Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Restore”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

2022 Annual Site Environmental Report for Sandia National Laboratories, Tonopah Test Range, Nevada

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the. U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, Tonopah Test Range. Activities at the site are conducted in support of U.S. Department of Energy weapons programs and have operated at the site since 1957. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding file environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Tonopah Test Range during calendar year 2022. Environmental topics include cultural resource management, chemical management, air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE 0 231.IB, Admin Change 1, Environment, Safety and Health Reporting and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for the Project Shoal Area: Subsurface Corrective Action Unit 447 Shoal,Nevada, Site

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has prepared this Closure Report for subsurface Corrective Action Unit (CAU) 447 at the Shoal, Nevada, Site, which was formerly called the Project Shoal Area. The Shoal site was the location of an underground nuclear test in 1963 that resulted in residual radionuclide contamination at the detonation depth of 1211 feet (ft) (DOE 2015a). The environmental restoration process and Corrective Action strategy are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) statues and regulations. Responsibility for the environmental site restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The Shoal site is south of U.S. Highway 50, approximately 30 miles southeast of Fallon, in Churchill County, Nevada (Figure 1). The site was selected for underground nuclear testing in 1961, as part of the Vela Uniform Program. Vela was a research and development program directed toward locating, detecting, and identifying underground and high-altitude nuclear detonations. The Vela Uniform program was specific to underground detonations (AEC 1964). The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States’ ability to detect, identify, and locate underground nuclear detonations. The underground nuclear test at Shoal was a joint effort between the U.S. Department of Defense (DOD) and the U.S. Atomic Energy Commission (AEC), which was the predecessor agency to DOE. Figure 1 is a map showing the site location.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Alternative Pozzolans for Replacement of Fly Ash in Grout: Literature Review for Continuous Improvement of Cement Waste Forms

The Department of Energy (DOE) is currently responsible for treating radioactive and mixed waste, performing environmental restoration, and closing contaminated tanks and facilities resulting from nuclear weapons production during the Cold War. Cementitious reagents are the most widely used materials for (1) chemically stabilizing and encapsulating radionuclides and hazardous metals and (2) solidifying radioactive wastewater. Cementitious grouts and flowable concretes are also the most widely used materials for tank and facility closures and are used extensively for physical as well as chemical stabilization in environmental restoration projects. Ambient temperature radioactive waste cementation is a widely used technology for producing waste forms for final disposal. The current practice of designing and testing waste forms is based on a mid to late 20th century technology approach (i.e., materials, characterization, and test methods) for generating parameters for risk assessments. DOE technology development is needed to address both current, long-term, and emerging issues in this area as new waste streams come online and as regulations, performance knowledge, and risk assessment methodology continue to evolve. Consequently, the use of cementation as a means of treating chemically challenging radioactive liquid waste streams and reactive debris requires an enduring effort.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Filtration of Hanford Tank 241-AN-107 Supernatant at 16 °C

