At least 793 records · Page 44

Wind Plant Performance Prediction Benchmark Phase 1 (Technical Report)

Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was created out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results.

17 WIND ENERGY↗

Advanced Ultra-Supercritical Component Test (ComTest) Project for 760*C Steam Conditions

ComTest is a $27M Department of Energy-funded project. Phase I, which began in November 2015, served to identify the technology gaps, as well as the scope and cost of required testing. Phase II, which was awarded in December 2018, includes an advanced manufacturing effort to complete U.S. based supply chain development for full commercial scale (800-850 MWe) AUSC components made of nickel-based alloys, components operating at up to 760°C. Completion of Phase II scheduled for September 30, 2021. Strategic Objectives of U.S. AUSC Project include: Power Plant Efficiency Improvements –Develop cost-effective, reliable technologies to improve the efficiency of new and existing high-temperature advanced generation power plants. Close gaps to achieve readiness for commercial scale demonstration of Advanced Ultra-Supercritical (AUSC) technology. Fabricate full-scale versions of key nickel-based alloy components. Validate capabilities of US supply chain for cost certainty. Support cross-cutting high-temperature generation technologies. Obtain ASME Code approval for new materials, components and processes. Increase power plant steam temperatures for higher cycle efficiency (Note: Average efficiency of US coal-fired fleet = 33% HHV; A-USC plant efficiency over 47% HHV at 1,400°F (760°C) steam temperature).

fireside corrosion↗

GRIDCERF - Geospatial Raster Input Data for Capacity Expansion Regional Feasibility

The Geospatial Raster Input Data for Capacity Expansion Regional Feasibility (GRIDCERF) data package is a high-resolution product to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. GRIDCERF offers hundreds of individual suitability layers for use with both renewable and non-renewable power plant technology configurations in a harmonized format that can be easily ingested by geospatially-enabled modeling software. It also provides pre-compiled technology-specific suitability layers and allows for user customization to robustly address science objectives when evaluating varying future conditions. GRIDCERF data can be directly used with the CERF (Capacity Expansion Regional Feasibility) model to site power plants at a 1km resolution. GRIDCERF includes composite technology siting suitability raster layers for the following utility scale technology configurations. Note that, in addition to technology sub-types shown below, various cooling types are also included (recirculating, pond, once-through, recirculating-seawater, dry-hybrid, or dry) for various technologies. Biomass Conventional (with or without CCS) IGCC (with or without CCS) Coal Conventional (with or without CCS) IGCC (with or without CCS) Natural Gas Combined-cycle (CC) (with or without CCS) Turbine Geothermal Enhanced Geothermal Systems (EGS) - Class 1 through Class 5 resource potential Nuclear Gen 2 Light Water Reactor (LWR) Gen 3 Small Modular Reactor (SMR) Gen 3 AP1000 Refined Liquids Combined-cycle (CC) (with or without CCS) Turbine Solar Photovoltaic (PV) - for capacity factors in the range of 6-18% Utility-scale Concentrating Solar Power (CSP) - for capacity factors in the range of 24-46% Tower Wind (Onshore) - for capacity factors in the range of 5-50% 80m hub height 100m hub height 120m hub height 140m hub height Wind (Offshore) - for capacity factors in the range of 25-60% 100m hub height 140m hub height 160m hub height

capacity expansion↗

GRIDCERF - Geospatial Raster Input Data for Capacity Expansion Regional Feasibility

