Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Management of government quality assurance functions for NASA contracts

This handbook sets forth requirements for NASA direction and management of government quality assurance functions performed for NASA contracts and is applicable to all NASA installations. These requirements will standardize management to provide the minimum oversight and effective use of resources. This handbook implements Federal Acquisition Regulation (FAR) Part 46, NASA FAR Supplement 18-46, Quality Assurance, and NMI 7410.1. Achievement of established quality and reliability goals at all levels is essential to the success of NASA programs. Active participation by NASA and other agency quality assurance personnel in all phases of contract operations, including precontract activity, will assist in the economic and timely achievement of program results. This involves broad participation in design, development, procurement, inspection, testing, and preventive and corrective actions. Consequently, government, as well as industry, must place strong emphasis on the accomplishment of all functions having a significant bearing on quality and reliability from program initiation through end-use of supplies and services produced. For purposes of implementing NASA and other agency agreements, and to provide for uniformity and consistency, the terminology and definitions prescribed herein and in a future handbook shall be utilized for all NASA quality assurance delegations and subsequent redelegations.

Source record↗

Los Alamos National Laboratory Nuclear Material Management and Storage Program: Storage Health Metrics

The Strategic Materials Sustainment Program (SMSP) supports activities needed to manage the National Nuclear Security Administration’s (NNSA) inventory of strategic materials. As part of the SMSP, the Nuclear Material Management and Storage (NMM&S) program at the Los Alamos National Laboratory (LANL) is responsible for: (1) safe and secure storage of the SMSP strategic materials and others, (2) analysis, forecasting, and management of accountable nuclear materials; and (3) disposition of nuclear material through the Office of Nuclear Materials Integration (ONMI). The nuclear material management (NMM) mission is to ensure efficient nuclear material management lifecycle activities at LANL. The storage program function includes the management of storage capabilities across the site, supply chain management of nuclear materials, storage requirements integration, and nuclear container management (i.e., procurement, compliance, and safety). This report identifies key performance indicators (KPI) and describes the criteria and metrics used to assess the health of the storage component of the NMM&S program. “Health” is the ability of a process, system, facility, or program to safely and reliably accomplish its required mission. A health assessment provides timely identification of significant risks to enable mission performance. Significant risks identified are most effectively mitigated, avoided, or eliminated by evaluating and coordinating with stakeholders to specifically target, document, and often proceduralize strategies directed towards risk reduction. An effective health assessment involves status measurements of specific metrics that are tied directly to representative KPIs for a program. This document will baseline the KPI, criteria, and specific metrics that will be used to measure the “health” of the LANL Storage Program (i.e., NMM is not included).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Crew interface specification development study for in-flight maintenance and stowage functions

The need and potential solutions for an orderly systems engineering approach to the definition, management and documentation requirements for in-flight maintenance, assembly, servicing, and stowage process activities of the flight crews of future spacecraft were investigated. These processes were analyzed and described using a new technique (mass/function flow diagramming), developed during the study, to give visibility to crew functions and supporting requirements, including data products. This technique is usable by NASA for specification baselines and can assist the designer in identifying both upper and lower level requirements associated with these processes. These diagrams provide increased visibility into the relationships between functions and related equipments being utilized and managed and can serve as a common communicating vehicle between the designer, program management, and the operational planner. The information and data product requirements to support the above processes were identified along with optimum formats and contents of these products. The resulting data product concepts are presented to support these in-flight maintenance and stowage processes.

