Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Reporting Verification of BOP Shear Ram Capability: Requirements and Good Practices on Reporting Blowout Preventer (BOP) Shear Ram Capability for Outer Continental Shelf (OCS) Oil and Gas Operations

The Bureau of Safety and Environmental Enforcement (BSEE) Well Control Rule (Subpart G)1 became effective on July 28, 2016. This rule is part of the BSEE regulations pertaining to well control equipment used for oil and gas operations on the U.S. Outer Continental Shelf (OCS). More recently BSEE issue a proposed rule to amend portions of the 2016 well control rule. This proposed rule (now implemented) appeared in the Federal Register on May 18, 2018. This report was prepared late in the public comment period for the current rule and intended is a sample of desirable documentation of blind shear ram shear testing and associated regulatory requirements either in place or anticipated at the time of preparation. In accordance with this original rule and the proposed revisions, BSEE requests specific information regarding the capabilities of blind shear rams (BSR) in the Blowout Preventer (BOP). This information is required prior to beginning any operation involving the use of any BOP. More specifically, Title 30 CFR 250.732(b) of these regulations requires documentation of shear testing demonstrating the shearing and sealing capabilities of the BOP BSR. Such documentation is consistent with and complementary to other documentation verifying the designs of individual well control components and the overall BOP system. Verification demonstrates performance and reliability of the equipment based on a testing process that is repeatable and reproducible.2 This document, an annotated outline of verification documentation, arises from the combination of regulations and good practices concerning how to report BOP shear ram tests and third-party verification of BSR capability to support BSEE’s regulatory role.

03 NATURAL GAS↗

Nuclear Physics Network Requirements Review Report

The Energy Sciences Network (ESnet) is the Office of Science’s high-performance network user facility, delivering highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the U.S. Department of Energy (DOE) science mission by connecting each and every DOE lab and its user facilities. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) Program, and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education networking community. ESnet connects DOE national laboratories, user facilities, and major experiments so scientists can use remote instruments and computing resources as well as share data with collaborators, transfer large data sets, and access distributed data repositories. While ESnet provides network connectivity, it cannot be characterized as an internet service provider as it is specifically built to provide a range of network services that are tailored to meet the unique requirements of DOE’s data-intensive science. In short, ESnet’s mission is to enable and accelerate scientific discovery by delivering unparalleled network infrastructure, capabilities, and tools. ESnet’s vision is summarized by these three points. 1. Scientific progress will be completely unconstrained by the physical location of instruments, people, computational resources, or data. 2. Collaborations at every scale, in every domain, will have the information and tools they need to achieve maximum benefit from scientific facilities, global networks, and emerging network capabilities. 3. ESnet will foster the partnerships and pioneer the technologies necessary to ensure that these transformations occur. In May 2019, ESnet and the Office of Nuclear Physics (NP) of the DOE Office of Science organized an ESnet requirements review of NP-supported activities. Preparation for this event included identification of key stakeholders to the process: program and facility management, research groups, technology providers, and a number of external observers. These individuals were asked to prepare formal case study documents about their relationship to the NP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward. A series of pre-planning meetings better prepared case study authors for this task and facilitated a smooth transition to the in-person review.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Symmetry requirements for double shell capsules with aluminum ablators

Double shell targets present a promising avenue to obtain robust neutron yield on current laser facilities. The nature of the target, like current single shell designs, requires a symmetric implosion of an outer ablator to obtain a symmetric fuel volume that will lead to alpha heating and thermonuclear burn. Due to using aluminum as an ablator material and requiring different convergence than single shell symmetry studies at various energies are required. This paper moves forward from previous experiments conducted at 1MJ to show implosion symmetry at 1.25 and 1.5MJ. Symmetry in these experiments is sufficient to merit experiments using double shells to study the platform further. Additional studies are carried out on the outer shell symmetry impacts, showing that mitigating mode growth on the outer ablator is of great importance.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; 40 CFR Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247 and 173-480 were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL-Richland Campus) and in Sequim, Washington, (PNNL-Sequim Campus, which formerly was known as the Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2021 for calendar year ending 2020.

