Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Effects of Chlorine Capture and a Proposed Density Law on the Reactivity of Plutonium Solution Systems

During fissionable material processing, all normal and credible abnormal conditions must remain safely subcritical. Nuclear Criticality Safety (NCS) uses a number of methods to determine subcriticality, one of which is the use of neutron transport codes such as MCNP6. In order to create models for use with MCNP6, both the geometry and materials in fissionable material processes must be known, or assumptions must be made and quantified for the impact to bias. One of the systems with a significant amount of bias due to material modeling assumptions is in the area of aqueous plutonium processing. These solutions are typically plutonium nitrate solutions or plutonium chloride solutions, which are modeled as fictitious plutonium metal-water mixtures because little is known about the actual density of the solution and there is no current predictive capability approved for use at Los Alamos National Laboratory (LANL) for modeling them. This research is currently underway to fill the gap and develop an algorithm for use with MCNP6 to model the density of plutonium chloride solutions. The method is to be validated with experimental data for density, and also validated with critical experiments using MCNP6. Note that the Chlorine Worth Study (CWS) was performed in December 2021 to help bridge the gap in chlorine data for critical experiments, and is currently awaiting International Criticality Safety Benchmark Evaluation Project (ICSBEP) review. This study was performed by LANL at the National Criticality Experiments Research Center (NCERC) at the Nevada National Security Site (NNSS). Additional information regarding this experiment may currently be found in LA-UR- 22-29180. Additionally, the Chemistry-Actinide Analytical Chemistry (C-AAC) at LANL has performed a number of solution density measurements for PuCl 3 -HC 1 -H 2 O, allowing for such data be used to create a semi-empirical density via the Pitzer method. The published dataset for the measurements is documented in LA-UR-22-25454. This method has already been tested successfully for aqueous plutonium nitrate solutions in SCALE. Current solution density measurements exist of plutonium concentrations of 0-~142g/L, all at 2M HC1, at temperatures 20-40°C. Additional data was taken for HC1-corrected density values, which essentially mimics the data for a pure PuCl x -water solution. The calculations in this report aim to support the current research by demonstrating the difference in system reactivity for the current modeling method when compared to the new proposed modeling with a density law implementation, which is being written as a Python tool to be used with MCNP6.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Experimental High Energy Physics Research

This final report summarizes activities of the Florida Tech High Energy Physics group supported by DOE under grant #DE-SC0008024 during the period June 2012 – March 2015. We focused on one of the main HEP research thrusts at the Energy Frontier by participating in the CMS experiment. We were exploiting the tremendous physics opportunities at the Large Hadron Collider (LHC) and prepared for physics at its planned extension, the High-Luminosity LHC. The effort comprised a physics component with analysis of data from the first LHC run and contributions to the CMS Phase-2 upgrades in the muon endcap system (EMU) for the High-Luminosity LHC. The emphasis of our hardware work was the development of large-area Gas Electron Multipliers (GEMs) for the CMS forward muon upgrade. We built a production and testing site for such detectors at Florida Tech to complement future chamber production at CERN. The first full-scale CMS GE1/1 chamber prototype ever built outside of CERN was constructed at Florida Tech in summer 2013. We conducted two beam tests with GEM prototype chambers at CERN in 2012 and at FNAL in 2013 and reported the results at conferences and in publications. Principal Investigator Hohlmann served as chair of the collaboration board of the CMS GEM collaboration and as co-coordinator of the GEM detector working group. He edited and authored sections of the detector chapter of the Technical Design Report (TDR) for the GEM muon upgrade, which was approved by the LHCC and the CERN Research Board in 2015. During the course of the TDR approval process, the GEM project was also established as an official subsystem of the muon system by the CMS muon institution board. On the physics side, graduate student Kalakhety performed a Z' search in the dimuon channel with the 2011 and 2012 CMS datasets that utilized 20.6 fb⁻¹ of p-p collisions at √s = 8 TeV. For the dimuon channel alone, the 95% CL lower limits obtained on the mass of a Z' resonance are 2770 GeV for a Z' with the same standard-model couplings as the Z boson. Our student team operated a Tier-3 cluster on the Open Science Grid (OSG) to support local CMS physics analysis and remote OSG activity. As a service to the HEP community, Hohlmann participated in the Snowmass effort over the course of 2013. Specifically, he acted as a liaison for gaseous detectors between the Instrumentation Frontier and the Energy Frontier and contributed to five papers and reports submitted to the summer study.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2020 (Rev. 0)

