A definition study of the on-orbit assembly operations for the outboard photovoltaic power modules for Space Station Freedom

A concept is described for the assembly of the outboard PV modules for Space Station Freedom. Analysis of the on-orbit assembly operations was performed using CADAM design graphics software. A scenario for assembly using the various assembly equipment, as currently defined, is described in words, tables and illustrations. This work is part of ongoing studies in the area of space station assembly. The outboard PV module and the assembly equipment programs are all in definition and preliminary design phases. An input is provided to the design process of assembly equipment programs. It is established that the outboard PV module assembly operations can be performed using the assembly equipment currently planned in the Space Station Freedom Program.

Sours, Thomas J.↗

Final report of a scalable, automated, semipermanent seismic array (SASSA) method for detecting CO 2 extent during geologic CO 2 injection

The scalable, automated, semipermanent seismic array (SASSA) project led and managed by the Energy & Environmental Research Center (EERC) was designed as a 3-year proof-of-concept study to evaluate and demonstrate an innovative application of the seismic method. The concept was to use a sparse surface array of 96 nodal seismic sensors paired with a single, remotely operated active seismic source at a fixed location to monitor for CO 2 saturation changes in a subsurface reservoir by processing the data for time-lapse changes at individual, strategically chosen reservoir reflection points. The combination of autonomous equipment and modern processing algorithms was used to apply the seismic method in a manner different from the normal paradigm of collecting a spatially dense data set to produce an image. It was used instead to monitor individual, strategically chosen reservoir reflection points for detectable signal character changes that could be attributed to the passing of a CO 2 saturation front or, possibly, changes in reservoir pressure. Data collection occurred over the course of 1 year at an oil field undergoing CO 2 injection for enhanced oil recovery (EOR) and focused on four overlapping “five-spot” EOR injector–producer patterns. Selection, procurement, configuration, installation, and testing of project equipment and collection of five baseline data sets were completed in advance of CO 2 injection within the study area. Weekly remote data collection produced 41 incremental time-lapse records for each of the 96 nodes. Validation was provided by two methods: 1) a conventional 2-D seismic line acquired through the center of the study area before injection started and again after the project ended and processed in a time-lapse manner and 2) by CO 2 saturation maps created from reservoir simulations based on injection and production history matching. Interpreted results were encouraging but mixed, with indications of changes likely due to the presence of CO 2 on some node reflection points where and when effects would be expected and noneffects where no CO 2 was expected, while results at some locations where simulation outputs suggested CO 2 should be present were ambiguous. Acquisition noise impacted interpretation of data at several locations. Many lessons learned were generated by the study to inform and improve results on a follow-up study. The ultimate aim of the project was to evaluate whether deployment of a SASSA technology can provide a useful and cost-effective monitoring solution for future CO 2 injection projects. The answer appears to be affirmative, with the expectation that lessons learned applied to future iterations, together with technology advances, will likely result in significant improvements.

58 GEOSCIENCES↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

Fluor Idaho's Technical and Programmatic Approach That Resolved the Problems with the Integrated Waste Treatment Unit - 19290

