Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Sault Tribe Building Efficiency Audits of Tribally-Owned Governmental Buildings and Residential Tribal Housing

The Tribe is working to reduce energy consumption and expense in Tribally-owned governmental buildings and low income housing sites. In 2009, the Tribe applied to the U. S. Department of Energy for funding to conduct energy audits of Tribally-owned governmental buildings. Findings from the energy audits would define the extent and types of energy efficiency improvements needed, establish a basis for energy priorities, strategies and action plans, and provide a benchmark for measuring improvements from energy efficiency implementations. In 2010, the DOE awarded a grant in the amount of $95,238 to the Tribe to fund the energy audits of nine governmental buildings and to pay for travel expenses associated with attendance and participation at the DOE annual program reviews. In 2011, the Tribe applied for and was awarded a DOE grant in the amount of $75,509 to conduct energy audits of the remaining 30 Tribally-owned governmental buildings. Repeating mobilization steps performed during the first DOE energy audits grant, the Tribe initiated the second round of governmental building energy audits by completing energy auditor procurement. The selected energy auditor successfully passed DOE debarment and Sault Tribe background clearances. The energy audits contract was awarded to U. P. Engineers and Architects, Inc. of Sault Ste. Marie, Michigan. The Tribe continued mobilizing for the energy audits by providing the energy auditor with one year of electric, gas and water utility invoice copies per building, as well as supplemental building information, such as operating hours. The Tribe also contacted building occupants to coordinate scheduling for the on-site energy audit inspections and arranged for facilities management personnel to guide the energy auditor through the buildings and answer questions regarding building systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of Toroidal Core Transformers

The original objective of this project was to design, build and test a few prototypes of single-phase dry-type distribution transformers of 25 kVA, 2.4 kV primary to 120 V transformers using cores made of a continuous steel strip shaped like a doughnut (toroid). At different points during the development of the project, the scope was enhanced to include the more practical case of a 25 kVA transformer for a 13.8 kV primary system voltage. Later, the scope was further expanded to design and build a 50 kVA unit to transformer voltage from 7.62 kV to 2x120 V. This is a common transformer used by Con Edison of New York and they are willing to test it in the field. The project officially started in September 2009 and ended in May 2014. The progress was reported periodically to DOE in eighteen quarterly reports. A Continuation Application was submitted to DOE in June 2010. In May 2011 we have requested a non-cost extension of the project. In December 2011, the Statement of Project Objectives (SOPO) was updated to reflect the real conditions and situation of the project as of 2011. A second Continuation Application was made and funding was approved in 2013 by DOE and the end date was extended to May 2014. The technical challenges that were overcome in this project include: the development of the technology to pass the impulse tests, derive a model for the thermal performance, produce a sound mechanical design, and estimate the inrush current. However, the greatest challenge that we faced during the development of the project was the complications of procuring the necessary parts and materials to build the transformers. The actual manufacturing process is relatively fast, but getting all parts together is a very lengthy process. The main products of this project are two prototypes of toroidal distribution transformers of 7.62 kV (to be used in a 13.8 kV system) to 2x120 V secondary (standard utilization voltage); one is rated at 25 kVA and the other at 50 kVA. The 25 kVA transformer passed the impulse test in KEMA high-voltage laboratories. Additional products include: nine papers published in the IEEE Transactions on Power Delivery, one patent has been filed, three PhD students were supported from beginning to graduation, five postdoctoral fellows, and three MSc students were partially supported. The electrical characteristics of our dry-type toroidal transformers are similar to those of the oil-immersed pole mounted transformers currently in use by many utilities, but toroids have higher efficiency. The no-load losses of the 50 kVA prototype are only 45 W. A standard transformer has no-load losses between 90 and 240 W. Thus, even the finest transformer built today with standard technology has double the amount of no-load losses than the prototype toroidal transformer. When the manufacturing process is prepared for mass production, the cost of a dry-type toroidal transformer would be similar to the price of an oil-filed standard design. However, because of the greatly reduced losses, the total ownership cost of a toroidal transformer could be about half of a traditional design. We got a grant from Power Bridge NY in the amount of $149,985 from June 2014 to May 2015 to continue developing the transformer with commercialization objectives. We are considering the possibility to incorporate a company to manufacture the transformers and have contacted investors. The current status of the real life testing is as follows: after several months of silence, Con Edison has re-started conversations and has shown willingness to test the transformer. Other companies, PSE&G and National Grid have recently also shown interest and we will present our product to them soon.

