Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PILOT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Remote Pilot Handoffs in Large UAS Multi-Vehicle Operations: Best Practices and Supportive Technologies

In response to pilot shortages and increasing air cargo demands, NASA's Pathfinding for Airspace with Autonomous Vehicles (PAAV) sub-project conducted the fourth in a series of tabletop studies investigating scalable solutions for integrating large Uncrewed Aircraft Systems (UAS) into the National Airspace System (NAS). This study solicited subject matter expertise to identify solutions to potential challenges for a further term vision, guiding participants through scenario-based discussions where the remote pilot (RP)-to-vehicle ratio has been scaled from 1:1 to m:N. Of those challenges, remote pilot handoffs were found throughout all phases of flight, both in nominal and non-nominal scenarios. The current paper details participant-suggested procedural and technological solutions for overcoming the handoff challenge, including determining the accepting RP, which aircraft to release, the location and timing of the transition, and options for supporting personnel, tools, and automation that could facilitate safe and efficient handoffs.

uncrewed aircraft systems↗

Training the Powered-Lift Evaluation Pilot

This paper focuses on the preparation and training of evaluation pilots during the second of two research studies: Automation Enabled Pilot studies 1 and 2 (AEP-1 and AEP-2). These studies are intended to assess novel aircraft automation concepts for electric powered aircraft equipped with Indirect Flight Control Systems (IFCS) capable of Vertical Takeoff and Landing (eVTOL). The AEP-1 study importantly introduced the concept of future evaluation methods used in the AEP-1 study for eVTOL equipped with IFCS that are agnostic and cut cross both airworthiness and operational requirements. The AEP-2 study utilized an updated Lift Plus Cruise aircraft model and examined pilot interaction with novel procedures and interfaces. Specifically, it explored challenges related to transitioning from forward flight to landing with an industry representative Urban Air Mobility (UAM) approach procedure, establishing baselines for future automation studies.

AAM↗

Training the Powered-Lift Evaluation Pilot

This presentation focuses on the preparation and training of evaluation pilots during the second of two research studies: Automation Enabled Pilot studies 1 and 2 (AEP-1 and AEP-2). These studies are intended to assess novel aircraft automation concepts for electric powered aircraft equipped with Indirect Flight Control Systems (IFCS) capable of Vertical Takeoff and Landing (eVTOL). The AEP-1 study importantly introduced the concept of future evaluation methods used in the AEP-1 study for eVTOL equipped with IFCS that are agnostic and cut cross both airworthiness and operational requirements. The AEP-2 study utilized an updated Lift Plus Cruise aircraft model and examined pilot interaction with novel procedures and interfaces. Specifically, it explored challenges related to transitioning from forward flight to landing with an industry representative Urban Air Mobility (UAM) approach procedure, establishing baselines for future automation studies.

AAM↗

The Contribution of Pilots to Resilience in Normal Operations: A Survey Approach

Much of our knowledge about human performance in flight safety has come from the analysis of undesired events, whether accidents, incidents, or crew behaviors identified via flight exceedance monitoring or observational techniques. In recent years, there has been an acknowledgement that operational personnel are not merely sources of “human error”, but also make a unique human contribution to safe outcomes. In a few celebrated cases, this takes the form of “heroic saves”, but on many more occasions, operational personnel contribute to safety through everyday, often-unnoticed actions that turn potentially hazardous situations into non-events. An emerging approach to safety, frequently referred to as “Safety II,” proposes that the positive human contribution is an important and largely untapped source of safety information. Some airlines have successfully trained observers to identify and record the positive behaviors exhibited by the crew over the course of a flight. In other cases, flight crew are interviewed about good practices or positive behaviors. However, each of these methods are relatively limited in scale and resource intensive. A survey could provide a relatively low-cost approach to systematically gather this information on a larger scale. The primary purpose of the research was to develop and assess a surveys methodology for assessing crews' activities in normal flights and the operational perturbations encountered during normal operations. We hope that such a survey could be both a research tool as well as a safety management aid for the aviation industry. We collected responses concerning revenue flights from two groups of airline pilots (N = 25 & N= 65). The results indicated that relatively few flights proceeded exactly as in the original flight plan. Pilots routinely anticipated and adapted to changing circumstances. We will review the challenges encountered in developing the survey and summarize preliminary findings from two administrations of the survey to airline pilots.