The Integrated Waste Treatment Unit (IWTU) is a facility designed to treat approximately 900,000 gallons of radioactive liquid waste, referred to as Sodium Bearing Waste (SBW). IWTU is a Fluidized Bed Steam Reforming process that will be used to treat the SBW to produce a granular sodium carbonate and sodium aluminate product. The product is planned to be managed as remote handled transuranic waste. Construction of the IWTU was completed in 2011 and Critical Decision 4 was achieved in 2012 with the expectation that the treatment of the SBW would be completed in 2012. However, process instabilities and equipment problems prevented the safe and reliable operation of the facility. All of the nonradiological tests of the IWTU had to be stopped prematurely because each time the IWTU was operated, the process would become unstable within a few days of initiating the operation. The instabilities were associated with the primary fluidized bed reaction vessel, the Denitration Mineralization Reformer (DMR). The instabilities included difficulties maintaining fluidization conditions and scale formation within the DMR. Design inadequacies and equipment reliability problems in other parts of the facility also hampered the testing the IWTU. The U.S. Department of Energy (DOE) awarded the Idaho Clean-up contract to Fluor Idaho (Fluor) in 2016. To resolve the issues with the IWTU, Fluor assembled a dedicated team to develop the technical and programmatic strategy to resolve the issues with the IWTU and get it operational. Fluor's approach has successfully resolved the primary issues with the IWTU. As a result of modifications of equipment and operating strategies implemented by Fluor, the core part of the IWTU process now works reliably when processing simulated Sodium Bearing Waste over a wide range of operating conditions. This paper describes Fluor's approach and summarize key steps in the process to resolve the issues with the IWTU. Fluor has used strong fundamentals including a first principles approach and unique program management techniques to solve the technical problems with the IWTU. The successful approach has provided renewed confidence in the IWTU process enabling the troubled project to move forward. Important factors in the success of the project include using a dedicated project team separate from the IWTU line organization, a Technical Review Group, the Chemistry Team and a diverse set of supporting contractors and National Laboratories. Fluor typically used multiple means to validate solutions before testing them in the IWTU. Fluor's successful full-scale demonstration runs of the IWTU confirm the process will reliably produce a compliant, treated waste product over a wide range of operating conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Industry-Academia Collaboration Projects on Cluster Ion Beam Process Technology

Processes employing clusters of ions comprised of a few hundred to many thousand atoms are now being developed into a new field of ion beam technology. Cluster-surface collisions produce important non-linear effects which are being applied to shallow junction formation, to etching and smoothing of semiconductors, metals, and dielectrics, to assisted formation of thin films with nano-scale accuracy, and to other surface modification applications. In 2000, a four year R and D project for development of industrial technology began in Japan under funding from the New Energy and Industrial Technology Development Organization (NEDO). Subjects of the projects are in areas of equipment development, semiconductor surface processing, high accuracy surface processing and high-quality film formation. In 2002, another major cluster ion beam project which emphasized nano-technology applications has started under a contract from the Ministry of Economy and Technology for Industry (METI). This METI project involved development related to size-selected cluster ion beam equipment and processes, and development of GCIB processes for very high rate etching and for zero damage etching of magnetic materials and compound semiconductor materials. This paper describes summery of the results.

36 MATERIALS SCIENCE↗

Challenges, Successes, and Lessons Learned on Two Active DOE Facility D and D Projects - 18379

'Surgical removal', although having a number of technical and safety challenges, is an effective alternative to traditional Demolition and Decommissioning (D and D) methods. When carefully planned and managed, surgical removal of equipment can be safely performed to achieve cost savings and accelerated schedule. At Fernald, a large groundwater extraction system that treats radionuclides was downsized during continued operations. Challenges included demolition of remedial components in tight spaces adjacent to active components, in-situ management and removal of slurry multimedia and resins, and complex hoisting/rigging of whole vessels from very tight areas. The approach realized a significant reduction in waste volumes and slurry transfer to reduce radionuclide exposure while allowing use of existing vessels as IP-1 shipping containers while providing an opportunity to implement out of the box design for hoisting/rigging/moving large vessels. Several lessons were learned as Los Alamos Technical Associates, Inc. (LATA) faced the project challenges and progressed through the D and D process. The slurry removal required thorough understanding of equipment selection and circulation techniques to maintain a slurry while avoiding plugging of extraction equipment. The physical condition of each individual tank was different and required development of alternate removal techniques, such as draining the vessel and removal of the hard material with an air vacuum truck, for each one. Lessons learned regarding large tank removal focused on recertification of an overhead crane, determination of pick points from a partially filled vessel, reanalyzing the lifting lugs for a partially full tank, and requirements to fill all void space in the vessels to meet off-site disposal specifications. At Oak Ridge National Laboratory (ORNL), LATA performed the surgical removal of all biomass process equipment inside ORNL's Building 2719. Among the challenges was a requirement that the removal action had to be conducted during continued operations. Live steam lines, fire protection, water process and boiler feed water systems were operational during LATA's D and D effort and were in close proximity to removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Operating Conditions on Cryogenic Carbon Dioxide Removal

