Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Transactive Campus Energy Systems (Final Report)

Transactive energy refers to the combination of economic and control techniques to improve grid reliability and efficiency. The fundamental purpose of transactive energy management is to seamlessly coordinate the operation of large numbers of new intelligent assets—such as distributed solar, energy storage and responsive building loads—to provide the flexibility needed to operate the power grid reliably and at minimum cost, particularly one filled with intermittent renewable generation such as the Pacific Northwest. It addresses the key challenge of providing smooth, stable, and predictable “control” of these assets, despite the fact that most are neither owned nor directly controlled by the power grid. The Clean Energy and Transactive Campus (CETC) work described in this report was done as part of a Cooperative Research and Development Agreement (CRADA) between the U.S. Department of Energy’s Pacific Northwest National Laboratory (PNNL) and the Washington State Department of Commerce (Commerce) through the Clean Energy Fund (CEF). The project team consisted of PNNL, the University of Washington (UW) and Washington State University (WSU), to connect the PNNL, UW, and WSU campuses to form a multi-campus testbed for transaction-based energy management—transactive—solutions. Building on the foundational transactive system established by the Pacific Northwest Smart Grid Demonstration (PNWSGD), the purpose of the project was to construct the testbed as both a regional flexibility resource and as a platform for research and development (R&D) on buildings/grid integration and information-based energy efficiency. This report provides a summary of the various tasks performed under the CRADA.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transactive Campus Energy Systems: Final Report

Transactive energy refers to the combination of economic and control techniques to improve grid reliability and efficiency. The fundamental purpose of transactive energy management is to seamlessly coordinate the operation of large numbers of new intelligent assets—such as distributed solar, energy storage and responsive building loads—to provide the flexibility needed to operate the power grid reliably and at minimum cost, particularly one filled with intermittent renewable generation such as the Pacific Northwest. It addresses the key challenge of providing smooth, stable, and predictable “control” of these assets, despite the fact that most are neither owned nor directly controlled by the power grid. The Clean Energy and Transactive Campus (CETC) work described in this report was done as part of a Cooperative Research and Development Agreement (CRADA) between the U.S. Department of Energy’s Pacific Northwest National Laboratory (PNNL) and the Washington State Department of Commerce (Commerce) through the Clean Energy Fund (CEF). The project team consisted of PNNL, the University of Washington (UW) and Washington State University (WSU), to connect the PNNL, UW, and WSU campuses to form a multi-campus testbed for transaction-based energy management—transactive—solutions. Building on the foundational transactive system established by the Pacific Northwest Smart Grid Demonstration (PNWSGD), the purpose of the project was to construct the testbed as both a regional flexibility resource and as a platform for research and development (R&D) on buildings/grid integration and information-based energy efficiency. This report provides a summary of the various tasks performed under the CRADA.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluating Transactive Controls of Integrated Transmission and Distribution Systems using the Framework for Network Co-Simulation

With an ever-evolving power grid, concerns regarding how to maintain system stability, efficiency, and reliability remain constant because of increasing uncertainties and decreasing rotating inertia. To alleviate some of these concerns, demand response represents a viable solution and is virtually an untapped resource in the current power grid. This work describes a hierarchical control framework that allows coordination between distributed energy resources and demand response. This control framework is composed of two control layers: a coordination layer that ensures aggregations of resources are coordinated to achieve system objectives and a device layer that controls individual resources to assure the predetermined power profile is tracked in real time. Large-scale simulations are executed to study the hierarchical control, requiring advancements in simulation capabilities. Technical advancements necessary to investigate and answer control interaction questions, including the Framework for Network Co-Simulation platform and Arion modeling capability, are detailed. Insights into the interdependencies of controls across a complex system and how they must be tuned, as well as validation of the effectiveness of the proposed control framework, are yielded using a large-scale integrated transmission system model coupled with multiple distribution systems.

demand response↗

Modelling and analysis of nuclear reactor system coupled with a liquid metal battery