This report provides the results of the annual post-closure use restriction (UR) inspections at corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR). This report covers post-closure UR inspections for calendar year 2020, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR). Note: CAU 400, Bomblet Pit and Five Points Landfill (TTR) (CASs TA-19-001-05PT, Ordnance Disposal Pit; and TA-55-00-TAB2, Ordnance Disposal Pit) no longer requires inspection and reporting, as described in the Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2019. Site figures are included in Appendix A. The Post-Closure Inspection Plans and Record of Technical Change modifying the requirements for each UR are included in Appendix B. The Post-Closure Inspection Checklists are included in Appendix C. Field Notes are included in Appendix D. Appendix E, Inspection Photographs, does not include photographs because none were taken during the 2020 post-closure inspections. Appendix F, Post-Closure Vegetation Monitoring Report, does not include any data because vegetation monitoring was not conducted or required at any CAU in 2020. Visual inspections were conducted according to the post-closure requirements outlined in specific CAU and CAS URs, and approved by NDEP. The annual post-closure inspections for CASs associated with CAUs 407, 424, 453, and 487 were conducted on May 20, 2020. No maintenance or repair issues were noted at CAUs 487, or at CASs associated with CAU 424 (except CASs 03-08-002-A304 and 03-08-002-A308). Maintenance items and subsequent repairs include the following: • CAU 407, CAS TA-23-001-TARC (Roller Coaster RadSafe Area): A UR sign was loose and was rehung during the inspection. • CAU 424, CAS 03-08-002-A304 (Landfill Cell A3-4): The northeast monument needed a UR sign. The UR sign was attached to the monument on August 11, 2020. • CAU 424, CAS 03-08-002-A308 (Landfill Cell A3-8): The southeast monument needed additional lava rock. The lava rock was added during the inspection. • CAU 453, CAS 09-55-001-0952 (Area 9 Landfill): Two animal burrows were noted in the western portion of the northern and southern trenches (one burrow per trench). The animal burrows were repaired on August 11, 2020.

54 ENVIRONMENTAL SCIENCES↗

Renewable Energy Opportunities at the Kanto Installations, Japan

This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.

15 GEOTHERMAL ENERGY↗

Communicating Performance Assessments Results - 13609

The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is important to stress that the primary goal of the PA results is to provide risk understanding, recognizing the magnitude of risk and identifying the conceptual model decisions and critical assumptions that most impact the results. Conceptual models that describe reality using simplified, mathematical approaches, and their roles in arriving at the PA results, must also be communicated. When presenting PA results, evaluations will typically be focused on a single baseline (or Base Case) to provide a foundation for discussion. The PA results are supplemented by other studies (alternate configurations, uncertainty analyses, and sensitivity analyses) which provide a breadth of modeling to supplement the Base Case. The suite of information offered by the various modeling cases and studies provides confidence that the overall risk is understood along with the underlying parameters and conditions that contribute to risk. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safeguards Lessons Learned from the Rokkasho Reprocessing Plant - 19502

Once operational, the Rokkasho Reprocessing Plant (RRP) will have an operating throughput of 800 MT of uranium in irradiated LWR fuel per year. In order to establish effective and efficient safeguards at RRP, the safeguards discussion with the IAEA was initiated in 1988. However, at that time there were no available models or guidelines that could be used as a reference and multiple difficulties were recognized for the implementation of safeguards into a large scale reprocessing plant. Therefore, from 1988 to 1992, a multinational forum, referred to as LASCAR (Large Scale Reprocessing Plant Safeguards) [1], provided the recommendations on how an effective safeguards approach could be implemented into a large scale reprocessing plant while efficiently using existing resources. During the course of safeguards discussions between the IAEA, the State, and JNFL, the use of operator's equipment and measurement systems (by signal splitting with authentication) for inspections was studied. JNFL also examined incorporating inspection requirements into the process design: to reduce the costs associated with system installation and future system maintenance and to ensure effective, efficient, and credible safeguards implementation into the RRP (this approach has essentially become the 'Safeguards by Design (SBD)' process). From these studies and JNFL's experience of implementing safeguards into a new plant [2], JNFL established and applied signal splitting from operator's equipment as a means for providing inspectors required safeguards information. In addition, the LASCAR findings were utilized to establish the safeguards implemented into the RRP. Safeguards implementation into RRP commenced March 31, 2006. On June 4, 2008, the IAEA approved the 'integrated safeguards approach' for RRP. This paper provides a high level overview of the major safeguards implemented at RRP and the lessons learned from this implementation that can be applied to existing or future similar facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Approaches for Successful Implementation of DOE-STD-3009-2014 - 18585