In this investigation, a natural-gas (NG) treatment system for NG sources with high CO 2 content is simulated experimentally and theoretically using Aspen Plus. The concept uses patented heat exchangers and a process design developed as part of the cryogenic carbon capture(CCC) process to remove enough CO 2 to enable the treated gas to be handled without the modification of traditional NG equipment. Simultaneously, the process removes liquefied natural gas (LNG) very efficiently. This process provides a simpler alternative to the solvent-based CO 2 removal, absorbent drying, and cryogenic NG liquid extraction systems found in traditional NG processing. The data from an experimental bench-scale apparatus verify the results of the simulations as a function of NG composition and pressure. Costing parameters, exergy loss, and heat-exchanger efficiency are also discussed. The results confirm low exergy losses for bench-scale apparatus. The system uses heat exchangers with efficiencies of more than 90 %. High pressure and low methane content in the NG result in high CO 2 capture.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Component-Level Electronic-Assembly Repair (CLEAR) System Architecture

This document captures the system architecture for a Component-Level Electronic-Assembly Repair (CLEAR) capability needed for electronics maintenance and repair of the Constellation Program (CxP). CLEAR is intended to improve flight system supportability and reduce the mass of spares required to maintain the electronics of human rated spacecraft on long duration missions. By necessity it allows the crew to make repairs that would otherwise be performed by Earth based repair depots. Because of practical knowledge and skill limitations of small spaceflight crews they must be augmented by Earth based support crews and automated repair equipment. This system architecture covers the complete system from ground-user to flight hardware and flight crew and defines an Earth segment and a Space segment. The Earth Segment involves database management, operational planning, and remote equipment programming and validation processes. The Space Segment involves the automated diagnostic, test and repair equipment required for a complete repair process. This document defines three major subsystems including, tele-operations that links the flight hardware to ground support, highly reconfigurable diagnostics and test instruments, and a CLEAR Repair Apparatus that automates the physical repair process.

Oeftering, Richard C.↗

Atomic Force Microscope Active Optical Probe for Single-Molecule Imaging and Time-Resolved Optical Spectroscopy (DOE SBIR Phase II/IIA Final Report)

Actoprobe LLC reports on the results of its DOE SBIR Phase II/IIA project on the development of Atomic Force Microscope Active Optical Probe for Single-Molecule Imaging and Time-Resolved Optical Spectroscopy. While chemistry science and technology greatly benefit from Atomic Force Microscopy in surface characterization, time-resolved chemical imaging on the single-molecule level lags far behind. Current scanning probe microscopy only obtains information about mechanical but not optical/chemical properties. To address this problem, the Actoprobe LLC research team has proposed a novel class of Atomic Force Microscopy probes, Ultra-Fast Pulsed Active Atomic Force Microscopy Optical Probes (UFP AAOPs), that will allow ultrafast time-resolved optical and chemical imaging at the nanoscale. As envisioned, these unique optical probes will perform the functions of conventional Atomic Force Microscopy probes and, in addition, will simultaneously provide chemical information about molecular scale interactions. This innovation is accomplished by integrating an ultrafast pulsed Quantum Dot laser source into an Atomic Force Microscopy probe. This report describes our progress with the fabrication of an ultrafast micrometer-size semiconductor laser, based on “artificial atoms” - Quantum Dots, integrated with an Atomic Force Microscopy probe. In this Phase II/IIA project, we have demonstrated the feasibility of the UFP AAOP concept by fabricating a first prototype of the UFP AAOP. The excellent performance of the probe has been proven in terms of AFM and optical spatial resolution through rigorous tests. The UFP AAOP provides pulses with less than 4 ps duration and higher than 11 GHz repetition rate, and spatial resolution better than 300 nm at 1240 nm wavelength. Technically, it is possible to reduce the pulse width to less than 1 ps and to improve lateral resolution to ~ 0.5 nm, which implies the potential capability for the probe to characterize chemical compounds with single-molecule resolution. The UFP AAOP fabrication procedure has been developed for wafer-scale production of multiple devices, with the yield of the process estimated to be lower than 1% with the limited fabrication capabilities and equipment available for use in the research project. However, using high-volume production tools and special GaAs processing equipment, the yield can be significantly improved, theoretically to ~ 50%. Finally, economic feasibility and scale-up manufacturing potential were analyzed for UFP AAOP and found to be very promising. In summary, the Actoprobe team has successfully demonstrated the feasibility of the UFP AAOP concept.

