Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stakeholder”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Resilience Framework for Electric Energy Delivery Systems (R.1)

The intent of this document is to provide a Resilience Framework for electrical energy delivery systems which can be applied to Distributed Wind. However, the framework is not limited by application to any resource or system. This framework represents the defined steps to a cyclical process similar in mechanism to both cybersecurity and risk frameworks, while providing a common set of language and process for all stakeholders involved. The need for this Resilience Framework was established in a previous document, “Distributed Wind Resilience Metrics for Electric Energy Delivery Systems.” One important characteristic we see in resilience is the unique needs and perspectives of different systems, geographies, resources, stakeholders, perceived risks, and consequences, which we term the distinctiveness property. This distinctiveness property drives the requirement to have a resilience framework or methodology that can be implemented by different types of organizations and systems. The process or methodology should be cyclic. Recognizing that a system’s resilience is based on finite resources and time, it must continually evolve through this framework’s risk management and capital investment steps at an appropriate pace for its distinctiveness property.

17 WIND ENERGY↗

A System Approach to Deep Heating Savings Through Measurement, Management, and Motivation

Across multi-tenant commercial office and multifamily buildings, centrally metered fuel use represents a substantial fraction of whole-building energy use. Energy audit practitioners understand that improving heating distribution efficiency is typically more of an opportunity than combustion efficiency and that differing thermal comfort preferences between tenants are the bane of operators across these building typologies. There is an unmet market need for retrofit technologies that allow for the delivery of the right amount of heat to the right spaces, at the right time. The Energy Management and Information System (EMIS) package fills this gap through enhanced controls and metering, incorporating low-cost sensors and wireless communication infrastructure to provide a platform for ongoing commissioning and tenant feedback, including heat cost allocation. With support from the US DOE Building Technologies Office, Steven Winter Associates, Inc. (SWA) partnered with Sentient Buildings, E Source, building owners, and utility and policy stakeholders, to demonstrate a market viable EMIS that achieves a reduction in space heating energy use by reducing heating load, improving control, and positively impacting behavior while providing an acceptable financial return. In this study, EMIS packages were implemented in two New York City multifamily rental buildings. Both buildings conducted basic mechanical work (e.g., repairing steam traps) to ensure the heating system was operating well before any tenant feedback was layered in. Heating Energy Use Reports (HEUR) were created to provide tenants with social comparisons and energy savings tips to influence their behavior; these were provided monthly to all tenants in both buildings. Additionally, one building allocated heating costs to a portion of the tenants. Heat cost allocation (HCA) has a long history in the European Union (EU), although it is not common in the US or in steam-heated buildings. SWA leveraged existing EU best practices and stakeholder feedback to develop a Heat Cost Allocation algorithm that was considered equitable and intuitive. Energy use and tenant behavior impacts were tracked throughout the study. The basic mechanical repair work saved between 11-20% of heating energy. Those savings rose to 17-24% with the addition of tenant feedback. While it may not be possible to precisely determine the impact of COVID-19 on research studies like this, there may have been additional savings realized had the study taken place in a period of normal occupancy patterns. These types of central heating systems have been a blind spot for utilities, who have traditionally had little visibility into detailed behind-the-meter gas usage. Heating energy savings stayed consistent during the coldest months, indicating the potential for utilities to utilize EMIS packages for peak gas demand reductions or demand response programs. Tenant comfort was also improved. Post installation, room temperatures more closely matched thermostat set points. Perhaps due to this greater level of control, the vast majority of tenants being billed for heating were accepting of the allocation costs. And tenants receiving heat cost allocations were more likely to reduce their thermostat setpoints than tenants receiving behavioral feedback without financial impacts were. Variation in building specifics makes it difficult to provide precise energy and financial savings estimates. But within the range of expected conditions, the study identified a few key variables that can have the greatest impact on financial returns: the cost of fuel, the ability and willingness to allocate heating costs to tenants, and a well-functioning heating system as a starting point. This study focused on two multifamily buildings, but additional use cases, such as commercial buildings and affordable housing, should be explored to better understand the full market potential. While this type of upgrade has the potential for deep energy reductions and cost savings, future projects should take into account the balance of costs and benefits between owners and tenants, especially in the affordable, regulated, or other low-to-moderate income (LMI) segments of the market. Rent credits, utility allowances, or a shared savings program are possible options to accelerate adoption of this strategy in these market segments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Distributed Wind Market Report: 2021 Edition

The U.S. Department of Energy’s annual Distributed Wind Market Report provides stakeholders with market statistics and analysis along with insights into market trends and characteristics. By providing a comprehensive overview of the distributed wind market, this report can help guide future investments and decisions by industry, utilities, federal and state agencies, and other interested parties. This report provides key information to help stakeholders understand and access market opportunities and inform distributed wind industry research and development needs.

