Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STEAM SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Potential for Reduction in Emissions by U.S. Industries While Meeting Thermal Energy Demand

The study highlights the greenhouse gas emissions by various top U.S. industries while meeting their need for thermal energy (heat) and potential for reduction in their carbon foot print by using possible clean energy alternatives such as nuclear energy. Most industries vary in their production and usage of thermal energy, which is shown by detailed process diagram, and some have a combined heat and power system, which generally provides mid- to high-quality of steam. The paper focuses on these detailed processes, and associated requirement and emissions entailed from these process with opportunities in reduction of carbon emission.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pseudo-dynamic Aspen Plus{sup R} Model of the Defense Waste Processing Facility - 18475

The Defense Waste Processing Facility (DWPF) at the Savannah River Site converts legacy high-level waste from the Cold War into borosilicate glass for permanent disposal in a geological repository. The waste sludge is chemically adjusted by the addition of acid, mixed with frit, and concentrated in the DWPF Chemical Process Cell (CPC) to ensure that the final glass has the desired properties. The resulting mixture is fed into the melter where the waste is melted and poured into stainless steel storage canisters. We present an Aspen Plus{sup R} model of the DWPF CPC, which is being developed to aid chemical processing decisions pertaining to the current flowsheet and to aid decisions regarding optimizing future processing. Given a waste feed composition with acid and frit additions, the model will predict the sludge and off-gas compositions throughout the processing, as well as the final melter feed composition. This allows different processing scenarios to be investigated easily, reducing the reliance on experimental testing, and hence saving time and money. The model has multiple potential applications, including calculating the acid and frit additions required to give acceptable glass properties, off-gas permitting, tracking mercury steam-stripped from the waste in the off-gas system, tracking flammable gases in the offgas system, investigating the effect of reducing air purges in the condensers, and general process optimization. The waste is processed in the CPC in batches, requiring dynamic simulation to track the time-dependent operations. Accurate modeling of the processing also requires calculations of phase and electrolyte chemical equilibria and parallel rate-dependent reactions. Due to existing technical limitations with dynamic simulation of the complex chemical system, we have adopted a pseudo-dynamic approach in which time intervals are treated as consecutive steady-state operations in Aspen Plus{sup R}. Thus, the model consists of ∼100 replicas of the processing vessel and its off-gas system, with the sludge output by one replica (representing one time interval) becoming the feed to the next (representing the next time interval). By examining the results from these replicas in sequence, one can see the time evolution of the model. This general approach can be used wherever simultaneous calculation of phase and electrolyte chemical equilibria in a dynamically evolving system is needed. In addition to describing the general structure and chemistry of the model, we present results from tests of the model against experimental data. These data are from laboratory-scale process simulations of the CPC with a nonradioactive waste sludge simulant. These tests include the model's predictions of the offgas composition, the sludge pH, and the final sludge composition. We will also discuss planned future developments of the model. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coordinated control design and verification of the HTR-PM plant - 18485

Through multi-modular scheme, i.e. the superheated steam flows produced by multiple MHTGR-based nuclear supplying system (NSSS) modules are combined together to drive a common thermal load, the inherent safety feature of MHTGR can be applicable to the large-scale nuclear plants at any desired power ratings. Since the plant power control technique of classical single-modular plants cannot be directly applied to multi-modular plants, it is necessary to develop the power control method of the multi-modular plants. In this paper, the plant power control strategy of the two-modular HTR-PM plant, i.e. the first under-constructed multi-modular high temperature gas-cooled nuclear plant in the world is given, which includes both the feedback loops and control algorithms. Then, the control strategy is verified through numerical simulation, and the simulation results in the cases of plant power step and ramp show the satisfactory performance of this control strategy. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Brush Seals for Improved Steam Turbine Performance

GE Energy has retrofitted brush seals into more than 19 operating steam turbines. Brush seals offer superior leakage control compared to labyrinth seals, owing to their compliant nature and ability to maintain very tight clearances to the rotating shaft. Seal designs have been established for steam turbines ranging in size from 12 MW to over 1200 MW, including fossil, nuclear, combined-cycle and industrial applications. Steam turbines present unique design challenges that must be addressed to ensure that the potential performance benefits of brush seals are realized. Brush seals can have important effects on the overall turbine system that must be taken into account to assure reliable operation. Subscale rig tests are instrumental to understanding seal behavior under simulated steam-turbine operating conditions, prior to installing brush seals in the field. This presentation discusses the technical challenges of designing brush seals for steam turbines; subscale testing; performance benefits of brush seals; overall system effects; and field applications.