The U.S. Department of Energy (DOE) released a new version of the standard for the Preparation of Non-reactor Nuclear Facility Documented Safety Analysis, DOE-STD-3009-2014. Although this revised standard only specifically applies to new facilities, major modifications to existing facilities, and existing facilities with mitigated offsite consequences greater than 25 rem, other existing DOE nuclear facilities are beginning to implement the new requirements in this revised standard as well. The most obvious change is the consolidation of the eleven Safety Management Program (SMP) chapters into a single chapter. However, development of a compliant safety analysis is more than an effort in shuffling these sections. Examples of the substantive changes include: a more rigorous approach to defense-in-depth; a more comprehensive process for functionally classifying safety-supporting structures, systems and components; explicit direction for evaluating chemical hazards; and additional quantitative analysis for co-located workers. For any facility, the publication of an approved Documented Safety Analysis (DSA) and associated Technical Safety Requirements (TSRs) is a significant milestone. However, implementation of the DSA/TSR is often the greater challenge. Ensuring that the implementing assumptions, analysis inputs, and operational limitations are realistic is critical to this success. This should be addressed in the safety basis strategy document. In addition, DSA implementation must occur using a logical and planned approach. The approach should address the following: - Procedure preparation, review and verification; - Operator, mechanic, technician, and support staff training; - Management assessments to evaluate SMP effectiveness; and - Independent assessments to confirm effective DSA implementation. This project approach to managing DSA/TSR development and implementation has been demonstrated as successful at multiple DOE sites. Lessons learned associated with all of these topics will be discussed in the context of the new DOE-STD-3009-2014 requirements. The discussed lessons are taken from the multiple DOE sites and facilities. The presentation describes implemented approaches for successful incorporation of these lessons. While the context for the presentation is DOE-STD-3009-2014, the need to properly manage safety basis development and implementation applies to all nuclear facilities. Thus the lessons and implementation strategies should appeal to a general audience interested in safety basis development. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sealed source peer review plan

Sealed sources are known quantities of radioactive materials that have been encapsulated in quantities that produce known radiation fields. Sealed sources have multiple uses ranging from instrument calibration sources to sources that produce radiation fields for experimental applications. The Off-Site Source Recovery (OSR) Project at Los Alamos National Laboratory (LANL), created in 1999, under the direction of the Waste Management Division of the U.S. Department of Energy (DOE) Albuquerque has been assigned the responsibility to recover and manage excess and unwanted radioactive sealed sources from the public and private sector. LANL intends to ship drums containing qualified sealed sources to the Waste Isolation Pilot Plant (WIPP) for disposal. Prior to shipping, these drums must be characterized with respect to radiological content and other parameters. The U. S. Environmental Protection Agency (EPA) requires that ten radionulcides be quantified and reported for every container of waste to be disposed in the WIPP. The methods traditionally approved by the EPA include non-destructive assay (NDA) in accordance with Appendix A of the Contact-Handled Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (DOE, 2002) (CH WAC). However, because of the nature and pedigree of historical records for sealed sources and the technical infeasibility of performing NDA on these sources, LANL proposes to characterize the content of these waste drums using qualified existing radiological data in lieu of direct measurement. This plan describes the process and documentation requirements for the use of the peer review process to qualify existing data for sealed radiological sources in lieu of perfonning radioassay. The peer review process will be performed in accordance with criteria provided in 40 CFR {section} 194.22 which specifies the use of the NUREG 1297 guidelines. The plan defines the management approach, resources, schedule, and technical requirements for the subject peer review.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Conceptual Design of a Tension Leg Platform With 22.3 MW Vertical Axis Turbine

Here, this paper presents the conceptual design of a tension leg platform (TLP) for the ARCUS “towerless” vertical-axis wind turbine (VAWT). VAWTs are ideal for floating offshore sites and have several advantages over horizontal-axis wind turbines (HAWT) including reduced top mass, lower center of gravity, increased energy capture, and in turn lower cost. The towerless ARCUS VAWT drives these advantages further through increased structural efficiency and by enabling more optimized TLP designs with simplified installation procedures. For hull sizing, we have studied three turbine sizes with corresponding power ratings of 5.1 MW, 10.4 MW and 22.3 MW. The largest turbine was identified as having the greatest potential to reduce the levelized cost of energy (LCOE) and is the reference size used for the further detailed design process. The conceptual design of the VAWT TLP has been awarded with an ABS Approval in Principle Certificate. This paper contains brief analysis results and design findings for a TLP designed to house a VAWT, including the following topics: • Applicable Design Codes • Metocean Conditions • ARCUS Turbine Loads • Design Load Cases and Requirements - Pre-service TLP Stability - In-place TLP Global Performance • Platform Configurations, Hull Structure Scantling Design, Weight and CG Estimation, and General Arrangement Drawings • Hull Ballast Plan for both Pre-service and In-place Conditions • Pre-service Quayside Integration, Transportation and Wet Tow Stability Analysis • Global Performance Analysis for Motions and Tendon tensions • Summary of cost components and system levelized cost of energy