Carl, J. G.↗

Examining the effectiveness of municipal solid waste management systems: An integrated cost-benefit analysis perspective with a financial cost modeling in Taiwan

In order to develop a sound material-cycle society, cost-effective municipal solid waste (MSW) management systems are required for the municipalities in the context of the integrated accounting system for MSW management. Firstly, this paper attempts to establish an integrated cost-benefit analysis (CBA) framework for evaluating the effectiveness of MSW management systems. In this paper, detailed cost/benefit items due to waste problems are particularly clarified. The stakeholders of MSW management systems, including the decision-makers of the municipalities and the citizens, are expected to reconsider the waste problems in depth and thus take wise actions with the aid of the proposed CBA framework. Secondly, focusing on the financial cost, this study develops a generalized methodology to evaluate the financial cost-effectiveness of MSW management systems, simultaneously considering the treatment technological levels and policy effects. The impacts of the influencing factors on the annual total and average financial MSW operation and maintenance (O and M) costs are analyzed in the Taiwanese case study with a demonstrative short-term future projection of the financial costs under scenario analysis. The established methodology would contribute to the evaluation of the current policy measures and to the modification of the policy design for the municipalities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The technology application process as applied to a firefighter's breathing system

The FBS Program indicated that applications of advanced technology can result in an improved FBS that will satisfy the requirements defined by municipal fire departments. To accomplish this technology transfer, a substantial commitment of resources over an extended period of time has been required. This program has indicated that the ability of NASA in terms of program management such as requirement definition, system analysis, and industry coordination may play as important a role as specific sources of hardware technology. As a result of the FBS program, a sequence of milestones was passed that may have applications as generalized milestones and objectives for any technical application program.

Mclaughlan, P. B.↗

Responsible AI Framework for Air Traffic Management

Future system will require increased levels of automation to address increased diversity, density, environmental considerations resulting in higher complexity. Will automation be able to manage off-nominal, non-normal, unexpected, contingency situations?

artificial intelligence↗

Responsible AI Framework for Air Traffic Management

Future system will require increased levels of automation to address increased diversity, density, environmental considerations resulting in higher complexity. Will automation be able to manage off-nominal, non-normal, unexpected, contingency situations?

artificial intelligence↗

Security-Enhanced Autonomous Network Management

Ensuring reliable communication in next-generation space networks requires a novel network management system to support greater levels of autonomy and greater awareness of the environment and assets. Intelligent Automation, Inc., has developed a security-enhanced autonomous network management (SEANM) approach for space networks through cross-layer negotiation and network monitoring, analysis, and adaptation. The underlying technology is bundle-based delay/disruption-tolerant networking (DTN). The SEANM scheme allows a system to adaptively reconfigure its network elements based on awareness of network conditions, policies, and mission requirements. Although SEANM is generically applicable to any radio network, for validation purposes it has been prototyped and evaluated on two specific networks: a commercial off-the-shelf hardware test-bed using Institute of Electrical Engineers (IEEE) 802.11 Wi-Fi devices and a military hardware test-bed using AN/PRC-154 Rifleman Radio platforms. Testing has demonstrated that SEANM provides autonomous network management resulting in reliable communications in delay/disruptive-prone environments.

Zeng, Hui↗

Unreviewed Disposal Question Evaluation: Disposal of the Idaho Nuclear Technology and Engineering Center Mixed Low-Level Waste Requiring Macroencapsulation at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the Idaho National Laboratory (INL), Idaho Nuclear Technology and Engineering Center (INTEC) Mixed Low-Level Waste (MLLW) requiring macroencapsulation (INEL166322NR1, Revision 0 [INL 2019]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the INTEC MLLW requiring macroencapsulation waste stream meets all the performance objectives contained in U.S. Department of Energy (DOE) Manual DOE M 435.1-1, “Radioactive Waste Management Manual,” Chapter IV, Section P (DOE 2011). The INTEC MLLW requiring macroencapsulation waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SWIM: A Switch Manager for Datacenter Networks

As modern datacenter networks (DCNs) grow to support hundreds of thousands of servers and beyond, managing network equipment - such as routers, firewalls, and load balancers - becomes increasingly complex. Network attributes such as IP address allocations and BGP neighbor relations are scattered among various network engineering groups, which makes troubleshooting the network a cumbersome task. In addition, network vendor diversity leads to an explosion of vendor-specific management systems or single-use automation scripts, limiting network scalability while increasing the time required to perform management tasks. In this article, the authors propose a unified network management system, Switch Manager (SWIM), to cope with the growth by standardizing the language for describing network attributes and unifying the interface for executing management actions on the network equipment.

