Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Orbit Determination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Asteroid approach covariance analysis for the Clementine mission

The Clementine mission is designed to test Strategic Defense Initiative Organization (SDIO) technology, the Brilliant Pebbles and Brilliant Eyes sensors, by mapping the moon surface and flying by the asteroid Geographos. The capability of two of the instruments available on board the spacecraft, the lidar (laser radar) and the UV/Visible camera is used in the covariance analysis to obtain the spacecraft delivery uncertainties at the asteroid. These uncertainties are due primarily to asteroid ephemeris uncertainties. On board optical navigation reduces the uncertainty in the knowledge of the spacecraft position in the direction perpendicular to the incoming asymptote to a one-sigma value of under 1 km, at the closest approach distance of 100 km. The uncertainty in the knowledge of the encounter time is about 0.1 seconds for a flyby velocity of 10.85 km/s. The magnitude of these uncertainties is due largely to Center Finding Errors (CFE). These systematic errors represent the accuracy expected in locating the center of the asteroid in the optical navigation images, in the absence of a topographic model for the asteroid. The direction of the incoming asymptote cannot be estimated accurately until minutes before the asteroid flyby, and correcting for it would require autonomous navigation. Orbit determination errors dominate over maneuver execution errors, and the final delivery accuracy attained is basically the orbit determination uncertainty before the final maneuver.

Ionasescu, Rodica↗

Long and short arc altitude determination for GEOS-C

The accuracy with which the GEOS-C altitude may be estimated over long (7 day) and short (40 minute) orbital arcs is investigated. Over the long are excellent agreement was attained between a simulation of the orbit determination process and a covariance analysis. Both approaches yielded RMS altitude errors of about 1.5 meters over the Caribbean calibration area and approximately 7.5 meters overall. The geopotential was identified as the largest error source. For the short arc, the covariance analysis revealed that the propagated altitude error is linearly dependent upon station survey component errors which are also the largest source of altitude errors. An Appendix contains the mathematics of covariance analysis as applied to orbit determination.

Koch, D.↗

Solar Radiation Pressure Binning for the Geosynchronous Orbit

Orbital maintenance parameters for individual satellites or groups of satellites have traditionally been set by examining orbital parameters alone, such as through apogee and perigee height binning; this approach ignored the other factors that governed an individual satellite's susceptibility to non-conservative forces. In the atmospheric drag regime, this problem has been addressed by the introduction of the "energy dissipation rate," a quantity that represents the amount of energy being removed from the orbit; such an approach is able to consider both atmospheric density and satellite frontal area characteristics and thus serve as a mechanism for binning satellites of similar behavior. The geo-synchronous orbit (of broader definition than the geostationary orbit -- here taken to be from 1300 to 1800 minutes in orbital period) is not affected by drag; rather, its principal non-conservative force is that of solar radiation pressure -- the momentum imparted to the satellite by solar radiometric energy. While this perturbation is solved for as part of the orbit determination update, no binning or division scheme, analogous to the drag regime, has been developed for the geo-synchronous orbit. The present analysis has begun such an effort by examining the behavior of geosynchronous rocket bodies and non-stabilized payloads as a function of solar radiation pressure susceptibility. A preliminary examination of binning techniques used in the drag regime gives initial guidance regarding the criteria for useful bin divisions. Applying these criteria to the object type, solar radiation pressure, and resultant state vector accuracy for the analyzed dataset, a single division of "large" satellites into two bins for the purposes of setting related sensor tasking and orbit determination (OD) controls is suggested. When an accompanying analysis of high area-to-mass objects is complete, a full set of binning recommendations for the geosynchronous orbit will be available.

Hejduk, M. D.↗

Flight Experiment Demonstration System (FEDS) functional description and interface document

This document presents a functional description of the Flight Experiment Demonstration System (FEDS) and of interfaces between FEDS and external hardware and software. FEDS is a modification of the Automated Orbit Determination System (AODS). FEDS has been developed to support a ground demonstration of microprocessor-based onboard orbit determination. This document provides an overview of the structure and logic of FEDS and details the various operational procedures to build and execute FEDS. It also documents a microprocessor interface between FEDS and a TDRSS user transponder and describes a software simulator of the interface used in the development and system testing of FEDS.