17 WIND ENERGY↗

Efficient 15 N hyperpolarization of [ 15 N 3 ]metronidazole antibiotic via spin-relayed pulsed SABRE-SHEATH

Signal Amplification by Reversible Exchange in SHield Enables Alignment Transfer to Heteronuclei (SABRE-SHEATH) is an NMR hyperpolarization technique that relies of the simultaneous exchange of parahydrogen and a to-be-hyperpolarized molecule on the metal center of a polarization-transfer catalyst in a microtesla magnetic field. Until recently, this method has been understood to perform hyperpolarization by establishing level anti-crossings between the nuclear spins of the parahydrogen derived hydrides (acting as a source of hyperpolarization) and those of the substrate. Recently, the application of highly non-intuitive pulse sequences (comprising pulses of microtesla DC fields) was predicted to hyperpolarize nuclear spins more efficiently than the canonical (static-field) SABRE-SHEATH approach. Here we show that by employing a basic “on-off” pulse sequence of rectangular microtesla pulses, it is possible to improve the hyperpolarization efficiency for SABRE-SHEATH of [ 15 N 3 ]metronidazole, an FDA-approved antibiotic (in non-enriched and non-hyperpolarized form) and potential hypoxia sensing molecule. Specifically, we demonstrate that 15N polarization of 18.5 % can be obtained in 80 s of parahydrogen bubbling parahydrogen through a solution containing 20 mM [ 15 N 3 ]metronidazole. In practice, (1.32 ± 0.14)-fold improvements in P 15N was obtained with the pulsed method described here compared to static field technique variant. These results show that pulsed SABRE-SHEATH was successfully applied to 15 N-labeled biologically relevant molecule. Moreover, we also demonstrate that although the pulsed SABRE-SHEATH sequence was designed for polarization transfer from parahydrogen derived hydrides to the metronidazole’s 15 N catalyst-binding site, all three 15 N sites of [ 15 N 3 ]metronidazole attained the hyperpolarized state. This spin-relayed polarization transfer becomes possible due to the 15 N relay network established by their spin-spin J-couplings. The feasibility of the spin-relayed polarization transfer is demonstrated here for the first time for pulsed SABRE-SHEATH (as opposed to the static-field SABRE-SHEATH reported previously) and it paves the way to broad applicability of the technique.

Hyperpolarization↗

It Just Keeps Getting Better-Tru Waste Inventory

The Waste Isolation Pilot Plant (WIPP) opened on March 26, 1999, becoming the nation's first deep geologic repository for the permanent disposal of defense-generated transuranic (TRU) waste. In May 1998, the U. S. Environmental Protection Agency (EPA) certified WIPP and re-certified WIPP in March 2006. The knowledge of TRU waste inventory is fundamental to packaging, transportation, disposal strategies, resource allocation, and is also imperative when working in a regulatory framework. TRU waste inventory data are used to define the waste that will fill the WIPP repository in terms of volume, radionuclides, waste material parameters, other chemical components, and to model the impact of the waste on the performance of the WIPP over a 10,000-year evolution. The data that pertain to TRU waste is defined in the WIPP Land Withdrawal Act (LWA), as '..waste containing more that 100 nanocuries of alpha-emitting transuranic isotopes per gram of waste, with half-lives greater than 20 years..' Defining TRU waste further, the wastes are classified as either contact-handled (CH) or remote-handled (RH) TRU waste, depending on the dose rate at the surface of the waste container. CH TRU wastes are packaged with an external surface dose rate not greater than 200 milli-rem (mrem) per hour, while RH TRU wastes are packaged with an external surface dose rate of 200 mrem per hour or greater. The Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) Inventory Team has developed a powerful new database, the Comprehensive Inventory Database (CID), to maintain the TRU waste inventory information. The CID is intended to replace the Transuranic Waste Baseline Inventory Database (TWBID), Revision 2.1, as the central inventory information repository for tracking all existing and potential (TRU) waste generated across the Department of Energy (DOE) TRU waste complex. It is also the source for information submitted for the Annual TRU Waste Inventory Reports some of which will be used in future Compliance Re-certification Applications (CRAs) for the WIPP. Currently, the DOE is preparing for the second re-certification, CRA-2009. The CID contains comprehensive TRU waste inventory that is consistent, relevant, and easily accessible to support DOE needs, not only the CRAs and performance assessments, but also waste management planning activities and other regulatory needs (e.g., National Environmental Policy Act (NEPA) analyses). The comprehensive inventory contains information obtained via inventory updates and approved acceptable knowledge (AK) characterization information to ensure inventory data integrity is maintained and the inventory is current. The TRU waste inventory is maintained in the CID under configuration management as defined in the LANL-CO Quality Assurance Program. The CID was developed using Microsoft{sup TM} Access Data Project{sup TM} (ADP) technology with a Microsoft SQL Server{sup TM} back end. The CID is user friendly, contains more fields, provides for easy upload of data, and has the capability to generate fully qualified data reports. To go along with the new database, the LANL-CO Inventory Team has developed an improved data collection/screening process and has excellent communications with the TRU waste site personnel. WIPP has now received over 6,000 shipments, emplaced over 50,000 cubic meters of CH waste, and successfully completed one re-certification. With a new robust qualified database, the CID, to maintain the inventory information, the TRU waste inventory information is continuously improving in quality, accuracy, and usability (better). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of groundwater monitoring at Everest, Kansas, in April 2008.

