Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Trade Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Space Shuttle bipropellant RCS engine.

The requirements of the Space Shuttle bipropellant reaction control system engine technology contract and the scheduled contract effort are presented herein. The requirements included an engine concept scalable from 400 to 1100 lbf, with a 100 mission life employing N2O4/MMH propellants. Emphasis is placed on reusability and minimum post-flight servicing. The engine components are reviewed and their selection is supported by tradeoff analyses, thrust chamber firing test data, materials test data, and metallurgical evaluations. The materials test data indicate that the proposed silicide coated columbium chamber and uncoated columbium injector have the potential of meeting the mission life requirements. The engine valve trade studies resulted in the selection of a torque motor operated bipropellant valve configuration. Fuel vortex film cooling of the insulated chamber is described together with the fuel vortex film cooling scaling parameter and its verification by test data to a thrust level of 5500 lbf.

Sanscrainte, W.↗

Status report on shuttle program.

Following a brief summary of previous work, major attention is given to Phase-B extension, the Request for Proposal (RFP), the selected configuration and associated activities, and the future. NASA extended Phase-B contracts to examine other options that might lower peak annual funding and decrease program risk. Most of the discussion deals with the shuttle and orbiter systems. The efforts of the shuttle program in the past year have seen the completion of numerous trade studies and the selection of a prime shuttle contractor.

Swigert, J. L., Jr.↗

Ocean recovery of Shuttle Solid Rocket Boosters.

Cost effective recovery of the expended Space-Shuttle Solid Rocket Boosters (SRB) from the ocean will result in significant overall cost savings to the Space Shuttle Program. The ocean recovery mission begins with the dispatching of the recovery team to the predicted splashdown area. The SRBs, drogue parachutes and main parachutes must be tracked, located, retrieved, and transported to land where they will be refurbished and recycled for reuse. Trade studies to be conducted will consider the recovery mission requirements and weigh the advantages, disadvantages and costs of various candidate recovery systems. Major parameters effecting the selection of the final system will ensure that the system will meet overall objectives. Large- and small-scale SRB model testing has been conducted to establish characteristics of SRBs during water entry, floating free and under tow.

Junker, L. J.↗

A visual display system approach for an advanced spaceflight simulator.

Future training and procedures simulators for advanced spacecraft will require that visual attachments provide forward, side and overhead window field of view capability. This paper presents an approach to high resolution, full color simulation of visual cues over the field of view offered by these crew station windows. Baseline requirements along with supporting rationale are presented. Candidate visual display hardware is identified and trade study results discussed. The display system approach presented is the result of studies which investigated the applicability of Apollo simulator visual display and image generation hardware to advanced spaceflight simulation.

Hock, E. A.↗

Space shuttle atmospheric revitalization subsystem/active thermal control subsystem computer program (users manual)

A shuttle (ARS) atmosphere revitalization subsystem active thermal control subsystem (ATCS) performance routine was developed. This computer program is adapted from the Shuttle EC/LSS Design Computer Program. The program was upgraded in three noteworthy areas: (1) The functional ARS/ATCS schematic has been revised to accurately synthesize the shuttle baseline system definition. (2) The program logic has been improved to provide a more accurate prediction of the integrated ARS/ATCS system performance. Additionally, the logic has been expanded to model all components and thermal loads in the ARS/ATCS system. (3) The program is designed to be used on the NASA JSC crew system division's programmable calculator system. As written the new computer routine has an average running time of five minutes. The use of desk top type calculation equipment, and the rapid response of the program provides the NASA with an analytical tool for trade studies to refine the system definition, and for test support of the RSECS or integrated Shuttle ARS/ATCS test programs.

Source record↗

Evaluation of coated columbium alloy heat shields for space shuttle thermal protection system application. Volume 2, phase 2: Subsize heat shield and small size TPS evaluation

Initially a trade study was conducted of seven heat shield configurations. These were evaluated for structural reliability, fabricability, weight, inspectability, and refurbishability. Two concepts, a tee-stiffened and an open corrugation, were selected as offering the most potential for system success. Fourteen subsize heat shields of a full scale section were fabricated from C-129Y and Cb-752 and silicide coated with R-512E. These subsize panels were subjected to a simulated flight profile representing temperature, local surface pressures, and applied pressure differential loads. All corrugated panels of both alloys sustained 100 cycles without structural or coating failure. All Cb-752/R-512E panels performed well with one panel being successfully repaired after 66 cycles and completing 100 cycles. As a result of this evaluating the Cb-752/R-512E system was selected for hardware application during the subsequent phases. In addition, the tee-stiffened configuration was selected for further development and application in Phase III. This selection was based on an overall assessment of relative weight, cost, and structural performance of the tee-stiffened and open corrugation TPS.

Black, W. E.↗

Absolute pressure transducers for space shuttle and orbiter propulsion and control systems

A preliminary design was completed, reviewing of such subjects as: the trade studies for media isolation and one sensor vs. two sensors for two bridges; compensation resistors; unit design; hydrogen embrittlement; sealing techniques and test station design. A design substantiation phase was finished, consisting of testing of a prototype unit and fabrication technique studies. A cryogenic test station was implemented and prototype sensor cells were fabricated, sensors assembled, and cryogenic tests performed.

Bolta, J. J.↗

Space Shuttle EVA requirements

Description of a Space Shuttle mission and task analysis conducted to derive the requirements for the extravehicular life support system and pressure suit. A baseline extravehicular mobility unit concept that was derived from trade studies to meet these requirements is summarized. It is shown that pressure suits improved over the Apollo and Skylab hardware will be required. Extravehicular activity (EVA) requirements for the Space Shuttle will be highly varied and are expected to average 1.3 hr per flight. About 98% of the EVAs are expected to be of 4-hour duration or less.

