Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Power, Optimization, Waste Estimating, Resourcing Tool

Planning, Optimization, Waste Estimating, Resourcing tool (POWERtool) is a comprehensive relational database software tool that can be used to develop and organize a detailed project scope, plan work tasks, develop bottoms-up field cost and waste estimates for facility Deactivation and Decommissioning (D&D), equipment, and environmental restoration (ER) projects and produces resource-loaded schedules.

Nelson, Jerel↗

Study on Evaluation of Project Management Data for Decommissioning of Uranium Refining and Conversion Plant - 12234

Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management data such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered. Establishment of the calculation formula for dismantling of each kind of equipment makes it possible to evaluate manpower for dismantling the whole facility. However, it is not easy to prepare calculation formula for all kinds of equipment that exist in the facility. Therefore, a simpler evaluation method was considered to calculate manpower based on facility characteristics. The results showed promise for evaluating dismantling manpower with respect to each chemical process. For dismantling of contaminated equipment, a GH has been used for protection of the spread of contamination. The use of a GH increases manpower for installation and removal of GH etc. Moreover, structural materials of the GH such as plastic sheets, adhesive tape become a burnable secondary waste. To create an effective dismantling plan, it is necessary to carefully consider use of a GH preliminarily. Thus, an evaluation method of project management data such as manpower and secondary waste generation was considered. The results showed promise for evaluating project management data of GH by using established calculation formula. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY↗

Pathways Toward Electric Mobility: Communities LEAP in Hennepin County, Minnesota

This report presents the findings from a comprehensive community engagement initiative focused on advancing equitable transportation electrification in Hennepin County. This initiative responds to the critical need for inclusive and sustainable mobility solutions in the face of rising environmental and financial challenges in the transportation sector. This project has two goals. First, to learn what each community's priorities are and share them with the city, county, and state government to inform transportation plans and projects. Second, to bridge divides between government and community, building pathways for community-guided decision making on future transportation plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pathways Toward Electric Mobility in Hennepin County, Minnesota

This fact sheet presents the findings from a comprehensive community engagement initiative focused on advancing equitable transportation electrification in Hennepin County. This initiative responds to the critical need for inclusive and sustainable mobility solutions in the face of rising environmental and financial challenges in the transportation sector. This project has two goals. First, to learn what each community's priorities are and share them with the city, county, and state government to inform transportation plans and projects. Second, to bridge divides between government and community, building pathways for community-guided decision making on future transportation plans.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Resource Management in the Microgravity Science Division

In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.

Casselle, Justine↗

Stormwater Pollution Prevention Plan (SWPPP) for Site Wide Landscaping Project

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the SNL/CA Site Landscaping Project at Sandia National Laboratories/California (SNL/CA), 7011 East Avenue, Livermore, California (SNL/CA). The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia (NTESS), LLC. The project proposes landscape improvements throughout SNL/CA. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stepping into the Midwest Bioeconomy: Stakeholder Engagement and Geospatial Tools to Assist in Perennial Bioenergy Crop Decision Making and Entrepreneurship

This project, “Ecosystem Services and Farm Entrepreneurship Technical Assistance,” was a three-year project originally planned for FY22–FY24. Due to a late start and a few extensions, it is being completed in early FY25. This project explored opportunities to support the deployment of a bioeconomy with a circular, more sustainable supply chain. Using a tool developed by Argonne to identify agricultural areas suitable for use in the bioeconomy, we sought to create opportunities in the bioeconomy as biomass producers, bioenergy users, and environmental entrepreneurs. We proposed to focus at the beginning on enhancing the tool’s capabilities, while engaging with key stakeholders to improve and expand the tool’s functionality for all potential stakeholders in the bioeconomy. We believe that expanding our tools and technologies, coupled with conversations in agricultural spaces, will be needed as we continue to explore how best to offer farmers whole-of supply-chain opportunities to participate in the bioeconomy. Through this project we have continued to gain a better understanding of the ways in which farmers, landowners, bioenergy users, and environmental entrepreneurs may approach the bioeconomy. In addition, as we improve our analytic toolkit, we can continue to refine our communication and the ways in which we can valuate the bioeconomy. Refining these tools allows us to dive deeper into conversations around plausible policies and drivers for future bioeconomy investment and engagement by stakeholders. By working with farmers and agricultural landowners to enable a sustainable bioeconomy business model, enhance their energy options, and recover resources from their waste streams, this project directly responds to the Bioenergy Technology Office’s (BETO) priorities of building a resilient energy economy. It addresses BETO’s focus on fostering the development and adoption of energy technologies that enable the conversion of waste to energy, efficient land use, and robust job creation. By establishing a technical assistance program that develops capabilities and practices in agricultural areas to implement a bioeconomy future, this program will develop an important linkage between technology being developed at U.S. Department of Energy national laboratories and the agricultural communities of the Midwest. This project focuses on farmers with lower productivity farmland. Because less productive lands create a more difficult revenue stream for conventional crops, these farmers may therefore be more open to alternative agricultural land management regimes. Consequently, the technical assistance program and the methodologies for targeting perennial bioenergy crop application on marginal land provide a distinct opportunity to engage with and invest in the bioeconomy in these economically stressed areas. Stakeholders in this project include farmers and landowners, local conservation organizations (NRCS, SWCS, etc.), universities, non-profit environmental and agricultural entities, farm consultants, environmental regulators, and industry, including the industries working on conversion technologies, anaerobic digestion, pyrolysis, and biochar generation, and the companies interested in trading or purchasing/supporting the valuation of ecosystem services (ES).

