Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Enhanced methods for operating refueling station tube-trailers to reduce refueling cost

A method and apparatus are provided for operating a refueling station including source tube-trailers and at least one compressor to reduce refueling cost. The refueling station includes a gaseous fuel supply source including a plurality of tanks on a tube trailer coupled to a first control unit, and high pressure buffer storage having predefined capacity coupled to a second control unit and the first tanks by a pressure control valve and the first control unit, and at least one compressor. The refueling station is operated at different modes depending on a state of the refueling station at the beginning of each operational mode. The refueling system is assessed at the end of each operational mode to identify the state of the system and select a next mode of operation. The operational modes include consolidating hydrogen, or any gaseous fuel, within the tubes mounted on the trailer.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Evaluating Direct and Indirect Influence on EV Charging Stations Across the US

The adoption of new technology for electric vehicles (EV) and mobility applications can bring underappreciated vulnerabilities to the power grid. One area of potential fraud and adversarial influence is through the business ecosystem of startups that own and deploy EV technology. Yet, there are no models or analyses that map the network of organizations and people that have direct and indirect influence over technologies currently deployed in the grid. To fill this gap, we develop a multilayer network model to measure direct and indirect influence on EV charging stations. First, we create and adversarial socio-technical network (ASTN) model via a data fusion pipeline for different US regions of interest (ROI). Then, we develop an integrated ASTN for Chicago, Los Angeles, New York, and Philadelphia. We rank EV charging companies direct influence within each geographic region as well as indirect influence via social network analysis. While some companies have strong direct and indirect influence (i.e., ChargePoint) others show a mismatch between their influence over charging stations and their position within the social network. For example, Tesla has strong direct influence on stations and weak indirect influence over competitors. In contrast, 7Charge has weak direct influence over stations, but strong indirect influence over competitors.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Brady's Geothermal Field - Map of DAS, Nodal, Vibroseis and Reftek Station Deployment

Map of DAS, nodal, vibroseis and Reftek stations during March 2016 deployment. The plot on the left has nodal stations labeled; the plot on the right has vibroseis observations labeled. Stations are shown in map-view using Brady's rotated X-Y coordinates with side plots denoting elevation with respect to the WGS84 ellipsoid. Blue circles denote vibroseis data, x symbols denote DAS (cyan for horizontal and magenta for vertical), black asterisks denote Reftek data, and red plus signs denote nodal data. This map can be found on UW-Madison's askja server at /PoroTomo/DATA/MAPS/Deployment_Stations.pdf

15 GEOTHERMAL ENERGY↗

Fire Station #1 Area, SWMU 116 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Fire Station #1 (FS1) Area (formerly known as Fire Station #4) located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 116 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 116 as the fire station was identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. During the SA, a total of six soil, 48 groundwater direct push technology (DPT), eight groundwater monitoring well, and one surface water sample were collected between October 2021 and March 2022. The samples were analyzed for 28 PFAS compounds using the Department of Defense Quality Systems Manual-compliant Method. SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the FS1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSLs) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Overall, results from the SA showed exceedances of the applicable screening criteria for soil, groundwater and surface water. Considering the current and historical dataset, perfluorooctanesulfonic acid (PFOS) is the prevalent PFAS compound, which is indicative of AFFF releases. Based on results of the SA, additional groundwater DPT and surface water sampling should be considered, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between groundwater and surface water in the FS1 Area.

PFAS↗

Consumer Convenience and the Availability of Retail Stations as a Market Barrier for Alternative Fuel Vehicles: Preprint

The availability of retail stations can be a significant barrier to the adoption of alternative fuel light-duty vehicles in household markets. This is especially the case during early market growth when retail stations are likely to be sparse and when vehicles are dedicated in the sense that they can only be fuelled with a new alternative fuel. For some bi-fuel vehicles, which can also fuel with conventional gasoline or diesel, limited availability will not necessarily limit vehicle sales but can limit fuel use. The impact of limited availability on vehicle purchase decisions is largely a function of geographic coverage and consumer perception. In this paper we review previous attempts to quantify the value of availability and present results from two studies that rely upon distinct methodologies. The first study relies upon stated preference data from a discrete choice survey and the second relies upon a station clustering algorithm and a rational actor value of time framework. Results from the two studies provide an estimate of the discrepancy between stated preference cost penalties and a lower bound on potential revealed cost penalties.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

How Advanced Hydrogen Fueling Protocols Can Improve Fueling Performance and H2 Station Design

This presentation introduces concepts to lower the cost of hydrogen fueling by making improvements to the existing SAE J2601 protocols and by utilizing completely new protocol approaches that can facilitate customer acceptable fueling at warmer hydrogen pre-cooling temperatures. These methods would reduce the cost of chillers at the station, reduce energy consumption, and increase station reliability without sacrificing fueling performance. These approaches are especially applicable to high flow fueling at 70 MPa, a key aspect of H2@Scale, wherein station energy consumption and customer sensitivity to fuel costs is even more prominent than it is for light-duty fueling.