human contribution safety↗

The Contribution of Pilots to Resilience in Normal Operations. Part II: A closer look at briefings: Anticipation and Monitoring Also Known as Planning and Coordination

Much of our knowledge about human performance in flight safety has come from the analysis of undesired events, whether accidents, incidents, or crew behaviors identified via flight exceedance monitoring or observational techniques. In recent years, there has been an acknowledgement that operational personnel are not merely sources of “human error”, but also make a unique human contribution to safe outcomes. In a few celebrated cases, this takes the form of “heroic saves”, but on many more occasions, operational personnel contribute to safety through everyday, often-unnoticed actions that turn potentially hazardous situations into non-events. An emerging approach to safety, frequently referred to as “Safety II,” proposes that the positive human contribution is an important and largely untapped source of safety information. Some airlines have successfully trained observers to identify and record the positive behaviors exhibited by the crew over the course of a flight. In other cases, flight crew are interviewed about good practices or positive behaviors. However, each of these methods are relatively limited in scale and resource intensive. A survey could provide a relatively low-cost approach to systematically gather this information on a larger scale. The primary purpose of the research was to develop and assess a surveys methodology for assessing crews' activities in normal flights and the operational perturbations encountered during normal operations. We hope that such a survey could be both a research tool as well as a safety management aid for the aviation industry. We collected responses concerning revenue flights from two groups of airline pilots (N = 25 & N= 65). The results indicated that relatively few flights proceeded exactly as in the original flight plan. Pilots routinely anticipated and adapted to changing circumstances. We will review the challenges encountered in developing the survey and summarize preliminary findings from two administrations of the survey to airline pilots.

human contribution safety↗

A Queuing Theory Approach to Pilot-Controller Coordination for m:N Operations

In recent years, attention and interest by industry and researchers has grown in a control paradigm for remotely piloted aircraft termed “m:N operations.” In an m:N operation, a team of m remote pilots in command (RIPCs) collaboratively manage the flights of N aircraft. A consequence of an m:N concept of operations is that the RPICs will have to switch attention from one aircraft to another and from one task to another. Previous research in m:N operations has focused on the workload experienced by an RPIC and their level of situation awareness on their flights. Researchers have found that RPIC workload and situation awareness are generally sensitive to increasing N, although NASA’s Multi-Vehicle (m:N) Working Group has suggested that the driver of workload/situation awareness is the number of exceptions requiring human intervention as opposed to the value of N itself. In any case, a natural antecedent of workload is task load. In this paper, queueing theory is applied to a 1:N Urban Air Mobility (UAM) air taxi operation in order to estimate pilot task load for managing radio communications with air traffic controllers (ATCs) under increasing N. An M/M/1 queueing system is used to model the RIPC’s servicing of calls and clearance requests (e.g., departure, arrival, or airspace transition) to ATC for the N aircraft. Important parameters for the queueing model are the task arrival rate and the average service time for task completion. Radio communication times from past human-in-the-loop simulation studies are used to measure service times for a 1:4 and 1:12 UAM operation and to interpolate service times for 4 < N < 12. A Monte Carlo method is then employed, using the measured and interpolated service times, to estimate arrival rate and related queueing statistics. The paper concludes by considering the estimated queuing statistics, particularly the RPIC’s utilization (i.e., proportion of time actively servicing tasks), the length of the task queue over time, and the implications for task-balanced system design.

task load↗

TF Inner Leg Space Allocation for Pilot Plant Design Studies

A critical design feature of any tokamak is the space taken up by the inner leg of the toroidal field (TF) coil. The radial build needed for the TF inner leg, along with shield thickness , size of the central solenoid and plasma minor radius set the major radius of the machine. The cost of the tokamak core roughly scales with the cube of the major radius. Small reductions in the TF build can have a big impact on the overall cost of the reactor. The cross section of the TF inner leg must structurally support the centering force and that portion of the vertical separating force that is not supported by the outer structures. In this paper, the TF inner leg equatorial plane cross sections are considered. Out-of- Plane (OOP) forces must also be supported, but these are largest away from the equatorial plane, in the inner upper and lower corners and outboard sections of the TF coil. OOP forces are taken by structures that are not closely coupled with the radial build of the central column at the equatorial plane. The "Vertical Access AT Pilot Plant" currently under consideration at PPPL is used as a starting point for the structural, field and current requirements. Other TF structural concepts are considered. Most are drawn from existing designs such as ITER&#x27;s circular conduits in radial plates bearing on a heavy nose section, and TPX&#x27;s square conduits in a case, Each of these concepts can rely on full wedging, or partial wedging. Vaulted TF coils are considered as are those with some component of bucking against a central solenoid or bucking post. With the expectation that the pilot plant will be a steady state machine, a static stress criteria is used for all the concepts. The coils are assumed to be superconducting, with the superconductor not contributing to the structural strength. Limit analysis is employed to assess the degree of conservatism in the static criteria as it is applied to a linear elastic stress analysis. TF concepts, and in particular the PPPL AT PILOT plate concept are evaluated based on amount of space needed for structure and the amount of space left for superconductor.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Comparison of Options for a Pilot Plant Fusion Nuclear Mission