42 ENGINEERING↗

Business Case Analysis of Prototype Fabrication Division Recapitalization Plan. Summary

Business case studies were completed to support procurement of new machines and capital equipment in the Prototype Fabrication (PF) Division SM-39 and TA-03-0102 machine shops. Economic analysis was conducted for replacing the Mazak 30Y Mill-Turn Machine in SM-39, the Haas Vertical CNC Mill in Building 102, and the Hardinge Q10/65-SP Lathe in SM-39. Analysis was also conducted for adding a NanoTech Lathe in Building 102 and a new electrical discharge machine (EDM) in SM-39 to augment current capabilities. To determine the value of switching machinery, a baseline scenario was compared with a future scenario where new machinery was purchased and installed. Costs and benefits were defined via interviews with subject matter experts.

99 GENERAL AND MISCELLANEOUS↗

Brahman

The Adversary & Interdiction Methods (AIM) program provides training and capability assessment services to government agencies around the country. Interdisciplinary teams equipped with gear and radioactive sources are repeatedly fielded to offsite events to collaborate with law enforcement agencies at all levels of government. AIM has grown rapidly over the past three years. A knowledge management system as evolved along with the program but it has failed to keep pace. A new system is needed. The new system must comply with cybersecurity and information technology solutions already in place at an institutional level. The offsite nature of AIM activities must also be accommodated. Cost and schedule preclude the commissioning of new software and the procurement of expensive hardware. The new system must exploit in-house capabilities and be established quickly. A novel system is proposed. This solution centers on a recently introduced institutional file sharing capability called Syncplicity. AIM-authored software will be combined with a dedicated institutional account to vastly extend the capability of this resource. The new knowledge management system will reduce error and increase efficiency through automation and be accessible offsite via mobile devices.

42 ENGINEERING↗

Changes in the Economic Value of Variable Generation at High Penetration Levels: A Pilot Case Study of California

We estimate the long-run economic value of variable renewable generation with increasing penetration using a unique investment and dispatch model that captures long-run investment decisions while also incorporating detailed operational constraints and hourly time resolution over a full year. High time resolution and the incorporation of operational constraints are important for estimating the economic value of variable generation, as is the use of a modeling framework that accommodates new investment decisions. The model is herein applied with a case study that is loosely based on California in 2030. Increasing amounts of wind, photovoltaics (PV), and concentrating solar power (CSP) with and without thermal energy storage (TES) are added one at a time. The marginal economic value of these renewable energy sources is estimated and then decomposed into capacity value, energy value, day-ahead forecast error cost, and ancillary services. The marginal economic value, as defined here, is primarily based on the combination of avoided capital investment cost and avoided variable fuel and operations and maintenance costs from other power plants in the power system. Though the model only captures a subset of the benefits and costs of renewable energy, it nonetheless provides unique insights into how the value of that subset changes with technology and penetration level. Specifically, in this case study implementation of the model, the marginal economic value of all three solar options is found to exceed the value of a flat-block of power (as well as wind energy) by \$20--30/MWh at low penetration levels, largely due to the high capacity value of solar at low penetration. Because the value of CSP per unit of energy is found to be high with or without thermal energy storage at low penetration, we find little apparent incremental value to thermal storage at low solar penetration in the present case study analysis. The marginal economic value of PV and CSP without thermal storage is found to drop considerably (by more than \$70/MWh) as the penetration of solar increases toward 30\percent on an energy basis. This is due primarily to a steep drop in capacity value followed by a decrease in energy value. In contrast, the value of CSP with thermal storage drops much less dramatically as penetration increases. As a result, at solar penetration levels above 10\percent, CSP with thermal storage is found to be considerably more valuable relative to PV and CSP without thermal storage. The marginal economic value of wind is found to be largely driven by energy value, and is lower than solar at low penetration. The marginal economic value of wind drops at a relatively slower rate with penetration, however. As a result, at high penetration, the value of wind can exceed the value of PV and CSP without thermal storage. Though some of these findings may be somewhat unique to the specific case study presented here, the results: (1) highlight the importance of an analysis framework that addresses long-term investment decisions as well as short-term dispatch and operational constraints, (2) can help inform long-term decisions about renewable energy procurement and supporting infrastructure, and (3) point to areas where further research is warranted.