Traditionally, nuclear power plants in the U.S. provide baseload power to the power grid because they have less flexibility for ramping their output power than natural gas peaking plants. However, achieving climate goals to reduce the consumption of fossil‐based natural gas places pressure on nuclear power plants and other power generators to ramp up their power output to balance grid generation with demand. This paper presents the modelling and performance analysis of a nuclear reactor system (NRS) coupled to a liquid‐metal battery (LMB) to improve its dynamic response and enable its black start capability. The NRS and LMB thermal behaviour are modelled in Dymola, while the electrical dynamics of the LMB and power grid are modelled in RTDS‐RSCAD. Both simulation platforms are coupled and share their thermal and electrical data using a Transmission Control Protocol/Internet Protocol (TCP/IP) communication protocol. The dynamic performance of the NRS‐LMB integration is tested on the IEEE 9 bus, which demonstrates its ability to respond and provide frequency and voltage regulation. The black start capability of the NRS‐LMB is also evaluated by simulating a grid outage and using the LMB to supply the auxiliary loads required to bring the NRS back online as soon as possible. The results show that coupling an NRS to an LMB improves the system dynamic performance and enables it to black start after being disconnected from the grid for several days.

25 ENERGY STORAGE↗

Wide area fault detection method using PMU data

The embodiments herein are directed to monitoring in real time, power system data so as to provide insights into global operation of a power grid. Such a scheme disclosed herein utilizes rules, which are created by analyzing PMU measurement data, in order to detect the fault location (bus and line) and fault type. Three common types of faults in a power grid, single-line-to-ground (SLG), line-to-line (LL), and three phase faults, can be detected using the methods herein.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lunar Microgrid Trade Studies to Define Interface Converter Requirements

The National Aeronautics and Space Administration (NASA) is interested in developing an incremental lunar power grid to support continuous human/robotic operations under the Artemis missions and can scale to global power utilization and industrial power levels. The initial lunar surface power system will be composed primarily of assets that contain their own power generation and energy storage. These assets can be connected to form a grid, which allows power to be shared between the system’s distributed energy resources. This grid can provide backup power to existing assets as well as primary power to future assets. A trade study was conducted for an Artemis scale grid, which has identified 3 kVAC as an ideal transmission voltage. This paper documents the analysis and findings from these trade studies. These studies were used to define the operating voltage and develop a common interface for connecting lunar surface assets to the power grid. The Universal Modular Interface Converter (UMIC) connects lunar surface assets to the high voltage grid. Products from this grid definition and UMIC development work will enable highly reliable and available power for Artemis and future planetary surface missions, which is key to achieving NASA’s long-term vision of space exploration.

Planetary surface power↗

Machine Learning-based Cyber-Physical Anomaly Detection in Wide Area Voltage Control Systems

Wide-area voltage control systems (WAVCS) are widely deployed in power grid to improve the voltage stability in transmission system using Flexible AC Transmission System (FACTS) devices. The WAVCS relies on wide-area measurement and control signals for closed-loop control of FACTS devices to improve the transient voltage stability in power grid in real-time. Since the WAVCS utilizes a cyber-layer communication during its normal operation, they are susceptible to cyber attacks from adversaries which can lead to a voltage collapse if the attacks go undetected and unmitigated. This paper proposes a supervised machine learning (ML)-based anomaly detection algorithm for detecting various stealthy cyber attacks in the context of WAVCS cybersecurity. In particular, a fuzzy logic-based wide-area controller, as proposed by the Bonneville Power Administration (BPA), is implemented on the Kundur’s four machine two-area system that is integrated with a static var compensator (SVC) to improve voltage profile on sensitive buses. Later, different types of data integrity attacks, including pulse and ramp attacks, are considered on the wide-area measurement and control signals to analyze the performance of the proposed anomaly detector. Our experimental evaluation shows a promising performance with a high true-positive rate (more than 99%) and low false-negative rate (less than 1%) while exhibiting a small prediction time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RECOVERY ACT - Robust Optimization for Connectivity and Flows in Dynamic Complex Networks