A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant, following a path similar to the approach adopted for the commercialization of fission. The pilot plant mission encompassed component test and fusion nuclear science missions plus the requirement to produce net electricity with high availability in a device designed to be prototypical of the commercial device. Three magnetic configuration options were developed around this mission: the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS). With the completion of the study and separate documentation of each design option a question can now be posed; how do the different designs compare with each other as candidates for meeting the pilot plant mission? In a pro/con format this paper will examine the key arguments for and against the AT, ST and CS magnetic configurations. Key topics addressed include: plasma parameters, device configurations, size and weight comparisons, diagnostic issues, maintenance schemes, availability influences and possible test cell arrangement schemes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Understanding Building Infrastructure and Building Operation through DOE Asset Score Model: Lessons Learned from a Pilot Project

The U.S. Department of Energy (DOE) is developing a national voluntary energy asset score system to help building owners to evaluate the as-built physical characteristics (including building envelope, the mechanical and electrical systems) and overall building energy efficiency, independent of occupancy and operational choices. The energy asset score breaks down building energy use information by simulating building performance under typical operating and occupancy conditions for a given use type. A web-based modeling tool, the energy asset score tool facilitates the implementation of the asset score system. The tool consists of a simplified user interface built on a centralized simulation engine (EnergyPlus). It is intended to reduce both the implementation cost for the users and increase modeling standardization compared with an approach that requires users to build their own energy models. A pilot project with forty-two buildings (consisting mostly offices and schools) was conducted in 2012. This paper reports the findings. Participants were asked to collect a minimum set of building data and enter it into the asset score tool. Participants also provided their utility bills, existing ENERGY STAR scores, and previous energy audit/modeling results if available. The results from the asset score tool were compared with the building energy use data provided by the pilot participants. Three comparisons were performed. First, the actual building energy use, either from the utility bills or via ENERGY STAR Portfolio Manager, was compared with the modeled energy use. It was intended to examine how well the energy asset score represents a building’s system efficiencies, and how well it is correlated to a building’s actual energy consumption. Second, calibrated building energy models (where they exist) were used to examine any discrepancies between the asset score model and the pilot participant buildings’ [known] energy use pattern. This comparison examined the end use breakdowns and more detailed time series data. Third, ASHRAE 90.1 prototype buildings were also used as an industry standard modeling approach to test the accuracy level of the asset score tool. Our analysis showed that the asset score tool, which uses simplified building simulation, could provide results comparable to a more detailed energy model. The buildings’ as-built efficiency can be reflected in the energy asset score. An analysis between the modeled energy use through the asset score tool and the actual energy use from the utility bills can further inform building owners about the effectiveness of their building’s operation and maintenance.

Wang, Na↗

Sequential Design of Experiments to Maximize Learning from Carbon Capture Pilot Plant Testing

Pilot plant test campaigns can be expensive and time-consuming. Therefore, it is of interest to maximize the amount of learning and the efficiency of the test campaign given the limited number of experiments that can be conducted. This work investigates the use of sequential design of experiments (SDOE) to overcome these challenges by demonstrating its usefulness for a recent solvent-based CO2 capture plant test campaign. Unlike traditional design of experiments methods, SDOE regularly uses information from ongoing experiments to determine the optimum locations in the design space for subsequent runs within the same experiment. However, there are challenges that need to be addressed, including reducing the high computational burden to efficiently update the model, and the need to incorporate the methodology into a computational tool. We address these challenges by applying SDOE in combination with a software tool, the Framework for Optimization, Quantification of Uncertainty and Surrogates (FOQUS) (Miller et al., 2014a, 2016, 2017). The results of applying SDOE on a pilot plant test campaign for CO2 capture suggests that relative to traditional design of experiments methods, SDOE can more effectively reduce the uncertainty of the model, thus decreasing technical risk. Future work includes integrating SDOE into FOQUS and using SDOE to support additional large-scale pilot plant test campaigns.