Turnquist, Norman↗

MODELING THE IMPACT OF ELEVATED MERCURY IN DEFENSE WASTE PROCESSING FACILITY MELTER FEED ON THE MELTER OFF-GAS SYSTEM - PRELIMINARY REPORT

The Defense Waste Processing Facility (DWPF) is currently evaluating an alternative Chemical Process Cell (CPC) flowsheet to increase throughput. It includes removal of the steam-stripping step, which would significantly reduce the CPC processing time and lessen the sampling needs. However, its downside would be to send 100% of the mercury that come in with the sludge straight to the melter. For example, the new mercury content in the Sludge Batch 5 (SB5) melter feed is projected to be 25 times higher than that in the SB4 with nominal steam stripping of mercury. This task was initiated to study the impact of the worst-case scenario of zero-mercury-removal in the CPC on the DWPF melter off-gas system. It is stressed that this study is intended to be scoping in nature, so the results presented in this report are preliminary. In order to study the impact of elevated mercury levels in the feed, it is necessary to be able to predict how mercury would speciate in the melter exhaust under varying melter operating conditions. A homogeneous gas-phase oxidation model of mercury by chloride was developed to do just that. The model contains two critical parameters pertaining to the partitioning of chloride among HCl, Cl, Cl{sub 2}, and chloride salts in the melter vapor space. The values for these parameters were determined at two different melter vapor space temperatures by matching the calculated molar ratio of HgCl (or Hg{sub 2}Cl{sub 2}) to HgCl{sub 2} with those measured during the Experimental-Scale Ceramic Melter (ESCM) tests run at the Pacific Northwest National Laboratory (PNNL). The calibrated model was then applied to the SB5 simulant used in the earlier flowsheet study with an assumed mercury stripping efficiency of zero; the molar ratio of Cl-to-Hg in the resulting melter feed was only 0.4, compared to 12 for the ESCM feeds. The results of the model run at the indicated melter vapor space temperature of 650 C (TI4085D) showed that due to excessive shortage of chloride, only 6% of the mercury fed is expected to get oxidized, mostly as HgCl, while the remaining mercury would exist either as elemental mercury vapor (90%) or HgO (4%). Noting that the measured chloride level in the SB5 qualification sample was an order of magnitude lower than that used in the SB5 simulant, the degree of chloride shortage will be even greater. As a result, the projected level of HgCl in the actual SB5 melter exhaust will be even lower than 6% of the total mercury fed, while that of elemental mercury is likely to be greater than 90%. The homogeneous oxidation of mercury in the off-gas was deemed to be of primary importance based on the postulation that mercury and other volatile salts form submicron sized aerosols upon condensation and thus remain largely in the gas stream downstream of the quencher where they can deposit in the off-gas lines, Steam-Atomized Scrubbers (SAS), and High-Efficiency Mist Eliminator (HEME). Formation of these submicron semi-volatile salts in the condensate liquid is considered to be unlikely, so the liquid phase reactions were considered to be less important. However, subsequent oxidation of mercury in the liquid phase in the off-gas system was examined in a simplified model of the off-gas condensate. It was found that the condensate chemistry was consistent with further oxidation of elemental mercury to Hg{sub 2}Cl{sub 2} and conversion of HgO to chlorides. The results were consistent with the available experimental data. It should also be noted that the model predictions presented in this report do not include any physically entrained solids, which typically account for much of the off-gas carryover on a mass basis. The high elemental mercury vapor content predicted at the DWPF Quencher inlet means that physically entrained solids could provide the necessary surface onto which elemental mercury vapor could condense, thereby coating the solids as well as the internal surfaces of the off-gas system with mercury. Clearly, there are many process benefits to be gained by removing the steam-stripping step from the CPC cycle. The goal of this task was to study what adverse impact the zero-mercury-removal scenario would have on the DWPF melter off-gas system operation. It is stressed again that this study was intended to be scoping in nature, so the results presented in this report are preliminary. Any further substantiation of these results for actual implementation into the DWPF flowsheet would require an in-depth modeling study of all three reaction zones, including the aqueous-phase reactions in the quencher, OGCT, Steam Atomized Scrubber (SAS), and off-gas condenser with recirculated condensate, and the proof-of-principle experiments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy and Cost Optimized Technology Options to Meet Energy Needs of Food Processors