Belcher, R. C.↗

Metric Tracking Services in the Era of Optical Communications

The Space Communications and Navigation program, at the National Aeronautics and Space Administration, is developing free-space optical communications technology to facilitate the next generation of space missions in near-Earth, Lunar, and planetary space. A discussion of optimetric observation performance and hardware-in-the-loop test results are presented. Simulation of orbit-determination for LEO and Lunar spacecraft relying on optimetric tracking extends raw observation accuracy to realizable orbit-determination performance. Potential science and operational applications are reviewed, along with NASA's approach for developing optimetric technology. Current investments in developing optimetric hardware and plans for NASA's future optical communications network define the path for a future operational optimetric capability in the 2020's and beyond.

optimetrics↗

Gravitational wave forms for a three-body system in Lagrange's orbit: Parameter determinations and a binary source test

Continuing work initiated in an earlier publication [Y. Torigoe, K. Hattori, and H. Asada, Phys. Rev. Lett. 102, 251101 (2009)], gravitational wave forms for a three-body system in Lagrange's orbit are considered especially in an analytic method. First, we derive an expression of the three-body wave forms at the mass quadrupole, octupole, and current quadrupole orders. By using the expressions, we solve a gravitational-wave inverse problem of determining the source parameters to this particular configuration (three masses, a distance of the source to an observer, and the orbital inclination angle to the line of sight) through observations of the gravitational wave forms alone. For this purpose, the chirp mass to a three-body system in the particular configuration is expressed in terms of only the mass ratios by deleting initial angle positions. We discuss also whether and how a binary source can be distinguished from a three-body system in Lagrange's orbit or others.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Precise orbit computation for the Geosat Exact Repeat Mission

Results are reported from an extensive investigation of orbit-determination strategies for the Geosat Exact Repeat Mission (ERM). The goal is to establish optimum geodetic parameters and procedures for the computation of the most accurate Geosat orbits possible and to apply these procedures for routine computation during the ERM for the following purposes: (1) to enhance the value of the Geosat oceanographic investigations by providing the user community with improved ephemerides, (2) to develop orbit determination techniques for the upcoming altimetric mission Topex/Poseidon, and (3) to assess the radial orbit accuracy obtainable with recently developed gravity models. To this end, ephemerides for the entire first year of the ERM have been computed using the GEODYN II orbit program on the Cyber 205 supercomputer system at the NASA Goddard.

Haines, Bruce J.↗

Gravity field covariance analysis for the TOPEX/Poseidon mission

The TOPEX/Poseidon satellite oceanography mission will require very accurate orbit determination in order to fulfill its mission requirements of altimetrically mapping the ocean surface with approximately 10 centimeter accuracy. To meet such stringent orbit determination specifications will require very accurate tracking data and very accurate dynamical models of the satellite motion. The accuracy of the TOPEX/Poseidon orbit is expected to be driven by the accuracy of the earth's gravity field model. Expected orbit accuracy for several recent gravity models is presented. Both the capability of the models for modeling the motion of TOPEX/Poseidon and their global modeling characteristics are discussed. In addition, the gravity model improvement that can be expected by utilizing GPS tracking of TOPEX/Poseidon is evaluated. This evalution is based on a recent simulation of a gravity field recovery using 10 days of TOPEX/Poseidon GPS tracking.

Rosborough, G. W.↗

Navigation Support at JPL for the JAXA Akatsuki (PLANET-C) Venus Orbiter Mission

This paper details the orbit determination activities undertaken at JPL in support of the Japanese Aerospace Exploration Agency's (JAXA) Akatsuki (a.k.a. Plan-et-C and/or Venus Climate Orbiter) mission. The JPL navigation team's role was to provide independent navigation support as a point of comparison with the JAXA generated orbit determination solutions. Topics covered include a mis-sion and spacecraft overview, dynamic forces modeling, cruise and approach or-bit determination results, and the international teaming arrangement. Significant discussion is dedicated to the events surrounding recovery from the unsuccessful Venus orbit insertion maneuver.