Approximately 9 liters of supernatant from Hanford waste tank 241-AN-107 was delivered by Washington River Protection Solutions to the Radiochemical Processing Laboratory (RPL) at Pacific Northwest National Laboratory. The thirty-six AN-107 sample bottles consisted of six sets of six samples, with each set pulled from a unique tank sampling level. Prior to testing, samples from each level were composited to provide nominally level-independent feed for dead end filtration and ion exchange testing. The composited 241-AN-107 supernatant was chilled to 16 °C for 1 week prior to testing. Filtration testing was then conducted using a backpulse dead-end filter (BDEF) system equipped with a feed vessel and a Mott inline filter Model 6610 (Media Grade 5) in the hot cells of the RPL. The purpose of this testing is to a) demonstrate dead-end filtration (DEF) of AN-107 feed at reduced temperature to obtain prototypic tank side cesium removal (TSCR) flux rates and identify issues that may impact filtration after dilution to 5.5M Na, and b) provide feed for a follow on ion exchange unit operation. The feed was filtered through the BDEF system at a targeted flux of 0.065 gpm/ft 2 . During filtration the differential pressure required to effect filtration at 0.065 gpm/ft 2 was slow to increase for most of the filtration campaign. After all the feed bottles had been pumped into the slurry reservoir, the bottoms of the bottles were added to the reservoir and transmembrane pressure (TMP) reached 2.0 psid (the TSCR action limit). The prototypic filter cleaning process was unable to effectively restore filter performance, and cleaning with oxalic acid was required before flow through the filter could be restored. This indicates that the Media Grade 5 filter may require an alternative cleaning protocol when processing AN-107 supernatant. After completing filtration of the AN-107 feed, the filter was cleaned. Solids concentrated from the backpulse solutions were composed of natrophosphate, Mn-Fe phases, and fluoro-natrophosphate that occurred as particle agglomerates. The individual particles were in some cases 100s of micrometers across which is consistent with prior observations from AN-107 supernate waste characterizations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2023 Site Environmental Report: Volume 1

Brookhaven National Laboratory (BNL) is managed on behalf of the Department of Energy (DOE) by Brookhaven Science Associates (BSA), a partnership between Stony Brook University and Battelle, and six core universities: Columbia, Cornell, Harvard, Massachusetts Institute of Technology, Princeton, and Yale. For over 75 years, the Laboratory has played a lead role in the DOE Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. BNL manages its world-class scientific research operations with sensitivity to environmental issues and community concerns. The Laboratory’s Environmental, Safety, Security, and Health (ESSH) Policy reflects the commitment of BNL’s management to fully integrate environmental stewardship into all facets of its mission and operations. BNL prepares an annual Site Environmental Report (SER) in accordance with DOE Order 231.1B, Environment, Safety, and Health Reporting. The report is written to inform the public, regulators, employees, and other stakeholders of the Laboratory’s environmental performance during the calendar year in review. Volume I of the SER summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and performance in restoration and surveillance monitoring programs. BNL has prepared annual SERs since 1971 and has documented nearly all its environmental history since the Laboratory’s inception in 1947. Volume II of the SER, the Groundwater Status Report, is also prepared annually to report on the status of groundwater protection and restoration efforts. Volume II includes detailed technical summaries of groundwater data and treatment system operations and is intended for regulators and other technically oriented stakeholders. A summary of the information contained in Volume II is included in Chapter 7, Groundwater Protection, of this volume.

54 ENVIRONMENTAL SCIENCES↗

CEERP SM3 Research, Monitoring, and Evaluation Workshop: Summary Report

The Columbia Estuary Ecosystem Restoration Program (CEERP) workshop, “CEERP Synthesis Memorandum (SM3): Research, Monitoring, and Evaluation,” was held in Portland, Oregon on June 24–25 2024. A diverse group of 26 domain experts with demonstrated knowledge and experience working in the Lower Columbia River Estuary (LCRE) participated. The workshop supported development of the forthcoming third Synthesis Memorandum for CEERP. The workshop furthered the collaborative understanding of the state of the science regarding the LCRE, helped to identify remaining knowledge gaps and uncertainties, and assisted in the prioritization of future restoration research and monitoring.

54 ENVIRONMENTAL SCIENCES↗

2023 Annual Site Environmental Report for Sandia National Laboratories, Tonopah Test Range, Nevada

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, Tonopah Test Range. Activities at the site are conducted in support of U.S. Department of Energy weapons programs and have operated at the site since 1957. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Tonopah Test Range during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Post-Fire Vegetation Monitoring Report for Calendar Year 2023