17 WIND ENERGY↗

GMLC Southeast Regional Consortium: Technology Driven Improvements to Power Grid Resiliency

Recognizing that electric grid challenges can differ by geographical regions across the US, the Department of Energy (DOE) created a pioneer regional partnership to provide technical assistance to stakeholders facing grid modernization challenges. The southeast regional teams will transfer technologies developed under DOE auspices to stakeholders for testing, evaluation, and market validation. Regional members will help define critical challenges and pave the way for transition of technologies to the commercial sector. Using the depth and expertise at Oak Ridge National Laboratory, Savannah River National Laboratory, University of Tennessee’s CURENT, CAPER and the Clemson 20 MVA Electrical Grid Laboratory—along with critical industry partners, such as Duke Energy, TVA, Southern Company, EPB, and Santee Cooper—the Southeast Regional Consortium team will conduct collaborative research to advance the state of the grid in the Southeast region and improve power system resiliency to enhance responsiveness, enable faster restoration of power, and increase distributed energy resource (DER) concentrations. This report provides details of the technical research and demonstration projects accomplished by Oak Ridge National Laboratory (ORNL) as part of the Southeast Regional Consortium. Specifically, ORNL analyzed the application of optical current and voltage measurements impedance relays which would enable step distance protection to be deployed on distribution systems. This would improve the precision of determining the geographic location of faults, increase network topology flexibility, and allow bi-directional power flow. Next, ORNL deployed time sensitive networking technology on the EPB fiberoptic data network to study the impact of increased sensor traffic on existing supervisory control and data acquisition data. The deterministic latency and high bandwidth were demonstrated by remotely inspecting a substation using a drone with full HD streaming video operated at the EPB Control Center. Finally, a new application-based communication and control system developed at ORNL call CSEISMIC was tested for future deployment on the EPB Control Center microgrid using a hardware-in-the-loop testbed that was also developed at ORNL. The controller was able to successfully optimize ancillary service when the microgrid is connected to the distribution network. The seamless islanding, resynchronization, and reconnection of the microgrid was also demonstrated through the testing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Business Models for Coal Plant Decommissioning

Aging coal-fired power plants are retiring across the United States. Researchers at Pacific Northwest National Laboratory studied coal-fired power plant decommissioning business models to support program development for the Department of Energy’s Office of Energy Efficiency & Renewable Energy (EERE) to engage with communities affected by power plant retirement processes. Evaluating and reducing the impact on coal-dependent communities from phasing out coal production is a crucial piece of nationwide economic development and community-directed engagement in the clean energy future. This report describes the steps in the typical coal-fired power plant decommissioning process, including analysis of the following key factors: Drivers including policy and regulations, competition with other fuels, and corporate responsibility goals; Types of coal plant decommissioning including plant retirement without full decommissioning, repurposing with fuel switch, redeveloping to utilize existing transmission, and decommissioning and repurposing with other commercial activities; and, Costs of coal plant decommissioning, including variations across regulated and deregulated markets and the funding resources to support decommissioning activities. The details described in this report relied heavily on the availability of local news reports and communications regarding plant retirements, as the researchers identified a lack of formal literature surrounding business models for coal plant decommissioning and a need for a more robust source material collection. In addition, a lack of oversight entities responsible for decommissioning processes may have led to this shortfall of information. Future research regarding coal plant decommissioning can include quantitative studies on power plant retirement drivers, procedures, and costs, qualitative assessments on affects decommissioning has on surrounding communities, investors, and other stakeholders, and identifying best practices to engage community stakeholders in the decommissioning process.

01 COAL, LIGNITE, AND PEAT↗

DOE Fffice of Nuclear Energy cybersecurity research, development and demonstration program plan

This document describes the Cybersecurity Research Development and Demonstration (RD&D) Program, established by the Department of Energy Office of Nuclear Energy (NE) to provide sciencebased methods and technologies necessary for cost-effective, cyber-secure digital instrumentation, control and communication in collaboration with nuclear energy stakeholders. It provides an overview of program goals, objectives, linkages to organizational strategies, management structure, and stakeholder and cross-program interfaces.