ADVANCED PROPULSION SYSTEMS↗

Investigation of precooling unit design options in hydrogen refueling station for heavy-duty fuel-cell electric vehicles

Precooling gaseous hydrogen fuel to a cold temperature before refueling a heavy-duty (HD) hydrogen fuel cell electric vehicle (HFCEV) is essential to avoid overheating the vehicle tank, as well as achieving a high state of charge (SOC). Because a large volume of hydrogen is dispensed during each fill, the need for a shorter fill time amplifies the need to precool each load for refueling a HFCEV. Thus, the design and operation of a precooling unit (PCU), as well as the associated capital and operating costs, plays a pivotal role in any plans for heavy-duty hydrogen refueling stations. Here, in this paper, we present a thermodynamic and technoeconomic analysis of a PCU in a gaseous hydrogen refueling station (HRS) for HD HFCEVs. By employing Argonne National Laboratory's hydrogen station cost optimization and performance evaluation (H2SCOPE) model, the refueling of 50 kg of hydrogen on-board type IV tank at ambient temperatures of 15–45 °C and varying fill rates is simulated. The required degree of precooling temperature to obtain either 100% or the maximum possible SOC is obtained from the simulation. Additionally, the simulation results demonstrate that the average flow rate of hydrogen is approximately 40% lower than the maximum flow rate during a typical fill; which motivates further evaluation of the instantaneous hydrogen mass flow rate profile and suggests the scope of improving precooling unit design. Accordingly, a hybrid strategy of precooling hydrogen has been proposed to address the cooling load by sizing the refrigeration unit for the average flow rate of hydrogen, while supplementing the above average peak hydrogen flow cooling load through thermal buffering. The combined technique enables the downsizing of the original PCU capacity by 25–40% and demonstrates a potential cost reduction of the PCU by approximately 30%, which translates to an installed cost reduction of ∼$125,000 per dispenser.

25 ENERGY STORAGE↗

Operational optimization for multi-functional charging station with electric and hydrogen-powered vehicles

The rapid adoption of electric vehicles (EVs) and hydrogen fuel cell vehicles (HFCVs), combined with global efforts to reduce carbon emissions, has accelerated the development of EV charging and hydrogen refueling stations. In response to this demand, this paper introduces the concept of Multi-Functional Charging Station (MFCS) that integrates power generation, EV charging, battery swapping, and hydrogen refueling. A comprehensive operational model is developed for the MFCS that couples electricity and hydrogen conversion and storage technologies to enhance infrastructure utilization and improve overall system efficiency. The model also considers multiple revenue streams, including participation in energy and ancillary markets. To validate the effectiveness of the proposed model and evaluate its performance, a series of numerical experiments are conducted with different charger numbers, different electricity purchase limits, and different charger allocations. Numerical results demonstrate that shared charger configurations can lead to 8.11 % improvement in operational profit by improving resource utilization and reducing the number of depleted batteries at the end of operations compared to allocated charger setups. By varying the number of chargers, sensitivity analysis identifies diminishing marginal returns beyond about 45 chargers, suggesting it as an optimal sizing point under current settings. The integration of electricity and hydrogen conversion is also explored under scenarios with limited external electricity purchases. In conclusion, these findings indicate that optimizing charger allocation and energy management can significantly enhance station productivity and profitability, ultimately supporting the broader adoption of electrified and hydrogen-based transportation solutions.

Charging station↗

Finding gaps in the national electric vehicle charging station coverage of the United States

Abstract The United States federal government has invested $7.5 billion into charging infrastructure, including the National Electric Vehicle Infrastructure Program, to build fast charging stations along designated highways for long-distance car travel. We develop a consecutive coverage metric to compute the percent of United States roads (traffic-weighted) that are consecutively accessible within 500 miles of each county. We answer (1) what the state of consecutive coverage is in each county and (2) what the increase in coverage is when designated highways receive fast chargers. In 2023, 10% of counties had at least 75% minimum viable coverage. We find that if all designated highways receive fast-charging stations, 94% of United States counties will reach at least 75% fast charger coverage. However, the remaining counties are rural. This demonstrates that federal funding for fast chargers will help connect most—but not all—counties to the national network of continuously accessible charging stations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a DC Fast Charging Station Model for Use with EV Infrastructure Projection Tool