Full Paper Submission for: Combined cooling, heating and electric power (CCHP) distributed generation (DG) systems can provide electric power and, heating and cooling capability to commercial and industrial facilities directly onsite, while increasing energy efficiency, security of energy supply, grid independence and enhancing the environmental and economic situation for the site. Food processing industries often have simultaneous requirements for heat, steam, chilling and electricity making them well suited for the use of such systems to supply base-load or as peak reducing generators enabling reduction of overall energy use intensity. This paper documents analysis from a project evaluating opportunities enabled by CCHPDG for emission and cost reductions and energy storage systems installed onsite at food processing facilities. In addition, this distributed generation coupled with energy storage demonstrates a non-wires solution to delay or eliminate the need for upgrades to electric distribution systems. It was found that a dairy processing plant in the Pacific Northwest currently purchasing 15,000 MWh/yr of electricity and 190,000 MMBtu/yr of gas could be provided with a 1.1 MW CCHP system reducing the amount of electric power purchased to 450 MWh/yr while increasing the gas demand to 255,000 MMBtu/yr. The high percentage of hydro-power in this region resulted in CO2 emissions from CCHP to be higher than that attributed to the electric utility/regional energy mix. The value of this work is in documenting a real-world example demonstrating the value of CCHP to facility owners and financial decision makers to encourage them to more seriously consider CCHP systems when building or upgrading facilities.

Makhmalbaf, Atefe↗

Stormwater Pollution Prevention Plan, TA-03-22 Power and Steam Plant, Revision 4: LANS Archived 2019

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant and associated areas. The current permit expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

GREENHOUSE GAS REDUCTION POTENTIAL WITH COMBINED HEAT AND POWER WITH DISTRIBUTED GENERATION PRIME MOVERS - ASME 2012

Pending or recently enacted greenhouse gas regulations and mandates are leading to the need for current and feasible GHG reduction solutions including combined heat and power (CHP). Distributed generation using advanced reciprocating engines, gas turbines, microturbines and fuel cells has been shown to reduce greenhouse gases (GHG) compared to the U.S. electrical generation mix due to the use of natural gas and high electrical generation efficiencies of these prime movers. Many of these prime movers are also well suited for use in CHP systems which recover heat generated during combustion or energy conversion. CHP increases the total efficiency of the prime mover by recovering waste heat for generating electricity, replacing process steam, hot water for buildings or even cooling via absorption chilling. The increased efficiency of CHP systems further reduces GHG emissions compared to systems which do not recover waste thermal energy. Current GHG mandates within the U.S Federal sector and looming GHG legislation for states puts an emphasis on understanding the GHG reduction potential of such systems. This study compares the GHG savings from various state-of-the- art prime movers. GHG reductions from commercially available prime movers in the 1-5 MW class including, various industrial fuel cells, large and small gas turbines, micro turbines and reciprocating gas engines with and without CHP are compared to centralized electricity generation including the U.S. mix and the best available technology with natural gas combined cycle power plants. The findings show significant GHG saving potential with the use of CHP. Also provided is an exploration of the accounting methodology for GHG reductions with CHP and the sensitivity of such analyses to electrical generation efficiency, emissions factors and most importantly recoverable heat and thermal recovery efficiency from the CHP system.

03 NATURAL GAS↗

Technical and Economic Assessment and Gap Analysis of Advanced Nuclear Reactor Integration with a Reference Oil Refinery