The Hanford Site is comprised of an expanse of shrub-steppe habitats that provide exceptional value to plants and animals located on the Hanford Site and in the surrounding greater Columbia Basin. The greatest threat to this habitat is fire-related conversion to a cheatgrass-dominated monoculture. To decrease future fire risk and to disrupt the positive feedback cycle between cheatgrass and fire, land managers can make efforts to restore native vegetation following a fire. The goal of this report is to summarize fires and fire monitoring efforts that occurred in 2023 and analyze vegetation recovery post-fire in both restored and unrestored areas to inform future post-fire response actions.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Post-Fire Vegetation Monitoring Report for Calendar Year 2022

The Hanford Site is comprised of an expanse of shrub-steppe habitats that provide exceptional value to plants and animals located on the Site and in the surrounding greater Columbia Basin. The greatest threat to this habitat is fire-related conversion to a cheatgrass-dominated monoculture. In order to decrease future fire risk and to disrupt the positive feedback cycle between cheatgrass and fire, land managers can make efforts to restore native vegetation following a fire. The goal of this report is to analyze vegetation recovery post-fire in both restored and unrestored areas to inform future post-fire response actions.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Post-Fire Vegetation Monitoring Report for Calendar Year 2021

The Hanford Site presents an expanse of shrub-steppe habitat that provides exceptional value to plants and animals located on the Site and in the surrounding greater Columbia Basin. The greatest threat to this habitat is fire-related conversion to a cheatgrass-dominated monoculture. In order to decrease future fire risk and to disrupt the positive feedback cycle between cheatgrass and fire, land managers can make efforts to restore native vegetation following a fire. The goal of this report is to analyze vegetation recovery post-fire in both restored and unrestored areas to inform future post-fire response actions.

54 ENVIRONMENTAL SCIENCES↗

Small Hydro Power Plants with Integrated BESS for Enhance Resiliency

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a black start- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFM controlled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validating Greater Sage-Grouse Individual-based Model (IBM) Tool (Final Report)

The project focused on validating the previously developed Greater Sage-Grouse Individual-based Model (GrSG IBM; LaGory et al. 2012, 2021). The objective was to transform this predictive, spatially and temporally explicit model into a portable resource to assist siting/resource managers in proactively assessing the cumulative impacts of wind energy development on the greater sage-grouse. Utilizing a bottom-up, individual-based approach, the GrSG IBM accounts for landscape context and species behavior, aiming to reduce uncertainty in estimating development impacts and support ecologically mindful land-based wind energy development. The validation effort covered approximately 6,540 km 2 near the Seven Mile Hill Wind Project in Wyoming. The GrSG IBM tool, built on the NetLogo platform (Tisue and Wilensky 2004), was executed over a 50-year period, with the analysis focusing on years following a 10-year initialization phase. Key results demonstrated the tool’s biological soundness across five key biological metrics: non-chick age class distribution (older than 10 weeks), adult sex ratio, life expectancy, population size, and overall population growth. For instance, the tool estimated that 58.6% of the non-chick population was reproductively immature, while the reference ranges from 51.4% to 57.8% (Patterson 1952, Rogers 1964). Experts confirmed the tool’s estimate was within a reasonable range for the species. The tool estimated average life expectancy of 1.43 years, while the reference ranges from 0.9 years to 1.1 years (Ammann 1957, Hamerstrom 1949). Experts also supported the model’s life-expectancy estimate as ecologically sound for the species in the study area. In terms of population change, the model estimated an annual shift between a 0.6% decline and a 1.0% increase over 50 years. While the reference suggests 2.9% annual decline in range-wide populations (Cortes et al. 2023), that includes many at-risk populations in South Dakota and Washington, for example. Our study area—in the northeastern part of Carbon County and western-edge of Albany County, Wyoming—is one of the remaining greater sage-grouse habitats supporting some of the most stable populations. Experts confirmed that the range of the annual population change spanning from a 0.6% decline to a 1.0% increase estimated by the tool was reasonable for our study area for this reason and confirmed that aligned with population estimates from existing studies on the greater sage-grouse and wind energy development in the study area (LeBeau et al. 2017a, Smith et al. 2024). Furthermore, the project showed that temporally explicit biological metrics generated by the GrSG IBM tool can complement the USGS’ Prioritizing Restoration of Sagebrush Ecosystems Tool (PReSET; Duchardt et al. 2021) by incorporating habitat restoration strategies into seasonal habitat suitability models to visualize population responses over time.