97 MATHEMATICS AND COMPUTING↗

Bridge Seismic Screening Tool (BSST), Version 2.0

The Regional Resiliency Assessment Program (RRAP) is a cooperative assessment of specific critical infrastructure within a designated geographic area and a regional analysis of the surrounding infrastructure that addresses a range of infrastructure resilience issues that could have regionally and nationally significant consequences. In 2018, DHS’s Cybersecurity and Infrastructure Security Agency (CISA) sponsored the Oregon Transportation Systems RRAP project in coordination with the Office of the Governor (under the oversight of the state resilience officer), the Oregon Office of Emergency Management (OEM), the Oregon Department of Transportation (ODOT), and other regional stakeholders (CISA 2021). This project focuses on assessing the impacts of a Cascadia Subduction Zone (CSZ) earthquake on state transportation systems and, in particular, how those impacts may affect the ability of emergency response efforts to move supplies into the region. The intended outcome of this analysis is the prioritization of transportation routes and modes for additional planning, investment, hardening, or other activities to enhance their resilience—and therefore, to enhance their ability to support response and recovery efforts following a CSZ earthquake. An important part of this transportation system-level assessment has been to assess the seismic vulnerability of the state highway system. In doing so, the RRAP project team used the Bridge Seismic Screening Tool (BSST) to assess, at a system-level, the potential impacts that a CSZ earthquake could have on state highway bridges (Bergerson et al. 2019).1 Argonne National Laboratory (Argonne), in collaboration with the Washington State Department of Transportation (WSDOT), originally developed the BSST as part of the 2017 Washington State Transportation Systems RRAP project, a sister project to the 2018 Oregon Transportation Systems RRAP project. Argonne updated the BSST during this more recent project in Oregon based on feedback from stakeholders and subject matter experts (SMEs) on the original version of the tool. The first step in the BSST is to assess the seismic vulnerability of roadway bridges following a CSZ earthquake to determine a projected or potential damage state. Damage states then help determine approximate reopening times for bridge crossings.2 This document provides details on the BSST methodology, the implementation of that tool to analyze the projected damage incurred in a CSZ earthquake scenario, and the determination of corresponding reopening times of interstate, state highway, and local bridges following such an event.

58 GEOSCIENCES↗

2021 Thermal Energy Storage Systems for Buildings Workshop: Priorities and Pathways to Widespread Deployment of Thermal Energy Storage in Buildings

The 2021 U.S. Department of Energy's (DOE) "Thermal Energy Storage Systems for Buildings Workshop: Priorities and Pathways to Widespread Deployment of Thermal Energy Storage in Buildings" was hosted virtually on May 11 and 12, 2021. This report provides an overview of the workshop proceedings. Organized by DOE's Building Technologies Office (BTO), the National Renewable Energy Laboratory, Lawrence Berkeley National Laboratory, and Oak Ridge National Laboratory, the workshop convened more than 600 stakeholders from around the world to discuss the need for advancing the deployment of thermal energy storage (TES) in buildings. This workshop was designed to build on BTO's webinar series and 2019 workshop. The goals of this workshop were to promote discussion on TES related to: 1. Market adoption and deployment barriers, 2. Key applications and value drivers, 3. System cost, performance, and market requirements, and 4. End-use specific needs. The workshop took place over two days and consisted of keynote presentations, moderated panels, breakout sessions, and open discussion forums. The keynote presentations introduced opportunities for building TES, barriers to widespread deployment, and future visions. Moderated panel discussions presented diverse perspectives, breakout sessions provided opportunities for more intimate conversations, and open discussions captured feedback from the entire workshop group. Over the course of the two days, attendees exchanged experiences and ideas surrounding multiple aspects of TES in buildings. The first section of this report provides background on the motivations behind advancing TES for residential and commercial buildings and elaborates on the workshop objectives. The second section details the workshop structure and participant demographics. The third section provides key findings of the discussions that took place during the breakout sessions. Finally, this report details recommendations and actions to increase the TES deployment. Several recommendations from workshop attendees are presented in Table ES-1. TES holds significant potential to help increase building efficiency, grid-interactivity, and energy resilience, as well as reduce associated carbon emissions. The outputs generated from this workshop will aid stakeholders in advancing TES in buildings through a deeper understanding of the opportunities and barriers surrounding widespread deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of Renewable Energy Data for Facilitating the Clean Energy Transition in Vietnam

Vietnam is transforming its power system with an increasing share of variable renewable energy (VRE) in the generation mix and plans to achieve 27% VRE by capacity in 2030 and 42% by capacity in 2045, as indicated by the draft Eighth Power Development Plan for 2020–-2045 (PDP8). Further increase in VRE penetration is possible with data-driven analysis where availability of data, specifically VRE data, becomes critical. NREL has worked with various stakeholders in Vietnam to create high-resolution multi-year VRE data publicly available to all. This paper reviews this new VRE data for Vietnam and how different stakeholders can use this data to inform VRE deployment decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancing the Useability of the IAEA's Physical Model: An Analysis of User Feedback