14 SOLAR ENERGY↗

Integrated Waste Treatment Unit (IWTU) Input Coal Analyses and Off-Gass Filter (OGF) Content Analyses

A full engineering scale Fluidized Bed Steam Reformer (FBSR) system is being used at the Idaho Nuclear Technology and Engineering Center (INTEC) to stabilize acidic Low Activity Waste (LAW) known as Sodium Bearing Waste (SBW). The INTEC facility, known as the Integrated Waste Treatment Unit (IWTU), underwent an Operational Readiness Review (ORR) and a Technology Readiness Assessment (TRA) in March 2014. The IWTU began non-radioactive simulant processing in late 2014 and by January, 2015 ; the IWTU had processed 62,000 gallons of simulant. The facility is currently in a planned outage for inspection of the equipment and will resume processing simulated waste feed before commencing to process 900,000 gallons of radioactive SBW. The SBW acidic waste will be made into a granular FBSR product (carbonate based) for disposal in the Waste Isolation Pilot Plant (WIPP). In the FBSR process calcined coal is used to create a CO2 fugacity to force the waste species to convert to carbonate species. The quality of the coal, which is a feed input, is important because the reactivity, moisture, and volatiles (C,H,N,O, and S) in the coal impact the reactions and control of the mineralizing process in the primary steam reforming vessel, the Denitration and Mineralizing Reformer (DMR). Too much moisture in the coal can require that additional coal be used. However since moisture in the coal is only a small fraction of the moisture from the fluidizing steam this can be self-correcting. If the coal reactivity or heating value is too low then the coal feed-rate needs to be adjusted to achieve the desired heat generation. Too little coal and autothermal heat generation in the DMR cannot be sustained and/or the carbon dioxide fugacity will be too low to create the desired carbonate mineral species. Too much coal and excess S and hydroxide species can form. Excess sulfur from coal that (1) is too rich in sulfur or (2) from overfeeding coal can promote wall scale and contribute to corrosion in process piping and materials, in excessive off-gas absorbent loading, and in undesired process emissions. The ash content of the coal is important as the ash adds to the DMR and other vessel products which affect the final waste product mass and composition. The amount and composition of the ash also affects the reaction kinetics. Thus ash content and composition contributes to the mass balance. In addition, sodium, potassium, calcium, sulfur, and maybe silica and alumina in the ash may contribute to wall-scale formation. Sodium, potassium, and alumina in the ash will be overwhelmed by the sodium, potassium, and alumina from the feed but the impact from the other ash components needs to be quantified. A maximum coal particle size is specified so the feed system does not plug and a minimum particle size is specified to prevent excess elutriation from the DMR to the Process Gas Filter (PGF). A vendor specification was used to procure the calcined coal for IWTU processing. While the vendor supplied a composite analysis for the 22 tons of coal (Appendix A), this study compares independent analyses of the coal performed at the Savannah River National Laboratory (SRNL) and at the National Energy Technology Laboratory (NETL). Three supersacks a were sampled at three different heights within the sack in order to determine within bag variability and between bag variability of the coal. These analyses were also compared to the vendor’s composite analyses and to the coal specification. These analyses were also compared to historic data on Bestac coal analyses that had been performed at Hazen Research Inc. (HRI) between 2004-2011.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Helium Loop Cooling Channel Hydraulic Characterization

