Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes

Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Cañada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste management and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste management units at Area G. These MDA G disposal units include 32 pits, 193 shafts, and 4 trenches and contain LLW, MLLW and TRU waste. The remaining 105 solid waste management units (SWMUs) include RCRA-regulated landfill and storage units and DOE-regulated LLW disposal units. The TA-54 closure project must ensure that continuing waste operations at Area G and their transition to an interim or enduring facility are coordinated with closure activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practice on Facility Characterisation from a Material and Waste End- State Perspective - 16041

Radiological characterisation plays a significant role in the process of decommissioning of shut-down nuclear facilities in order to ensure the protection of the environment and radiation safety. At all stages of a decommissioning programme or project, adequate radiological characterisation is of crucial importance, not least from a material and waste perspective. The radiological characterisation is a key element for planning, controlling and optimising decommissioning and dismantling activities. Experience has shown that data and information from the operation of a facility can - supplemented by recently collected and analysed data and information - be of crucial importance for decisions on waste management and for characterisation of radioactive waste. Once the dismantling has been done, some information may be hard, costly or even impossible to obtain later in the waste management process. This was the reason why the Working Party on Decommissioning and Dismantling (WPDD) of the OECD Nuclear Energy Agency (NEA) decided in late 2013 to extend the mandate of the Task Group on Radiological Characterisation and Decommissioning (TGRCD) for a second phase focusing on nuclear facility characterisation from a waste and material end-state perspective whereas the first phase focused on overall strategies of radiological characterisation. This paper gives an overview of the activities and findings within both phases up to now. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing spacecraft waste

Waste is a universal problem, on Earth, in spacecraft, and for any closed ecological system. Waste must be processed and is often recycled to recover resources. Many different approaches and technologies are used. Spacecraft waste is derived from the spacecraft logistics supplies, the materials provided for use by the crew. The composition of spacecraft logistics and the resulting waste depend on the mission and its duration and use of recycling. Spacecraft waste is a more serious problem on long duration missions because of the large logistics supplies consumed and the difficulty of storing or disposing of waste. The quantity and composition of waste can vary and may require flexible management. Most missions will produce about two kilograms per crewmember per day of trash, consisting of food waste, plastic, paper, packaging, hygiene wipes and many other supplies used and discarded by the crew. The waste is bulky, messy and difficult to store since the wet waste can decompose and produce odors and an accumulation of pathogenic bacteria. Many different methods have been proposed for managing spacecraft waste.

Harry W Jones↗

Design, Development and Operational Experience of Demonstration Facility for Cs-137 Source Pencil Production at Trombay - 13283

Radioactive waste management is a vital aspect of any nuclear program. The commercial feasibility of the nuclear program largely depends on the efficiency of the waste management techniques. One of such techniques is the separation of high yield radio-nuclides from the waste and making it suitable for medical and industrial applications. This will give societal benefit in addition to revenue generation. Co-60, the isotope presently being used for medical applications, needs frequent replacement because of its short half life. Cs-137, the major constituent of the nuclear waste, is a suitable substitute for Co-60 as a radioactive source because of its longer half life (28 years). Indian nuclear waste management program has given special emphasis on utilization of Cs-137 for such applications. In view of this a demonstration facility has been designed for vitrification of Cs-137 in borosilicate glass, cast in stainless steel pencils, to be used as source pencils of 300 Ci strength for blood irradiation. An induction heated metallic melter of suitable capacity has been custom designed for the application and employed for the Cs-137 pencil fabrication facility. This article describes various systems, design features, experiments and resulting modifications, observations and remote handling features necessary for the actual operation of such facility. The layout of the facility has been planned in such a way that the same can be adopted in a hot cell for commercial production of source pencils. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Spent Nuclear Fuel Storage and Radioactive Waste Disposal in the United States: A Law and Policy Analysis - 20302