Venus Climate Orbiter↗

On the simultaneous improvement of a satellite orbit and determination of sea surface topography using altimeter data

A method is presented in satellite altimetry that attempts to simultaneously determine the geoid and sea surface toography with minimum wavelengths of about 500 km and to reduce the radial orbit errors caused by geopotential uncertainties. The modeling of these errors is made using the linearized Lagrangian perturbation theory. Observation equations are developed using sea surface heights and crossover discrepancies as observables. A minimum variance solution with prior information can then provide estimates of parametrs representing the sea surface topography and corrections to the orbit. The potential of the method is demonstrated in a solution where simulated geopotential errors and the Levitus sea surface topography are used to generate the observables for a Seasat 3 day arc. The simulation results suggest that the method can be used to efficiently process real altimeter data.

Engelis, Theodossios↗

The Development of the GSFC DORIS Contribution to ITRF2014

The NASA GSFC DORIS analysis center has processed data from January 1993 to December 2014 and provided 1141 weekly solutionsin the form of normal equations for incorporation into the DORIS solution for ITRF2014. The solution time series, designated asgscwd26, were based on tracking data to eleven DORIS satellites divided generally into seven-day arcs. With respect to the ITRF2008 submission (Le Bail et al., 2010), the measurement model was updated to model the beacon frequency variations at certain DORIS sites,to apply the DORIS antenna phase law for the Starec and Alcatel antennae, and to apply the antenna offset corrections in the NASAGSFC orbit determination software rather than using the data-supplied corrections. We show that computing the antenna offset correctionsin the orbit determination software is superior to using the offset corrections that are supplied with the DORIS data, and that thisimproves the RMS of fit for SPOT-2, Envisat, SPOT-4, and SPOT-5. The updates for the force model included: (1) the development of improved nonconservative force modeling for SPOT-2, SPOT-3, SPOT-5, Envisat, and HY-2A, and (2) the application of an updatedstatic gravity model based on GRACE and GOCE data, and weekly models of the variations in the low degree gravity field deducedindependently from tracking by Satellite Laser Ranging (SLR) and DORIS. The post-ITRF2008 DORIS coordinate WRMS afterthe launch of Envisat and SPOT-5 is improved from 11.20 to 12.45 mm with ITRF2008 (Le Bail et al., 2010), to between 8.50 and9.99 mm with the gscwd26 SINEX solution. The application of the DORIS antenna phase laws shifts the DORIS scale wrt DPOD2008by +6.0 mm from 19930103 to 20020606, and by +11.4 mm from 20020613 to 20111030. The application of more detailed models of time-variable gravity reduces the slopes in the Helmert transformation parameters Tx, and Ty (w.r.t. DPOD2008) after 2005. The annual amplitude in these parameters is reduced from 3.2 mm (for Tx), 4.1 mm (for Ty), to 1.7 mm (for Tx) and 2.8 mm (for Ty).

Lemoine, F. G.↗

Impact of DORISx Post Seismic Deformation and Seasonal Corrections on the DPOD2020 Solution

As one of the tracking systems used for the altimeter missions (such as TOPEX/Poseidon, Envisat, Jason-1/-2/-3, CryoSat-2, Saral/AltiKa, Sentinel-3A/-3B, HY-2A/C/D, Jason-CS/Sentinel-6A, SWOT), the position of the DORIS tracking stations provides a fundamental reference for the estimation of the precise orbits and so, by extension is fundamental for the quality of the altimeter data analysis and derived products. Due to the time evolution of the DORIS ground network, stations included in ITRF2020 may have been decommissioned and stations that were added to the tracking network after 2021.0 are, by definition, not part of ITRF2020. Therefore, to satisfy operational requirements for precise orbit determination and routine delivery of geodetic products, the International DORIS Service maintains the DORIS terrestrial reference frame for Precise Orbit Determination (DPOD) solutions. Since 2016, the DPOD products are computed by the IDS Combination Center (CC) as a DORIS cumulative position and linear velocity solution aligned to the latest available ITRF and using the latest IDS weekly combined series. Mid-2023, the IDS CC started the computation of the second version of the DPOD2020 based on the IDS 20 weekly solutions from 1993.0 to 2023.0. With that new solution, the IDS CC will include Post Seismic Deformation (PSD) corrections for some DORIS sites such as Socorro Island. These DPOD PSD corrections are determined from the analysis of DORIS coordinate time series only. The second version will also include optional annual and semi-annual station corrections. The presentation will describe the analysis used for extracting the PSD and seasonal DORIS station corrections, compare such corrections to those derived for ITRF2020, and evaluate the impact these new corrections have on station positioning and satellite POD.