On September 7, 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented a Scoping Memo (Argonne 2005) for preliminary consideration by the Kansas Department of Health and Environment (KDHE), suggesting possible remedial options for the carbon tetrachloride contamination in groundwater at Everest, Kansas. The suggested approaches were discussed by representatives of the KDHE, the CCC/USDA, and Argonne at the KDHE office in Topeka on September 8-9, 2005, along with other technical and logistic issues related to the Everest site. In response to these discussions, the KDHE recommended (KDHE 2005) evaluation of several remedial processes, either alone or in combination, as part of a Corrective Action Study (CAS) for Everest. The primary remedial processes suggested by the KDHE were the following: Hydraulic control by groundwater extraction with aboveground treatment; Air sparging (AS) coupled with soil vapor extraction (SVE) in large-diameter boreholes (LDBs); and Phytoremediation. As a further outcome of the 2005 meeting and as a precursor to development of a possible CAS, the CCC/USDA completed the following supplemental investigations at Everest to address several specific technical concerns discussed with the KDHE: (1) Construction of interpretive cross sections at strategic locations selected by the KDHE along the main plume migration pathway, to depict the hydrogeologic characteristics affecting groundwater flow and contaminant movement (Argonne 2006a). (2) A field investigation in early 2006 (Argonne 2006b), as follows: (a) Installation and testing of a production well and associated observation points, at locations approved by the KDHE, to determine the response of the Everest aquifer to groundwater extraction near the Nigh property. (b) Groundwater sampling for the analysis of volatile organic compounds (VOCs) and the installation of additional permanent monitoring points at locations selected by the KDHE, to further constrain the existing contaminant plume. (c) Resampling of all existing permanent monitoring points for VOCs and biodegradation parameter analyses, at the request of the KDHE. On the basis of these studies (Argonne 2006a,b) and the CCC/USDA's past investigations at Everest (Argonne 2006c), the CCC/USDA concluded that groundwater extraction is not an effective remedial option for the main body of the groundwater plume, and the KDHE concurred (KDHE 2006); the KDHE later noted, however (KDHE 2007a), that this and other technologies might represent viable remedial options in the event of further downgradient migration of the plume toward the intermittent creek. In February 2007, the CCC/USDA presented preliminary analyses of (1) the AS-SVE remedial alternative, incorporating the use of LDBs, and (2) the risks to human health and the environment posed by the observed carbon tetrachloride plume in groundwater (Argonne 2007a). The results of these analyses demonstrated the following: (1) Neither groundwater extraction nor AS-SVE in LDBs represents a practical approach for effective remediation of the groundwater contamination at Everest (near the Nigh property). (2) Periodic sampling and analyses for VOCs conducted by the CCC/USDA documented that the areal extent and range of carbon tetrachloride concentrations detected in the groundwater plume at Everest had changed relatively little from 2000 to 2006. (3) Estimates of groundwater flow and contaminant migration times, based on the hydrogeologic properties of the groundwater flow system identified at Everest (Argonne 2003, 2006b,c), indicated that, at minimum, approximately 4 years would be required for the carbon tetrachloride plume (in the subsurface) to reach the vicinity of the intermittent creek directly west of the Nigh property, and more than 20 years would be required for the contamination to reach the identified groundwater discharge area southwest of the Nigh property. (4) The existing (January-March 2006) plume posed no immediate danger of contamination to the surface waters of the intermittent creek. In light of these observations, the CCC/USDA proposed a phased program--over approximately 2-3 years--of groundwater sampling, surface water sampling, and related monitoring activities at Everest to (1) identify locations where a phytoremediation system would be effective and determine that area's extent and (2) support the potential development of a phytoremediation treatment alternative for the site. The recommended elements of the monitoring program are summarized in Table 1.1. In conjunction with this program, both the CCC/USDA and the KDHE recommended the construction of several new monitoring wells, at locations along and near the intermittent creek west of the Nigh property (Argonne 2007b; KDHE 2007b).