While Congress plays political football, spent nuclear fuel continues to sit in de facto interim nuclear waste storage sites throughout the country. This ad hoc approach - if it can even be called an approach - to nuclear waste management is in no one's best interests, because of financial, safety, environmental, and national security concerns with the status quo. Senate leadership had asserted that an up-or-down vote on the Yucca Mountain Project would take place in September or October 2019, but that did not occur. Rather, a conference bill was agreed to, and it provided that, although the nuclear program should receive some funding, funding was not made available for centralized interim storage ('CIS') or the Yucca Mountain Project. The President's FY2021 Budget Request does not contain any proposed funding for the Yucca Mountain Project ('the Project'). This paper will discuss the implications of that process, both for the Project itself and for the U.S. nuclear waste program more generally. In order to provide context for the current situation, this paper will begin by chronicling the history of U.S. nuclear waste management, from the passage of the Nuclear Waste Policy Act of 1982 and to the present day. It will discuss the roles of the U.S. Department of Energy, the Nuclear Regulatory Commission, federal and state political delegations, and the nuclear energy industry. The paper will then identify key themes that can be expected to affect the future of nuclear waste management in the United States. For example, it will consider whether development of additional CIS facilities is a viable short- to medium-term solution. CIS facilities may relieve immediate pressure at decommissioned or soon-to-be-decommissioned nuclear power plants; but with that pressure partially alleviated, support for building a long-term repository may be reduced. It will also discuss opposition by the State of New Mexico and others to the proposed New Mexico CIS project, based not only on siting concerns but also whether it might become a de facto repository, and whether the State of Texas and others may also be opposed, for similar reasons, to the proposed CIS facility in Texas. Additionally, the paper will examine consent-based siting and its implications for Nevada and other states that are potential hosts for spent nuclear fuel storage and disposal facilities. Further, if the Project is not a politically viable solution, the paper will examine whether it is now time for serious consideration of an alternate location for a permanent repository, as well as consideration of other options entirely, such as deep geologic disposal. The paper will conclude by looking ahead to the 2020 elections. It will describe the positions of candidates (particularly Presidential candidates) on spent nuclear fuel storage and disposal options, without advocating for any particular candidate or political party. Perhaps in 2020, we will at least see a start to a solution to the seemingly intractable problem of nuclear waste management in the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 097B - Panel: Pathway to End State at the East Tennessee Technology Park in Oak Ridge, TN (2/4) (R1.16b)

This panel was to focus on the 'Pathway to End State at the East Tennessee Technology Park (ETTP)'. It was to discuss the DoE's long-term vision for the ETTP site and the process for converting the site into a multi-use industrial park, historic preservation and national park, and conservation area. The Panelists were to discuss the challenges in executing a cleanup project of this magnitude, the waste management, and the monitoring efforts that supported the achievement of the Oak Ridge Office of Environmental Management (OREM) Vision 2020. This session integrated with panel sessions 97A, 97C, and 97D. Panelists with presentations: Beginning with the End in Mind (Kevin Ironside); Project Execution (Daniel Macias); Waste Management (John Wrapp); Environmental Remediation (Samantha Pack); Waste Management (Josh Pemberton); DOE's Long-Range Vision (Laura Wilkerson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on site selection for Canada's national repository for used nuclear fuel - 15481

In 2007, the Government of Canada selected Adaptive Phased Management as Canada's plan that provides for long-term management of Canada's used nuclear fuel in a deep geological repository, located in an informed and willing host. The Nuclear Waste Management Organization is tasked through federal legislation to select the site and develop and manage all aspects of Canada's plan. In May 2010 the Nuclear Waste Management Organization published and initiated the site selection process that serves as a road map for decision-making on the location for the deep geological repository. The Nuclear Waste Management Organization continues to lead the site selection process for a deep geological repository for the long term management of Canada's used nuclear fuel and centre of expertise. The screening down process is advancing and, from an initial starting point of 22 communities expressing interest in learning about the project, as of November 2014 14 communities are now the focus of more detailed studies. Preliminary assessments are underway with these communities, which is the third step in the 9 step site selection process. Preliminary assessments involve preliminary technical and social desktop and field assessments, engagement activities within and beyond the interested community and seeking involvement of Indigenous peoples and nearby municipalities in the planning and conduct of the work. The paper provides an update on the advancement of the site selection process. It describes the nature of the technical and social studies being conducted at this phase of work, including the progressively more detailed field studies which are the focus of technical work at this stage, approach to engagement and collaboration with communities to direct these studies, and the work underway to ensure the framework used for this assessment and engagement includes the range of priorities and perspectives of First Nations and Metis peoples and communities in the broader area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 16623

The U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) is laying the groundwork for implementing an integrated nuclear waste management system. This includes preparing for future large-scale transport of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) since transport will be a necessary component of an integrated waste management system. DOE continues to plan and develop options for the design of an integrated nuclear waste management disposition system. A significant destination-independent component of this integrated system is a rail transport capability for SNF and HLW. This paper provides an overview of the current DOE-NE effort related to designing and fabricating prototype rail cars. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

'A Good Decision Is Based On Information, Not On Numbers' - A Process For National Strategic Decision Making - 17203