Guilhem Moreaux↗

Current Trends in Satellite Laser Ranging

Satellite Laser Ranging (SLR) techniques are used to accurately measure the distance from ground stations to retroreflectors on satellites and the moon. SLR is one of the fundamental techniques that define the international Terrestrial Reference Frame (iTRF), which is the basis upon which we measure many aspects of global change over space, time, and evolving technology. It is one of the fundamental techniques that define at a level of precision of a few mm the origin and scale of the ITRF. Laser Ranging provides precision orbit determination and instrument calibration/validation for satellite-borne altimeters for the better understanding of sea level change, ocean dynamics, ice budget, and terrestrial topography. Laser ranging is also a tool to study the dynamics of the Moon and fundamental constants. Many of the GNSS satellites now carry retro-reflectors for improved orbit determination, harmonization of reference frames, and in-orbit co-location and system performance validation. The GNSS Constellations will be the means of making the reference frame available to worldwide users. Data and products from these measurements support key aspects of the GEOSS 10-Year implementation Plan adopted on February 16, 2005, The ITRF has been identified as a key contribution of the JAG to GEOSS and the ILRS makes a major contribution for its development since its foundation. The ILRS delivers weekly additional realizations that are accumulated sequentially to extend the ITRF and the Earth Orientation Parameter (EOP) series with a daily resolution. Additional products are currently under development such as precise orbits of satellites, EOP with daily availability, low-degree gravitational harmonics for studies of Earth dynamics and kinematics, etc. SLR technology continues to evolve toward the next generation laser ranging systems as programmatic requirements become more stringent. Ranging accuracy is improving as higher repetition rate, narrower pulse lasers and faster detectors are implemented. Automation and pass interleaving at some stations is already expanding temporal coverage. Web-based safety keys are allowing the SLR network stations to range to optically vulnerable satellites. Some stations are experimenting with two-wavelength operation as a means of better understanding the atmospheric refraction and with very low power laser to improve eye-safety conditions. New retroreflector designs are improving the signal link and enable daylight ranging. Dramatic improvements have also been made with lunar ranging with the new APOLLO Site in New ?Mexico, USA and the upgraded lunar station "MEO" in Grasse,

Pearlman, M. R.↗

Mariner Venus-Mercury 1973 midcourse velocity requirements and delivery accuracy

The primary mission is described, which consists of encounters with Venus and Mercury; (a second encounter with Mercury is also possible). The exptected navigation sequences were simulated with a Monte Carlo computer program for the purpose of determining midcourse correction velocity requirements and delivery accuracies. These simulations provide sensitivity in velocity requirements and delivery accuracies to error sources affecting the navigation process. The orbit determination capability at the final pre-Venus maneuver is shown to be the dominant contributor to the velocity requirements for the primary mission. Similarly, the orbit determination capability at the final pre-Mercury maneuver is shown to be the dominant contributor to the delivery accuracy at Mercury.

Mckinley, E. L.↗

Short- and long-term determination of the TDRS solar reflectivity parameter using the Goddard trajectory determination system

Two aspects of the orbit determination of the Tracking and Data Relay Satellite-East (TDRS-E) are considered. The TDRS-E solar reflectivity parameter, as it affects the accuracy of the determination and propagation of the TDRS-E geosynchronous orbit, varies seasonally due to the changing declination of the sun. Orbit solutions are carried out using varying tracking data arc lengths to ascertain the minimum arc length needed for an accurate determination of the TDRS-E orbital elements and the solar reflectivity parameter.