40 CFR 61 Subpart H↗

An Analysis of PNM's Renewable Reserve Requirements to Meet New Mexico's Decarbonization Goals

Over the next three years, the Public Service Company of New Mexico (PNM) plans to increase utility-scale solar photovoltaic (PV) capacity from today’s roughly 330MW to about 1600MW. This massive increase in variable generation—from about 15% to 75% of peak load—will require changes in how PNM operates their system. We characterize the 5 and 30-minute solar and wind forecast errors that the system is likely to experience in order to determine the level of reserves needed to counteract such events. Our focus in this study is on negative forecast error (in other words, shortfalls relative to forecast) – whereas excess variable generation can be curtailed if needed, a shortfall must be compensated for to avoid loss of load. Calculating forecast error requires the use of the same forecasting methods that PNM uses or a reasonable approximation thereof. For wind, we use a persistence forecast on actual 5-minute 2019 wind output data (scaled up to reflect the amount of wind capacity planned for 2025). For solar, we use a formula incorporating the clear sky index (CSI) for the forecast. As the solar on the grid now is a small fraction of what is planned for 2025, we generated 5-minute solar data using 2019 weather inputs. We find that to handle 99.9% of the 5-minute negative forecast errors, a maximum of 275MW of variable generation reserve during daylight hours, and a maximum of 75MW during non-daylight hours, should be sufficient. Note that this variable generation reserve is an additional reserve category that specifies reserves over and above what are currently carried for contingency reserve. This would require a significant increase in reserve relative to what PNM currently carries or can call upon from other utilities per reserve sharing agreements. This variable generation reserve specification may overestimate the actual level needed to deal with PNM’s planned variable generation in 2025. The forecasting methodologies used in this study likely underperform PNM’s forecasting – and better forecasting allows for less reserve. To obtain more precise estimates, it is necessary to consider load and use the same forecasting inputs and methods used by PNM.

14 SOLAR ENERGY↗

VERAIn Software Requirements, Test Plan, and Test Report

This document describes the software test plan for VERAIn and provides appendices for the software requirements and software test report. In this document, the test platform hardware and software are described. Appendix A provides a list of the tests run and their acceptability as a test report, and Appendix B provides the list of low-level software requirements as a requirements traceability matrix.

97 MATHEMATICS AND COMPUTING↗

MPACT Software Test Plan, Requirements, and Test Report (V.4.3)

This document presents the software test plan for MPACT. The software requirements and software test report are provided in the appendices. The test platform hardware and software are described herein. Appendix A provides a list of the tests that were run and their acceptability as a test report. Appendix B provides the list of low-level software requirements as a requirements traceability matrix.

97 MATHEMATICS AND COMPUTING↗

Requirements and Recommendations for a Physical Attack Characterization Framework

This study seeks to identify existing frameworks or develop requirements and recommendations for a new framework that can consistently characterize physical attacks, analogous to MITRE ATT&CK®. MITRE ATT&CK is widely used across government, research organizations, and the cyber security community to characterize cyber attack tactics, techniques, and procedures (TTPs) in a consistent and commonly understood manner. While physical attack taxonomies, methodologies, and other tools for evaluating physical security do exist, many are sector and/or facility-type specific—and therefore not able to provide comparable scenarios across sectors—or are more focused on security assessment instead of the characterization of attacks themselves. A MITRE ATT&CK analog for physical attacks on critical infrastructure would provide a common language and structure for analysis of physical attacks. Existing attack characterization methodologies do not robustly address cyber-physical security risks. To fully understand a facility’s security needs, it is important to understand the entire vulnerability landscape from both a physical and a cyber perspective. To underscore this need, organizations such as the Cybersecurity and Infrastructure Security Agency (CISA) are calling for a coordinated approach to cyber and physical security, which they refer to as cyber and physical security convergence. A physical attack characterization framework that could be used jointly with MITRE ATT&CK would help support a more robust analysis in support of convergence, enabling the consistent characterization of attacks that utilize both cyber and physical tactics and techniques. This could provide analysts and stakeholders with a clearer understanding of how security mitigations deployed in the physical realm impact security risks in the cyber realm, and vice versa. In this study, the project team evaluates existing physical security taxonomies and methodologies to assess whether an existing method can be used to create a “physical half” of MITRE ATT&CK. This study then provides requirements and recommendations for a framework that can leverage aspects of existing methodologies. The goal of the final framework is for it to be widely adopted and referenced, regardless of critical infrastructure sector, facility type, or facility components. This study also identifies applicable use cases for when and how a framework could be applied across the various critical infrastructure sectors for a variety of attack types or motivations. Through a literature review of existing security-focused methodologies and taxonomies, engagement with relative stakeholders, evaluation of potential physical attack framework use cases, and subsequent identification of requirements, this study identified the following key findings and recommendations: There is a need for a new physical attack characterization framework; A physical attack framework should be interoperable with the MITRE ATT&CK framework; A physical attack framework should be broadly applicable, but with detailed tactics, techniques, and procedures that encompass the entire attack path; A physical attack framework should be based on observed or feasible events; A physical attack framework should adapt features from existing methodologies, frameworks, and taxonomies; A physical attack framework should be owned, overseen, and maintained by one organization.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)

