Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Draft Environmental Impact Statement for the Ulysses Mission (Tier 2)

This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Ulysses spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special(PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG). The potential effects considered in this EIS include risks of air and water quality impacts, local land area contamination, adverse health and safety impacts, the disturbance of biotic resources, impacts on wetland areas or areas containing historical sites, and socioeconomic impacts. Intensive analysis of the possible accidents associated with the proposed action are underway and preliminary results indicate small health or environmental risks. The results of a Final Safety Analysis Report will be available for inclusion into the final EIS.

Source record↗

Investigation of IGES for CAD/CAE data transfer

In a CAD/CAE facility there is always the possibility that one may want to transfer the design graphics database from the native system to a non-native system. This may occur because of dissimilar systems within an organization or a new CAD/CAE system is to be purchased. The Initial Graphics Exchange Specification (IGES) was developed in an attempt to solve this scenario. IGES is a neutral database format into which the CAD/CAE native database format can be translated to and from. Translating the native design database format to IGES requires a pre-processor and transling from IGES to the native database format requires a post-processor. IGES is an artifice to represent CAD/CAE product data in a neutral environment to allow interfacing applications, archive the database, interchange of product data between dissimilar CAD/CAE systems, and other applications. The intent here is to present test data on translating design product data from a CAD/CAE system to itself and to translate data initially prepared in IGES format to various native design formats. This information can be utilized in planning potential procurement and developing a design discipline within the CAD/CAE community.

Zobrist, George W.↗

Large screen display for the Mission Control Center

The Mission Control Center (MCC), located at the Johnson Space Center near Houston, Texas, is the primary point of control and monitoring for National Space Transportation System (NSTS) flight activities. NSTS flight managers monitor and command spacecraft from one of two Flight Control Rooms (FCR). Each FCR is equipped with five large screen displays for group dissemination of spacecraft system status and vehicle position relative to Earth geography. The primary or center screen display is ten feet in height and twenty feet in width. The secondary or side screens are seven and one-hald feet high and ten feet wide. The center screen projection system is exhibiting high maintenance costs and is considered to be in wear-out phase. The replacement of the large center screen displays at the MCC is complicated by the unique requirements of the Flight Controller user. These requirements demand a very high performance, multiple color projection system capable of the display of high resolution text, graphics and images produced in near real time. The current system to be replaced, the replacement system requirements, the efforts necessary to procure the major element of this system (the projector) for the government, and how the new capabilities are to be integrated into the existing MCC operational configuration are discussed.

Skudlarek, Martin J.↗

Transportation monitoring unit qualification

Transportation monitoring unit (TMU) qualification testing was performed between 3 Mar. and 14 Dec. 1989. The purpose of the testing was to qualify the TMUs to monitor and store temperature and acceleration data on redesigned solid rocket motor segments and exit cones while they are being shipped from Utah's Thiokol Corporation, Space Operations, to Kennedy Space Center. TMUs were subjected to transportation tests that concerned the structural integrity of the TMUs only, and did not involve TMU measuring capability. This testing was terminated prior to completion due to mounting plate failures, high and low temperature shutdown failures, and data collection errors. Corrective actions taken by the vendor to eliminate high temperature shutdowns were ineffective. An evaluation was performed on the TMUs to determine the TMU vibration and temperature measuring accuracy at a variety of temperatures. This test demonstrated that TMU measured shock levels are high, and that TMUs are temperature sensitive because of decreased accuracy at high and low temperatures. It was determined that modifications to the current TMU system, such that it could be qualified for use, would require a complete redesign and remanufacture. Because the cost of redesigning and remanufacturing the present TMU system exceeds the cost of procuring a new system that could be qualified without modification, it is recommended that an alternate transportation monitoring system be qualified.

Cook, M.↗

Draft environmental impact statement for the Galileo Mission (Tier 2)

This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special (PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of: (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG).