The goal of this project was to study robust connectivity and flow patterns of complex multi-scale systems modeled as networks. Networks provide effective ways to study global, system level properties, as well as local, multi-scale interactions at a component level. Numerous applications from power systems, telecommunication, transportation, biology, social science, and other areas have benefited from novel network-based models and their analysis. Modeling and optimization techniques that employ appropriate measures of risk for identifying robust clusters and resilient network designs in networks subject to uncertain failures were investigated in this collaborative multi-university project. In many practical situations one has to deal with uncertainties associated with possible failures of network components, thereby affecting the overall efficiency and performance of the system (e.g., every node/connection has a probability of partial or complete failure). Some extreme examples include power grid component failures, airline hub failures due to weather, or freeway closures due to emergencies. These are also situations in which people, materials, or other resources need to be managed efficiently. Important practical examples include rerouting flow through power grids, adjusting flight plans, and identifying routes for emergency services and supplies, in the event network elements fail unexpectedly. Solutions that are robust under uncertainty, in addition to being economically efficient, are needed. This project has led to the development of novel models and methodologies that can tackle the optimization problems arising in such situations. A number of new concepts, which have not been previously applied in this setting, were investigated in the framework of the project. The results can potentially help decision-makers to better control and identify robust or risk-averse decisions in such situations. Formulations and optimal solutions of the considered problems need to capture uncertainty and risk using appropriate probabilistic, statistical and optimization concepts. The main difficulty arising in addressing these issues is the dramatic increase in the computational complexity of the resulting optimization problems. This project studied novel models and methodologies for risk-averse network optimization- specifically, network design, network flows and cluster detection problems under uncertainty. The approach taken was to incorporate a quantitative risk measure known as conditional value-at-risk that is widely used in financial applications. This approach presents a viable alternate modeling and optimization framework to chance-constrained optimization and mean-variance optimization, one that also facilitates the detection of risk-averse solutions.

97 MATHEMATICS AND COMPUTING↗

An Assessment of Deploying Advanced Pumped Storage Hydropower Technology in U.S. Electricity Markets

Pumped storage hydropower (PSH) is a type of hydropower technology where energy can be stored and generated by moving water between two reservoirs of differing elevations. In addition to providing 97% of the total utility-scale hydropower storage in the United States, PSH plants have operational characteristics - such as high ramp rates and the ability to provide reserves - that contribute to greater flexibility and reliability of the power grid. New PSH technologies can provide additional flexibility beyond existing, fixed-speed units. With the emergence of high levels of variable renewable energy resources (e.g., wind and solar), energy storage is expected to be crucial to the reliability and reliance of the power grid in a low-carbon future. At diurnal and longer durations, PSH plants have some of the lowest costs per unit of energy, have been proven to be reliable and efficient, are not cycle-limited, and typically have long lives, often exceeding 50 years. The work presented here focuses on a new generation of PSH: ternary PSH and quaternary PSH (together referred to as T/Q-PSH). Given recent experience in Europe, grid operators in the United States and elsewhere are increasingly focusing their attention on T/Q-PSH as a proven, financeable technology that can offer utility-scale, long-duration, fast-acting energy storage capabilities and grid services. T/Q-PSH differs from conventional PSH in that it can provide fast-response ancillary services during both generating and pumping operations. This capability together with fast mode switching times are key attributes that make T/Q-PSH technologies attractive for managing and stabilizing electricity systems with high amounts of variable renewable energy.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Dynamic Temporal Graph Sequence Data for Resilience-Oriented Distribution Network Reconfiguration

This dataset comprises temporal dynamic graph sequences generated from power grid simulations focused on grid reconfiguration to enhance resilience. The simulations model failure propagation under varying conditions, with nodes assigned distinct failure probabilities. For each time step, the dataset captures the evolution of node states (functional or failed) and features critical to grid operations, such as pv_output, load_profile, load_dispatch, dg_output, loss, and voltage. Node types include sources, normal loads, and nodes with specific equipment like PVs, micro turbines, or shunt capacitors. The dataset is structured to support the training of dynamic graph neural networks, facilitating research on node feature prediction and edge dynamics under failure scenarios. Three distinct configurations are included, providing a robust foundation for modeling power grid resilience.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data Requirements for Application of Risk-Based Dynamic Contingency Analysis to Evaluate Hurricane Impact to Electrical Infrastructure in Puerto Rico