20 FOSSIL-FUELED POWER PLANTS↗

NREL's Biochemical Conversion Pilot Plant Capabilities

NREL's biochemical conversion plant is a flexible pilot plant for testing a wide range of bio-based technologies for producing renewable fuels and byproducts. The biochemical conversion pilot plant is housed in the Integrated Biorefinery Research Facility located on the National Renewable Energy Laboratory's (NREL's) main campus. The facility provides industry partners the opportunity to test and develop their own biorefining technology using NREL equipment or rental equipment that can be brought into the plant. The pilot plant can process materials up to one dry ton per day in an integrated fashion using a variety of operating modes including batch, fed-batch, and continuous processing.

biochemical↗

Delivering Effective Virtual Energy-Focused Trainings: Successful Strategies and Lessons Learned from the Virtual Cohort In-Plant Training Pilot

While there are always barriers to energy efficiency efforts, few challenges have been as severe as the global COVID-19 pandemic. Many manufacturers throughout the United States and the world have been trying to determine how to safely open and operate their plants. To minimize the number of people working within facilities and maximize the physical distance between workers, only essential facility engineers are allowed into plants to ensure proper operations. The Department of Energy’s Better Plants Program created In-Plant Trainings (INPLTs) to help partners develop in-house expertise in energy efficiency. Delivering INPLTs in the traditional in-person fashion is infeasible under these circumstances. To continue providing INPLTs during this difficult time, the Better Plants Program piloted Virtual Cohort In-Plant Trainings (VINPLTs) on wastewater treatment and ammonia industrial refrigeration systems from October 27 to November 19, 2020. This paper provides an overview of the pilot, then discusses successful strategies and lessons learned from this pilot for delivering effective virtual energy-focused trainings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

History Matching and Prediction of a Polymer Flood Pilot in Heavy Oil Reservoir on Alaska North Slope

The first-ever polymer flood pilot to enhance heavy oil recovery on Alaska North Slope is ongoing. After more than 3 years of polymer injection, significant benefit has been observed from the decrease in water cut from 65% to less than 15% in the project producers. The primary objective of this study is to develop a robust history-matched reservoir simulation model capable of predicting future polymer flood performance. In this work, the reservoir simulation model has been developed based on the geological model and available reservoir and fluid data. In particular, four high transmissibility strips were introduced to connect the injector-producer well pairs, simulating short-circuiting flow behavior that can be explained by viscous fingering and reproducing the water cut history. The strip transmissibilities were manually tuned to improve the history matching results during the waterflooding and polymer flooding periods, respectively. It has been found that higher strip transmissibilities match the sharp water cut increase very well in the waterflooding period. Then the strip transmissibilities need to be reduced with time to match the significant water cut reduction. The viscous fingering effect in the reservoir during waterflooding and the restoration of injection conformance during polymer flooding have been effectively represented. Based on the validated simulation model, numerical simulation tests have been conducted to investigate the oil recovery performance under different development strategies, with consideration for sensitivity to polymer parameter uncertainties. The oil recovery factor with polymer flooding can reach about 39% in 30 years, twice as much as forecasted with continued waterflooding. Besides, the updated reservoir model has been successfully employed to forecast polymer utilization, a valuable parameter to evaluate the pilot test’s economic efficiency. All the investigated development strategies indicate polymer utilization lower than 3.5 lbs/bbl in 30 years, which is less than that of the same polymer used in a polymer pilot in Argentina.

Wang, Xindan↗

sCO2 Primary Power Large-Scale Pilot Plant FEED Summary

Echogen Power Systems and its project partners the Electric Power Research Institute, CDM Smith, Riley Power Inc. (a Babcock Power Inc. company), and the University of Missouri completed the Front-End Engineering Design (FEED) study of a nominal 10 MWe supercritical carbon dioxide (sCO2) large-scale pilot plant based on Recompression Brayton Cycle (RCBC) architecture. The FEED study was completed under Phase II of the U.S. Department of Energy Fossil Fuel Large-Scale Pilots program. The FEED study scope included the preliminary design of the combustion and environmental control systems, the primary heater, the sCO2 power cycle and its associated turbomachinery, and the balance of plant equipment to determine accurate cost and schedule requirements for fabrication and installation of the system at the University of Missouri’s Combined Cooling, Heat, and Power Plant, located in Columbia, Missouri. The RCBC sCO2 cycle presents superior thermodynamic efficiency compared to steam-Rankine cycles and is adaptable to a broad range of heat sources. The risk aversion of the power generation industry requires a successful large-scale pilot plant demonstration to enable financing and deployment of commercial-scale plants. Therefore, successful construction and demonstration of a 10 MWe RCBC sCO2 power plant would empower a transformational step forward for the efficiency of the next generation of utility power plants. This paper provides details on the primary heater, environmental control systems, and sCO2 power cycle design and performance.