This document specifies test stand requirements for testing the High Luminosity LHC (HL-LHC, or HiLumi LHC) MQXFA magnets and LQXFA/B cryostat assemblies. Total of 12 (3 pre-series, 7 series production and 2 re-work) of these cryostat assemblies are expected to be fabricated and delivered to CERN by the U.S. HL-LHC Accelerator Upgrade Project (US HL-LHC AUP) as part of the U.S. contributions to the LHC High Luminosity Upgrade. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 (LQXFA) and Q3 (LQXFB) inner triplet optical elements in front of the interactions points 1 (ATLAS) and 5 (CMS). One LMQXFA cold mass is installed in each cryostat assembly and each cold mass consists of two MQXFA quadrupole magnets. MQXFA, LMQXFA and LQXFA/B functional requirements are specified in [1,2,3].MQXFA magnets will be tested at BNL Vertical Magnet Test Facility (VMTF) and 12 cryostat assembly tests planned at Fermilab’s Horizontal Magnet Test Facility (HMTF). This document specifies the test stand functional requirements for testing MQXFA magnets and LQXFA/B cryostat assemblies.

43 PARTICLE ACCELERATORS↗

Grid Resilience Plans: State Requirements, Utility Practices, and Utility Plan Template

As of June 2024, 14 states and one city require jurisdictional electric utilities to file resilience plans. Drawing on these requirements and filed plans, this report offers a standard template that states and utilities can consider to improve utility filings for grid resilience plans, either as part of a distribution system plan or as a separate filing. Key elements include a vulnerability assessment, description of proposed resilience programs, and projected costs and rate impacts. While many of these requirements and plans focus on extreme weather hazards, the template also can be used to address additional threats, including cyber and physical attacks and seismic events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H↗

A Road Map to Determine Chemical Phenomenology Required for Molten Salt Reactor Accident Modeling

The differences between molten salt reactors (MSRs) and light water reactors (LWRs) has required modification of previous approaches to model reactor accident progression. Part of this is related to the different chemical phenomenology of these reactors as their fuel is not as contained and can react with their surroundings. MELCOR is a reactor simulation tool that has implemented methods and models to model MSRs. However, additional development of MELCOR for modeling MSRs is required. Although understanding the chemistry surrounding MSRs is important to general MSR licensing and operation, only a subset of reactions and phenomenology are required to model beyond design basis incidents and therefore to be captured by MELCOR. This report is intended to guide the chemical phenomenology to improve MELCOR MSR accident modeling and discusses phenomenology models that are in development.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Review of Technical Requirements for Inverter-Based Resources in Chile

This document compares the technical requirements in the grid code of Chile (NTSyCS) against the EirGrid (Ireland transmission system operator) and National Grid Electricity System Operator (NESO) grid codes and the Institute of Electrical and Electronics Engineers (IEEE) 2800-2022 standard for conventional inverter technology at the transmission and subtransmission levels in the process of being adopted by system operators in the U.S. The document is intended to be a guide and reference for future updates of the NTSyCS, considering the local system requirements and present improvements in inverter-based resource (IBR) technology. In light of the findings of the aforementioned comparative review, this document proposes and describes the requirements for conventional IBRs that could be incorporated and updated into the Chilean grid code. The document is structured around the main grid challenges posed by the transition to an IBR-dominated grid and conventional IBRs capabilities to help address them. This document does not provide guidance on how this specification should be implemented (e.g., through a mandate or market solution).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fast Molecular Cloud Destruction Requires Fast Cloud Formation