This study presents the results of Physical Model user interviews conducted with 12 people who have International Atomic Energy Agency (IAEA) safeguards experience. The goal of this report is to provide additional context for policy makers when prioritizing the needs of the IAEA regarding support for enhancements to the Physical Model. The interviews covered the general usability of the Physical Model, its effectiveness as a technical reference, and the scope and utility of the Physical Model's indicators and content. The key conclusions from these interviews are as follows: 1) The Physical Model is difficult to find and not well advertised. 2) The Physical Model can be difficult to use due to its format, which makes searching for information difficult, and lack of visual content. Therefore, the Physical Model should be supported in multiple formats (print, PDF, web) to maximize its usability for different stakeholders. 3) The scope of the Physical Model's content and indicators is likely sufficient, and translating indicators into other languages is unlikely to be worth the effort. 4) Despite its inefficiencies and other issues, the Physical Model in its current form is a vital (albeit under-utilized) resource for key stakeholders. 5) Despite its broad use case the Physical Model is not a catch-all tool and force-fitting the Physical Model into functions for which it has not been designed for would likely diminish its value. 6) It can be difficult to disentangle challenges related to the Physical Model and its usability from broader challenges at the Agency, such as general issues with communication and coordination. Based on these conclusions and considering the results of past studies on the Physical Model funded by NA-241, the analysis team developed a list of recommendations and associated actions for IAEA consideration. These recommendations are prioritized based on the assessed level of difficulty for the IAEA to implement a recommendation, emphasizing low hanging fruit then building to more ambitious changes to the Physical Model's format and content.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Estimating the Value of Automation for Concentrating Solar Power Industry Operations (Final Report)

This report summarizes findings from a small, mixed-method research study examining industry perspectives on the potential for new forms of automation to invigorate the concentrating solar power (CSP) industry. In Fall 2021, the Solar Energy Technologies Office (SETO) of the United States Department of Energy (DOE) funded Sandia National Laboratories to elicit industry stakeholder perspectives on the potential role of automated systems in CSP operations. We interviewed eleven CSP professionals from five countries, using a combination of structured and open comment response modes. Respondents indicated a preference for automated systems that support heliostat manufacturing and installation, calibration, and responsiveness to shifting weather conditions. This pilot study demonstrates the importance of engaging industry stakeholders in discussions of technology research and development, to promote adoptable, useful innovation.

14 SOLAR ENERGY↗

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

Energy I-Corps Electron Beam (EB) Potential for International Trade of Logs

The purpose of this document is to capture the potential from Fermilab’s “Team EB Treement” at the DOE Energy I-Corps program. Energy I-Corps, a key initiative of the Office of Technology Transitions, pairs teams of researchers with industry mentors for an intensive two-month training where the researchers define technology value propositions, conduct customer discovery interviews, and develop viable market pathways for their technologies. The team was composed prior to the Energy I-Corp program; however, the program was a catalyst for education and information exchange between the team members and stakeholders, customers, and regulators. These exchanges were captured in the evolution of a Business Model Canvas (BMC) and a Value Proposition (VP). The BMC and VP underwent numerous transformations based on feedback from the conversations between members of the team and forest or agriculture industry stakeholders and the program instructors.

43 PARTICLE ACCELERATORS↗

SECARB-USA: Needs Assessment Framework for Storage Complexes

The goal of this task is to develop an assessment to identify data needed to advance geologic storage projects, with a focus on the SECARB region. The GCCC team considers the needs of CO2 source, storage, and utilization operators and stakeholders, finance and insurance institutions, state and local government relators and agencies, property owners, local stakeholders at prospective storage complexes, and environmental non-governmental organizations (NGOs). Many of these needs are spelled out in the requirements of the Class VI permit. However, at the initial stages of project development, the workflow will not start with permit writing. A number of other factors must be evaluated prior to this major investment. The team’s goal in this report is to inventory the range of typical needs for a wide variety of projects. For subsequent tasks, the team will consider how these needs vary among projects and through the stages of investment, so that project developers can plan the early stages of capitalization.