The Geospatial Raster Input Data for Capacity Expansion Regional Feasibility (GRIDCERF) data package is a high-resolution product to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. GRIDCERF offers hundreds of individual suitability layers for use with both renewable and non-renewable power plant technology configurations in a harmonized format that can be easily ingested by geospatially-enabled modeling software. It also provides pre-compiled technology-specific suitability layers and allows for user customization to robustly address science objectives when evaluating varying future conditions. GRIDCERF data can be directly used with the CERF (Capacity Expansion Regional Feasibility) model to site power plants at a 1km resolution. GRIDCERF includes composite technology siting suitability raster layers for the following utility scale technology configurations. Note that, in addition to technology sub-types shown below, various cooling types are also included (recirculating, pond, once-through, recirculating-seawater, dry-hybrid, or dry) for various technologies. Biomass Conventional (with or without CCS) IGCC (with or without CCS) Coal Conventional (with or without CCS) IGCC (with or without CCS) Natural Gas Combined-cycle (CC) (with or without CCS) Turbine Geothermal Enhanced Geothermal Systems (EGS) - Class 1 through Class 5 resource potential Nuclear Gen 2 Light Water Reactor (LWR) Gen 3 Small Modular Reactor (SMR) Gen 3 AP1000 Refined Liquids Combined-cycle (CC) (with or without CCS) Turbine Solar Photovoltaic (PV) - for capacity factors in the range of 6-18% Utility-scale Concentrating Solar Power (CSP) - for capacity factors in the range of 24-46% Tower Wind (Onshore) - for capacity factors in the range of 5-50% 80m hub height 100m hub height 120m hub height 140m hub height Wind (Offshore) - for capacity factors in the range of 25-60% 100m hub height 140m hub height 160m hub height

capacity expansion↗

Virtual Synchronous Generator Control of Multi-port Autonomous Reconfigurable Solar Plants (MARS)

Multi-port autonomous reconfigurable solar power plant (MARS) is an integrated concept for integration of solar photovoltaic (PV) and energy storage systems (ESS) to transmission alternating current (ac) grid and high-voltage direct current (HVdc) links. The integrated development incorporates advanced control methods to provide enhanced grid ancillary services such as fast frequency responses and dynamic voltage support. In this paper, the virtual synchronous generator (VSG) control algorithm of MARS is discussed. The proposed VSG-based control enables enhanced synthetic inertial response and flexible frequency response characteristics of hybrid PV and ESS power plants in accordance with grid ancillary service requirements. Multi-port power electronics interface allows controlled emergency power support from MARS to local transmission ac grid and remote grid through the HVdc link. The performance of VSG control is validated using a reduced-order model of MARS in Simulink. Methods for estimating grid ancillary service capabilities of MARS are also discussed.

Pan, Jiuping↗

Stellarators as a fast path to fusion

Herein this paper is focused on three points: (1) overcoming obstacles to tokamak power plants may require a configuration modification as large as that of a stellarator. (2) The demonstrated reliability of the computational design of stellarators should change fusion strategy. (3) Deployment of carbon-free energy sources is mandated by the thirty-year doubling of carbon dioxide emissions. Carbon-free energy options must be developed and fully deployed within a few doubling times. Unit size and cost of electricity are only relevant in comparison to alternative worldwide energy solutions. Intermittency, site specificity, waste management, and nuclear proliferation make fusion attractive as the basis for a carbon-free energy system compared to the alternatives. Nonetheless, fusion is not an option for deployment until a power plant has successfully operated. A critical element in a minimal time and risk program is the use of computational design as opposed to just extrapolation. Only the stellarator has an empirical demonstration of the reliable computational design through large changes in configuration properties and scale. The computational design of stellarators should proceed while the inventions necessary for a more tokamak-like power plant are sought. The cost of computational design is extremely small, but adequate time is required for the development of ideas that maximize attractiveness and minimize risk. Rapid power-plant construction without many intermediate steps may seem risky, but the price is small compared to the cost of trillions of dollars for each year's delay in addressing carbon-dioxide emissions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Application Guide for the Cyber-Resilient Design Framework for Hybrid Systems

As the energy landscape evolves, hybrid power plants—integrating multiple renewable energy sources (e.g., solar, wind, and battery storage) with the bulk power electric system—play a crucial role in meeting growing energy demands. However, with a hybrid power plant’s increased number of components, complex network connectivity and digitization of controls, these systems face growing cybersecurity risks. To help mitigate these risks, Idaho National Laboratory (INL) presents this application guide specifically designed for operators and systems engineers to evaluate the cybersecurity resilience of their hybrid power plant’s design.