09 BIOMASS FUELS↗

Design of a lunar transportation system

The development of a good transportation infrastructure is a major requirement for the establishment of a permanent lunar base. Transportation is characterized by the technology available in a specific time frame and the need to transport personnel and cargo between Earth and Moon, and between lunar bases. In our study, attention was first focused on developing a transportation system for the first generation lunar base. As a first step, a tracked-type multipurpose lunar transportation vehicle was considered as a possible mode of transportation and a detailed study was conducted on the various aspects of the vehicle. Since the vehicle is composed of many moving parts, exposing it to the environment of the Moon, where fine dust particles are prevalent, can cause problems associated with lubrication and friction. The vehicle also posed problems concerning weight and power. Hence, several modifications were made to the above design ideas conceptually, and a Lunar Articulated Remote Transportation System (Lunar ARTS) is proposed as a more effective alternative with the following objectives: (1) minimizing the transportation of construction material and fuel from Earth or maximizing the use of the lunar material; (2) use of novel materials and light-weight structures; (3) use of new manufacturing methods and technology such as magnetic levitation using superconducting materials; and (4) innovative concepts of effectively utilizing the exotic lunar conditions, i.e., high thermal gradients, lack of atmosphere, lower gravity, etc. To achieve the above objectives of designing transportation systems from concept to operation, the project was planned in three phases: (1) conceptual design; (2) detailed analysis and synthesis; and (3) construction, testing, evaluation, and operation. In this project, both phases 1 and 2 have been carried out and work on phase 3 is in progress. In this paper, the details of the Lunar ARTS are discussed and the future work on the vehicle are also outlined.

Sankaravelu, A.↗

High-Fidelity Solar Irradiance Data: Simple Access to State-of-the-Art Information Accelerates Southeast Asia's Clean Energy Economic Transformation

High quality, robust, and reliable renewable energy resource data is foundational to climate-smart decision making, evidence-based policy planning, and clean energy investment mobilization. USAID and NREL, through the Advanced Energy Partnership for Asia, are expanding access to this critical resource data by providing free, high-fidelity solar resource data for Southeast Asia through the RE Data Explorer platform. This brief highlights several ways the Southeast Asia solar resource data has been used for power system planning and project development in the region.

Advanced Energy Partnership for Asia↗

Site 200 - Building 225 Construction Project: Steel Pipe Abandonment Work Plan (October 2020)

In December 2019, a capped, 4-inch diameter pipe located inside a square concrete collar was discovered on the north side of a driveway leading into a construction project located at the northeast corner of First Street and Avenue and petroleum like odors were reported to Lawrence Livermore National Laboratory's (LLNL) Environment, Safety and Health (ES&H) staff. The pipe was also found to contain liquid, which was sampled. Analysis of the liquid showed the presence of refined petroleum hydrocarbons - primarily benzene, toluene, ethylbenzene and total xylenes, and lead. Based on various historical documents and maps, the pipe is assumed to be associated with one, or more of four 25,000-gallon, single-wall, concrete-construction, underground storage tanks (USTs) installed by the U.S. Department of Navy in approximately 1943. The USTs were reported to have been closed - abandoned in place and filled with sand in 1950.

54 ENVIRONMENTAL SCIENCES↗

Multi-Purpose Crew Vehicle Camera Asset Planning: Imagery Previsualization

Using JSC-developed and other industry-standard off-the-shelf 3D modeling, animation, and rendering software packages, the Image Science Analysis Group (ISAG) supports Orion Project imagery planning efforts through dynamic 3D simulation and realistic previsualization of ground-, vehicle-, and air-based camera output.