This paper presents a risk-based dynamic contingency analysis framework that was used to evaluate the hurricane impact to electrical infrastructure in Puerto Rico. PNNL developed a scalable risk-based framework for identifying high-voltage transmission resilience improvements by classifying and prioritizing high-risk power grid contingencies (system failures) under hurricane impact. The risk-based framework is founded on grid outage definitions with their associated probabilities of occurrence from hurricane events, in combination with an impact assessment derived from detailed dynamic cascading failure analysis. This paper focuses on a discussion around data requirements for transmission resilience planning for hurricane events, derived from the development of the risk-based framework and its application to Puerto Rico. This paper launches an important first step in encouraging the engineering community and power system industry to move towards establishing resilience planning as a routine practice. Since actual results for Puerto Rico contain sensitive information, sample simulation results will be used to illustrate the data requirements and risk-based dynamic cascading framework on the Puerto Rico power grid, as well as demonstrate the potential for such a simulation framework. The paper includes a discussion on the lessons learned, importance and need for improved datasets that are not usually considered in traditional power system planning. The paper will also elaborate on how the scalable simulation framework and datasets might be expanded to larger footprints and leveraged for modelling other types of natural disasters.

DCAT, Puerto Rico, hurricane, Power System Stabili↗

Monthly hydropower generation data for Western Canada to support Western-US interconnect power system studies

Hydroelectric power generation in Western Canada significantly contributes to power grid operations of the North American Western Interconnection through substantial generation, some of which is exported to the United States (U.S.). However, the lack of publicly available hydropower generation datasets poses challenges for future market projections and resource adequacy evaluations. We present a simulation-based monthly power system model-ready hydropower generation dataset for 110 facilities in British Columbia and Alberta from 1981 to 2019. These monthly hydropower generation estimates are developed from integrated hydrologic model simulations of runoff and reservoir-operated streamflow, followed by scaling that considers diversion inflow constraints based on hydropower water license information. To address the lack of comparable hydropower generation records, we conduct step-by-step evaluations for simulated runoff, regulated streamflow, and hydropower generation using available observations or estimates. The presented hydropower dataset aims to enhance the representation of hydropower resources in Western Canada, supporting power grid system studies for the Western Interconnection of the U.S. and Canada.

13 HYDRO ENERGY↗

Barrier Function-based Reinforcement Learning for Emergency Control of Power Systems

Under voltage load shedding has been considered as a standard and effective measure to recover the voltage stability of the electric power grid under emergency and severe conditions. However, this scheme usually trips a massive amount of load which can be unnecessary and harmful to customers. Recently, deep reinforcement learning (RL) has been regarded and adopted as a promising approach that can significantly reduce the amount of load shedding. However, like most existing machine learning (ML)-based control techniques, RL control usually cannot guarantee the safety of the systems under control. In this paper, we introduce a novel safe RL method for load shedding of power systems, that can enhance the safe voltage recovery of the electric power grid after experiencing faults. Unlike standard RL method, the safe RL method integrates a Barrier function into the reward function. Consequently, the optimal control policy can render the power system to avoid the safety bounds. This method is general and can be applied to other safety-critical control problems. Numerical simulations on the 39-bus IEEE benchmark is performed to demonstrate the effectiveness of the proposed safe RL emergency control, as well as its adaptive capability to faults not seen in the training.

Vu, Thanh Long↗

Electromagnetic Transient (EMT) Simulation Algorithms for Evaluation of Large-Scale Extreme Fast Charging Systems (T&D Models)

Simulation of high-fidelity models of extreme fast charging (XFC) systems and large-area power grids with many XFCs can be time consuming in traditional simulators. Traditional simulators use a single method of discretization for all the components that results in imposing a large computational burden of inverting a large matrix as well as increased computations related to single method of discretization (that is typically a trapezoidal method). To overcome the problem of simulating large-area power grids with many XFCs, in this paper, advanced numerical simulation algorithms are applied for the first time together to reduce the dimension of matrix inversion. Here, the algorithms include numerical stiffness-based segregation, time constant-based segregation, clustering and aggregation on differential algebraic equations (DAEs), and multi-order integration approaches. These algorithms apply multiple discretization algorithms rather than a single discretization algorithm that further reduces the computational burden. The approaches mentioned here have resulted in speed-up of up to 18x in the simulation of a single distribution system with 15 XFCs and of up to 271x in the simulation of a transmission-distribution system with 300 XFCs in multiple distribution feeders with respect to conventional simulators (like power systems computer aided design [PSCAD]).