New methods for generating 99 Mo are being explored in an effort to eliminate proliferation issues and provide a domestic supply of 99m Tc for medical imaging. Electron accelerating technology is used by sending an electron beam through a series of 100 Mo targets. During this process a large amount of heat is created, which directly affects the operating temperature set for the system. In order to maintain the required temperature range, helium gas is used to serve as a cooling agent that flows through narrow channels between the target disks. Currently we are tailoring the cooling channel entrance and exits to decrease the pressure drop through the targets. Currently all hardware has be procured and manufactured to conduct flow measurements and visualization via solid particle seeder. Pressure drop will be studied as a function of mass flow and diffuser angle. The results from these experiments will help in determining target cooling geometry and validate CFD code results.

42 ENGINEERING↗

Lidar Inter-Comparison Exercise Final Campaign Report

The objective of this IOP was to evaluate the performances of the new Leosphere R-MAN 510 lidar procured by the Australian Bureau of Meteorology, by testing it against the MPL and Raman lidars at the Darwin ARM site. This lidar is an eye-safe (355 nm), turn-key mini Raman lidar, which allows for the detection of aerosols and cloud properties, and the retrieval of particulate extinction profiles. To do so, the R-MAN 510 lidar has been operated at the Darwin ARM site, next to the MPL, Raman lidar, and Vaisala ceilometer for three months (from 20 January 2013 to 20 April 2013) in order to collect a good sample for statistical comparisons. The comparisons with the Raman lidar were not performed, since the Raman lidar attenuated backscatter and depolarization ratio product was not available. A new product has just been delivered to the ARM archive as a value-added product, hence this study will continue. Nevertheless we have developed software to match the different space and time resolutions of the other lidars and project the data onto a common grid to permit detailed comparison of the instruments’ performance and an enhanced analysis of clouds and aerosols through the use of composite data products, like the ratios of attenuated backscatters, attenuated scattering ratios and depolarization ratios. Comparisons between the MPL and R-MAN510 lidar data exhibit large differences in total attenuated backscatter at 355 and 532 nm, attenuated scattering ratios, and aerosol volume depolarization ratios. Differences in attenuated backscatter result mainly from the different relative contributions of scattering from molecules and particles at the different wavelengths, but there are some intriguing differences that will require further investigations. The differences in volume depolarization ratios are due to the much larger contribution of molecular returns to the volume depolarization ratio (5 times larger at 355 nm than at 532 nm). The R-MAN510 lidar is also found to be much less sensitive to daylight solar background illumination, which is greater at the visible wavelength than in the UV.

54 ENVIRONMENTAL SCIENCES↗

Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 1

This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). NNSA/NSO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

54 ENVIRONMENTAL SCIENCES↗

Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2

This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence. NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

54 ENVIRONMENTAL SCIENCES↗

Hydrogen Gas Retention and Release from WTP Vessels: Summary of Preliminary Studies

The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release from Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Service Examination of PWR Baffle Bolts, Part I. Examination and Test Plan

In support of extended service and current operations of the US nuclear reactor plants, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Light Water Reactor Sustainability (LWRS) Program, is coordinating with Ginna Nuclear Power Plant, The Westinghouse Electric Company, LLC, and ATI Consulting, the selective procurement of baffle bolts that were withdrawn from service in 2011 and currently stored on site at Ginna. The goal of this program is to perform detailed microstructural and mechanical property characterization of baffle former bolts following in-service exposures. This report outlines the selection criteria of the bolts and the techniques to be used in this study. The bolts available are the original alloy 347 steel fasteners used in holding the baffle plates to the baffle former structures within the lower portion of the pressurized water reactor vessel. Of the eleven possible bolts made available for this work, none were identified to have specific damage. The bolts, however, did show varying levels of breakaway torque required in their removal. The bolts available for this study varied in peak fluence (highest dose within the head of the bolt) between 9.9 and 27.8x10 21 n/cm 2 (E>1MeV). As no evidence for crack initiation was determined for the available bolts from preliminary visual examination, two bolts with the higher fluence values were selected for further post-irradiation examination. The two bolts showed different breakaway torque levels necessary in their removal. The information from these bolts will be integral to the LWRS program initiatives in evaluating end of life microstructure and properties. Furthermore, valuable data will be obtained that can be incorporated into model predictions of long-term irradiation behavior and compared to results obtained in high flux experimental reactor conditions. The two bolts selected for the ORNL study will be shipped to Westinghouse with bolts of interest to their collaborative efforts with the Electric Power Research Institute. Westinghouse will section the ORNL bolts into samples specified in this report and return them to ORNL. Samples will include bend bars for fracture toughness and crack propagation studies along with thin sections from which specimens for bend testing, subscale tensile and microstructural analysis can be obtained. Additional material from the high stress concentration region at the transition between the bolt head and shank will also be preserved to allow for further investigation of possible crack initiation sites.