36 MATERIALS SCIENCE↗

Development of an Improved Process for Installation Projects of High Technology Manufacturing Equipment

High technology manufacturing equipment is utilized at Los Alamos National Laboratory (LANL) to support nuclear missions. This is undertaken from concept initiation where equipment is designed and then taken through several review phases, working closely with system engineers (SEs) responsible for each of the affected systems or involved disciplines (from gasses to HVAC to structural, etc.). After the design is finalized it moves to procurement and custom fabrication of the equipment and equipment installation, including all of the paperwork involved. Not only are the engineering and manufacturing aspects important, but also the scheduling, financial forecasting, and planning portions that take place initially and are sometimes modified as the project progresses should requirements, changes or additions become necessary. The process required to complete a project of this type, including equipment installation, is unique and involves numerous steps to complete. These processes can be improved and recent work on the Direct Current Arc (DC Arc) Glovebox Design, Fabrication and Installation Project provides an opportunity to identify some important lessons learned (LL) that can be implemented in the future for continued project improvement and success.

42 ENGINEERING↗

UMo Solutions Processing in La Hague Cold Crucible Induction Melter: the Feedback From the First Years of Operation - 16376

250 cubic meters of high-level liquid waste from reprocessed U-Mo-Sn-Al spent fuel, used in Gas Cooled Reactors (GCR), were produced during the mid-1960's at La Hague facility. These 'UMo' solutions are less radioactive than the current fission product concentrates coming from ongoing reprocessing activities, but are very rich in molybdenum and phosphorus whose contents make the molten glass quite corrosive and require a high-temperature glass formulation to obtain sufficiently high waste loading factors (12% in molybdenum oxide). Hence the use of the Cold Crucible Induction Melter (CCIM) technology to process such solutions has been deemed a good opportunity for AREVA to meet its performance expectations. In addition to being very corrosive, the UMo waste is quite challenging to process as the molybdenum has a strong tendency to stick in the calciner and causes clogging issues in off-gas treatment equipment. Therefore, the process and technological qualifications were deployed in order to address these specific issues. UMo solutions processing in the La Hague CCIM has started in January 2013 and is currently ongoing. During this period (from 2013 to 2015), many data have been collected to confirm the process parameters that were defined during the qualification of this innovating process. Even if some difficulties occurred, operations teams experience along with engineering and R and D support allowed managing them. This paper presents the start-up methodology and the feedback from the first years of UMo solutions processing with the CCIM technology at La Hague site. Lessons learned are presented with the difficulties encountered and the solutions implemented, emphasizing the benefits of a close integration between R and D, engineering and operations teams. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acquisition of an In-House X-ray Scattering Facility for Nanostructure Characterization and Student Training

This equipment grant was specifically dedicated to the development of a "state of the art" x-ray scattering facility. After a detailed competitive process a rotating anode Bruker AXS instrument was configured and purchased. The final purchase process for this equipment was very detailed and involved lengthy correspondence among Professor Schuller, the researchers in the lab, and Bruker AXS. Due to a variety of technical issues the instrument took much longer to become functional. Fortunately now the instrument is up and operational and producing state of the art data. The availability of this equipment had a major impact on a large number of young students and postdocs and on many DOE funded projects. The very strongly materials based research underway at UCSD could not be pursued without the availability of such an instrument.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Low cost solar array project. Experimental process system development unit for producing semiconductor-grade silicon using the silane-to-silicon process

Technical activities are reported in the design of process, facilities, and equipment for producing silicon at a rate and price comensurate with production goals for low cost solar cell modules. The silane-silicone process has potential for providing high purity poly-silicon on a commercial scale at a price of fourteen dollars per kilogram by 1986, (1980 dollars). Commercial process, economic analysis, process support research and development, and quality control are discussed.