17 WIND ENERGY↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cooperative Support of the Fermilab Site’s Natural Areas and Related Programs (CRADA Final Report)

Under the prime contract with the Department of Energy, Fermi Research Alliance, LLC (FRA) is responsible for effective stewardship of the Fermi National Accelerator Laboratory (Fermilab) 6,800-acre site, to assure that Fermilab is renewed and enhanced to meet future mission needs. As the steward of the Fermilab site, FRA is responsible for maintaining the natural areas for the site (e.g., prairie restoration sites, woodlands, etc.), which are essential for protecting the health and safety of personnel working on or visiting the site, while supporting the scientific and educational missions of Fermilab. Fermilab Natural Areas (FNA) is a not-for-profit corporation organized and existing under the laws of the State of Illinois. FNA was founded in 2006 and incorporated in 2008 for the purposes of studying, conserving, and restoring the Fermilab Site’s natural areas in a manner consistent with the science mission of Fermilab and enhancing the awareness and visibility of the natural amenities of Fermilab to neighboring communities.

54 ENVIRONMENTAL SCIENCES↗

Sulfur Poisoning and Performance Recovery of SOFC Air Electrodes

The sulfur poisoning and performance recovery of the state-of-the-art SOFC cathodes (La 0 . 80 Sr 0 . 20 ) 0 . 95 MnO 3 ± δ (LSM) and (La 0 . 60 Sr 0 . 40 ) 0 . 95 Co 0 . 20 Fe 0 . 80 O 3 – δ (LSCF), have been studied. Electrochemical impedance spectroscopy measurements of LSCF|GDC and LSM|YSZ half-cells are carried out in alternating atmospheres of air and SO 2 –air at 700°C for hundreds of hours. In the presence of SO 2 , the electrochemical performance of both the cells decays with ohmic and non-ohmic losses, owing to the absorption and chemical interaction of SO 2 with the electrodes. In LSCF, the SrO segregated on the surface tends to absorb and react with SO 2 , forming SrSO 4 followed by the exsolution of Co-Fe. As for LSM, SO 2 is absorbed onto the Sr-rich areas of LSM, including the active reaction sites near the TPBs, leading to Sr exsolution and SrSO 4 formation, leaving a Sr-deficient LSM. During the subsequent exposure to air, the performance of the sulfur-contaminated LSM is almost restored. The LSM particles, exposed to alternating atmospheres of air and SO 2 -air during the electrochemical tests, show a relatively clean surface with sparsely distributed SrSO 4 particles, indicating a high stability against sulfur poisoning. It is suggested that the loosely adsorbed SO 2 at the TPBs is readily swept away by the SO 2 -free air flow, recovering its ORR activity, whereas the Sr-deficient LSM due to Sr-exsolution stays modified, contributing to the incomplete performance restoration. Unlike the case of LSM, the performance of the sulfur-poisoned LSCF partially recovers during the subsequent exposure to air. Correspondingly, the LSCF particles have a modified morphology covered with numerous nanoparticles, mostly SrSO 4 , showing the irreversible aspect of the sulfur poisoning. The morphology modification is not concentrated near the electrode/electrolyte interface but over the entire cathode, indicating that the degree of recovery from sulfur poisoning is closely related to the presence of SrO and chemical activity of Sr in the electrodes at the solid-gas interface. These results also show the potential application of LSM for a sulfur sensor available in high-temperature harsh conditions.