42 ENGINEERING↗

Renewable Energy, Photovoltaic Systems Near Airfields. Electromagnetic Interference

Recent increases in photovoltaic (PV) systems on Department of the Navy (DON) land and potential siting near airfields prompted Commander, Naval Installations Command to fund the Naval Facilities Engineering Command to evaluate the impact of electromagnetic interference (EMI) from PV systems on airfield electronic equipment. Naval Facilities Engineering and Expeditionary Warfare Center tasked Department of Energy National Renewable Energy laboratory (NREL) to conduct the assessment. PV systems often include high-speed switching semiconductor circuits to convert the voltage produced by the PV arrays to the voltage needed by the end user. Switching circuits inherently produce electromagnetic radiation at harmonics of the switching frequency. In this report, existing literature is summarized and tests to measure emissions and mitigation methods are discussed. The literature shows that the emissions from typical PV systems are low strength and unlikely to cause interference to most airfield electronic systems. With diligent procurement and siting of PV systems, including specifications for FCC Part 15 Class A compliant equipment and a 250-foot setback from communication equipment, NREL anticipates little to no EMI impact on nearby communications or telemetry equipment.

14 SOLAR ENERGY↗

Demonstration of LED Retrofit Lamps at the Smithsonian Art Museum, Washington, DC

In the fall of 2010, Pacific Northwest National Laboratory contacted Scott Rosenfeld, Lighting Designer for the Smithsonian American Art Museum, to see if the Museum would be willing to participate in a GATEWAY demonstration project in which light-emitting diode (LED) replacement lamps would be used in exhibit space. At that time, the museum industry was concerned about increased damage potential from LEDs and other energy efficient lighting sources that produce a discontinuous spectrum. The Museum agreed to participate, based on a review of the existing literature conducted by Steven Weintraub of Art Preservation Services for the American Institute of Conservation, and subsequent testing of solid-state lighting sources on light sensitive materials performed by Jim Druzik of the Getty Conservation Institute. Thus began the process, which lasted more than a year, of procuring lamp samples and performance data, testing them in the museum workshop, temporarily installing the lamps in one gallery for feedback, and ultimately replacing all traditional incandescent lamps in one gallery of modernist art at the American Art Museum and partially replacing lamps in two galleries of the Museum’s Renwick Gallery. This report describes the selection and testing process, technology challenges, perceptions, economics, energy use, and mixed results of using LED replacement lamps in art galleries housing national treasures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High Performance Data Analytics on a Commodity Private Cloud