97 MATHEMATICS AND COMPUTING↗

Collaborative Systems Engineering in the Ascent Abort-2 Crew Module/Separation Ring Project

Generally speaking, systems engineering (SE) tool-sets face a dilemma balancing power and accessibility. High-powered SE tools (MagicDraw, Cradle, Core, etc.) tend to be specialized and are available only to highly trained Systems Engineers, and/or through the use of a 'back room' developer team making the output products available to the broader team. On the other hand, highly accessible tools (MS Word, Excel, etc.) do not have the power to implement SE in a rigorous manner. NASA has to test all aspects of the new human-rated Orion Multi-Purpose Crew Vehicle spacecraft prior to its first crewed mission. The test program includes uncrewed launch abort flight tests to demonstrate the capability to save the crew in the event that a launch failure occurs. Orion's second abort flight test will be a low-altitude flight test known as "Ascent Abort 2 (AA-2)." This test is currently scheduled to be carried out at Cape Canaveral Air Force Station's Space Launch Complex 46 (SLC-46) in Florida in 2019. NASA's in-house AA-2 Crew Module and Separation Ring (CSR) Team is producing the crew module and separation ring. Operating jointly as both an Advanced Exploration Systems (AES) Project and an Orion Project, the CSR project charter includes development of innovative, streamlined and generally more efficient practices for creation of flight hardware and software. One result of this tasking has been development of a collaborative and data-centric systems engineering environment within the team's shared web environment (Microsoft SharePoint). Through the use of built-in, 'out of the box capabilities' present in MS SharePoint, the CSR Systems Engineering team has created (with some limited developer support) a data-centric architecture for the project's SE implementation, including functional and interface analysis, requirements development and management, risk management, verification planning and management, test results, and end item management. Data elements are linked between data structures so as to define and control relationships between item types, link requirements to parents and children, and link tests to the requirements that they verify. The overall project team integration is increased by also linking SE content to project management content over the project life cycle, including team communication, action items, configuration management, decisional and meeting materials, and life cycle reviews. This presentation will provide an overview of the collaborative SE environment, showing how it provides the power for a number of SE tasks while still providing the accessibility and transparency to allow the full project team to collaborate and succeed. Given the project phase, we'll be able to present a nearly full lifecycle discussion, from concept through verification and approaching delivery.

Systems Engineering environments↗

Requirement Metrics for Risk Identification

The Software Assurance Technology Center (SATC) is part of the Office of Mission Assurance of the Goddard Space Flight Center (GSFC). The SATC's mission is to assist National Aeronautics and Space Administration (NASA) projects to improve the quality of software which they acquire or develop. The SATC's efforts are currently focused on the development and use of metric methodologies and tools that identify and assess risks associated with software performance and scheduled delivery. This starts at the requirements phase, where the SATC, in conjunction with software projects at GSFC and other NASA centers is working to identify tools and metric methodologies to assist project managers in identifying and mitigating risks. This paper discusses requirement metrics currently being used at NASA in a collaborative effort between the SATC and the Quality Assurance Office at GSFC to utilize the information available through the application of requirements management tools.

Hammer, Theodore↗

Driving Next-Generation Workflows from the Data Plane

We observe the emergence of a new generation of scientific workflows that process data produced at a sustained rate by scientific instruments and large scale numerical simulations. This data is consumed by multiple analysis, visualization, or Machine Learning components not only to enable inference and justify the scientific program, but also to monitor and steer the evolution of these experiments. In such workflows, moving intermediate data efficiently is key to performance, more than efficiently scheduling computational tasks. However, most traditional workflow management systems focus on optimizing task scheduling and then deal with data management, assuming a “move little, compute for long” model, which makes them unfit to the efficient management of this new generation of workflows. Therefore, we advocate for a new way to manage scientific workflows. We propose to consider an efficiently and independently managed data plane that can store and stream data. Workflows compute components, in the application plane can then interact with the data plane, abstracted from complexities of data management. Then, the role of a workflow management system would become that of a control plane that allows users to connect services together to execute the workflow and manages connections between the application and data planes. In this position paper, we characterize several next-generation workflow motifs and describe how their interaction with the data plane is a challenge to traditional workflow management systems. Then, we express a set of requirements that a workflow management system should meet to efficiently manage next-generation workflows at different scales. Based on these requirements, we expose our vision of driving next-generation workflows from the data plane and list remaining open challenges.