Efforts to identify the most-economic methods to decarbonize several sectors of the U.S. economy are underway. Industrial processes such as crude-oil refining rely heavily on energy-dense and easily stored and transported fossil fuels for powering their operations. Refineries use large amounts of energy, primarily derived from fossil sources to separate crude-oil components, break down heavier hydrocarbons into lighter compounds, remove impurities, reform hydrocarbon molecules, and generate steam and electricity for pumps and compressors and other various auxiliary systems. Crude-oil refining operations such as distillation, cracking, desulfurization, reforming, utilities systems and some offsite facilities collectively account for most of the energy consumption. Other operations such as hydrocracking or hydrotreating also require hydrogen for developing hydrogenation reactions which involve substantial heating to keep the reactors at high-temperature and pressure levels. All heat and energy demands are typically provided by natural gas (NG), oil, or other fuels, which makes refinery industry one of the most-difficult sectors to decarbonize. Nuclear power is a viable and energy-dense source of clean electricity, heat, and hydrogen to provide the large, sustainable energy supply that the refining industry demands. The U.S. Department of Energy’s (DOE’s) Integrated Energy Systems (IES) program is working to perform research and development, design, economic siting, and risk analysis. This state-of-the-art work will enable the first on-site demonstrations and commercial deployments of advanced small modular nuclear reactors (SMNRs) integrated with industries such as chemical production, refining, iron and steel making, and more. IES seeks to demonstrate the ability of advanced nuclear reactors to meet the heat and power demands of these industries while reducing carbon emissions in a sustainable and cost-competitive way. The primary objective of this research effort is to analyze industrial-scale SMNR integration intended to decarbonize refining facilities. The foreseen outcome is the provision of reliable, cost-competitive, and sustainable clean energy, alongside a reduction of carbon emissions. Specifically, the focus of this work lies on meeting the reference facilities’ heat and electricity demands with nuclear power while also supplying clean hydrogen via integrated high-temperature steam electrolysis (HTSE). This report presents a comprehensive technical and economic assessment of the integration of advanced nuclear reactors into a reference refinery, leveraging financial incentives from the Inflation Reduction Act (IRA). The evaluation aims to explore the potential economic benefits and challenges associated with incorporating advanced nuclear reactors into refinery operations, particularly in terms of energy efficiency, economic implications and environmental impact. By examining both the technical feasibility and economic viability, this analysis seeks to identify existing gaps and propose solutions for successful nuclear integration implementation. The findings are intended to provide valuable insights for stakeholders considering the adoption of advanced nuclear reactors in the refining sector. A refinery reference-plant was developed, using an open-source refinery model, Petroleum Refinery Lifecycle Inventory Model (PRELIM) and expert assessment, as a base case for comparison with various nuclear integration options. The capacity of 100 kbd/day (KBD) of heavy crude-oil feed was selected to represent a general coking-type refinery with deep conversion capabilities (incorporating heavy-oil upgrading with FCC, coking, and associated hydrotreating process units), using a heavy crude-oil feed, which represents about 70% of U.S. refineries configurations. A summary of all cases considered in this study is shown in Table 1.

13 HYDRO ENERGY↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

Mass budget for mining the moons of Mars

The mass budget is detailed for system architectures that use rocket fuels of propellants derived from Deimos and Phobos to transport 10000 ton payloads of exofuel (exoatmospheric fuels) or exomass (exoatmospheric mass) to earth orbits. A point design for the system architecture is used that includes a self-sustaining cycle, which requires no materials from earth, and an infrastructure, which must be emplaced to start the cycle. Both the use of steam rockets and the use of liquid oxygen and liquid hydrogen is examined. It is shown that a system delivering 10000 tons of payload to a highly elliptical earth orbit requires approximately 23000 tons of water for use by nuclear heated steam rockets to effect completely propulsive, round trip maneuvers. It is also shown that about 8000 tons will be available for sale at low earth orbit, each cycle, and that the number of cycles can number in the tens before critical components are replaced.

Zuppero, Anthony↗

A scintillator purification plant and fluid handling system for SNO+

A large capacity purification plant and fluid handling system has been constructed for the SNO+ neutrino and double-beta decay experiment, located 6800 feet underground at SNOLAB, Canada. SNO+ is a refurbishment of the SNO detector to fill the acrylic vessel with liquid scintillator based on Linear Alkylbenzene (LAB) and 2 g/L PPO, and also has a phase to load natural tellurium into the scintillator for a double-beta decay experiment with {sup 130}Te. The plant includes processes multi-stage dual-stream distillation, column water extraction, steam stripping, and functionalized silica gel adsorption columns. The plant also includes systems for preparing the scintillator with PPO and metal-loading the scintillator for double-beta decay exposure. We review the basis of design, the purification principles, specifications for the plant, and the construction and installations. The construction and commissioning status is updated.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Stormwater Pollution Prevention Plan for the TA-03-22 Power and Steam Plant, Los Alamos National Laboratory, Revision 3, January 2018

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant and associated areas. The current permit expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Advanced Thermal Barrier and Environmental Barrier Coating Development at NASA GRC

This presentation summarizes NASA's advanced thermal barrier and environmental barrier coating systems, and the coating performance improvements that has recently been achieved and documented in laboratory simulated rig test conditions. One of the emphases has been placed on the toughness and impact resistance enhancements of the low conductivity, defect cluster thermal barrier coating systems. The advances in the next generation environmental barrier coatings for SiCSiC ceramic matrix composites have also been highlighted, particularly in the design of a new series of oxide-silicate composition systems to be integrated with next generation SiC-SiC turbine engine components for 2700F coating applications. Major technical barriers in developing the thermal and environmental barrier coating systems are also described. The performance and model validations in the rig simulated turbine combustion, heat flux, steam and calcium-magnesium-aluminosilicate (CMAS) environments have helped the current progress in improved temperature capability, environmental stability, and long-term fatigue-environment system durability of the advanced thermal and environmental barrier coating systems.