The deployment of public charging infrastructure networks has been a major factor in enabling electric vehicle (EV) technology transition, and must continue to support the adoption of this technology. DC fast charging (DCFC) increases customer convenience by lowering charging time, enables long-distance EV travel, and could allow the electrification of high-mileage fleets. Yet, high capital costs and uneven power demand have been major challenges to the widespread deployment of DCFC stations. There is a need to better understand DCFC stations' loading, utilization, and customer service quality (i.e. queuing time, charging duration, and queue length). This study aims to analyze these aspects using one million vehicle-days of travel data within the Columbus, OH, region. Monte Carlo analysis is carried out in three types of areas - urban, suburban, and rural- to quantify the effect of uncertain parameters on DCFC station loading and service quality.

25 ENERGY STORAGE↗

Surrogate Modeling for Capacity Planning of Charging Station Equipped With Photovoltaic Panel and Hydropneumatic Energy Storage

Due to the promising potential for environmental sustainability, there has been a significant increase of electric vehicles (EVs) and plug-in hybrid electric vehicles (PHEV) in the market. To support this increasing demand for EVs and PHEVs, challenges related to capacity planning and investment costs of public charging infrastructure must be addressed. Hence, in this paper, a capacity planning problem for charging stations is developed and aims to balance the current capital investment costs and future operational revenue. The charging station is assumed to be equipped with the solar photovoltaic (PV) panel and an energy storage system, which could be electric battery or recently invented hydropneumatic energy storage (ground-level integrated diverse energy storage (GLIDES)) system. A co-optimization model that minimizes investment and operation cost is established to determine optimal solution while considering capacity planning and following operations. EV mobility is modeled as an Erlang-loss system. Meanwhile, stochastic programming is adopted to capture uncertainties from solar radiation and charging demand of EV fleet. To provide a more general and computationally efficient model, main configuration parameters are sampled in design space and then fixed in solving the co-optimization model. Sampled parameters include EV charging slots number, PV area, capacity of energy storage system, and daily mean EV arrival number. Based on the sampled parameter combinations and its responses, black-box mappings are then constructed using surrogate models, which could provide insights for charging station placement in different practical situations. The effectiveness of the proposed surrogate modeling approach is demonstrated in numerical experiments. Here, the results indicate better profit advantage of GLIDES over battery system with the increased power capacity

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

CROCUS Low Cost All-in-One Weather Station AMB-001 Data Argonne National Laboratory Prairie Site

The Ambient Weather WS-2902D (AMB) is a low cost weather station that has become very useful for filling data gaps in harder to deploy locations. These low cost weather stations collect 13 second data, which is averaged to a five minute data output available to users through an API key. The data files contain measurements for precipitation, temperature, wind chill/heat index, relative humidity, dew point, UV index, solar radiation, wind speed, wind direction, wind gust, and with an external particulate matter 2.5 (PM 2.5) sensor. Having all of these measurements in one condense system allows for fast deploying and dense network capabilities. Three of the AMB weather stations were deployed at the Argonne Testbed for Multiscale Observational Science (ATMOS), a 20-acre prairie site at Argonne National Laboratory in Lemont, Illinois. The instruments are denoted by their three digit identifier (CMS-AMB-xxx) format. The data is presented as daily NetCDF (.nc) files, each containing approximately 24 hours of observations. Files follow the naming convention of: the project (CROCUS), location (atmos), instrument name (CMS-AMB-001), data level (raw, a1), and date (year, month, day). The NetCDF format can be accessed using common scientific software such as Python using xarray, netCDF4 or ACT-DOE.

54 ENVIRONMENTAL SCIENCES↗

CROCUS Low Cost All-in-One Weather Station AMB-002 Data Argonne National Laboratory Prairie Site

The Ambient Weather WS-2902D (AMB) is a low cost weather station that has become very useful for filling data gaps in harder to deploy locations. These low cost weather stations collect 13 second data, which is averaged to a five minute data output available to users through an API key. The data files contain measurements for precipitation, temperature, wind chill/heat index, relative humidity, dew point, UV index, solar radiation, wind speed, wind direction, wind gust, and with an external particulate matter 2.5 (PM 2.5) sensor. Having all of these measurements in one condense system allows for fast deploying and dense network capabilities. Three of the AMB weather stations were deployed at the Argonne Testbed for Multiscale Observational Science (ATMOS), a 20-acre prairie site at Argonne National Laboratory in Lemont, Illinois. The instruments are denoted by their three digit identifier (CMS-AMB-xxx) format. The data is presented as daily NetCDF (.nc) files, each containing approximately 24 hours of observations. Files follow the naming convention of: the project (CROCUS), location (atmos), instrument name (CMS-AMB-002), data level (raw, a1), and date (year, month, day). The NetCDF format can be accessed using common scientific software such as Python using xarray, netCDF4 or ACT-DOE.