Source record↗

Final Environmental Impact Statement for the Ulysses Mission (Tier 2)

This Final (Tier 2) Environmental Impact Statement (FEIS) addresses the environmental impacts which may be caused by implementation of the Ulysses mission, a space flight mission to observe the polar regions of the Sun. The proposed action is completion of preparation and operation of the Ulysses spacecraft, including its planned launch at the earliest available launch opportunity on the Space Transportation System (STS) Shuttle in October 1990 or in the backup opportunity in November 1991. The alternative is canceling further work on the mission. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. This alternative was further evaluated and eliminated from consideration when, in November 1988, the U.S. Air Force, which procures the Titan 4, notified that it could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The Titan 4 launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special (PAM-S) for the November 1991 launch opportunity. The only expected environment effects of the proposed action are associated with normal launch vehicle operation and are treated elsewhere. The environmental impacts of normal Shuttle launches were addressed in existing NEPA documentation and are briefly summarized. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects were judged insufficient to preclude Shuttle launches. There could also be environmental impacts associated with the accidental release of radiological material during launch, deployment, or interplanetary trajectory injection of the Ulysses spacecraft. Intensive analysis indicates that the probability of release is small. There are no environmental impacts in the no-action alternative; however, the U.S. Government and the European Space Agency would suffer adverse fiscal and programmatic impacts if this alternative were adopted. The scientific benefits of the mission would be delayed and possibly lost. There could be significant impacts on the ability of the U.S. to negotiate international agreements for cooperative space activities.

Source record↗

A preliminary design of interior structure and foundation of an inflatable lunar habitat

A preliminary structural design and analysis of an inflatable habitat for installation on the moon was completed. The concept takes the shape of a sphere with a diameter of approximately 16 meters. The interior framing provides five floor levels and is enclosed by a spherical air-tight membrane holding an interior pressure of 14.7 psi (101.4kpa). The spherical habitat is to be erected on the lunar surface with the lower one third below grade and the upper two thirds covered with a layer of lunar regolith for thermal insulation and shielding against radiation and meteoroids. The total dead weight (earth weight) of the structural aluminum, which is of vital interest for the costly space transportation, is presented. This structural dead weight represents a preliminary estimate without including structural details. The design results in two versions: one supports the weight of the radiation shielding in case of deflation of the fabric enclosure and the other assumes that the radiation shielding is self supporting. To gain some indication of the amount of structural materials needed if the identical habitat were installed on Mars and Earth, three additional design versions were generated where the only difference is in gravity. These additional design versions are highly academic since the difference will be much more than in gravity alone. The lateral loading due to dust storms on Mars and wind loads on Earth are some examples. The designs under the lunar gravity are realistic. They may not be adequate for final material procurement and fabrication, however, as the connection details, among other reasons, may effect the sizes of the structural members.

Yin, Paul K.↗

Technical guide on documentation requirements for open market contract acquisitions of information resources

A guide is presented to assist requestors in formulating and submitting the required Complete Package for Information Resources (IR) acquisitions. Advance discussions with cognizant procurement personnel are strongly recommended for complex IR requirements or for those requestors new to the acquisition process. Open Market means the requirement either is not available on GSA Schedule Contract or exceeds the $300,000 threshold and/or the quantity Maximum Order Limitation of the GSA Schedule Contract. Only open market contract acquisitions (i.e., in excess of the $25,000 small purchase threshold), are addressed.

Shaw, Asa L., Jr.↗

Calculation of turbulence-driven secondary motion in ducts with arbitrary cross-section

Calculation methods for turbulent duct flows are generalized for ducts with arbitrary cross-sections. The irregular physical geometry is transformed into a regular one in computational space, and the flow equations are solved with a finite-volume numerical procedure. The turbulent stresses are calculated with an algebraic stress model derived by simplifying model transport equations for the individual Reynolds stresses. Two variants of such a model are considered. These procedures enable the prediction of both the turbulence-driven secondary flow and the anisotropy of the Reynolds stresses, in contrast to some of the earlier calculation methods. Model predictions are compared to experimental data for developed flow in triangular duct, trapezoidal duct and a rod-bundle geometry. The correct trends are predicted, and the quantitative agreement is mostly fair. The simpler variant of the algebraic stress model procured better agreement with the measured data.