Thermal Barrier and Environmental Barrier Coatings↗

Regulatory Compliance of H Retention Basin Using Rhombo Balls - 16151

Elevated pH conditions in the Savannah River Site 281-8H Retention Basin will have to be resolved prior to the issuance of a new National Pollutant Discharge Elimination System permit. The 281-8H retention basin collects rain water runoff, cooling tower blow downs and steam condensate from H Area Tank Farm operation processes. The basin discharges to a South Carolina Department of Health and Environmental Control National Pollutant Discharge Elimination System permitted out-fall, H-12. The permit requires the out-fall to meet certain discharge requirements. The National Pollutant Discharge Elimination System permit requires the pH to be within the range 4.8 to 8.5. The 281-8H Retention Basin has a steady history of elevated pH levels, above 8.5, especially during the warmer months of the year, normally March through October. The rise in pH has been attributed to the exponential growth of algae which occurs during the warm months of the year. The increased algae colonies undergo photosynthesis which depletes the CO{sub 2} in the basin water and subsequently raises the pH level. The current permit allows simultaneous discharge of low pH well water, pH between 4.6 and 5.0, and the 281-8H Retention Basin water which provides blending to achieve regulatory compliance. The regulatory agency indicated in 2010 that adding well water to achieve compliance of pH limits will not be allowed when the new permit is issued in the future. Therefore, a solution to the high pH had to be identified and implemented in order to ensure regulatory compliance. A system engineering evaluation was conducted to determine the best solution to the large algae colonies and high pH levels. The evaluation identified options in four primary categories as well as some combination of those categories to control algae growth and to ultimately increase the amount of CO{sub 2} in the basin. Eleven evaluation criteria were developed for the various options, and a percentage (out of 100%) was assigned to related groups of criteria. Twenty-six options were evaluated during this process. The highest ranking options determined from the evaluation were the 12-sided Rhombo ball floating cover, biological digester and a combination of the digester and the floating cover. Option 3, a combination of the top two choices, was chosen as the best approach. The Rhombo cover along with the initial shock application of a biological digester has worked to eliminate algae growth and lower the pH level. The Rhombos have significantly lowered the basin pH level from greater than 9 to less than 7, which is within the regulatory compliance pH requirements of 4.8 to 8.5. The system engineering evaluation and subsequent solution chosen are useful in many venues. The application of the 12 sided Rhombo ball's unique ability to nestle together no matter which way they turn is advantageous to applications/problems that need to block 99.99% sunlight from a body of water. The 281-8H Retention Basin required nine 18 wheeler truckloads with trailers that were 16.2 m (53 Ft) long and filled with Rhombo balls. The basin required a total of approximately 700,000 Rhombo balls to be fully covered. They are easy to install and handle. The Rhombo balls have wind resistance up to 120 Km/hr (75 MPH) and have a life expectancy of 25 years. This application can be used to control plant and algae growth and is effective in evaporation reduction at 99%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Baseline for Oxy-Coal MHD Power Plant with Carbon Capture

This presentation discusses the development of baseline Direct Power Extraction (DPE) plant designs incorporating oxy-coal combustion, a magnetohydrodynamic (MHD) topping cycle, a steam bottoming cycle, and a carbon dioxide purification unit for carbon capture and storage (CCS). Two MHD configurations have been developed; one representing the current state-of-the-art in MHD channel design, and a more advanced design capable of higher power density. The MHD cycle incorporates potassium seeding for plasma generation and a potassium formate seed recovery process that also removes sulfur from the combustion products. The air separation unit for oxygen production, MHD system, and seed recovery systems are all thermally integrated with a Rankine bottoming cycle operating at advanced ultra-supercritical (AUSC) steam conditions. The modeled performance of the two DPE plant systems are compared to IGCC and oxy-coal AUSC reference plants with CCS.

Weiland, Nathan↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