01 COAL, LIGNITE, AND PEAT↗

PILOT PLANT EVALUATIONS OF RARE EARTH ELEMENT RECOVERY AND CONCENTRATION FROM PRE-COMBUSTION BITUMINOUS COAL SOURCES

Rare earths and other critical elements are commonly associated with coal-based sources and sometimes at concentrations that may be attractive for recovery as a byproduct of coal production. The results obtained from laboratory research performed during the past five years have led to the design, construction and testing of a pilot plant that recovered rare earth elements from several bituminous coal-based materials including coarse refuse as well as solutions from a small heap leach and acid mine drainage. From this initial design, rare earth oxide (REO) concentrates having a purity greater than 90% have been produced using solvent extraction as the primary means of concentration. Following cost reduction and process intensification efforts, the circuit was revised to include feed calcination and several selective precipitation stages as a substitute for the original direct leach-solvent extraction circuit. Pilot test results revealed that the modified circuit was ideal for treating the relatively low-grade feedstocks and provided similar final REO purities at a significantly lower cost. This communication will present the flowsheets evaluated in the pilot plant along with technical and economic analyses for each circuit.

Coal↗

Radiological Soil Sorting Pilot Study Results - Middlesex Municipal Landfill - 19394

The U.S. Army Corps of Engineers (USACE) conducted a pilot scale study of radiological sorting technology at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Middlesex Municipal Landfill (MML) site in Middlesex, New Jersey. Residual uranium ore pieces or 'nuggets' and associated soil contamination are present at the MML site as a result of the nation's early atomic energy program. Study questions and objectives of the MML Pilot Study project were to 1) evaluate the accuracy with which contaminated soils can be separated from uncontaminated soils using a radiologic soil sorting system, 2) determine the optimal full-scale operational process throughput rate that might reasonably be achieved, 3) determine the waste volume reduction that might be expected when operating at full scale, and 4) help establish the feasibility of implementing soil sorting as a potential remedy to other areas of the site. To accomplish the objectives soils were processed through the sorting system in a series of 30 different sorting experimental (test) runs utilizing approximately 917 cubic meters [1200 cubic yards (CY)] of material. The test runs included varying parameters such as belt speeds, soil layer thicknesses, and alarm criteria, all in varying combinations. Test runs also included engineered tests to evaluate point source segregation issues. This paper presents the challenges, results, lessons learned, and recommendations of the radiological soil sorting pilot study. The technical aspects and evaluation of the results of the test runs will also be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Grid Deep Energy Retrofit Pilot

Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Gridin Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance. Evaluation of strategies is structured around the critical control functions of water, airflow, vapor flow, and thermal control. The aim of the research project is to develop guidance that could serve as a foundation for wideradoption of high performance, 'deep' retrofit work. The project will identify risk factors endemic to advanced retrofit in the context of the general building type, configuration and vintage encountered in the National Grid DER Pilot. Results for the test homes are based on observation and performance testing of recently completed projects. Additional observation would be needed to fully gaugelong-term energy performance, durability, and occupant comfort.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Leveraging a Southern California Energy Innovation Cluster to Pilot and Validate Emerging Energy Technologies

The EPIC Pilot Program, led by the Los Angeles Cleantech Incubator (LACI), was designed to help early-stage clean technology startups accelerate technical validation, investment readiness, and market entry. The project focused on supporting startups in designing and deploying small-scale pilots with the guidance of EPIC Partners, a network of regional stakeholders in the Southern California energy ecosystem, including but not limited to: the Los Angeles Department of Water and Power (LADWP), the California Energy Commission (CEC), Los Angeles County Metropolitan Transportation Authority (LA Metro), and Edison International, among others. Through mentorship, funding, and site access for technology deployments, the program provided a structured pathway for startups to test and refine their technologies in real-world settings.

14 SOLAR ENERGY↗