Demuren, A. O.↗

Neutral buoyancy methodology for studying satellite servicing EVA crewmember interfaces

Current economic constraints indicate the need for incorporating the satellite servicing philosophy of commonality within the design of spacecraft subsytems. This philosophy is essential for conserving resources including hardware/software development and implementation costs, on-orbit and ground-based manpower, crew training/testing time, and documentation. In addition, spacecraft subsystem commonality may be coupled with standardization of operation procedures, and test and verification techniques for spacecraft design. Several spacecraft have adopted this practice, including Hubble Space Telescope, Space Station Freedom, and the Explorer Platform. As these and other programs continue and if effective crew interfaces and procedures are clearly and consistently defined, crew retraining for similar spacecraft subsystems will lessen, and procurement efforts will diminish. A relatively high fidelity zero-gravity simulation using water immersion is available to establish crew interfaces economically. The flexibility and utility of this space simulation medium for planning and assisting on-orbit operations was exemplified by astronaut evaluations of potential EVA electrical connectors. The testing was conducted at a NASA underwater neutral buoyancy training facility.

Barnby, Mary E.↗

Computational fluid dynamics analysis of space shuttle main propulsion feed line 17-inch disconnect valves

A steady incompressible three-dimensional (3-D) viscous flow analysis was conducted for the Space Shuttle Main Propulsion External Tank (ET)/Orbiter (ORB) propellant feed line quick separable 17-inch disconnect flapper valves for liquid oxygen (LO2) and liquid hydrogen (LH2). The main objectives of the analysis were to predict and correlate the hydrodynamic stability of the flappers and pressure drop with available water test data. Computational Fluid Dynamics (CFD) computer codes were procured at no cost from the public domain, and were modified and extended to carry out the disconnect flow analysis. The grid generator codes SVTGD3D and INGRID were obtained. NASA Ames Research Center supplied the flow solution code INS3D, and the color graphics code PLOT3D. A driver routine was developed to automate the grid generation process. Components such as pipes, elbows, and flappers can be generated with simple commands, and flapper angles can be varied easily. The flow solver INS3D code was modified to treat interior flappers, and other interfacing routines were developed, which include a turbulence model, a force/moment routine, a time-step routine, and initial and boundary conditions. In particular, an under-relaxation scheme was implemented to enhance the solution stability. Major physical assumptions and simplifications made in the analysis include the neglect of linkages, slightly reduced flapper diameter, and smooth solid surfaces. A grid size of 54 x 21 x 25 was employed for both the LO2 and LH2 units. Mixing length theory applied to turbulent shear flow in pipes formed the basis for the simple turbulence model. Results of the analysis are presented for LO2 and LH2 disconnects.

Kandula, Max↗

Complete the development and construction of a spaceborne hydrogen maser clock

The objective, to complete the development of an engineering model of a spaceborne hydrogen maser, was successfully achieved. A layout of the maser and detail drawings of the physics package was completed during the first 7 months of the contract. A computer model was made for the maser's thermal design. Using numerical computations, heater resistances were established for 7 temperature controlled zones. The physics package includes: a vacuum manifold that houses four sorption pumps capable of scavenging hydrogen for 4 years, a titanium vacuum tank housing the cavity, metallic seals for all vacuum joints, an RF dissociator within the vacuum envelope, a two-layer printed circuit solenoid and four layers of moly-permalloy magnetic shields. Problems were encountered and overcome in the procurements of the PC solenoid and the magnetic shields. After completion of the fabrication of the maser's components, the maser was assembled using these parts and other components made available by SAO, NRL, and NASA from earlier development work. In March, 1990, the vacuum system was assembled, and by May the maser assembly was completed. The magnetic shielding was poor and the shields were removed, reannealed by a local vendor, and the maser was reassembled. The maser began tests in early June and has been oscillating since that time. The test results of the maser are very good and a life test of the maser is being conducted. It is anticipated that the development and construction of a maser to be tested in space under a new contract from NASA's Marshall Space Flight Center will continue.

Vessot, Robert F. C.↗

An assessment of the government liquid hydrogen requirements for the 1995-2005 time frame

The results of government study of long range liquid hydrogen (LH2) requirements for the time period of 1995 through the year 2005 are presented. To assure an adequate supply of LH2 is available in support of various programs, it is imperative a long range projection of LH2 requirements be developed and maintained. This information is vital in planning for necessary procurement actions and assuring adequate industry lead time to acquiring the necessary production and distribution capabilities. The Advanced Launch System and High-Altitude Long-Endurance programs may represent the predominant government needs for LH2 in the long range. The assembled data clearly indicates a need for KSC (Kennedy Space Center) constant program/project surveillance. Also clear is the need for KSC to monitor industry's plans for LH2 plant production and distribution expansion.