14 SOLAR ENERGY↗

Harmonized geospatial data to support infrastructure siting feasibility planning for energy system transitions

Climate change, energy system transitions, and socioeconomic change are compounding influences affecting the growth of electricity demand. While energy efficiency initiatives and distributed resources can address a significant amount of this demand, the United States will likely still need new utility-scale generation resources. The energy sector uses capacity expansion planning models to determine the aggregate need for new generation, but these models are typically at the state or regional scale and are not equipped to address the wide range of location- and technology-specific issues that are increasingly a factor in power plant siting. To help address these challenges, we have developed the Geospatial Raster Input Data for Capacity Expansion Regional Feasibility (GRIDCERF) data package, a high-resolution product to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. GRIDCERF offers 264 suitability layers for use with 56 power plant technologies in a harmonized format that can be easily ingested by geospatially-enabled modeling software allowing for customization to robustly address science objectives when evaluating varying future conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗

A Novel Steam Condenser with Loop Thermosyphons and Film-Forming Agents for Improved Heat Transfer Efficiency and Durability

In this DOE/NETL BAA program, Advanced Cooling Technologies, Inc. (ACT), with Suez Water Technologies & Solutions (Suez), developed film-forming amine coatings applied to condenser surfaces that incorporated loop thermosyphons to enhance steam surface condenser performance and efficiency for coal-fired power plants. The condensation phenomenon resulting from these coatings promotes efficient dropwise condensation without additional thermal resistance through the use of film-forming amines (FFA). The loop thermosyphon technology was being developed to supplant current pumped cooling water systems to reduce operations and maintenance issues, reduce energy use, and promote high thermal performance. Both of ACT’s advanced coating and loop thermosyphon technologies were developed for application to wet cooling and indirect dry cooling systems. Internal steam condensation and subsequent heat dissipation complete the thermodynamic power cycle used by power plant cooling systems. The successful 3-year project period delved into understanding the experimental performance gain using film-forming amines applied to flat and tubular condenser surfaces under realistic operating conditions. The performance gain was used to create a technoeconomic analysis to more clearly understand the market value for power plants using FFA coatings to achieve dropwise condensation on condenser surfaces. A tall (50 ft.) loop thermosyphon was designed, fabricated, and tested to optimize the performance characteristics by tuning the working fluid charge and determining the temperature drop across the loop at different heat loads. Commercialization opportunities were explored to transition the loop thermosyphon work into the building HVAC market.

20 FOSSIL-FUELED POWER PLANTS↗

Market analysis for the integration of new power technologies: A case study of the deployment of hybrid fossil-based generator plus energy storage (ES-FE)

This study examines the national landscape of hybridized fossil energy (FE) power plants with energy storage (ES) technologies (“ES-FE”) and presents the compilation of an ES-FE dataset, which includes over 65 ES-FE projects and concepts in the United States, comprising approximately 500 MWh of co-located ES capacity with FE power plants. This study also estimates the economic feasibility of adding ES to existing FE power plants by characterizing the potential revenues that can be generated by the ES component through flexibility and capacity value. The analysis focuses on ES technologies with 2- to 10-h. durations located in four U.S. independent system operators (ISOs): Midcontinent ISO (MISO), Electric Reliability Council of Texas (ERCOT), PJM Interconnection (PJM), and California ISO (CAISO), which have +70,000 MW of combined FE power capacity that could add ES. Annual revenues are estimated for the ES component using a what-if-analysis approach, for capacity value, price arbitrage, or ancillary services provision. The results show that annual revenues depend on the end-use storage service, wholesale electricity and capacity market prices, and ES technology operation parameters such as discharging duration and cycling frequency. When performing a sensitivity analysis, ES accrues $7–178/kW-yr. via price arbitrage and ancillary services provision in the four ISOs, and $13–92/kW-yr. when providing capacity value only in MISO and PJM. A cash flow analysis is performed to estimate the net present value (NPV) of the ES addition using a range of ES costs. The study finds that for most ES technologies considered, these revenues alone are insufficient to achieve economic feasibility. In conclusion, of the 1645 total runs analyzed, 115 had positive NPVs (7%). Therefore, other revenue streams or monetizable benefits are necessary to achieve the break-even point.