54 ENVIRONMENTAL SCIENCES↗

An evaluation framework for effective public participation in EIA in Pakistan

Evaluating the effectiveness of public participation in EIA related decisions is of crucial importance for developing a better understanding of overall EIA effectiveness. This paper aims to contribute to the professional debate by establishing a country specific evaluation framework for Pakistan, which, it is suggested, could also potentially be used in other developing countries. The framework is used to evaluate performance of public participation in EIA in terms of 40 attributes for four selected projects from the province of Punjab. The evaluation is based on interviews with stakeholders, review of EIA reports as well as public hearing proceedings and environmental approval conditions. The evaluation of the selected projects revealed an overall weak influence of public participation on substantive quality of EIA and on the final decision. Overall, EIA public participation has succeeded in providing a more egalitarian environment. Furthermore, it appears fair to say that sufficient time for submitting written comments on EIA reports as well as for raising concerns during public hearings had been given. Also, public consultation was significantly contributing to educating participants. Despite some impediments, it is argued that public participation in EIA is gradually gaining ground in Pakistan. Recommendations to enhance EIA public participation effectiveness in Pakistan include applying a more proactive approach which should take place before EIA is conducted and before site selection for development projects is happening.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Results of Temporary Shutdown Testing and Groundwater Pump-Testing at Agra, Kansas, February-September 2016 and march 2017, and Assessment of Groundwater and Contaminant Migration

In 2005, the Commodity Credit Corporation/U.S. Department of Agriculture (CCC/USDA) conducted a comprehensive investigation of potential contaminant source areas on, and in the vicinity of, the former CCC/USDA grain storage facility in Agra, Kansas (Argonne 2006). The data collected during this investigation identified three primary source areas for carbon tetrachloride contamination. One source is located on the former CCC/USDA property, and the other two (western and eastern) sources are located on adjacent property owned by Pro-Ag Marketing. The soil source located at the western end of the Pro-Ag property has been identified as the sole source of carbon tetrachloride contamination to the groundwater in this portion of the Agra site, and is not associated with any grain storage activities on the former CCC/USDA property. In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA initiated source area cleanup as an interim measure (IM). The cleanup employs five large-diameter boreholes (LDBs) that were excavated by auger drilling. The purposes of these borings were to (1) physically remove soils impacted by carbon tetrachloride from the most contaminated area for treatment by onsite land farming and (2) provide locations for the installation of coupled soil vapor extraction (SVE) and air sparging (AS) wells to facilitate in-situ treatment of the carbon tetrachloride in the soils and underlying groundwater. With the approval of the KDHE, operation of the SVE/AS systems began in May 2009, and has generally continued with minimal interruption since that time. Land farming operations to treat contaminated soil excavated from the LDBs were successfully completed in October 2010.

54 ENVIRONMENTAL SCIENCES↗

IBRD Operational Decision Framework

The IBRD Operational Decision Framework in this document is an expansion of an emerging general risk management framework under development by an interagency working group. It provides the level of detail necessary to develop a general Consequence Management Guidance Document for biological contamination remediation and restoration. It is the intent of this document to support both wide area and individual site remediation and restoration activities. This product was initiated as a portion of the IBRD Task 1 Systems Analysis to aid in identification of wide area remediation and restoration shortcomings and gaps. The draft interagency general risk management framework was used as the basis for the analysis. The initial Task 1 analysis document expanded the draft interagency framework to a higher level of resolution, building on both the logic structure and the accompanying text explanations. It was then employed in a qualitative manner to identify responsible agencies, data requirements, tool requirements, and current capabilities for each decision and task. This resulted in identifying shortcomings and gaps needing resolution. Several meetings of a joint LLNL/SNL working group reviewed and approved the initial content of this analysis. At the conclusion of Task 1, work continued on the expanded framework to generate this Operational Decision Framework which is consistent with the existing interagency general risk management framework. A large LLNL task group met repeatedly over a three-month period to develop the expanded framework, coordinate the framework with the biological remediation checklist, and synchronize the logic with the Consequence Management Plan table of contents. The expanded framework was briefed at a large table top exercise reviewing the interagency risk management framework. This exercise had representation from major US metropolitan areas as well as national agencies. This product received positive comments from the participants. Upon completion of the Operational Decision Framework, another joint LLNL/SNL working group conducted a day-long review. Identified modifications were made to the document, resulting in the included product.

