Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

NASA Platform for Autonomous Systems (NPAS)

NASA Platform for Autonomous Systems (NPAS) is a disruptive software platform and processes being developed by SSC Autonomous Systems Laboratory (ASL). Autonomous operations are critical for the success, safety and crew survival of NASA deep space missions beyond low Earth orbit, including Lunar Orbital Platform-Gateway, and for the future of cost-effective ground mission operations. NPAS represents the embodiment of an innovative implementation for "thinking" autonomy in contrast to brute-force autonomy. It also uniquely addresses the requirements and integrates five primary functionalities for autonomous operations including: (1) Integrated System Health Management (ISHM), (2) autonomy, guided by health and system concepts of operations; (3) knowledge models of applications; (4) infrastructure to create, schedule, and execute mission plans; and (5) infrastructure to integrate distributed autonomous applications across networks.

Figueroa, Fernando↗

The Effects of Background Pressure on SPT-140 Thruster Performance at Multiple Power Levels

NASA's planned Psyche mission is scheduled to launch in 2022 and begin a 3.5-year cruise to the metallic asteroid Psyche, where it would examine this unique body. The baseline spacecraft design is a hybrid of JPL's deep-space heritage subsystems with commercial partner SSL's power, structure, and SPT-140 electric propulsion subsystems. Since the deep-space implementation of the SPT-140 differs from the commercial implementation, primarily in the need for deep power throttling, characterization of the system at lower powers is necessary. One specific area of interest is the sensitivity of thruster performance to background pressure in ground-based test facilities, which can have an impact on the prediction of in-space performance. Measurements of this pressure dependence were performed on a qualification-model SPT-140 thruster over the 0.9-4.5 kW range of interest for the Psyche mission. Thrust sensitivity to pressure, in an absolute sense, was largest at 4.5 kW and decreased with power until there was little-to-no measurable effect at 0.9 kW. In a relative sense, thrust sensitivity was similar at all powers above 0.9 kW with about 2-4% higher thrust measured at 10 μTorr than at the lowest operating pressure. Thruster stability margin, examined as a function of magnet current, did not have a strong dependence on facility pressure. Finally, an investigation of low-power operation at the lowest facility pressure showed that a combination of added cathode keeper current and additional cathode propellant flow significantly mitigated the larger negative cathode-to-ground voltages that were observed. These test results, combined with thruster life test results, inform the selection of proper low-power operating conditions for Psyche.

Snyder, John S.↗

NASA Platform for Autonomous Systems (NPAS)

NASA Platform for Autonomous Systems (NPAS) is a disruptive software platform and processes being developed by the NASA Stennis Space Center (SSC) Autonomous Systems Laboratory (ASL). Autonomous operations are critical for the success, safety and crew survival of NASA deep space missions beyond low Earth orbit, including the Gateway, and for the future of cost-effective ground mission operations. NPAS represents the embodiment of an innovative paradigm for “thinking” autonomy in contrast to brute-force autonomy. NPAS uniquely addresses the requirements and integrates the primary functionalities for autonomous operations, in one platform that includes: (1) Integrated System Health Management (ISHM); (2) autonomy strategies, guided by system health and concepts of operations; (3) domain objects (system elements) and infrastructure to create complete application domain knowledge models (4) infrastructure to create, schedule, and execute mission plans; (5) infrastructure to develop user interfaces for comprehensive awareness; and (6) infrastructure to integrate distributed autonomous applications across networks. NPAS is a single platform that can be used to make any system operate with any desirable degree of autonomy, as well as provide comprehensive system awareness to operators and users.

Figueroa, Fernando↗

Space Chicken: A Historical Look at How the Critical Path Changes over a Mission’s Development

The critical path in schedule analysis defines the series of tasks that have no schedule slack leading to the delivery of a system. The critical path for NASA science missions, which typically runs through a spacecraft subsystem or a scientific instrument, is dynamic and changes over the development lifetime of a project. Often the critical path at the start of preliminary design will be through a specific spacecraft subsystem while the final, delivered critical path item is often a scientific instrument that is delivered late. The research for this paper looks at the postulated critical path at different milestones, and the actual critical path item at final delivery, for a variety of NASA science missions to understand what elements are impacting the delivery schedule the most. Recommendations are made based on these quantitative results relative to what elements should potentially be considered more often in early development schedules to more robustly plan for development issues.

Bitten, Robert↗

The Effects of Background Pressure on SPT-140 Hall Thruster Performance

NASA’s planned Psyche mission is scheduled to launch in 2022 and begin a 3.5-year cruise to the metallic asteroid Psyche, where it would examine this unique body. The baseline spacecraft design is a hybrid of JPL’s deep-space heritage subsystems with commercial partner SSL’s power, structure, and SPT-140 electric propulsion subsystems. Since the deepspace implementation of the SPT-140 differs from the commercial implementation, primarily in the need for deep power throttling, characterization of the system at lower powers is necessary. One specific area of interest is the sensitivity of thruster performance to background pressure in ground-based test facilities, which can have an impact on the prediction of in-space performance. Measurements of this pressure dependence were performed on a qualification-model SPT-140 thruster over the 0.9-4.5 kW range of interest for the Psyche mission. Thrust sensitivity to pressure, in an absolute sense, was largest at 4.5 kW and decreased with power until there was little-to-no measurable effect at 0.9 kW. In a relative sense, thrust sensitivity was similar at all powers above 0.9 kW with about 2-4% higher thrust measured at 10 µ µTorr than at the lowest operating pressure. Thruster magnetic field sensitivity, examined as a function of magnet current, did not have a strong dependence on facility pressure. Finally, an investigation of low-power operation at the lowest facility pressure showed that a combination of added cathode keeper current and additional cathode propellant flow significantly mitigated the larger negative cathode-to-ground voltages that were observed. These test results, combined with thruster life test results, inform the selection of proper low-power operating conditions for Psyche.