Bain, Addison↗

Selling to NASA

This handbook is designed to promote a better understanding of NASA's interests and the process of doing business with NASA. The document is divided into the following sections: (1) this is NASA; (2) the procurement process; (3) marketing your capabilities; (4) special assistance programs; (5) NASA field installations; (6) sources of additional help; (7) listing of NASA small/minority business personnel; and (8) NASA organization chart.

Source record↗

An overview of SAFENET and its implications for aerospace applications

The survivable, adaptable fiber optic embeddable network (SAFENET) is a draft standard for local area networking (LAN) developed by the Navy which, when adopted, will become a military standard. The standard is being developed for procurement specifications of computer resources to be used on ships and aircraft and has some of the real-time concerns that network standards for space vehicles have. Architecture and survivability are considered. It is noted that the token-ring LAN must implement the IEEE 802.5 recommended practice for dual ring reconfiguration, which is currently being reviewed for inclusion into the IEEE standard. A trunk coupling unit is used at each station to isolate a station from the ring in case of failure. Up to five stations can be bypassed in this fashion. Communication architecture has an OSI profile but differs from the standard concept of the seven layers by allowing alternate suits and breaking the layers into three groupings of services to allow for physical interfacing. It also provides several paths, even if only one profile is used. Management and synchronization protocols are discussed and security issues are addressed. Implications for aerospace applications are considered and it is projected that interoperability with the Navy and other U.S. Government systems may require SAFENET specifications for NASA systems.

Collins, George C.↗

The BBC network radio time and frequency standard and its role in the provision of the Greenwich time signal

The British Broadcasting Corporation (BBC) has broadcast the Greenwich Time Signal (GTS) on its networks since 1924. Up to February 1990 this signal was generated by the Royal Greenwich Observatory (RGO) in England. The BBC was informed that the RGO was moving its location to Cambridge and might not be able to continue to provide the Greenwich Time Service. The BBC in its role of a public service broadcaster believed that a long tradition of providing a time signal to its listeners should be upheld, and as such decided to seek alternative methods of provision. In parallel with this activity, an in-house requirement arose to re-engineer time switch equipment and provide new facilities for digital audio projects. As both requirements have a common engineering core, a decision was taken to design and procure a Time and Frequency Standard that could generate the Greenwich Time Signal to the same specification adhered to by the RGO, and provide additional time and frequency facilities. The concept of time and time/frequency dissemination as used in a broadcast network is discussed, as well as the details of an engineering solution to the requirements of BBC Network Radio.

Mcilroy, Jim J.↗

The surface of near-Earth asteroids

The surfaces of near-Earth asteroids are expected to differ significantly from those of large objects like the moon because of their different origin and evolution. A selection of such objects for an extensive procurement of material will also be made on criteria like the surface roughness and the rotation rate with respect to the surface gravity. From the currently known distribution of near-Earth asteroid rotation rates it is shown that a significant fraction of them is rotating near their escape velocities. The determination of macroscopic surface roughness from rotation light curves under an assumption of a fractal surface geometry is discussed. Much information is expected from the variation of harmonic expansions of the light curves with the phase angle.

Hoffmann, Martin↗

Experimental data from an oxygen plant for Mars

Experimental data are presented on various aspects of the plant operation intended to produce oxygen from the atmospheric carbon dioxide at any Martian site. A solid electrolytic cell is used in the tubular geometry. Anaerobic carbon dioxide is procured from a gas vendor and is used at a pressure of 1 bar (entrance to the plant). The variables include the voltage applied to the cell, the temperature of the cell, the current density, the flow rate and the duty-cycle. The oxygen production rates have been consistent with the specifications of the cell manufacturer. It is projected that a plant weighing between 145 and 197 kg can be built to produce 10 kg of oxygen per day. Various operational characteristics such as cell poisoning, carbon formation, nitrogen embrittlement, local current densities exceeding the breakdown potential for the cell material, reliability, risk, are all being quantitatively assessed.

Schallhorn, P. A.↗