Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Multiscale Framework Simulates Utility-Scale Wind Plant in Its Natural Environment. First-ever simulation could lead to a vital understanding of wind plant performance

Wind plant performance depends on local environmental conditions—and understanding those conditions is crucial to research on wind plant dynamics. Factors such as sloping terrain, surface type and cover, atmospheric heating and cooling, and weather events all play a role in determining the winds that turbines convert into power. However, most models used for wind plant design and operation do not sufficiently account for environmental effects. This can limit our understanding of wind plant dynamics and, thus, our ability to design, site, and operate wind plants for maximum power production and reliability. To meet this challenge, Arthur and other LLNL researchers partnered with scientists at the National Center for Atmospheric Research; the University of California, Berkeley; the University of Colorado, Boulder; and Texas Tech University to develop and demonstrate a novel, mesoscale-tomicroscale wind plant modeling framework.

17 WIND ENERGY↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗

NASA LSII Lunar Simulant Project

Introduction: America has entered a new era of exploration. NASA’s Artemis program will lead humanity forward to the Moon and prepare us for the next giant leap, the exploration of Mars [1]. To champion technologies needed to live on and explore the Moon, NASA’s Space Technology Mission Directorate (STMD) established the Lunar Surface Innovation Initiative (LSII)[2].LSII's technology development portfolio includes: Utilizing the Moon’s resources; Establishing sustainable surface power; Building machinery and electronics that work in extreme environments, like super-chilly permanently shadowed craters; Mitigating lunar dust; Carrying out surface excavation, manufacturing and construction duties; and Extreme access which includes navigating and exploring the surface/subsurface. To support the development and testing of these technologies, LSII created the lunar simulant project, to create and/or acquire low-, medium-and high-fidelity lunar simulants to match the needs of STMD projects at all levels of technology readiness levels (TRL), as well as other NASA programs. There is not one bulk lunar simulant that will satisfy the needs of all projects. NASA's Approach to Simulants: Just as LSII's activities are being implemented through a combination of unique NASA work and public-private partnerships, NASA will work with commercial simulant providers to acquire simulants that meet NASA's needs. If warranted, NASA will develop simulants using government agencies, as was done with the NASA/USGS Lunar Highlands Type (NU-LHT)series of lunar simulants [3].NASA is also collaborating with the Johns Hopkins University Applied Physics Laboratory(JHUAPL) Lunar Surface Innovation Consortium (LSIC) in the development and characterization of lunar simulants [4]. Within NASA, a small team (< 10 people) is coordinating simulant activities across the agency, with team members located at several NASA centers. The overall objective of the project is to procure lunar simulants in sufficient amounts for earth-based testing of subsystems and systems in a variety of environments (i.e., laboratory, high-bay, thermal-vacuum chambers), required for Artemis missions to the Moon, as well as other missions carrying NASA lunar payloads, such as the Commercial Lunar Payload Services (CLPS)program [5]. Lunar Highlands Simulant: NASA's Artemis Program is targeting the lunar south pole region for initial human missions and the Artemis Base Camp. Hence, the LSII lunar simulant project is currently focusing on the mineralogy and properties of lunar highlands regolith [6 and 7]. Plagioclase-rich rocks (e.g., anorthosite, norite) are the dominant constituent in highlands simulants, with Shawmere, Stillwater, and White Mountain anorthosites being used in commercially available simulants. However, because these feedstocks are terrestrial in nature, they include hydrated minerals, carbon-bearing minerals, and other chemical signatures that are not present on the Moon, and these minor mineral assemblages need to be taken into account when trying to understand test procedures and results. Glass Component: While much attention has been placed on the rock/mineral component of lunar simulants, glass is just as important when creating simulants. The glass component in lunar regoliths is often greater than 50% by volume [8]. This component includes impact melt glass, dark matrix breccias, and agglutinates. However, this component is difficult, time-consuming and expensive to make. Most lunar simulants, past and current, have relied on basaltic cinder as a feedstock for glass. Getting better glass components at a lower cost, particularly agglutinates and glass with an anorthositic composition is a near-term objective that the NASA simulant project is trying to address . Characterization: It is extremely important for lunar simulants to be characterized by several analytical methods. Gruener et al. [9] and JHUAPL LSIC [10] conducted initial assessments of some of the commercially available simulants in 2019 and early 2020, before the global pandemic. Further analyses are needed to better quantify important parameters such as, modal mineralogy and glass content, particle shape, and particle size distribution. These quantified results can then be used in determining figures of merit (FOM) that show how well simulants compare to lunar regolith [11 and 12].

J E Gruener↗