Waste management decision making is the process used by waste owners to determine and justify choices in across the lifecycle of a waste (from the manner of generation or retrieval to final disposition). In the UK, waste owners in the nuclear industry are obligated, by their environmental permits and authorisations, to demonstrate the application of robust and well-underpinned decision making processes for waste management. This is captured through the requirement for waste owners to demonstrate the identification and implementation of Best Available Technique (BAT). The National Waste Programme (NWP), led by LLW Repository Ltd, is a UK wide programme which leads the implementation of the UK National Strategy for the management of solid LLW from the nuclear industry [1] and which aims to deliver a self-sustaining culture for optimised management of Low Level Waste (LLW) in the UK. Recognising the requirement on waste owners, the NWP has - in conjunction with appointed contractors - led the development and publication of national strategic optioneering studies (so-called national strategic BAT studies) to support waste owners. Recognising the benefits that this approach to optioneering and strategic decision making could have for other waste producers, this paper provides an overview of the process used for the development of the suite of national strategic BAT assessments for the NWP. It details: the main phases of the process, the key features of each process phase, the benefits of the approach and key learning from its deployment in practice. Note: The legislative regime in England and Wales requires the identification and application of BAT. There is an equivalent regime in Scotland known as Best Practicable Environmental Option (BPEO) and Best Practicable Means (BPM). The requirements are comparable across the two legislative regimes and, for the purposes of simplicity, the term BAT will be utilised in this paper. The approach and outcomes of the national strategic optioneering process described are applicable across the UK. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Environmental Report 2014

This Nevada Nuclear Security Site Environmental Report (NNSSER) was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NNSA/NFO Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts.This NNSSER summarizes data and compliance status for calendar year 2014 at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) and its two support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory–Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). Through a Memorandum of Agreement, NNSA/NFO is responsible for the oversight of these ER projects, and the Sandia Field Office of NNSA (NNSA/SFO) has oversight of all other TTR and NTTR activities. NNSA/SFO produces the TTR annual environmental report, which is available at http://www.sandia.gov/news/publications/environmental/index.html.Major Site Programs and Facilities NNSA/NFO directs the management and operation of the NNSS and six sites across the nation. The six sites include two in Nevada (NLVF and RSL-Nellis) and four in other states (RSL-Andrews in Maryland, Livermore Operations in California, Los Alamos Operations in New Mexico, and Special Technologies Laboratory in California). Los Alamos, Lawrence Livermore, and Sandia National Laboratories are the principal organizations that sponsor and implement the nuclear weapons programs at the NNSS. National Security Technologies, LLC (NSTec), is the current Management and Operating contractor accountable for the successful execution of work and ensuring that work is performed in compliance with environmental regulations. The six sites all provide support to enhance the NNSS as a location for weapons experimentation and nuclear test readiness. The three major NNSS missions include National Security/Defense, Environmental Management, and Nondefense. The major programs that support these missions are Stockpile Stewardship and Management, Nonproliferation and Counterterrorism, Nuclear Emergency Response, Strategic Partnership Projects, Environmental Restoration, Waste Management, Conservation and Renewable Energy, Other Research and Development, and Infrastructure. The major facilities that support the programs include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility, Dense Plasma Focus Facility, Joint Actinide Shock Physics Experimental Research Facility, Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nonproliferation Test and Evaluation Complex (NPTEC), Radiological/Nuclear Weapons of Mass Destruction Incident Exercise Site (known as the T-1 Site), Area 5 Radioactive Waste Management Complex (RWMC), and the Area 3 Radioactive Waste Management Site (RWMS).

54 ENVIRONMENTAL SCIENCES↗

Panel Session 1: WM2019 Plenary Session

The plenary panel focused on government and industry world leaders speaking on the pressing issues facing radioactive waste management in 2019 and beyond. Presentations proposed include: 1 - Waste Management Symposium 2019 - Plenary Session (Rumina Velshi, Canadian Nuclear Safety Commission (Canada)); 2 - The DOE 2019 Featured Site - Idaho (Congressman Mike Simpson, United States House of Representatives, Idaho's 2. Congressional District)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Environmental Report 2014--Summary

This Nevada National Security Site Environmental Report (NNSSER) was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the National Nuclear Security Administration Nevada Field Office Environmental (NSA/NFO) Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. The three major NNSS missions include National Security/Defense, Environmental Management, and Nondefense. The major programs that support these missions are Stockpile Stewardship and Management, Nonproliferation and Counterterrorism, Nuclear Emergency Response, Strategic Partnership Project, Environmental Restoration, Waste Management, Conservation and Renewable Energy, Other Research and Development, and Infrastructure. The major facilities that support the programs include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility, Dense Plasma Focus Facility, Joint Actinide Shock Physics Experimental Research Facility, Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nonproliferation Test and Evaluation Complex (NPTEC), Radiological/Nuclear Weapons of Mass Destruction Incident Exercise Site, Area 5 Radioactive Waste Management Complex (RWMC), and the Area 3 Radioactive Waste Management Site (RWMS).