54 ENVIRONMENTAL SCIENCES↗

Evolution of Programmatic Asset Lifecycle Planning at MESA

Early on in 2018 Sandia recognized the Microsystems Engineering, Science and Applications (MESA) Programmatic Asset Lifecycle Planning capability to be unpredictable, inconsistent, reactive, and unable to provide strong linkage to the sponsor's needs. The impetus for this report is to share learnings from MESA's journey towards maturing this capability. This report describes re-building the foundational elements of MESA's Programmatic Asset Lifecycle Planning capability using a risk-based, Multi-Criteria Decision Analysis (MCDA) approach. To begin, MESA's decades-old Piano Chart + Ad Hoc Hybrid Methodology is described with a narrative of its strengths and weaknesses. Then its replacement, the MCDA /Analytical Hierarchy Process, is introduced with a discussion of its strengths and weaknesses. To generate a realistic Programmatic Asset Lifecycle Planning budget outlook, MESA used its rolling 20-year Extended Life Program Plan (MELPP) as a baseline. The new MCDA risk-based prioritization methodology implements DOE/NNSA guidelines for prioritization of DOE activities and provides a reliable, structured framework for combining expert judgement and stakeholder preferences according to an established scientific technique. An in-house Hybrid Decision Support System (HDSS) software application was developed to facilitate production of several key deliverables. The application enables analysis of the prioritization decisions with charts to display and provide linkage of MESA's funding requests to the stakeholders' priorities, strategic objectives, nuclear deterrence programs, MESA priorities, and much more.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Comprehensive Framework for Valuation of Ecosystem Services in the Context of Hydropower

While models to value ecosystem services exist, they suffer from a lack of “portability” in the sense that a single modelling framework developed for one site cannot be imported and applied to another. Additionally, benefit estimations are often fragmented, incomplete, incomparable, and in heterogenous metrics, thus preventing aggregation to arrive at one comprehensive value. In the context of hydropower, the methods, as well as the metrics used to value the associated ecosystem services, vary between stakeholders (e.g., competing water users, agencies, etc.), detracting from the ability to assess the total value of a hydropower project, water management schemes, or comparing value between competing water users. Further, current methods to value water neglect non-market ecosystem services’ values by failing to account for externalities, resulting in misallocation of costs (e.g., obligatory stakeholder payments for water use) and misinterpretation of hydropower benefits. The benefit-cost ratios in hydropower development are often incomplete because non-market benefits are excluded (e.g., benefits, such as fish habitat resiliency and agricultural water reliability, derived from hydropower development). An approach to enable consistent, standardized hydropower benefit-cost analyses does not currently exist. This paper conceptualizes a methodology to standardize ecosystem services valuation in the context of hydropower projects through the integration of the U.S. Environmental Protection Agency’s existing Final Ecosystem Goods and Services Classification System framework and economic valuation techniques, and demonstrates the applicability of this methodology through a limited proof-of-concept application (the New Waddell Plant, a pumped hydroelectric energy storage facility in Phoenix, AZ). The beauty of our proposed framework lies in its ability to be imported and applied to any other pumped storage facility after accounting for site-specific features.

13 HYDRO ENERGY↗

Application of Manufacturing Quality Management Principles to PV System Installations

To help SETO/DOE achieve its goals, the IBTS team proposed a project addressing system reliability by improving installation standards and quality management. The proposed approach was designed to help achieve measurable reductions in installation defect density and improvements in the performance of PV systems by optimizing design and installation of residential and commercial PV systems. This approach addressed the soft costs associated with installations and quality management. The project demonstrated improved system reliability and reduced PV system installation costs. The software developed improved operations, decreased risk, and increased the overall value of PV systems across their lifecycle. The project used several data collection methods, including extensive industry surveys, face-to-face high-level interviews at industry conferences, stakeholder teleconferences, and in-depth interviews conducted by IBTS staff. Results from the research found the industry needs a uniform assessment method for national providers to be more efficient; the software should support both code officials and installers; most industry stakeholders would find value in a centralized software system that allows them to collect, report, and review information on in-process and completed solar installations; and mobile solutions that bridge existing knowledge gaps with inspectors and integrate with existing methodologies (such as permitting software) are of great value. The software solution developed is web-based, allowing for national access, and is built on a Google Firebase platform that can handle significant users and data. It can be used onsite or remotely, allowing for code compliance to continue despite ongoing pandemic related delays or shutdowns for local economies. The information provided by the software tool allows users to uniformly assess a system for compliance and use that aggregated data to identify training topics or create internal process designed to improving issues and reducing occurrence. This solution has multiple benefits in managing quality at time of use and promoting an increase in future safety and quality through education. Perhaps most importantly, this software increases public safety by ensuring compliance of installed systems and allows for local AHJs to remotely engage specialized and qualified solar specific expertise for oversite of the installation in their jurisdictions. Data analysis provides the quality feedback loop identifying the root cause of failure and drives installation practices to improve through training and education, resulting in systems with higher performance, greater reliability, and reduced operations and maintenance costs. With the successful completion of this project, the industry can expect reduced soft costs and increased performance and safety and will ultimately benefit from longer performing systems that cost less to operate.

14 SOLAR ENERGY↗