99 GENERAL AND MISCELLANEOUS↗

New Generation Lidar Technology and Applications

Lidar has been a tool for atmospheric research for several decades. Until recently routine operational use of lidar was not known. Problems have involved a lack of appropriate technology rather than a lack of applications. Within the last few years, lidar based on a new generation of solid state lasers and detectors have changed the situation. Operational applications for cloud and aerosol research applications are now well established. In these research applications, the direct height profiling capability of lidar is typically an adjunct to other types of sensing, both passive and active. Compact eye safe lidar with the sensitivity for ground based monitoring of all significant cloud and aerosol structure and the reliability to operate full time for several years is now in routine use. The approach is known as micro pulse lidar (MPL). For MPL the laser pulse repetition rate is in the kilohertz range and the pulse energies are in the micro-Joule range. The low pulse energy permits the systems to be eye safe and reliable with solid state lasers. A number of MPL systems have been deployed since 1992 at atmospheric research sites at a variety of global locations. Accurate monitoring of cloud and aerosol vertical distribution is a critical measurement for atmospheric radiation. An airborne application of lidar cloud and aerosol profiling is retrievals of parameters from combined lidar and passive sensing involving visible, infrared and microwave frequencies. A lidar based on a large pulse, solid state diode pumped ND:YAG laser has been deployed on the NASA ER-2 high altitude research aircraft along with multi-spectral visible/IR and microwave imaging radiometers since 1993. The system has shown high reliability in an extensive series of experimental projects for cloud remote sensing. The retrieval of cirrus radiation parameters is an effective application for combined lidar and passive sensing. An approved NASA mission will soon begin long term lidar observation of atmospheric structure from space. The Geoscience Laser Altimeter System (GLAS) of the Earth Observing System is scheduled for deployment in the 2001 time frame. GLAS is both a cloud and aerosol lidar and a surface altimeter, principally for monitoring of polar ice sheets. The GLAS instrument is based on all solid state lasers operating at 40 Hz and high efficiency, solid state detectors. The design lifetime is three to five years. Data from the GLAS mission is expected to revolutionize some aspects of our understanding of the global distribution of cloud and aerosols for global climate prediction.

Spinhirne, James D.↗

Ecological Monitoring and Compliance Program 2014 Report

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2014. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2014, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives. Sensitive and protected/regulated species of the NNSS include 42 plants, 1 mollusk, 2 reptiles, 236 birds, and 27 mammals. These species are protected, regulated, or considered sensitive according to state or federal regulations and natural resource agencies and organizations. The desert tortoise (Gopherus agassizii) and the western yellow-billed cuckoo (Coccyzus americanus) are the only species on the NNSS protected under the Endangered Species Act, both listed as threatened. However, only one record of the cuckoo has ever been documented on the NNSS, and there is no good habitat for this species on the NNSS. It is considered a rare migrant. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 18 projects. A total of 199.18 hectares (ha) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found during these surveys included a predator burrow, one sidewinder rattlesnake (Crotalus cerastes), two mating speckled rattlesnakes (Crotalus mitchellii), and several species of cacti. NSTec provided to project managers a written summary report of all survey findings and mitigation recommendations, where applicable. Of the 18 projects on the NNSS, 15 occurred within the range of the threatened desert tortoise. Approximately 2.19 ha of desert tortoise habitat were disturbed. No desert tortoises were accidentally injured or killed by project activities, and no tortoises were killed by vehicles. On 13 occasions, tortoises were moved off the road and out of harm’s way. Six tortoises were found and transmitters attached as part of an approved study to assess impacts of vehicles on tortoises on the NNSS. NSTec biologists continued to monitor 37 juvenile desert tortoises as part of a collaborative effort to study survival and temperament of translocated animals. From 1978 until 2013, there has been an average of 11.2 wildland fires per year on the NNSS with an average of about 83.7 ha burned per fire. There were no wildland fires documented on the NNSS during 2014. Results from the wildland fuel surveys showed a very low risk of wildland fire due to reduced fuel loads caused by limited natural precipitation. Limited reptile trapping and reptile roadkill surveys were conducted to better define species distribution on the NNSS. Sixteen reptiles were trapped representing five species. Combined with data from 2013, 183 road kills were detected, representing 11 snake and 8 lizard species. Selected natural water sources were monitored to assess trends in physical and biological parameters, and one new water source was found. Wildlife use at five water troughs and four radiologically contaminated sumps was documented using motion-activated cameras. As part of the statewide effort to disseminate information throughout the botanical community, NSTec prepared a shape file with site-specific data for all 17 sensitive plants on the NNSS and provided it to the Nevada Natural Heritage Program for inclusion in their statewide database. No field surveys were conducted this year for sensitive plants on the NNSS due to poor growing conditions. Surveys of sensitive and protected/regulated animals during 2014 focused on winter raptors, bats, wild horses (Equus caballus), mule deer (Odocoileus hemionus), desert bighorn sheep (Ovis Canadensis nelsoni), and mountain lions (Puma concolor). Two permanent, long-term winter raptor survey routes were established and sampled in January and February. A total of 27 raptors representing 4 species were observed. The wild horse population increased from 30 to 41, with several yearlings recruiting into the population, possibly due to the death of a mountain lion known to prey on horse foals. Mule deer abundance and density measured with standardized deer surveys was similar to 2013 and appears to be stable. Desert bighorn sheep, including rams, ewes, and lambs, were detected using motion-activated cameras at four water sources. There are plans to conduct helicopter surveys to census the population during September 2015 and then capture and radio-collar up to 20 sheep during November 2015. Over 150 sheep scat samples have been collected for genetic analysis to try to determine how sheep on the NNSS are related to surrounding sheep populations. Information is presented about bird mortalities, Migratory Bird Treaty Act compliance, and a summary of nuisance animals and their control on the NNSS. A total of 93 mountain lion images (i.e., photographs or video clips) were taken during 220,379 camera hours at 16 of 32 sites sampled and another 11,946 images of at least 29 species other than mountain lions were taken as well. A mountain lion telemetry study continued in 2014. NNSS7 was tracked from January 1 to November 15 using a global positioning system satellite transmitter. He consumed 21 mule deer, 17 desert bighorn sheep, 1 juvenile bobcat, and 3 coyotes. Mule deer were primarily taken in the summer and fall. No new mountain lions were captured. A minimum of four adult lions (two males, two females), a subadult male, and three kittens were known to inhabit the NNSS during 2014. Two previously revegetated sites on the NNSS and one on the Tonopah Test Range (TTR) were monitored in 2014. The cover cap on the U-3ax/bl disposal unit, revegetated in 2000, and the 92-Acre Site at the Area 5 Radioactive Waste Management Complex, revegetated in 2011, were the restoration sites monitored on the NNSS. The Corrective Action Unit 407 Rollercoaster RADSAFE site, revegetated in 2000, was the restoration site monitored on the TTR. Plant cover and density were recorded at all sites except U-3ax/bl (qualitative monitoring), and reclamation success standards were evaluated, where applicable.