Bobrowsky, M.↗

Investigating On-Orbit Attitude Determination Anomalies for the Solar Dynamics Observatory Mission

The Solar Dynamics Observatory (SDO) was launched on February 11, 2010 from Kennedy Space Center on an Atlas V launch vehicle into a geosynchronous transfer orbit. SDO carries a suite of three scientific instruments, whose observations are intended to promote a more complete understanding of the Sun and its effects on the Earth's environment. After a successful launch, separation, and initial Sun acquisition, the launch and flight operations teams dove into a commissioning campaign that included, among other things, checkout and calibration of the fine attitude sensors and checkout of the Kalman filter (KF) and the spacecraft s inertial pointing and science control modes. In addition, initial calibration of the science instruments was also accomplished. During that process of KF and controller checkout, several interesting observations were noticed and investigated. The SDO fine attitude sensors consist of one Adcole Digital Sun Sensor (DSS), two Galileo Avionica (GA) quaternion-output Star Trackers (STs), and three Kearfott Two-Axis Rate Assemblies (hereafter called inertial reference units, or IRUs). Initial checkout of the fine attitude sensors indicated that all sensors appeared to be functioning properly. Initial calibration maneuvers were planned and executed to update scale factors, drift rate biases, and alignments of the IRUs. After updating the IRU parameters, the KF was initialized and quickly reached convergence. Over the next few hours, it became apparent that there was an oscillation in the sensor residuals and the KF estimation of the IRU bias. A concentrated investigation ensued to determine the cause of the oscillations, their effect on mission requirements, and how to mitigate them. The ensuing analysis determined that the oscillations seen were, in fact, due to an oscillation in the IRU biases. The low frequencies of the oscillations passed through the KF, were well within the controller bandwidth, and therefore the spacecraft was actually following the oscillating biases, resulting in movement of the spacecraft on the order of plus or minus 20 arcsec. Though this level of error met the ACS attitude knowledge requirement of [35, 70, 70] arcsec, 3 sigma, the desire of the ACS and instrument teams was to remove as much of the oscillation as possible. The Kearfott IRUs have an internal temperature controller, designed to maintain the IRU temperature at a constant temperature of approximately 70 C, thus minimizing the change in the bias drift and scale factors of the mechanical gyros. During ground testing of the observatory, it was discovered that the 83-Hz control cycle of the IRU heaters put a tremendous amount of stress on the spacecraft battery. Analysis by the power systems team indicated that the constant charge/discharge on the battery due to the IRU thermal control cycle could potentially limit the life of the battery. After much analysis, the decision was made not to run the internal IRU heaters. Analysis of on orbit data revealed that the oscillations in the IRU bias had a connection to the temperature of the IRU; changes in IRU temperature resulted in changes in the amplitude and period of the IRU biases. Several mitigating solutions were investigated, the result of which was to tune the KF with larger IRU noise assumptions which allows the KF to follow and correct for the time-varying IRU biases.

Vess, Melissa F.↗

Gravity model development for TOPEX/POSEIDON: Joint gravity models 1 and 2

The TOPEX/POSEIDON (T/P) prelaunch Joint Gravity Model-1 (JGM-1) and the postlaunch JGM-2 Earth gravitational models have been developed to support precision orbit determination for T/P. Each of these models is complete to degree 70 in spherical harmonics and was computed from a combination of satellite tracking data, satellite altimetry, and surface gravimetry. While improved orbit determination accuracies for T/P have driven the improvements in the models, the models are general in application and also provide an improved geoid for oceanographic computations. The postlaunch model, JGM-2, which includes T/P satellite laser ranging (SLR) and Doppler orbitography and radiopositioning integrated by satellite (DORIS) tracking data, introduces radial orbit errors for T/P that are only 2 cm RMS with the commission errors of the marine geoid for terms to degree 70 being +/- 25 cm. Errors in modeling the nonconservative forces acting on T/P increase the total radial errors to only 3-4 cm root mean square (RMS), a result much better than premission goals. While the orbit accuracy goal for T/P has been far surpassed geoid errors still prevent the absolute determination of the ocean dynamic topography for wavelengths shorter than about 2500 km. Only a dedicated gravitational field satellite mission will likely provide the necessary improvement in the geoid.

Nerem, R. S.↗