20 FOSSIL-FUELED POWER PLANTS↗

The Evaluation of Chemical Decontamination for Contaminated Carbon Steel Scrap by Multiphase Treatment Process - 20249

There is a significant growth in the field of decommissioning of nuclear facilities due the fact that for a lot of them their end of life is nearing. In Taiwan, the government plans to steadily reduce the dependence on nuclear power and moves gradually towards a nuclear-free homeland. Therefore, the development of decommissioning technology becomes the significant issue for the next coming years. The decommissioning of a nuclear power plant is a long process and practical work including radiological surveys, decontamination, dismantling, and the subsequent waste management. Chemical decontamination is an important task in the decommissioning of nuclear power plants and is usually performed by circulating the chemical solution in selected systems or full systems in order to reduce dose levels. However, the decontamination of segmented metal parts is also considered to reduce the contamination to such levels that they may be disposed of at a lower classification or be unconditionally released, and it helps to achieve the goal of waste minimization and provide a more economical cost for disposal management. Chemical decontamination technology is used to remove the contaminated oxides deposited on the surface of metals by dissolving them with chemical mechanisms, such as chelation, acidic or alkaline dissolution, redox reaction and so on. Carbon steel is the major material used in systems and pipelines in the nuclear power plant, thus it is also commonly selected as the target to be decontaminated in the decommissioning process. In this study, the effectiveness of chemical decontamination is evaluated by using multiphase treatment process including the reduction and the oxidation steps. In the step of redox reaction, the oxidation state of the substance is very important. Especially metals of some oxidation states show solubility in water, which has a decisive influence on the chemical decontamination. The experiment of decontamination of metal scraps is carried out by the immersion method within a chemical solution. The relative operation parameters such as temperature, pH, and concentration of the chemical solution are recorded to demonstrate the effect of the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sequential Bayesian inference of transition rates in the hidden Markov model for multi-state system degradation

The more easily available system performance data and advances in data analytics have provided us with opportunities to optimize maintenance programs for engineered systems, for example nuclear power plants. One key task in maintenance optimization is to obtain an accurate model for system degradation. Here, in this research, we propose a Bayesian method to address this problem. Noting that systems usually exhibit multiple states and that the actual state of a system usually is not directly observable, in the method we first model the system degradation process and the observation process based on a hidden Markov model. Then we develop a sequential Bayesian inference algorithm based on importance sampling and the forward algorithm to infer the posterior distributions of the transition rates in the hidden Markov model based on available observations. The proposed Bayesian method allows us to take advantage of evidence from multiple sources, and also allows us to perform Bayesian inference sequentially, without the need to use the entire history of observations every time new observations are collected. We demonstrate the proposed method using both synthetic data for a nuclear power plant feedwater pump and realistic data for a nuclear power plant chemistry analytical device.

42 ENGINEERING↗

A comprehensive framework for validating simulation models of power system equipment using terminal measurements

Accurate simulation of power-plants is essential to the planning and operation of modern power grids. The current methods used to periodically check power-plant simulation models have many open questions about their limitations and accuracy. The research in this project explored using Monte-Carlo Experimentation (MCE) as a means for answering these important questions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effect of aging on failure mechanism of Alloy 709 at various temperatures