25 ENERGY STORAGE↗

Prairie Strips and Lower Land Use Intensity Increase Biodiversity and Ecosystem Services

Agricultural landscapes can be managed to protect biodiversity and maintain ecosystem services. One approach to achieve this is to restore native perennial vegetation within croplands. Where rowcrops have displaced prairie, as in the US Midwest, restoration of native perennial vegetation can align with crops in so called “prairie strips.” We tested the effect of prairie strips in addition to other management practices on a variety of taxa and on a suite of ecosystem services. To do so, we worked within a 33-year-old experiment that included treatments that varied methods of agricultural management across a gradient of land use intensity. In the two lowest intensity crop management treatments, we introduced prairie strips that occupied 5% of crop area. We addressed three questions: (1) What are the effects of newly established prairie strips on the spillover of biodiversity and ecosystem services into cropland? (2) How does time since prairie strip establishment affect biodiversity and ecosystem services? (3) What are the tradeoffs and synergies among biodiversity conservation, non-provisioning ecosystem services, and provisioning ecosystem services (crop yield) across a land use intensity gradient (which includes prairie strips)? Within prairie strip treatments, where sampling effort occurred within and at increasing distance from strips, dung beetle abundance, spider abundance and richness, active carbon, decomposition, and pollination decreased with distance from prairie strips, and this effect increased between the first and second year. Across the entire land use intensity gradient, treatments with prairie strips and reduced chemical inputs had higher butterfly abundance, spider abundance, and pollination services. In addition, soil organic carbon, butterfly richness, and spider richness increased with a decrease in land use intensity. Crop yield in one treatment with prairie strips was equal to that of the highest intensity management, even while including the area taken out of production. We found no effects of strips on ant biodiversity and greenhouse gas emissions (N 2 O and CH 4 ). Our results show that, even in early establishment, prairie strips and lower land use intensity can contribute to the conservation of biodiversity and ecosystem services without a disproportionate loss of crop yield.

54 ENVIRONMENTAL SCIENCES↗

Evaluating Basin-Scale Forest Adaptation Scenarios: Wildfire, Streamflow, Biomass, and Economic Recovery Synergies and Trade-Offs

Active forest management is applied in many parts of the western United States to reduce wildfire severity, mitigate vulnerability to drought and bark beetle mortality, and more recently, to increase snow retention and late-season streamflow. A rapidly warming climate accelerates the need for these restorative treatments, but the treatment priority among forest patches varies considerably. We simulated four treatment scenarios across the 3,450 km 2 Wenatchee River basin in eastern Washington, United States. We used a decision support tool (DST) to assess trade-offs and synergies within and among treatments on wildfire risk and smoke emissions, water yield and snow retention, biomass production, and economic return. Treatment scenarios emphasized prescribed burning ( BurnOnly ), biomass production ( MaxBiomass ), gap-based thinning to optimize water yield ( IdealWater ), and a principle-based restoration scenario ( RA1 ). Fire hazard, smoke emissions, and biomass production metrics were evaluated across scenarios using the Forest Vegetation Simulator, and water yields were modeled using the Distributed Hydrology Soil Vegetation Model. Simulations were summarized to both patch- (10 1 –10 2 ha) and subwatershed- (10 3 –10 4 ha) scales, and treatment effects were evaluated against an untreated baseline landscape. We used logic models to rank effect sizes by scenario across metrics along a continuum between −1 (no or weak effect) to +1 (large effect). All treatments produced benefits across one or more ecosystem services and led to synergistic benefits to water yield and wildfire hazard reduction. Tradeoffs among resource benefits were clear in wilderness where reliance on prescribed burning without mechanical treatment increased costs and eliminated the potential for biomass recovery. The BurnOnly scenario improved fire risk metrics and streamflow, but effect sizes were lower compared to other treatments. IdealWater showed the strongest benefits overall, demonstrating the ability to capture multiple resource benefits through spatially explicit thinning. Our study provides a framework for integrating strategic and tactical models that evaluate tradeoffs and synergies gained through varied management approaches. We demonstrate the utility of decision support modeling to enhance management synergies across large landscapes.

54 ENVIRONMENTAL SCIENCES↗