54 ENVIRONMENTAL SCIENCES↗

CROCUS Low Cost All-in-One Weather Station AMB-004 Data Argonne National Laboratory Prairie Site

The Ambient Weather WS-2902D (AMB) is a low cost weather station that has become very useful for filling data gaps in harder to deploy locations. These low cost weather stations collect 13 second data, which is averaged to a five minute data output available to users through an Application Programming Interface (API) key. The data files contain measurements for precipitation, temperature, wind chill/heat index, relative humidity, dew point, UV index, solar radiation, wind speed, wind direction, wind gust, and with an external particulate matter 2.5 (PM 2.5) sensor. Having all of these measurements in one condense system allows for fast deploying and dense network capabilities. Three of the AMB weather stations were deployed at the Argonne Testbed for Multiscale Observational Science (ATMOS), a 20-acre prairie site at Argonne National Laboratory in Lemont, Illinois. The instruments are denoted by their three digit identifier (CMS-AMB-xxx) format. The data is presented as daily NetCDF (.nc) files, each containing approximately 24 hours of observations. Files follow the naming convention of: the project (CROCUS), location (atmos), instrument name (CMS-AMB-004), data level (raw, a1), and date (year, month, day). The NetCDF format can be accessed using common scientific software such as Python using xarray, netCDF4 or ACT-DOE.

EARTH SCIENCE > ATMOSPHERE > AEROSOLS > PARTICULAT↗

Impact of Electric Vehicle Charging Station Reliability, Resilience, and Location on Electric Vehicle Adoption

While the majority of electric vehicle (EV) charging events in the United States occur at home, issues with public charging stations are consistently found to be a top reason that potential EV buyers do not purchase an EV, demonstrating that both EVSE reliability and availability impacts EV adoption. This report explores multiple parameters that impact EVSE reliability and deployment, which in turn impact EV sales. These include extreme weather, codes and standards, region (urban vs. rural), and grid network type. Grid reliability was not found to impact EV adoption. The relationships between EV station reliability, station resilience, grid resilience, and EV adoption are largely outside the scope of the National Renewable Energy Laboratory's (NREL's) Automotive Deployment Options Projection Tool (ADOPT) and other vehicle adoption models, so the methodology of this report is varied. Section 2 sets the baseline for infrastructure reliability, user satisfaction, and maintenance practices. Section 3 explores the ways that electric vehicle supply equipment (EVSE) reliability impacts the relationship between EVSE and EV adoption. Section 4 shows how geographical categories such as urban, rural, large grid, off-grid, or microgrid can be helpful in EVSE deployment strategies, as well as how the relationship between EVSE and EV adoption differs among these categories. Section 5 investigates the impacts of grid reliability and infrastructure resilience on EV adoption. Finally, Section 6 reverses the perspective to examine the impact that EVs and EVSE have on grid resilience and reliability. As recent funding initiatives result in an expansion of public chargers across the United States, as well as an increase in the uptime of existing chargers, EV adoption will likely grow.

33 ADVANCED PROPULSION SYSTEMS↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Analysis of Fast Charging Station Network for Electrified Ride-Hailing Services

Today's electric vehicle (EV) owners charge their vehicles mostly at home and seldom use public direct current fast charger (DCFCs), reducing the need for a large deployment of DCFCs for private EV owners. However, due to the emerging interest among transportation network companies to operate EVs in their fleet, there is great potential for DCFCs to be highly utilized and become economically feasible in the future. This paper describes a heuristic algorithm to emulate operation of EVs within a hypothetical transportation network company fleet using a large global positioning system data set from Columbus, Ohio. DCFC requirements supporting operation of EVs are estimated using the Electric Vehicle Infrastructure Projection tool. Operation and installation costs were estimated using real-world data to assess the economic feasibility of the recommended fast charging stations. Results suggest that the hypothetical transportation network company fleet increases daily vehicle miles traveled per EV with less overall down time, resulting in increased demand for DCFC. Sites with overhead service lines are recommended for hosting DCFC stations to minimize the need for trenching underground service lines. A negative relationship was found between cost per unit of energy and fast charging utilization, underscoring the importance of prioritizing utilization over installation costs when siting DCFC stations. Although this preliminary analysis of the impacts of new mobility paradigms on alternative fueling infrastructure requirements has produced several key results, the complexity of the problem warrants further investigation.

33 ADVANCED PROPULSION SYSTEMS↗