feet off the ground. I was climbing El Capitan, a majestic 3,000-foot high, mile-wide granite monolith--one of the most sought after and spectacular rock climbs in the world. After three days of climbing on its sheer face, and having completed the most difficult part of the route, my partner and I were heading down. A thunderstorm lasting all night and into the morning had soaked our tiny perch and all our worldly possessions. We began rappelling down the vertical wall by sliding to the ends of two 50meter ropes tied together and looped through a set of fixed rings bolted into the rock. At the end of the ropes was another rappel station consisting of a set of rings, placed by previous climbers for retreating parties, which we used to anchor ourselves to the rock face. We then pulled the ropes down from the rings above, threaded the ones in front of our noses and started down another rope length. Everything we brought up for our five-day climb to the summit we had to bring back down with us: ropes, climbing gear of every sort, sleeping bags, extra clothes, food, water, and other essentials. All this we either stuffed into a haul bag (an oversized reinforced duffel bag) or slung over our shoulders. The retreat was slow and methodical, akin to a train backing down a mountain, giving me ample time to think. My situation made me think about my work, mostly, about all the projects I have managed, or been involved in managing. As a NASA project manager, I have worked on a number of successful projects. I have also been involved in a number of projects I never saw the end of. I thought about all the projects I transferred off of for other opportunities, projects that were in full stride and ran out of funding, and ones put on the shelf because they would not meet a flight date. Oh yes, I have had many success, to be sure, or I would have burned out years ago. Lessons from both the successful and not-so-successful projects have taught me valuable lessons, but it has always been the failures where I've learned the most.

Espinosa, Paul S.↗

Intelligent Fasteners

Under a Small Business Innovation Research contract from Marshall Space Flight Center, Ultrafast, Inc. developed the world's first, high-temperature resistant, "intelligent" fastener. NASA needed a critical-fastening appraisal and validation of spacecraft segments that are coupled together in space. The intelligent-bolt technology deletes the self-defeating procedure of having to untighten the fastener, and thus upset the joint, during inspection and maintenance. The Ultrafast solution yielded an innovation that is likely to revolutionize manufacturing assembly, particularly the automobile industry. Other areas of application range from aircraft, computers and fork-lifts to offshore platforms, buildings, and bridges.

Source record↗

STS-112 Crew Interviews: Yurchikhin

A preflight interview with mission specialist Fyodor Yurchikhin is presented. He worked for a long time in Energia in the Russian Mission Control Center (MCC). Yurchikhin discusses the main goal of the STS-112 flight, which is to install the Integrated Truss Assembly S1 (Starboard Side Thermal Radiator Truss) on the International Space Station. He also talks about the three space walks required to install the S1. After the installation of S1, work with the bolts and cameras are performed. Yurchikhin is involved in working with nitrogen and ammonia jumpers. He expresses the complexity of his work, but says that he and the other crew members are ready for the challenge.

Source record↗

Efficient Design in a DC to DC Converter Unit

Space Flight hardware requires high power conversion efficiencies due to limited power availability and weight penalties of cooling systems. The International Space Station (ISS) Electric Power System (EPS) DC-DC Converter Unit (DDCU) power converter is no exception. This paper explores the design methods and tradeoffs that were utilized to accomplish high efficiency in the DDCU. An isolating DC to DC converter was selected for the ISS power system because of requirements for separate primary and secondary grounds and for a well-regulated secondary output voltage derived from a widely varying input voltage. A flyback-current-fed push-pull topology or improved Weinberg circuit was chosen for this converter because of its potential for high efficiency and reliability. To enhance efficiency, a non-dissipative snubber circuit for the very-low-Rds-on Field Effect Transistors (FETs) was utilized, redistributing the energy that could be wasted during the switching cycle of the power FETs. A unique, low-impedance connection system was utilized to improve contact resistance over a bolted connection. For improved consistency in performance and to lower internal wiring inductance and losses a planar bus system is employed. All of these choices contributed to the design of a 6.25 KW regulated dc to dc converter that is 95 percent efficient. The methodology used in the design of this DC to DC Converter Unit may be directly applicable to other systems that require a conservative approach to efficient power conversion and distribution.