Beaulieu, K.↗

Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

Source record↗

NASA Standing Review Board Handbook

This handbook provides guidance based on best practices for the planning, preparation, review, reporting, and closeout of Standing Review Board (SRB) activities. Revision C updates the Revision B version of the SRB Handbook published in 2016 to incorporate updates to NASA Procedural Requirements (NPR) 7120.5F, NASA Space Flight Program and Project Management Requirements. These updates include: - Changing the Dissenting Opinion process to the Formal Dissent process, which retains the current process augmented with an expedited escalation path. - Updates to requirements for establishing an Agency Baseline Commitment (ABC) and for performing Joint Cost and Schedule Confidence Level (JCL) analyses for tightly coupled programs. - Additional requirements for performing a JCL analysis for single-project programs and projects over $1B Life-Cycle Cost (LCC). - Use of initial capability cost estimates instead of LCC estimates in specific, identified instances for single-project programs and projects that plan continuing operations and production, including integration of capability upgrades, with an unspecified Phase E end point. These single-project programs and projects define an initial capability during Phase A and develop an initial capability cost that establishes the ABC at Key Decision Point (KDP) C. Initial capability is the first operational mission flight (or as defined in the KDP B Review Plan) and is documented in the KDP B Decision Memorandum. Initial capability cost includes operations cost for the initial capability. The Phase E cost estimate for continuing operations and production is established separately as part of the Operational Readiness Review (ORR) and KDP E for the 5 years after initial capability and subsequently updated and documented annually for the next 5-year period. Upgrades during Phase E that meet the Agency criteria for a major project for external reporting are treated as projects for the purposes of establishing their own development ABC outside the Phase E cost estimate. The Phase E cost estimate is updated to include production and operations costs associated with these upgrades. Development, production, and operations costs of other (i.e., non-major) upgrades are included in the Phase E cost estimate. (See NPR 7120.5, Sections 2.4.1.5 and 2.4.1.6 and the NASA Space Flight Program and Project Management Handbook (PM Handbook), Section 5.5.4 for additional information.) The scope of the SRB’s assessment with respect to initial capability, Phase E cost estimate, and major upgrades for these single-project programs and projects is defined in the Terms of Reference (ToR).

Kevin Michael Gilligan↗

The next 25 years: Industrialization of space: Rationale for planning

The goals of NASA's space industralization program include contributing to increased productivity on earth without taxing the environment, generating new values through extraterrestrial productivity, and providing new growth options for the future which include the permanent settlement of space and long-range colonization and exploration projects. In planning the long-range space program based on essentially utilitarian aspects, without losing sight of the more humanistically significant long term, and to forecast associated technology requirements, a realistic approach is obtained by combining extrapolative and normative planning modes so that common stepping stones can be identified. In the extrapolative view, alternative futures are projected on the basis of past and current trends and tendencies. In the normative view, some ideal state in the far future is envisioned or postulated, and policies and decisions are directed toward its attainment.

Vonputtkamer, J.↗

NASA's In-Situ Resource Utilization Project: Current Accomplishments and Exciting Future Plans

The utilization of Space resources has been identified in publications for over 40 years for its potential as a "game changing" technology for the human exploration of Space. It is called "game changing" because of the mass leverage possible when local resources at the exploration destination arc used to reduce or even eliminate resources that are brought from the Earth. NASA, under the Exploration Technology Development Program has made significant investments in the development of Space resource utilization technologies as a part of the In-Situ Resource Utilization (ISRU) project. Over the last four years, the ISRU project has taken what was essentially an academic topic with lots of experimentation but little engineering and produced near-full-scale systems that have been demonstrated. In 2008 & again in early 2010, systems that could produce oxygen from lunar soils (or their terrestrial analogs) were tested at a lunar analog site on a volcano in Hawaii. These demonstrations included collaborations with International Partners that made significant contributions to the tests. The proposed federal budget for Fiscal Year 2011 encourages the continued development and demonstration of ISRU. However it goes beyond what the project is currently doing and directs that the scope of the project be expanded to cover destinations throughout the inner solar system with the potential for night demonstrations. This paper will briefly cover the past accomplishments of the ISRU project then move to a di scussion of the plans for the project's future as NASA moves to explore a new paradigm for Space Exploration that includes orbital fuel depots and even refueling on other planetary bodies in the solar system.

Larson, William E.↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 3.4 Report: Complete Well Design and Drilling Plan

We are pleased to present the following materials, which serve as confirmation of the successful completion of Task 3.4 Complete Well Design and Drilling Plan Milestone, in accordance with the Project OASIS Project Management Plan. More specifically, the following provides confirmation of a team-wide call that was held on September 25, 2023, to discuss the CarbonSAFE Phase II drilling program, the well drilling prognosis, and an overview of risks associated with the program by category as well as probability and impact. A comprehensive Site-Specific Drilling Report will be provided to DOE-NETL 30 days after completion of drilling activities.

20 FOSSIL-FUELED POWER PLANTS↗

The Global Oscillation Network Group site survey. 1: Data collection and analysis methods

The Global Oscillation Network Group (GONG) Project is planning to place a set of instruments around the world to observe solar oscillations as continuously as possible for at least three years. The Project has now chosen the sites that will comprise the network. This paper describes the methods of data collection and analysis that were used to make this decision. Solar irradiance data were collected with a one-minute cadence at fifteen sites around the world and analyzed to produce statistics of cloud cover, atmospheric extinction, and transparency power spectra at the individual sites. Nearly 200 reasonable six-site networks were assembled from the individual stations, and a set of statistical measures of the performance of the networks was analyzed using a principal component analysis. An accompanying paper presents the results of the survey.

Hill, Frank↗