Mackey, Jonathan A.↗

Base Support Building Solid Waste Management Unit (SWMU) 014 PlumeStop Injection Pilot Study Work Plan

This document is a Pilot Study Work Plan (PSWP) for a PlumeStop® permeable reactive barrier (PRB) at the Base Support Building (BSB; the Site) located at the John F. Kennedy Space Center (KSC), Florida. The Site has been designated as Solid Waste Management Unit (SWMU) 014 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This document was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0010, Task Order 80KSC021F0096. This PSWP details the permeable reactive barrier (PRB) being installed at the BSB to decrease concentrations of per- and polyfluoroalkyl substances (PFAS) in downgradient groundwater using PlumeStop®. PlumeStop® is a colloidal activated carbon that PFAS compounds readily adsorb to. This PSWP outlines the design criteria, injection plan, and performance monitoring schedule for the proposed PlumeStop® PRB study that will guide the possible selection for use and future design of future full-scale PlumeStop® PRBs at KSC.

PFAS↗

Probabilistic Forecasting of Generators Startups and Shutdowns in the MISO System Based on Random Forest

Solving security constrained unit commitment (SCUC) problems to plan an economical generation schedule for day-head electricity market has been an important research topic in recent years. Mixed integer programming method (MIP), the-state-of-art approach for solving SCUC problem, is known computationally hard when the number of binary status variables is large. In this paper, a machine learning-based algorithm - random forest (RF), was applied to forecast the startups (SU) and shutdowns (SD) hours of generators, based on historical hourly system condition observations in the Midcontinent Independent System Operator (MISO) system. The main purpose is to reduce the number of binary status variables, by fixing the SU/SD hours to a narrow range of high confidence. This would significantly reduce the size of the decision space, and therefore speed up SCUC solutions with reduced uncertainty.

Lin, Xinming↗

GradientGraph

Under this SBIR Phase II, Reservoir Labs has developed G2 Analytics, a new technology that allows network operators to analyze bottleneck and flow performance with high precision. G2 delivers a new analytical approach and framework to resolve a variety of key problems found in modern communication networks, including: traffic engineering, routing, flow scheduling, network design, capacity planning, resiliency analysis, network slicing, or service level agreement (SLA) management, among others. G2 leverages the bottleneck structure of congestion-controlled communication networks, a recent mathematical discovery by the Reservoir team [RL19b, RL20a, RL20b, RL21a]. Bottleneck structures reveal how perturbations on flows and links propagate through the network, providing an analytical framework to measure (qualitatively and quantitatively) the ripple effects induced as they traverse the network. Leveraging the mathematics of bottleneck structures, Reservoir Labs is developing the G2 technology to provide network operators with a framework to design, optimize and troubleshoot network performance. This delivery includes the G2 software stack.

Yellamraju, Sruthi↗

SNoGloDe: A Structured Nonlinear Global Decomposition Solver

Large-scale optimization problems often require decomposition strategies and customized algorithms to achieve optimal solutions within a reasonable time. Building on the work of Cao and Zavala (2019) for solving nonlinear two-stage stochastic programs to global optimality, we implement and extend their approach. We generalize to optimization problems reformulated with a block-angular constraint structure (e.g., temporal decomposition). Our framework, written in Python using Pyomo, is highly customizable and enables parallel execution of the decomposition. SNoGloDe allows tailored branching strategies, lower bounding problems, and candidate generators to leverage problem-specific knowledge. To demonstrate effectiveness, we compare SNoGloDe’s performance with Gurobi on a temporally decomposed produced water case study.

algorithms↗

Crew Autonomy through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

As NASA considers long-duration exploration missions, it is envisioned that crews will behave more autonomously as compared to low-Earth orbit missions. When considering long duration exploration missions, Flight Operations Directorate (FOD) identified the following benefits and challenges presented on this slide. As missions operate further from Earth, the communication latency between the spacecraft and Mission Control Center will increase requiring the crew to take a more active role in reacting to daily planning. However, one of the key challenges for crew self-scheduling is that we do not want to overwhelm astronauts who are not expert mission planners. This leads to our primary research objective: to first, characterize the human performance envelope for the task of planning and scheduling in the context of human spaceflight operations, then, develop countermeasure aids to mitigate adverse performance effects due to plan complexity, and finally, inform performance standards and guidelines based on research results. Our next steps are to finish summarizing our findings from the experiment in conference papers and our upcoming yearly report. In the upcoming year, we will continue to collect data in analog missions and begin summarizing our recommended standards and guidelines.

user experience↗