Source record↗

Capability to Recover Plutonium-238 in H-Canyon/HB-Line - 13248

Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site had previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np- 237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-Canyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase- 3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ∼2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase- 1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Success Path Method: Introduction to the Success Path Method Software Tool©

As part of its commitment to advancing safety and reliability assessment methodologies, Argonne National Laboratory pioneered the use of an evaluation method called the Success Path Method (SPM) to improve risk management for offshore oil and gas operations. The development of the SPM at Argonne has been driven by the need to improve existing risk assessment methodologies by focusing on the steps necessary for success rather than failure modes alone. This is particularly important for industrial environments like offshore facilities that perform multiple functions under a continuously evolving set of operational conditions – such as water depth and temperature, currents, and weather conditions. In these dynamic environments, the traditional Probabilistic Risk Assessment (PRA) approach is far too complex as it focuses on what can go wrong – which comprises an infinite failure space that must be fully explored and understood. By shifting the focus to a finite space of success paths, the SPM enables operators and decision makers to prioritize a manageable number of steps that must go right to ensure success. Building on its five decades of experience in safety assessments for the nuclear industry, Argonne made major adaptations to existing risk assessment methods utilizing features similar to fault trees that are traditionally used in PRA to map all pathways in which the system can malfunction. In contrast, SPM identifies the components and processes that must function correctly to achieve specific outcomes – such as preventing the uncontrolled release of hydrocarbons during drilling operations. The SPM framework integrates equipment, procedures, software, processes, and human actions to ensure that physical barriers meet critical safety functions in dynamic operational conditions. This approach helps identify failure modes and improve operational risk management by narrowing the focus to key success elements, which in turn reduces uncertainty and helps users understand, manage, and respond to failures.

97 MATHEMATICS AND COMPUTING↗

Integrated Process Optimization for Biochemical Conversion

This research is motivated by the challenges faced during biomass processing in bioenergy plants. It has been observed that variations in biomass characteristics, such as moisture, ash, and carbohydrate contents cause variations in feeding of the system which led to underutilization of equipment and the reactor. The objective of this research is to ensure a continuous flow of biomass to the reactor in plants that use the biochemical conversion process to generate liquid fuels. The overall goal is to lower the cost of producing biofuels, which could lead to improving US’s energy independency and growing US’s rural economy. The research team developed analytical models, such as discrete element method (DEM) models and mathematical models. The DEM models are unit-level models that explicitly capture biomass characteristics and quantify the impacts of biomass characteristics on bulk material properties and the performance of specific equipment. The mathematical models are system-level models that capture the impacts of system infeed rate, equipment processing rate, storage location and capacity, and biomass characteristics on system throughput. The functional relations predicting the bulk material properties from DEM models are incorporated to the mathematical models. The models developed were validated and evaluated using data collected at Idaho National Laboratory’s biomass processing facility. Via these models, we identified process control strategies that ensure a continuous flow of biomass to the reactor, while meeting the requirements of biochemical conversion process. Our analysis indicates that sequencing of biomass bales based on moisture level, and carbohydrate contents could have a positive impact on reducing processing time and inventory level and increasing throughput rate. Short bale sequences that repeat frequently, seem to have the greatest impact on improving system’s performance. Based on our experiments, the total annual system operating costs reduced by 20-30%, and the maximum inventory level reduced by 3 to 4 times. The operating costs include the annual equipment amortization cost and processing cost. The implementation of the models developed requires the use of standardized bale format, Radio Frequency Identification technology, sensing and real time monitoring of material attributes, automated material handling equipment, and automated process control. The scope of the model proposed can be extended to include the whole supply chain. The supply chain models help identify how many bales of different biomass feedstock to purchase given biomass availability in the region, biomass price and quality, and the biomass processing capabilities of the biorefinery. Thus, the outcomes of supply chain models can be used to inform the design of long-term contracts among farmers and the biorefinery.