54 ENVIRONMENTAL SCIENCES↗

Special Analysis: Disposal Plan for Pit 38 at Technical Area 54, Area G

Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Operational waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research; environmental restoration (ER), and decontamination and decommissioning (D&D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on- and off-site exposure scenarios. The assessments are based on existing site and disposal facility data, and on assumptions about future rates and methods of waste disposal. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, disposal operations have been confined to MDA G and are scheduled to continue in that region until MDA G undergoes final closure at the end of 2013. Given its impending closure, efforts have been made to utilize the remaining disposal capacity within MDA G to the greatest extent possible. One approach for doing this has been to dispose of low-activity waste from cleanup operations at LANL in the headspace of selected disposal pits. Waste acceptance criteria (WAC) for the material placed in the headspace of pits 15, 37, and 38 have been developed (LANL, 2010) and the impacts of placing waste in the headspace of these units has been evaluated (LANL, 2012a). The efforts to maximize disposal efficiency have taken on renewed importance because of the disposal demands placed on MDA G by the large volumes of waste that are being generated at LANL by cleanup efforts. For example, large quantities of waste were recently generated by the retrieval of waste formerly disposed of at TA-21, MDA B. A portion of this material has been disposed of in the headspace of pit 38 in compliance with the WAC developed for that disposal strategy; a large amount of waste has also been sent to off-site facilities for disposal. Nevertheless, large quantities of MDA B waste remain that require disposal. An extension of pit 38 was proposed to provide the disposal capacity that will be needed to dispose of institutional waste and MDA B waste through 2013. A special analysis was prepared to evaluate the impacts of the pit extension (LANL, 2012b). The analysis concluded that the disposal unit could be extended with modest increases in the exposures projected for the Area G performance assessment and composite analysis, as long as limits were placed on the radionuclide concentrations in the waste that is placed in the headspace of the pit. Based, in part, on the results of the special analysis, the extension of pit 38 was approved and excavation of the additional disposal capacity was started in May 2012. The special analysis presented here uses performance modeling to identify a disposal plan for the placement of waste in pit 38. The modeling uses a refined design of the disposal unit and updated radionuclide inventories to identify a disposal configuration that promotes efficient utilization of the pit and ensures continued compliance with DOE Order 435.1 performance objectives. Section 2 describes the methods used to conduct the analysis; the results of the evaluation are provided in Section 3. The disposal plan for pit 38 is provided in Section 4 and the conclusions of the investigation are provided in Section 5. Throughout the report, pit 38 is used to refer to the entire disposal unit, including the existing pit and the extension that is currently under construction. Where a distinction between the two portions of the pit is necessary, the existing unit is referred to as pit 38 proper and the new portion of the pit as the pit 38 extension or, more simply, the extension.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