Alloy 709 is a novel austenitic stainless steel with high temperature creep strength, weldability, and corrosion resistance. These properties make the material suitable for applications in the structure of next-generation nuclear power plants. Enduring high temperatures for an extended period of time in the harsh environments of a nuclear power plant results in thermal aging of the material. Therefore, it is imperative to study the effect of thermal aging on the microstructure and mechanical properties of Alloy 709 before its application in the next generation power plants. In this study, hot-processed (forged + rolled), annealed and quenched ingots of Alloy 709 are aged at 650 °C for 2000 h in air and then tested at various temperatures up to 850 °C in an in-situ heating-loading Scanning Electron Microscope (SEM) equipped with Energy Dispersive Spectroscopy (EDS) and Electron Backscatter Diffraction (EBSD). The effect of testing temperature and aging on microstructural evolutions during tensile testing of as-received and aged samples are studied. Furthermore, both as-received and aged samples displayed serrations and drop in ductility at elevated temperatures, due to the effect of dynamic strain aging (DSA). The occurrence of DSA activity was found within temperatures range of 500 °C–750 °C in as-received and 550 °C - 650 °C in aged samples. The aged samples showed less elongation accompanied by shallower dimples on the fractured surface, indicating less ductile failure mechanism compared to as-received samples. Failure mechanism observations on the fracture surface using SEM fractography are correlated to the observations made on the sample surface using in-situ SEM to achieve a complementary set of information to better understand the failure mechanism of this novel alloy.

36 MATERIALS SCIENCE↗

VPP Cybersecurity: Stakeholder Roles and Responsibilities

This presentation was presented at the Aggregation and Grid Security Workshop - held on June 17-18, 2025, at NREL in Golden, Colorado. The goal of the two-day workshop was to address the critical cybersecurity challenges for the future electric grid. This presentation outlines a framework for assessing the roles and responsibilities of virtual power plant stakeholders in mitigating cyber risk to virtual power plant projects and the overall power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nuclear Safety [Vol. 33, No. 4, October-December 1992]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 499 Technical Note: Nuclear Regulatory Commission’s Examination Question Bank System, C. L Jensen and N. L. Skinner; 506 Report on the Specialists’ Meeting on Passive and Active Safety Features of Liquid-Metal Fast Breeder Reactors Organized by the International Atomic Energy Agency at Oarai Engineering Centre of Power Reactor and Nuclear Development Corporation, Japan, November 5-7,1991, S. R. Paranjpe; ACCIDENT ANALYSIS: 514 A Review of Hydrogen Production During Melt/Water Interaction in LWRs, D. F. Fletcher, B. D. Turland, and S. P. A. Lawrence; 535 A Review of the U 3 0 8 -Al Reaction as a Potential Heat Source in Research and Test Reactor Accidents, J. L. Snelgrove; CONTROL AND INSTRUMENTATION: 543 Multilevel Interfaces for Power Plant Control Rooms II: A Preliminary Design Space, K. J. Vicente; DESIGN FEATURES: 549 Twenty-Second DOE/NRC Nuclear Air Cleaning and Treatment Conference, R. R. Bellamy, D. W. Moeller, and M. W. First; 562 Book Review: Safety Assessment of Unit 5 (WWER-440/W-213) of the Greifswald Nuclear Power Station, M. H. Fontana; WASTE AND SPENT FUEL MANAGEMENT: 576 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver; OPERATING EXPERIENCES: 586 Analysis of Corrective Actions Applied to Nuclear Power Plant Operations, A. E. Cross; 593 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 596 Operating U.S. Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver; 609 Non-Commercial Power Operating Experience; 614 World Nuclear Performance, Compiled by M. D. Muhlheim; RECENT DEVELOPMENTS: 623 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 635 Reports, Standards, and Safety Guides, D. S. Queener; 639 Proposed Rule Changes as of June 30, 1992; ANNOUNCEMENTS: 513 Fourth International Conference on Nuclear Fuel Reprocessing and Waste Management RECOD '94; 585 International Topical Meeting on Advanced Reactors Safety; 622 International Workshop on Implementation of ALARA at Nuclear Power Plants; 648 Short Course on Nuclear Criticality Safety; 648 8th Topical Meeting on Problems in Reactor Physics MEPhi-VOLGA-93; 643 The Authors; 646 Reviewers of Nuclear Safety, Vol. 33

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