Cox, R. L.↗

LST design considerations

Following a review of the major LST program elements, LST/Space Shuttle interface characteristics and Shuttle performance capabilities are reviewed. The influence these considerations have on the LST configuration, design, and on-orbit servicing is discussed. Significant systems trade studies and design constraints associated with the Shuttle/LST interface are discussed, including telescope focal ratio limitations and on-orbit access provisions for maintenance. LST internal interfaces are described with particular emphasis on simplicity and minimization of integration costs. Characteristics and design requirements of the OTA, SI, and SSM also are discussed with emphasis on critical subsystem requirements.

Olivier, J. R.↗

Dual S and Ku-band tracking feed for a TDRS reflector antenna

The results are presented of a trade study designed to identify a synchronous satellite antenna system suitable for receiving and transmitting data from lower orbiting satellites at both S- and K sub u-bands simultaneously as part of the Tracking and Data Relay Satellite System. All related problems associated with maintaining a data link between two satellites with a K sub u-band half-power beamwidth of 0.4 db are considered including data link maintenance techniques, beam pointing accuracies, gimbal and servo errors, solar heating, angle tracking schemes, acquisition problems and aids, tracking accuracies versus SNR, antenna feed designs, equipment designs, weight and power budgets, and detailed candidate antenna system designs.

Pullara, J. C.↗

Acoustic attenuation design requirements established through EPNL parametric trades

An optimization procedure for the provision of an acoustic lining configuration that is balanced with respect to engine performance losses and lining attenuation characteristics was established using a method which determined acoustic attenuation design requirements through parametric trade studies using the subjective noise unit of effective perceived noise level (EPNL).

Veldman, H. F.↗

Tug fleet and ground operations schedules and controls. Volume 3: Program cost estimates

Cost data for the tug DDT&E and operations phases are presented. Option 6 is the recommended option selected from seven options considered and was used as the basis for ground processing estimates. Option 6 provides for processing the tug in a factory clean environment in the low bay area of VAB with subsequent cleaning to visibly clean. The basis and results of the trade study to select Option 6 processing plan is included. Cost estimating methodology, a work breakdown structure, and a dictionary of WBS definitions is also provided.

Source record↗

Spacelab user implementation assessment study. Volume 1: Concept development and evaluation

The total matrix of alternate Spacelab processing concepts and the rejection rationale utilized to reduce the matrix of 243 alternates to the final candidate processing concepts are developed. The work breakdown structure used for the systematic estimation and compilation of integration and checkout resources is presented along with descriptors of each element. Program models are provided of the space transportation system, the Spacelab, the orbiter, and the ATL that were used as the basis for the study trades, analyses, and optimizations. Resource requirements for all processing concepts are summarized along with the optimizations of the processing concepts. Concept evaluations including flight-rate sensitivities of the GSE, facilities, Spacelab hardware elements, and personnel are delineated. An analysis is presented of the applicability of the candidate concepts to potential spacelab users. The impact of the use of the western test range as an orbiter/spacelab launch site on the candidate processing concepts is evaluated. An assessment of the geographical co-location of experiment, Spacelab, and orbiter-cargo integration is included. Ownership options of the support module/system igloo are discussed.

Source record↗

Lageos phase B technical report

Analysis and design of the LASER Aerodynamic Satellite was performed and the design integrated with the launch vehicle interfaces and launch operations. The satellite has a requirement to be compatible with techniques for ranging from earth to satellite to an accuracy of + or - sq cm. The results indicate the satellite design while maintaining low program cost, met the design and mission requirements. Trade studies and satellite design are documented along with thermal and optical tests.

Source record↗

General purpose simulation system of the data management system for space shuttle mission 18

The simulation program of the science and engineering data management system for the space shuttle is presented. The programming language used was General Purpose Simulation System V (OS). The data flow was modeled from its origin at the experiments or subsystems to transmission from the space shuttle. Mission 18 was the particular flight chosen for simulation. First, the general structure of the program is presented and the trade studies which were performed are identified. Inputs required to make runs are discussed followed by identification of the output statistics. Some areas for model modifications are pointed out. A detailed model configuration, program listing and results are included.

Bengtson, N. M.↗

Crew appliance computer program manual, volume 1

Trade studies of numerous appliance concepts for advanced spacecraft galley, personal hygiene, housekeeping, and other areas were made to determine which best satisfy the space shuttle orbiter and modular space station mission requirements. Analytical models of selected appliance concepts not currently included in the G-189A Generalized Environmental/Thermal Control and Life Support Systems (ETCLSS) Computer Program subroutine library were developed. The new appliance subroutines are given along with complete analytical model descriptions, solution methods, user's input instructions, and validation run results. The appliance components modeled were integrated with G-189A ETCLSS models for shuttle orbiter and modular space station, and results from computer runs of these systems are presented.

Russell, D. J.↗

Crew appliance concepts. Volume 1, appendix A: Bibliography

A review of crew appliance related literature was made to provide background engineering information for development of conceptual appliance systems for the shuttle orbiter and the modular space station. From this review, a file containing abstracts of 299 appliance-related documents coded according to subject was developed along with a computerized bibliography of 682 references. Trade studies were conducted using information from these references to determine the optimum concepts to satisfy the shuttle and space station mission requirements. An appliance system was devised for each vehicle which has minimum impact to the respective environmental control system with the smallest possible weight, volume, and electrical penalty. Engineering parameters for each appliance concept considered are presented along with the total thermal and electrical loads and weight and volume penalties for each of the optimized appliance systems.

Proctor, B. W.↗