Sandia is researching novel methods of analysis for large datasets. The term “Big Data” has been used frequently in recent years to describe a discipline of computer science that attempts to distil an increasing quantity of data into a result or meaningful subset that can be easily visualized and acted upon by human consumers. These data are frequently characterized by one or more of the following: high volume, velocity, variety, and veracity. Sandia scientists and researchers are no strangers to large datasets, which often typify the result of high-performance computing workloads. The challenge for Sandia data scientists, however, comes at the arrival of exascale computing, which has become mandated by executive order for national computing centers. Because of power and networking limitations, exascale computing precludes the movement of datasets at exascale from data production to data analysis. Such analysis must be done in-situ, to mitigate the time and power costs of network transport. Currently, many of Sandia’s data analytics environments exist as independent entities, often specialized for individual use cases, interconnected to other data analytics, high-performance computing, and storage systems. Sandia is procuring, installing, and researching future platforms for such data analytics. A memory footprint of 256 GB per node, fourteen data rate (FDR) InfiniBand networking, PCIe connected non-volatile memory (NVMe) data storage, and an object data store will characterize the coming institutional data analytics platforms. The combined systems will contain 300 compute nodes. A cloud-inspired software stack resulting from collaboration between the Sandia centers will allow the systems to support a flexible mix of user and system-facing workloads and use cases including code development and testing in R and Python, Apache Hadoop and Spark, distributed in-memory databases, graph analytics, emulytics, system log and predictive analytics, and data visualization for institutional and mission customers. These systems will arrive at the end of FY 2015 and production is planned by the spring of FY 2016.

97 MATHEMATICS AND COMPUTING↗

2015 HPC Annual Report

Center 9300 is very proud to provide a wide range of computing and networking resources ranging from desktop support to high performance computing that enable Sandia’s national security mission needs. Our goal is to provide these services in the most efficient, secure, user friendly, and agile means necessary. High performance computing is one example of how we are delivering on this goal. Thanks to investments from NNSA’s Advanced Simulation and Computing program, coupled with Sandia’s Institutional Computing program, a wide variety of computing resources are available and used to support national security needs. This year we are expanding our high performance computing infrastructure with the procurement of institutional resources for information computing or analytics. Big data analytics has been the buzzword in the computing industry for over a decade now and industries in finance, food and drug, business, and security organizations have been leading the charge. Much like how scientific computing has changed the way science and engineering are performed, data analytics is changing just about every aspect of our lives and more especially our ability to contribute to the national security mission of Sandia. This third edition of our HPC Annual Report continues our commitment to communicate the details and impact of Sandia’s large-scale computing resources that support missions work across Sandia. The Laboratories’ and NNSA’s strategic investments in high performance computing demonstrate our commitment to keeping mission-related research on the cutting edge of science, at pace with technology advances, and at a scale that meets the toughest demands of the nation we so proudly serve.

97 MATHEMATICS AND COMPUTING↗

Parallel Application Performance on Two Generations of Intel Xeon HPC Platforms

Two next-generation node configurations hosting the Haswell microarchitecture were tested with a suite of microbenchmarks and application examples, and compared with a current Ivy Bridge production node on NREL" tm s Peregrine high-performance computing cluster. A primary conclusion from this study is that the additional cores are of little value to individual task performance--limitations to application parallelism, or resource contention among concurrently running but independent tasks, limits effective utilization of these added cores. Hyperthreading generally impacts throughput negatively, but can improve performance in the absence of detailed attention to runtime workflow configuration. The observations offer some guidance to procurement of future HPC systems at NREL. First, raw core count must be balanced with available resources, particularly memory bandwidth. Balance-of-system will determine value more than processor capability alone. Second, hyperthreading continues to be largely irrelevant to the workloads that are commonly seen, and were tested here, at NREL. Finally, perhaps the most impactful enhancement to productivity might occur through enabling multiple concurrent jobs per node. Given the right type and size of workload, more may be achieved by doing many slow things at once, than fast things in order.

97 MATHEMATICS AND COMPUTING↗

Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization

This report describes the application functions for distribution management systems (DMS). The application functions are those surveyed by the IEEE Power and Energy Society’s Task Force on Distribution Management Systems. The description of each DMS application includes functional requirements and the key features and characteristics in current and future deployments, as well as a summary of the major benefits provided by each function to stakeholders — from customers to shareholders. Due consideration is paid to the fact that the realizable benefits of each function may differ by type of utility, whether investor-owned, cooperative, or municipal. This report is sufficient to define the functional requirements of each application for system procurement (request-for-proposal [RFP]) purposes and for developing preliminary high-level use cases for those functions. However, it should not be considered a design document that will enable a vendor or software developer to design and build actual DMS applications.

Wang, Jianhui↗