09 BIOMASS FUELS↗

Decision Point 3 of Statement of Project Objectives (SOPO) “Recovery Act: Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems”

Air Products is carrying out a scope of work under Phase 5 of the ITM Oxygen Cooperative Agreement to design, build, and operate a ceramic membrane fabrication facility (the -CerFabII) to enable production of membrane modules to supply a conceptual 2000 ton per day (TPD) ITM Oxygen facility (the -ITM Oxygen Development FacilityII), and to perform supporting development tasks in materials development and engineering development toward industrial, carbon capture and sequestration applications. Air Products is executing this project under the American Recovery and Reinvestment Act (ARRA) with the objective to accelerate the adoption of ITM Oxygen technology to help meet the country’s goals for deploying clean power plants. The objective of this Topical Report is to address the requirements of Decision Point 3 (DP3), which pertains to the status of all Tasks within Phase 5 and most notably the project status of the CerFab (Task 30) prior to authorization of funds for equipment purchase and construction of the facility. The intent of the DP3 is to provide the opportunity for DOE-NETL to review the status of these tasks and to make recommendations on forward project direction, including a recommendation to pass into Budget Period 8. In the area of Materials Development, Air Products has specified a high pressure dilatometer system which will enable measurements of material expansion of ITM ceramic compounds at very high oxygen partial pressures consistent with CCS applications. Under Task 28.2, subcontractor Ceramatec has made significant progress since DP2 in materials selection and process development and improvement for advanced architecture module fabrication. Ceramatec has determined a materials specification, and has selected a process for making the material. Ceramatec has further developed and selected the process for applying the membrane to unsintered advanced architecture wafers with a Two Step process. Ceramatec has built submodules meeting leak rate specifications and intact 1-TPD modules compromised of advanced architecture components. Equipment and processes required for implementation of the advanced architecture design in the CerFab have been identified and are included in the Task 30 scope of equipment supply. Under Task 29.0, Air Products has developed conceptual ideas for implementation of ITM Oxygen in a 2000 TPD test unit. These concepts are proposed for scale up of the ITM technology to large scale with reduced commercial risk. Under Task 30, Air Products and Ceramatec have collaborated to re-design the CerFab process with the advanced architecture wafer production process as primary, and laid out the new process in the Tooele building; the required process equipment have been specified. The project team updated the project cost and schedule estimates, including all environmental permit schedules. The team also re-assessed project risk and costs for the commissioning and operating phases of the program. Newly projected costs for the CerFab, for which details are provided here as attachments, indicate a savings of approximately $100,000 relative to the original estimate at the time of Phase 5 contract definitization. However, an assessment of risks associated with the equipment, process, and operations of the CerFab indicate that approximately $2.9 million of costs should be expected to address various issues in the project. In addition, $1.6 million of additional spending is expected relative to the original estimate to operate the facility during Task 30.2. Air Products proposes a plan to re-direct funds from Tasks 28, 29, and 31 to Task 30 as necessary to allow the CerFab to meet the Phase 5 program objectives.

Armstrong, Phillip↗

Heat Treatment of Iron-Carbon Alloys in a Magnetic Field (Phase 2)

Thermomagnetic processing was shown to shift the phase transformation temperatures and therefore microstructural evolution in the high performance engine valve spring 9254 steel alloy by applying a high magnetic field during cooling. These effects would be anticipated to improve performance such as high cycle fatigue as demonstrated in prior projects. Thermomagnetic processing of gears and crank shafts was constrained by the size of the prototype equipment currently available at ORNL. However, the commercial procurement viability of production scale 9-Tesla, 16-inch diameter bore thermomagnetic processing equipment for truck idler gears up to ~11-inch diameter and potential crank shaft applications was shown, as multiple superconducting magnet manufacturing companies (in conjunction with an induction heat treating company, AjaxTOCCO Magnethermic) offered cryogen-free or cryocooler equipment designs to Cummins.

36 MATERIALS SCIENCE↗