Bruemmer, Joel E.↗

STS-110 Flight Day 7 Highlights

On the seventh day of STS-110, Mission Specialists Steven Smith and Rex Walheim are shown preparing for their second extravehicular activity (EVA) and the third of the mission, with the assistance of Mission Specialist Jerry Ross. Following this mission, Ross and Smith will be the first and second most experienced spacewalkers, respectively, in history. A camera mounted on the Space Shuttle Atlantis shows footage of the International Space Station. While Smith and Walheim are on EVA, Mission Specialists Ross and Lee Morin will provide choreography from inside the Atlantis crew cabin, Pilot Stephen Frick will operate the robotic arm, and Commander Mike Bloom will control the cameras on the robotic arm. Smith and Walheim are shown exiting the airlock hatch and then installing an PFR (Portable Foot Restraint) on the end of the robotic arm, from which much of the work will be done. Following the switching off of a circuit breaker, the main EVA task of rewiring umbilical cables that provide power, commands, and video is begun. These cables will be connected to the Mobile Transporter's (MT) robotic arm. The MT, an external transportation system which runs on rails, is seen with a helmet mounted camera as the astronauts work to release bolts that had served to secure the MT during launch. After a final check of the umbilical connections mated, the Umbilical Reconfiguration Panel is fitted over the cables, and the astronauts make their way to the airlock hatch.

Source record↗

STS-111 Flight Day 7 Highlights

On Flight Day 7 of STS-111 (Space Shuttle Endeavour crew includes: Kenneth Cockrell, Commander; Paul Lockhart, Pilot; Franklin Chang-Diaz, Mission Specialist; Philippe Perrin, Mission Specialist; International Space Station (ISS) Expedition 5 crew includes Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer; ISS Expedition 4 crew includes: Yury Onufrienko, Commander; Daniel Bursch, Flight Engineer; Carl Walz, Flight Engineer), this video opens with answers to questions asked by the public via e-mail about the altitude of the space station, the length of its orbit, how astronauts differentiate between up and down in the microgravity environment, and whether they hear wind noise during the shuttle's reentry. In video footage shot from inside the Quest airlock, Perrin is shown exiting the station to perform an extravehicular activity (EVA) with Chang-Diaz. Chang-Diaz is shown, in helmet mounted camera footage, attaching cable protection booties to a fish-stringer device with multiple hooks, and Perrin is seen loosening bolts that hold the replacement unit accomodation in launch position atop the Mobile Base System (MBS). Perrin then mounts a camera atop the mast of the MBS. During this EVA, the astronauts installed the MBS on the Mobile Transporter (MT) to support the Canadarm 2 robotic arm. A camera in the Endeavour's payload bay provides footage of the Pacific Ocean, the Baja Peninsula, and Midwestern United States. Plumes from wildfires in Nevada, Idaho, Yellowstone National Park, Wyoming, and Montana are visible. The station continues over the Great Lakes and the Eastern Provinces of Canada.

Source record↗

STS-113 Crew Training Clip

The STS-113 crew consists of Commander Jim Weatherbee, Pilot Paul Lockhart, and Mission Specialists Michael Lopez-Alegria and John Herrington. The goal of the STS-113 mission is to deliver the Expedition Six crew to the International Space Station and return the Expedition Five crew to Earth. Also, the P1 Truss will be installed on the International Space Station. The STS-113 crew is shown getting suited for Pre-Launch Ingress and Egress. The Neutral Buoyancy Lab Extravehicular Activity training (NBL) (EVA), CETA Bolt Familiarization, and Photography TV instruction are also presented.

Source record↗

Self Locking Fasteners

Detroit Tool Industries' Spiralock threading tool solves a major industrial problem, fasteners coming loose under vibration. Loosening is caused between the flanks of the bolt and nut threads. This lateral movement releases the locking friction that holds the joint together. Spiralock is a uniquely designed female thread form which used with male fasteners of standard thread form provides a self locking action that prevents the lateral movement, and thus makes the threaded joint highly resistant to the effects of vibration. Additionally, a thread contract runs the entire length of the nut, offering greater stress resistance than earlier fasteners.

Source record↗

Ultrasonic Monitor

MicroUltrasonics PLR-1000 is a refined microprocessor-controlled version (usable on bolts, plates, liquids and gases) of the P2L2 developed by Langley Research Center. New technique is for nondestructive measurement of residual stress in various types of structures, for example, nuclear pressure vessels, pipes in nuclear reactors, offshore platforms, bridges, railroad tracks and wheels, aircraft wings, and engines. The instrument produces sound tone pulses that travel through a test specimen. PLR-1000 precisely measures speeds as stress increases speed of sound, tone changes, making precise measurements possible.

Source record↗