42 ENGINEERING↗

Center for Alternate Synchronization and Timing (CAST) PTP Network Monitoring Report

The Oak Ridge National Laboratory Center for Alternative Synchronization and Timing (CAST) performs research, development, testing, and evaluation of alternative terrestrial-based timing and synchronization infrastructure for the US power grid and other critical infrastructures. Alternative timing options reduce reliance on GPS and enhance the overall resilience of critical infrastructures. CAST infrastructure uses Precision Time Protocol (PTP) as the primary conduit for delivery of synchronization packets. CAST deploys PTP over long terrestrial links to synchronize a multitude of remote boundary clocks and downstream power grid components with the authoritative grand master clocks. Network traffic issues can severely degrade PTP accuracy. This report focuses on examining network traffic anomalies and their effects on PTP operation as well as the potential implications to CAST’s high-precision remote synchronization operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Propulsion Powertrain Real-Time Simulation Using Hardware-in-the-Loop (HIL) for Aircraft Electric Propulsion System

It is essential to design a propulsion powertrain real-time simulator using the hardware-in-the-loop (HIL) system that emulates an electrified aircraft propulsion (EAP) systems power grid. This simulator would enable us to facilitate in-depth understanding of the system principles, to validate system model analysis and performance prediction, and to demonstrate the proof-of-concept of the EAP electrical system. This paper describes how subscale electrical machines with their controllers can mimic the power components in an EAP powertrain. In particular, three powertrain emulations are presented to mimic 1) a gas turbo-=shaft engine driving a generator, consisting of two permanent magnet (PM) motors with brushless motor drives, coupled by a shaft, 2) a motor driving a propulsive fan, and 3) a turbo-shaft engine driven fan (turbofan engine) operation. As a first step towards the demonstration, experimental dynamic characterization of the two motor drive systems, coupled by a mechanical shaft, were performed. The previously developed analytical motor models1 were then replaced with the experimental motor models to perform the real-time demonstration in the predefined flight path profiles. This technique can convert the plain motor system into a unique EAP power grid emulator that enables rapid analysis and real-time simulation performance using hardware-in-the-loop (HIL).

turbo-electric propulsion↗

A Blockchain Based Co-Simulation Framework for Integrating DERs to Wholesale Electricity Markets

As the number of distributed energy resources (DERs) continue to increase across energy-delivery systems, there remains a need for integrating their capabilities into traditional grid operations. In this paper, a blockchain-based solution is proposed to facilitate FERC's Order No. 2222 implementations. The presented use-case enables small-scale DERs to participate in wholesale market operations through DER aggregators, while also enabling local distribution system operators to enforce distribution system constraints in a secure and traceable manner. The presented use case is built around the Unified Testing Platform (UTP) being developed as a part of the Blockchain for Optimized Security and Energy Management (BLOSEM) project. This is a multi-lab effort intended to simplify the deployment of blockchain-powered grid solutions by enabling the integration of simulation tools, and blockchain technologies through the use of system-agnostic interfaces that provide a modular, interoperable, and reusable connectivity layer.

blockchain interoperability↗

Analysis of Electrical Grid Capacity in Major U.S. Metropolitan Areas for Urban Air Mobility

A wide range of challenges must be overcome to conduct Urban Air Mobility (UAM) operations at scale with electric vertical takeoff and landing aircraft as envisioned. This paper documents an analysis of one potential infrastructure challenge for UAM: available electrical grid power capacity. The success of UAM depends on the availability of electricity, which will be increasingly impacted by the proliferation of ground electric vehicles (EVs) over time. Under the worst-case assumption that each U.S. Metropolitan Statistical Area (MSA) can only access and utilize the electricity generated by power plants within its boundaries, it is estimated that the maximum number of UAM aircraft that can charge simultaneously in the 25 most populous MSAs will decrease by about 61% from about 129,000 in the year 2021 to about 51,000 in the year 2050, due to the projected increase in ground EVs. Also, it is estimated that the number of these MSAs that may lack any available electrical grid power capacity for UAM operations will increase from zero MSAs in 2021 to eleven MSAs in 2050—including three MSAs that prospective UAM operators have announced as target markets (Los Angeles, Miami, and Orlando)—unless electricity demand for other purposes is reduced.

electrical grid↗