54 ENVIRONMENTAL SCIENCES↗

Optimization of Post Dismantling Radwaste Management: a French Innovative Initiative - 18013

The extent and duration of French dismantling operations require the proactive management of the large volumes of radioactive waste to be generated, and that sustainable, innovation processes be engaged. This approach should associate not only the waste producers and dismantling sites operators but also organizations responsible for the safety and waste disposal. The final goal is that all constrains and requirements related to radioactive waste management are anticipated prior to the design stages. While considering those objectives, The French State has decided to give Andra, within the 'Investissements d'Avenir' program, an endowment to support innovation at all steps of radioactive waste life cycle with a special emphasis on the dismantling process. Currently, some 30 R and D projects dealing with the optimization of post dismantling radioactive waste management are underway. They aim at providing strong innovations in terms of characterization, processing, conditioning and disposal of post dismantling radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2025

The U.S. Department of Energy (DOE) requires the performance assessment (PA) (Department of Energy Idaho Operations Office [DOE-ID] 2018a), composite analysis (CA) (DOE-ID 2012), and CA addendum (DOE-ID 2018b) for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility at the Idaho National Laboratory (INL) Site shall be maintained to evaluate changes that could affect the performance, design, and operating basis for the facility (DOE Manual 435.1-1 Change 3, “Radioactive Waste Management Manual,” Section IV.P. [4]). The RHLLW Disposal Facility became operational in September 2018 after the completion of operational readiness activities required by DOE Order 425.1D, “Verification of Readiness to Start Up or Restart Nuclear Facilities,” and the issuance of the startup authorization by the Startup Approval Authority (Boston 2018). The first waste disposals at the RHLLW Disposal Facility began in Fiscal Year (FY) 2019. In Fiscal Year (FY) 2025, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. This FY 2025 annual summary report (ASR) documents the continued adequacy of the PA, CA, operating disposal authorization statement (ODAS) (ODAS 2018), ODAS technical-basis documents, and the radioactive waste management basis (RWMB) (INL 2024a) to meet DOE Order 435.1, “Radioactive Waste Management,” performance objectives for the RHLLW Disposal Facility. Annual review of the adequacy of the PA and CA at the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of DOE Order 435.1.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Potential Cost Implications of an Interim Storage Facility for Commercial SNF+ - 17132

The question of whether or not consolidated interim storage of commercial spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. This paper summarizes an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). In this study, the order-of-magnitude estimates of total system costs were calculated and tabulated. The analyzed scenarios involve shipment of SNF from reactors in dual-purpose storage and transportation canisters (DPCs) currently being used by utilities for dry storage at reactor sites. A number of pertinent conclusions can be drawn from this evaluation, including: - Delay in repository availability increases total system costs. Any delay in opening a repository increases total system costs, regardless of whether the system has an ISF or not. This is due to the increased cost associated with an extended duration for storage, whether at multiple independent spent fuel storage installations (ISFSIs) or at an ISF, until waste can be disposed of.- There is a potential total system lifecycle cost avoidance in realistic scenarios with an ISF when compared to scenarios with no ISF. However, most of the cost avoidance occurs several decades after the ISF is opened. The total WMS cost differential over the long term is mainly attributed to the reduced operational costs of storing the fuel in a consolidated facility rather than at individual reactor sites. - Earlier establishment of an ISF allows for more avoidance of post-shutdown at-reactor storage costs for any repository opening date. An ISF allows earlier acceptance of fuel from reactors, which reduces at-reactor costs from a total system perspective. - Transportation costs have little impact on a WMS with or without an ISF. These impacts range from 3-11% of the total cost in all scenarios. Therefore, transporting the fuel twice does not appear to be a significant cost concern driver relative to other system costs. In conclusion, designing, licensing, and constructing an ISF will require a large near-term financial investment. However, reduced annual operating and maintenance costs for an integrated waste management system with an ISF, compared to a system without an ISF, could eventually result in system-wide (integrated) cost avoidance due to reductions in at-reactor storage costs in the long term. The largest cost avoidances would not occur for several decades, so assumptions about inflation, escalation, and discount rates will have a significant effect on potential economic impacts of an ISF. It should be noted that other benefits associated with the investment of an ISF-such as earlier removal of SNF from shutdown reactor sites, earlier prospects for site re-utilization, and additional overall integrated waste management system flexibility-were not addressed in this study. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A BIM-based system for demolition and renovation waste estimation and planning

Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from More than Three Decades of Decommissioning and RAW Management in Slovakia - 20074

The purpose of this paper is to describe utilization of experience of JAVYS Company acquired while acting as the Slovak national decommissioning and radioactive waste management entity. JAVYS manages both the decommissioning of A1 NPP (shut down after series of accidents) and V1 NPP (shut down after standard operation) and related radioactive waste management. Besides JAVYS is responsible for management of institutional radioactive waste in Slovakia. The paper is focusing on selected successfully completed projects and related lessons learned from development of special procedures and implementation of activities within decommissioning and management of generated waste streams from cradle to grave. Recently, experience and lessons learned from all aforementioned activities are used internationally to provide assistance to other countries in order to overcome difficulties and to successfully implement various projects dealing with decommissioning and radioactive waste management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