A large fraction of the gas in the Galaxy is cold, dense, and molecular. If all this gas collapsed under the influence of gravity and formed stars in a local free-fall time, the star formation rate in the Galaxy would exceed that observed by more than an order of magnitude. Other star-forming galaxies behave similarly. Yet, observations and simulations both suggest that the molecular gas is indeed gravitationally collapsing, albeit hierarchically. Prompt stellar feedback offers a potential solution to the low observed star formation rate if it quickly disrupts star-forming clouds during gravitational collapse. However, this requires that molecular clouds must be short-lived objects, raising the question of how so much gas can be observed in the molecular phase. This can occur only if molecular clouds form as quickly as they are destroyed, maintaining a global equilibrium fraction of dense gas. We therefore examine cloud formation timescales. We first demonstrate that supernova and superbubble sweeping cannot produce dense gas at the rate required to match the cloud destruction rate. On the other hand, Toomre gravitational instability can reach the required production rate. We thus argue that, although dense, star-forming gas may last only around a single global free-fall time; the dense gas in star-forming galaxies can globally exist in a state of dynamic equilibrium between formation by gravitational instability and disruption by stellar feedback. At redshift z ≳ 2, the Toomre instability timescale decreases, resulting in a prediction of higher molecular gas fractions at early times, in agreement with the observations.

79 ASTRONOMY AND ASTROPHYSICS↗

Refinement of Pitting Factor Basis to Evaluate Minimum Nitrite Requirement in Dilute Waste Chemistries

Considering that chloride concentrations are an order of magnitude lower at SRS than the maximum chloride previously tested to evaluate pitting susceptibility of carbon steel, it has been proposed that the Pitting Factor methodology be refined to determine if a reduction in the minimum nitrite requirement is warranted in more dilute solutions and those with chloride concentrations more indicative of waste tank chemistries at SRS. Through the use of cyclic potentiodynamic polarization, the susceptibility of A537 carbon steel to pitting corrosion was evaluated. The Pitting Factor was shown to accurately predict pitting susceptibility throughout the chemistry envelope evaluated. In addition, it was shown that nitrite is not required for inhibition of pitting corrosion in tank conditions with chloride concentrations observed at SRS and up to 4 M nitrate. Based upon these findings, new control limits were proposed that removed the minimum nitrite requirement within the chemistry envelope evaluated up to 50 °C.

36 MATERIALS SCIENCE↗

Flux Sensor Measurement and Calibration Requirements for High-Intensity Heat Flux Applications: A Trade Study

Stakeholders of CSP and non-CSP high-intensity broadband flux measurements were surveyed and interviewed to obtain flux sensor design and calibration requirements. Existing sensor technologies and existing calibration facilities were then compared against this standard. Stakeholders require a flux sensor designed for >5,000 kW/m2 flux measurements, >1,000 life cycles, <500 ms response time, >60-minute exposure at maximum flux, and <5% measurement uncertainty. Stakeholders also require a sensor with minimal cost, short procurement lead time, and a high-intensity broadband flux calibration. Commercial CSP stakeholders primarily rely on infrared (IR) temperature measurements of receiver equipment to control CSP plant process operation, whereas CSP research and development (R&D) and non-CSP stakeholders rely on accurate flux gauge measurements for a variety of applications. It was determined that existing flux sensor technologies and calibration facilities do not comprehensively meet stakeholder needs. This study suggests a more robust circular foil gauge with a high-intensity solar flux calibration comprehensively meets stakeholder flux measurement needs. Improved circular foil gauge designs and an improved flux sensor calibration facility are discussed.

McLaughlin, Luke (ORCID:0000000303711310)↗

LSE-61: Rubin Observatory Data Management System (DMS) Requirements

This document contains the top-level requirements for the Data Management subsystem of the LSST, when combined with the Data Management-related requirements in the LSST System Requirements (LSR, LSE-29) and Observatory System Specifications (OSS, LSE-30).

79 ASTRONOMY AND ASTROPHYSICS↗

Solar permitting, inspection, and interconnection cycletimes and requirements

Twenty three small-to-large residential, commercial, and industrial PV installers submitted project-level data for analysis, which included timestamps for major components of the permitting, inspection, and interconnection process as well as contract and installation dates. NREL calculated median timelines for these processes across the authorities having jurisdiction (AHJs) and utilities represented in the data. Also included are relevant permitting requirements for AHJs and interconnection process requirements for utilities. This dataset represents the underlying results shown in the Solar Time-based Residential Analytics and Cycle time Estimator (SolarTRACE) viewer. This dataset has been reviewed but errors may exist, and it may not be comprehensive. Errors in the sources (e.g., AHJ permitting requirements lists from data partners) may be duplicated in the dataset.

14 SOLAR ENERGY↗