Suter, Fred↗

Army Energy and Water Reporting System Assessment

There are many areas of desired improvement for the Army Energy and Water Reporting System. The purpose of system is to serve as a data repository for collecting information from energy managers, which is then compiled into an annual energy report. This document summarizes reported shortcomings of the system and provides several alternative approaches for improving application usability and adding functionality. The U.S. Army has been using Army Energy and Water Reporting System (AEWRS) for many years to collect and compile energy data from installations for facilitating compliance with Federal and Department of Defense energy management program reporting requirements. In this analysis, staff from Pacific Northwest National Laboratory found that substantial opportunities exist to expand AEWRS functions to better assist the Army to effectively manage energy programs. Army leadership must decide if it wants to invest in expanding AEWRS capabilities as a web-based, enterprise-wide tool for improving the Army Energy and Water Management Program or simply maintaining a bottom-up reporting tool. This report looks at both improving system functionality from an operational perspective and increasing user-friendliness, but also as a tool for potential improvements to increase program effectiveness. The authors of this report recommend focusing on making the system easier for energy managers to input accurate data as the top priority for improving AEWRS. The next major focus of improvement would be improved reporting. The AEWRS user interface is dated and not user friendly, and a new system is recommended. While there are relatively minor improvements that could be made to the existing system to make it easier to use, significant improvements will be achieved with a user-friendly interface, new architecture, and a design that permits scalability and reliability. An expanded data set would naturally have need of additional requirements gathering and a focus on integrating with other existing data sources, thus minimizing manually entered data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

National Renewable Energy Laboratory Wildland Fire Management Plan (August 2022-August 2025): February-August 2022

The National Renewable Energy Laboratory (NREL) is located in a moderate wildfire risk region. The region has a history of damaging wildland fire activity and is also susceptible to changing environmental conditions (drought, elevated temperatures) that may lead to an increase in wildfire frequency and consequence over time. An integrated, site-wide wildland fire management plan is required by the Department of Energy and is to be consistent with the Federal Wildland Fire Management Policy. The NREL Wildland Fire Management Plan (WFMP) provides an integrated approach to reducing risk to wildland fire at NREL. The goals of the WFMP are to protect human health and safety, protect NREL facilities and research, enhance community protection, diminish risk and consequences of wildland fires, and maintain the health of the ecosystem. The WFMP accomplishes these goals through the use of tools such as fire behavior modeling, fire growth modeling, a structure ignition risk assessment, and through the application of robust fire prevention, emergency management, and environmental programs. The NREL WFMP was developed in a collaborative manner with input from regional stakeholders including cities, counties, local fire departments, and other governmental agencies. The WFMP provides for recommendations to reduce overall wildland fire risk to life safety and property at NREL.

54 ENVIRONMENTAL SCIENCES↗

F-8 digital fly-by-wire flight test results viewed from an active controls perspective

The results of the NASA F-8 digital fly-by-wire flight test program are presented, along with the implications for active controls applications. The closed loop performance of the digital control system agreed well with the sampled-data system design predictions. The digital fly-by-wire mechanization also met pilot flying qualities requirements. The advantages of mechanizing the control laws in software became apparent during the flight program and were realized without sacrificing overall system reliability. This required strict software management. The F-8 flight test results are shown to be encouraging in light of the requirements that must be met by control systems for flight-critical active controls applications.

Zalai, K. J.↗